Search NASA⌕ Search

SEARCH · Search NASA

Results for “coordinated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

The Solar-B Mission

The Solar-B mission is a joint enterprise between Japan, the United States of America and the United Kingdom. The collaboration is led by ISAS, the Japanese Institute for Space and Astronautical Science (ISAS), NASA and PPARC (Particle Physics and Astrophysics Research Council) play supporting roles in the development of the scientific objectives and provision of the scientific instruments. The mission's primary objective is to conduct a systems study of the solar atmosphere through the acquisition of coordinated measurements of the photosphere, the transition region/low corona and the upper corona using three instruments: an optical telescope, an extreme ultraviolet imaging spectrometer and a soft x-ray telescope. Drs. Saku Tsuneta (NAOJ) and Alan Title (LMSAL) lead the optical imaging team. The optical telescope is a 50-cm aperture, diffraction limited, Gregorian. The focal plane package will record high resolution images, Dopplergrams, and vector magnetic fields on spatial scales dominated by elemental photospheric flux tubes, and over a field of view large enough to contain small active regions. Drs. Tetsuya Watanabe, Len Culhane (MSSL) and George Doschek (NRL) led the EUV imaging and spectroscopy team. The EUV telescope has a 15-cm primary mirror feeding a toroidal grating. The optics have multiplayer coatings which select two wavebands between 180-204 A and 250-290 A. Drs. Kiyoto Shibasaki (NAOJ) and Leon Golub (SAO) lead the X-ray imaging team. The x-ray telescope will provide full disk, soft x-ray images with twice the spatial resolution of the Yohkoh SXT and enhanced sensitivity to longer (>40 A) wavelengths. The launch of Solar-B, into a sun-synchronous orbit, is scheduled for August 2004. Solar-B is the second mission in the Sun-Earth Connection, Solar-Terrestrial Probe Program which is managed by the Goddard Space Flight Center. The Science Directorate of the Marshall Space Flight Center manages the Solar-B Project for the ST Probe Project Office. This paper discusses the objectives, specifications, and design of the scientific instruments as presented at the Preliminary Design Review held at MSFC in May 2000.

Davis, John M.↗

X-ray Cryogenic Facility (XRCF) Handbook

The X-ray & Cryogenic Facility (XRCF) Handbook is a guide for planning operations at the facility. A summary of the capabilities, policies, and procedures is provided to enhance project coordination between the facility user and XRCF personnel. This handbook includes basic information that will enable the XRCF to effectively plan and support test activities. In addition, this handbook describes the facilities and systems available at the XRCF for supporting test operations. 1.2 General Facility Description The XRCF was built in 1989 to meet the stringent requirements associated with calibration of X-ray optics, instruments, and telescopes and was subsequently modified in 1999 & 2005 to perform the challenging cryogenic verification of Ultraviolet, Optical, and Infrared mirrors. These unique and premier specialty capabilities, coupled with its ability to meet multiple generic thermal vacuum test requirements for large payloads, make the XRCF the most versatile and adaptable space environmental test facility in the Agency. XRCF is also recognized as the newest, most cost effective, most highly utilized facility in the portfolio and as one of only five NASA facilities having unique capabilities. The XRCF is capable of supporting and has supported missions during all phases from technology development to flight verification. Programs/projects that have benefited from XRCF include Chandra, Solar X-ray Imager, Hinode, and James Webb Space Telescope. All test programs have been completed on-schedule and within budget and have experienced no delays due to facility readiness or failures. XRCF is currently supporting Strategic Astrophysics Technology Development for Cosmic Origins. Throughout the years, XRCF has partnered with and continues to maintain positive working relationships with organizations such as ATK, Ball Aerospace, Northrop Grumman Aerospace, Excelis (formerly Kodak/ITT), Smithsonian Astrophysical Observatory, Goddard Space Flight Center, University of Alabama Huntsville, and more.

XRCF↗

Exotic Molecules in Space: A Coordinated Astronomical, Laboratory, and Theoretical Study

The past year has been a period of spectacular progress in our investigation of exotic molecules of astrophysical interest. During this period an entirely new spectrometer for the investigation of reactive molecules was finished: a Fourier-transform microwave spectrometer with a supersonic molecular beam. The instrument is operating almost flawlessly, and during the above period of less than two years has discovered the 23 new carbon chain and ring-chain molecules. Seventeen research papers, nearly all in leading refereed journals such as the Astrophysical Journal and the Journal of Chemical Physics have been published. At least five more papers are being prepared for publication. Already four of our new molecules have been detected in space with large radio telescopes. In many ways the most interesting of these is HC(11)N, which now ranks as the largest molecule definitely identified beyond the solar system. Nearly all the other new molecules are candidates for astronomical detection, and we will be disappointed if a number of them are not found as more sensitive receivers and larger telescopes are constructed. During the next year we expect this wave of discovery to continue, and to insure rapid progress we have designed an even more sensitive spectrometer which will operate at the temperature of liquid helium. The goal of this system is to enhance the sensitivity of Fourier-transform spectroscopy by a further factor of 20 to 50, achieving this by reducing the amplifier and thermal noise to levels routinely achieved in radio astronomy. This new instrument offers a number of technical challenges in cryogenic and microwave engineering, but none of these appears to be insurmountable, and our current schedule is to have the helium cooled system operating within the next six months. A number of investigations continued with our conventional free space spectrometer, which remains a powerful complement to our new FTM instrument.

Thaddeus, Patrick↗

Stranded Fuel, Orphan Sites, Dead Plants: Transportation Planning Considerations After the BRC Report - 13393

The author explores transportation, packaging and storage questions related to a primary recommendation of the Blue Ribbon Commission on America's Nuclear Future; i.e., that fuel from shutdown plants be removed to consolidated storage as soon as possible to enable final decommissioning and beneficial re-use of those sites. The paper discusses the recommendations of the BRC, the implications and challenges that implementing those recommendations present, and provides recommended solutions for beginning the multi-year planning, coordination, material acquisition, and communications processes that will be needed to move fuel from shutdown plants when a destination site becomes available. Removal of used nuclear fuel from shutdown reactor sites (which are serving no other purpose other than storing SNF and GTCC, at considerable expense) was a central recommendation of the BRC, for a number of reasons. This recommendation was one of the most widely acclaimed that the Commission put forward. However, there are significant challenges (such as availability of fuel canister overpacks, lack of infrastructure, handling constraints and others) that will need to be addressed, apart from the critically important identification of a suitable and workable storage destination site. Resolving these logistical challenges will need to begin even before a destination site is identified, given the long lead-times required for planning and procurement. Based on information available today, it is possible to make informed predictions about what will be needed to modify existing contractual arrangements with utilities, address equipment and infrastructure needs, and begin working with states, tribes and local governments to start initial preparation needs. If DOE, working with industry and other experienced parties, can begin planning and acquisition activities in the near term, overall schedule risk can be reduced and potential cost avoidance achieved. The most immediate benefit will accrue to the operators of the shutdown plants, but beginning to accept fuel as required under the NWPA will reduce the liability to the federal government, and also offer some assurance to other utilities and the public that DOE (or another entity if one is established) is capable of meeting its obligations under the NWPA. The indirect benefits, therefore, will be quite broad. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations

This paper proposes a new departure pushback decision-support tool (DST) for airport ramp-tower controllers. It is based on NASA's Spot and Runway Departure Advisor (SARDA) collaborative decision-making concept, except with the modification that the gate releases now are controlled by tactical pushback (or gate-hold) advisories instead of strategic pre-assignments of target pushback times to individual departure flights. The proposed ramp DST relies on data exchange with the airport traffic control tower (ATCT) to coordinate pushbacks with the ATCT's flow-management intentions under current operational constraints, such as Traffic Management Initiative constraints. Airlines would benefit in reduced taxi delay and fuel burn. The concept was evaluated in a human-in-the-loop simulation experiment with current ramp-tower controllers at the Charlotte Douglas International Airport as participants. The results showed that the tool helped reduce taxi time by one minute per flight and overall departure flight fuel consumption by 10-12% without reducing runway throughput. Expect Departure Clearance Time (EDCT) conformance also was improved when advisories were provided. These benefits were attained without increasing the ramp-tower controllers' workload. Additionally, the advisories reduced the ATCT controllers' workload.

aerospace human factors↗

Vacuum Ultraviolet Radiation and Atomic Oxygen Durability Evaluation of HST Bi-Stem Thermal Shield Materials

Bellows-type thermal shields were used on the bi-stems of replacement solar arrays installed on the Hubble Space Telescope (HST) during the first HST servicing mission (SMI) in December 1993. These thermal shields helped reduce the problem of thermal gradient- induced jitter observed with the original HST solar arrays during orbital thermal cycling and have been in use on HST for eight years. This paper describes ground testing of the candidate solar array bi-stem thermal shield materials including backside aluminized Teflon(R)FEP (fluorinated ethylene propylene) with and without atomic oxygen (AO) and ultraviolet radiation protective surface coatings for durability to AO and combined AO and vacuum ultraviolet (VOV) radiation. NASA Glenn Research Center (GRC) conducted VUV and AO exposures of samples of candidate thermal shield materials at HST operational temperatures and pre- and post-exposure analyses as part of an overall program coordinated by NASA Goddard Space Flight Center (GSFC) to determine the on-orbit durability of these materials. Coating adhesion problems were observed for samples having the AO- and combined AO/UV-protective coatings. Coating lamination occurred with rapid thermal cycling testing which simulated orbital thermal cycling. This lack of adhesion caused production of coating flakes from the material that would have posed a serious risk to HST optics if the coated materials were used for the bi-stem thermal shields. No serious degradation was observed for the uncoated aluminized Teflon(R) as evaluated by optical microscopy, although atomic force microscopy (AFM) microhardness testing revealed that an embrittled surface layer formed on the uncoated Teflon(R) surface due to vacuum ultraviolet radiation exposure. This embrittled layer was not completely removed by AO erosion, No cracks or particle flakes were produced for the embrittled uncoated material upon exposure to VUV and AO at operational temperatures to an equivalent exposure of approximately five years in the HST environment. Uncoated aluminized FEP Teflon(R) was determined to be the most appropriate thermal shield material and was used on the bi-stems of replacement solar arrays installed on HST during SMI in December 1993. The SMI -installed solar arrays air scheduled to be replaced during MST's fourth servicing mission (SM3B) in early 2002.

Dever, Joyce↗

Advance Network Reservation and Provisioning for Science

We are witnessing a new era that offers new opportunities to conduct scientific research with the help of recent advancements in computational and storage technologies. Computational intensive science spans multiple scientific domains, such as particle physics, climate modeling, and bio-informatics simulations. These large-scale applications necessitate collaborators to access very large data sets resulting from simulations performed in geographically distributed institutions. Furthermore, often scientific experimental facilities generate massive data sets that need to be transferred to validate the simulation data in remote collaborating sites. A major component needed to support these needs is the communication infrastructure which enables high performance visualization, large volume data analysis, and also provides access to computational resources. In order to provide high-speed on-demand data access between collaborating institutions, national governments support next generation research networks such as Internet 2 and ESnet (Energy Sciences Network). Delivering network-as-a-service that provides predictable performance, efficient resource utilization and better coordination between compute and storage resources is highly desirable. In this paper, we study network provisioning and advanced bandwidth reservation in ESnet for on-demand high performance data transfers. We present a novel approach for path finding in time-dependent transport networks with bandwidth guarantees. We plan to improve the current ESnet advance network reservation system, OSCARS [3], by presenting to the clients, the possible reservation options and alternatives for earliest completion time and shortest transfer duration. The Energy Sciences Network (ESnet) provides high bandwidth connections between research laboratories and academic institutions for data sharing and video/voice communication. The ESnet On-Demand Secure Circuits and Advance Reservation System (OSCARS) establishes guaranteed bandwidth of secure virtual circuits at a certain time, for a certain bandwidth and length of time. Though OSCARS operates within the ESnet, it also supplies end-to-end provisioning between multiple autonomous network domains. OSCARS gets reservation requests through a standard web service interface, and conducts a Quality-of-service (QoS) path for bandwidth guarantees. Multi-protocol Label Switching (MPLS) and the Resource Reservation Protocol (RSVP) enable to create a virtual circuit using Label Switched Paths (LSP's). It contains three main components: a reservation manager, a bandwidth scheduler, and a path setup subsystem. The bandwidth scheduler needs to have information about the current and future states of the network topology in order to accomplish end-to-end bandwidth guaranteed paths.

97 MATHEMATICS AND COMPUTING↗

Evaluation of APREQCFR Coordination Procedures for Charlotte Douglas International Airport

NASA has been collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for the Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the goal of The IADS capabilities in the ATD-2 project is to increase predictability and increase throughput via improving TMI compliance. The IADS capabilities that will impact TMI compliance are built upon previous NASA research, the Precision Departure Release Capability (PDRC). The proposed paper will evaluate the APREQCFR process between ATC Tower and Center and information sharing between ATC Tower and the airline Ramp tower. Subjective measures collected from the HITL surveys (e.g., workload, situational awareness, acceptability, usability) and performance metrics such as TMI, TMAT, and pushback advisory compliance from APREQCFR flights and will be reported.

APREQ scheduling↗

Neighbors on the Red Planet: Mars Science Laboratory Relay Coordination Post InSight Arrival

The Mars Science Laboratory (MSL) strategic communications planning toolset selects orbiter relay opportunities that the rover will use for transmitting data back to Earth. The toolset was extensively reworked in preparation for the Interior Exploration using Seismic Investigations, Geodesy and Heat Transport's (InSight) arrival at Mars in November 2018 and the regular use of Mars Atmosphere and Volatile Evolution (MAVEN) and Trace Gas Orbiter (TGO) orbiters as relay assets in addition to Mars Reconnaissance Orbiter (MRO) and 2001 Mars Odyssey (ODY). Overflight selection criteria was automated in the new toolset to take into account overflight deconfliction and down-selection as well as tactical timeline planning impacts and total data return. This was done while remaining flexible and configurable for changing mission priorities. As the Curiosity rover ages, the MSL planning team must overcome issues such as reduced budgets, memory bank anomalies, and reduced power availability. These are some examples of factors that affect the strategic communications planning toolset. In addition to adapting to evolving internal mission needs, the toolset must also be flexible to changes in the relay planning interface with other landers. The concept of shared relay or “split passes” was introduced when InSight began operating on Mars just 600 kilometers away and at the same longitude as MSL. This proximity meant that orbiters could now communicate with two landers during the same relay session. Over time, this new operational use-case became common practice as InSight and MSL settled into relay planning negotiations. Today, many TGO relay sessions are shared between MSL and InSight. As more orbiters pursue integrating this capability into nominal relay operations, and more landers arrive on Mars, the strategic communications process and toolsets increases in complexity. Development of a single tool that schedules relay sessions for all orbiters and landers simultaneously may become necessary as the number of Martian spacecraft increases. Examples of how toolset selection criteria and capabilities have helped or hindered MSL planning will be presented. Ongoing improvements to MSL toolsets and processes, as well as to shared relay tools such as Mars Relay Operations Service (MaROS) and General Telecom Predictor (GTP) are also discussed in this paper. Examples of how toolset selection criteria and capabilities have helped or hindered MSL planning will be presented. Ongoing improvements to MSL toolsets and processes, as well as to shared relay tools such as Mars Relay Operations Service (MaROS) and General Telecom Predictor (GTP) are also discussed in this paper.

Vandermey, Nancy↗

A Strawman for an HPC PowerStack

The landscape of High-Performance Computing (HPC) is changing as we enter the exascale era and power and energy management are key design points for any next generation of supercomputers. Efficiently utilizing procured power and optimizing performance of scientific applications under power and energy constraints is challenging due to several reasons including dynamic phase behavior, processor manufacturing variability and increasing heterogeneity of node-level components. Extending the scope from the node- and application-level up to the system-level introduces further challenges on top of power-unaware job scheduling, which is known to be NP-hard on its own. While there exists several individual efforts across the community to research automatic techniques for managing power and energy better, the majority of these techniques have been specialized to meet the needs of a specific HPC center or specific optimization goals and provide little support to connect them to each other. Some projects, most notably the PowerAPI efforts [1], discuss interfaces that form a good starting point for full stack integration, but these interfaces still need to be hooked up to the wide range of software components offered by academic partners, developers or vendors. Furthermore, a recent survey conducted by the EE HPC WG concluded that the majority of such techniques have lacked the application-awareness required to achieve the best system performance and throughput. Other observations were that each technique tended to target management of power and energy for a different subset of the site or system hardware and that the different techniques tended to perform management at different (and often conflicting) granularities. Unfortunately, the existing techniques have not been designed to coexist simultaneously on one site and cooperate on management in an integrated manner [2]. The lack of application-awareness, lack of coordinated management across different granularities, and the lack of widely accepted interfaces and consequent limited connectivity between modules, can result in substantially underutilized Watts and FLOPS. To address these gaps, the HPC community needs a holistic stack for power and energy management and none currently exists. In our view, a holistic stack is one that is extensible enough to support the present and anticipated future needs of various different HPC centers, one that achieves best system performance and throughput through application-awareness, one that is designed to coordinate management at different granularities, and one that enables the seamless integration of software components from different developers and vendors. In this seminar, our goal is bring together experts from academia, research laboratories, and industry in order to take stock of existing approaches, design points and power management concepts and requirements at the various participant’s institutions, and to design concepts for a holistic power and energy management stack, which we refer to as the HPC PowerStack. Further, we hope to take steps toward defining the interfaces necessary for providing a complete prototype shared among many groups. The intention is to align development and research efforts across the community so that we may share development resources, avoid duplicating effort, agree on common interfaces and reap the rewards together as a community. The intended final outcome of this collaboration will be a holistic, flexible and extensible concept of a software stack ecosystem that allows us to combine product-grade open-source software components to enable runtime optimization of system power, energy, and performance.

97 MATHEMATICS AND COMPUTING↗

Automatic Imagery Data Analysis for Proactive Computer-Based Workflow Management during Nuclear Power Plant Outages

This report is being submitted for the task “Final Report” of DOE NEUP Project 15-8121 “Automatic Imagery Data Analysis for Proactive Computer-Based Workflow Management during Nuclear Power Plant Outages.” Typical nuclear power plant (NPP) outages always involve thousands of maintenance and refueling activities and a large number of workers in limited workspaces, while having tight schedules and zero-tolerance for accidents. During an outage, thousands of workers will be working in various workspaces across the NPP. High outage costs and expensive delays (approximately 1.5 million dollars of loss per day of delay) in NPP maintenance demand tight outage schedules. In packed workspaces, an automatic system that monitors human behaviors in real-time and provides insights about current and pending schedule deviations from the plan is critical for ensuring: 1) effective collaboration among workers and worker teams from different trades; 2) less waste of time and resources due to the lack of situational awareness; and 3) proactive outage project control. The overall goal of this project is to test the hypothesis that real-time imagery-based object tracking and spatial analysis, as well as human behavior modeling of outage participants, will significantly improve the efficiency of outage control while lowering the rates of accidents and incidents. Three objectives of this project are: 1) Establish real-time object tracking and spatiotemporal analysis methods that automatically assess the productivity of field activities and detect anomalous spatiotemporal relationships among activities that cause inefficiencies and risks; 2) Establish realtime human tracking and human factor modeling methods for automatically diagnosing unexpected actions of and interactions between outage participants, those which cause inefficient collaborations between Advanced Outage Control Center (AOCC), satellite outage centers, NPP workers, and maintenance service providers; and 3) Test the proposed automated object tracking, human behavior modeling, and spatiotemporal analysis methods in outage control case studies in order to characterize the effectiveness of automated imagery-data-driven methods in proactively improving the efficiency and safety of workflows in outage coordination and risk management. Recent studies of detailed human behavior monitoring on construction sites have examined the potential of applying advanced computer vision algorithms in detecting and tracking anomalous workers (i.e., workers who do not wear hard hats or safety vests) for ensuring job site safety. Some studies of human factor studies revealed the importance of modeling detailed interactions between individuals within and across teams in better understanding the impact of human in proactive project control. Other studies in the construction domain have developed computational simulation frameworks that formalize detailed spatiotemporal interactions between tasks in order to simulate the impacts of individual tasks on the performance of workflows. While integrated analyses that combine human factor assessment, as well as image processing and simulation, are in demand for effective decision-making, limited studies have examined the potential of such integrated analyses in NPP outage control. This research project has examined an automatic outage monitoring and control system that integrates human factor analysis, computer vision techniques, and simulation methods in order to enable engineers to better understand the interactions between humans, resources, and workflows during outage processes. The project aims at providing NPP maintenance agencies insights into more efficient use of limited resources in extending the life of a nuclear plant, as well as reducing waste while ensuring sufficient generation of electricity. This study is significant for the safety of nuclear plants, sustainable electricity generation for livable communities, and cost savings for maintaining electricity infrastructures in the United States.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Impact of ATD-2 Tools on Human Factors Metrics at Charlotte Douglas International Airport

New decision support tools were introduced at Charlotte Douglas International Airport (CLT) as part of NASA’s Air Traffic Demonstration 2 (ATD-2) project. ATD-2 is based on concepts which enable integrated arrival, departures, and surface (IADS) operations in a metroplex environment. Metrics on environmental benefits from ATD-2’s surface metering at CLT have shown impressive reductions in fuel consumption and CO2 emissions. Questions have remained on 1) the human factors impact of these new ATD-2 tools and surface metering and 2) the users’ perceptions of how these tools affect operations. To address these questions, post-bank surveys were designed for the four types of users of the new tools at CLT: Ramp Controllers, Ramp Managers, Tower Traffic Management Coordinators (TMCs) and Terminal Radar Approach Control (TRACON) TMCs. These surveys were administered during five-day blocks at three different times. Three types of banks were compared: No ATD-2 tool use, ATD-2 tool use, and ATD-2 use plus surface metering. Results indicate that higher workload or decreased situation awareness was not significantly associated with ATD-2 tool use more than no ATD-2 tool use--in fact for many users the opposite was true. Also, acceptability and operational efficiency measures indicate that the users did not perceive that banks with ATD-2 tools were significantly less acceptable or less efficient than banks without ATD-2 tools.

Airspace Technology Demonstration 2↗

Prototyping Operational Autonomy for Space Traffic Management

Current state of the art in Space Traffic Management (STM) relies on a handful of providers for surveillance and collision prediction, and manual coordination between operators. Neither is scalable to support the expected 10x increase in spacecraft population in less than 10 years, nor does it support automated manuever planning. We present a software prototype of an STM architecture based on open Application Programming Interfaces (APIs), drawing on previous work by NASA to develop an architecture for low-altitude Unmanned Aerial System Traffic Management. The STM architecture is designed to provide structure to the interactions between spacecraft operators, various regulatory bodies, and service suppliers, while maintaining flexibility of these interactions and the ability for new market participants to enter easily. Autonomy is an indispensable part of the proposed architecture in enabling efficient data sharing, coordination between STM participants and safe flight operations. Examples of autonomy within STM include syncing multiple non-authoritative catalogs of resident space objects, or determining which spacecraft maneuvers when preventing impending conjunctions between multiple spacecraft. The STM prototype is based on modern micro-service architecture adhering to OpenAPI standards and deployed in industry standard Docker containers, facilitating easy communication between different participants or services. The system architecture is designed to facilitate adding and replacing services with minimal disruption. We have implemented some example participant services (e.g. a space situational awareness provider/SSA, a conjunction assessment supplier/CAS, an automated maneuver advisor/AMA) within the prototype. Different services, with creative algorithms folded into then, can fulfil similar functional roles within the STM architecture by flexibly connecting to it using pre-defined APIs and data models, thereby lowering the barrier to entry of new players in the STM marketplace. We demonstrate the STM prototype on a multiple conjunction scenario with multiple maneuverable spacecraft, where an example CAS and AMA can recommend optimal maneuvers to the spacecraft operators, based on a predefined reward function. Such tools can intelligently search the space of potential collision avoidance maneuvers with varying parameters like lead time and propellant usage, optimize a customized reward function, and be implemented as a scheduling service within the STM architecture. The case study shows an example of autonomous maneuver planning is possible using the API-based framework. As satellite populations and predicted conjunctions increase, an STM architecture can facilitate seamless information exchange related to collision prediction and mitigation among various service applications on different platforms and servers. The availability of such an STM network also opens up new research topics on satellite maneuver planning, scheduling and negotiation across disjoint entities.

space traffic management↗

Geostationary Operational Environmental Satellite (GOES)-8 mission flight experience

The Geostationary Operational Environmental Satellite (GOES)-8 spacecraft was launched on April 13, 1994, at 06:04:02 coordinated universal time (UTC), with separation from the Atlas-Centaur launch vehicle occurring at 06:33:05 UTC. The launch was followed by a series of complex, intense operations to maneuver the spacecraft into its geosynchronous mission orbit. The Flight Dynamics Facility (FDF) of the Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) was responsible for GOES-8 attitude, orbit maneuver, orbit determination, and station acquisition support during the ascent phase. This paper summarizes the efforts of the FDF support teams and highlights some of the unique challenges the launch team faced during critical GOES-8 mission support. FDF operations experience discussed includes: (1) The abort of apogee maneuver firing-1 (AMF-1), cancellation of AMF-3, and the subsequent replans of the maneuver profile; (2) The unexpectedly large temperature dependence of the digital integrating rate assembly (DIRA) and its effect on GOES-8 attitude targeting in support of perigee raising maneuvers; (3) The significant effect of attitude control thrusting on GOES-8 orbit determination solutions; (4) Adjustment of the trim tab to minimize torque due to solar radiation pressure; and (5) Postlaunch analysis performed to estimate the GOES-8 separation attitude. The paper also discusses some key FDF GOES-8 lessons learned to be considered for the GOES-J launch which is currently scheduled for May 19, 1995.

Noonan, C. H.↗

High Altitude Long Endurance Remotely Operated Aircraft - National Airspace System Integration - Simulation IPT: Detailed Airspace Operations Simulation Plan. Version 1.0

The primary goal of Access 5 is to allow safe, reliable and routine operations of High Altitude-Long Endurance Remotely Operated Aircraft (HALE ROAs) within the National Airspace System (NAS). Step 1 of Access 5 addresses the policies, procedures, technologies and implementation issues of introducing such operations into the NAS above pressure altitude 40,000 ft (Flight Level 400 or FL400). Routine HALE ROA activity within the NAS represents a potentially significant change to the tasks and concerns of NAS users, service providers and other stakeholders. Due to the complexity of the NAS, and the importance of maintaining current high levels of safety in the NAS, any significant changes must be thoroughly evaluated prior to implementation. The Access 5 community has been tasked with performing this detailed evaluation of routine HALE-ROA activities in the NAS, and providing to key NAS stakeholders a set of recommended policies and procedures to achieve this goal. Extensive simulation, in concert with a directed flight demonstration program are intended to provide the required supporting evidence that these recommendations are based on sound methods and offer a clear roadmap to achieving safe, reliable and routine HALE ROA operations in the NAS. Through coordination with NAS service providers and policy makers, and with significant input from HALE-ROA manufacturers, operators and pilots, this document presents the detailed simulation plan for Step 1 of Access 5. A brief background of the Access 5 project will be presented with focus on Steps 1 and 2, concerning HALE-ROA operations above FL400 and FL180 respectively. An overview of project management structure follows with particular emphasis on the role of the Simulation IPT and its relationships to other project entities. This discussion will include a description of work packages assigned to the Simulation IPT, and present the specific goals to be achieved for each simulation work package, along with the associated deliverables necessary to achieve these goals and the needs of other Access 5 IPTs. The simulation environment chosen for this task is then outlined. This section includes a description of the system architecture, a list of the necessary assumptions made by the Simulation IPT, and the roles, responsibilities and interactions of simulation participants. The method of simulation conduct is presented in the next section with particular emphasis on scenario development and applicability to evaluation of Step 1 HALE-ROA operations. Following, data collection and analysis methods are discussed for air traffic specialists and air vehicle control station operators. Lastly, a schedule of Step 1 simulation activities is presented for reference.

Source record↗

Color Choice is Everything - Impacts Color makes to the Lighting Environment

When contracts are let out to design multiple systems in a vehicle, it is a challenge to maintain integration between system leads. Designers on niche systems, like lighting and control panel design, often get caught up in the challenge of designing the light source or visual interface and fail to include time in their schedule to work with system architects on how their lighting system will be integrated. Additionally, behavioral scientists, industrial designers, and materials engineers get caught up with the materials and look of the system, but often fail to consider how the selection of their materials could affect the certification or performance of electronic devices like lighting systems. Additionally, computer modeling of the system architecture often assumes a perfect environment without the clutter of actual human use (dirt, stowage, crowding). As a result, lighting systems, and backlit displays run the risk of being overdesigned or under designed. Engineers making the assumption that because they have no input or there is no requirement on work surface reflectance, make the assumption that they can t count on good material choices and thus may install more lighting than is necessary. While having more lights may seem better, for a vehicle that is trying to conserve power, more lights may not be a good option. On the other hand, designers who made the opposite assumption and designed a lighting system that only produced just enough light, often wind up with a system that did conserve power, but didn t produce enough light. These situations are exasperated when the system starts to be used and the models are not perfect anymore. The lack of coordination and iterative design not only can impact lighting levels within an environment, but also can affect color perception. This is because, if materials do not represent a gradation of white or black, the material unevenly absorbs and reflects light at different wavelengths of the visual spectrum. The lighting designer may have built a light that meets light spectra requirements, but the eventual light reaching the human user may not be the spectra of light architects intended, if materials near the light source change the spectrum just by how much color is absorbed or reflected. With the recent findings concerning Circadian rhythm, where the spectra of light is extremely important for addressing crew sleep and wake cycles, system architects should pay considerable attention on the impact material choices have in changing the light spectrum in an environment. This presentation will show examples of how material choices impact the resulting illuminance, color spectrum, and power usage of an illuminated space. Its goal is to encourage system designers and planners to use more care in development of requirements and the verification of systems intended for the human visual interface.

Clark, Toni A.↗

Development of Methodologies for Technology Deployment for Advanced Outage Control Centers that Improve Outage Coordination, Problem Resolution and Outage Risk Management

This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The long term viability of existing nuclear power plants in the U.S. will depend upon maintaining high capacity factors, avoiding nuclear safety issues and reducing operating costs. The slow progress in the construction on new nuclear power plants has placed in increased importance on maintaining the output of the current fleet of nuclear power plants. Recently expanded natural gas production has placed increased economic pressure on nuclear power plants due to lower cost competition. Until recently, power uprate projects had steadily increased the total output of the U.S. nuclear fleet. Errors made during power plant upgrade projects have now removed three nuclear power plants from the U.S. fleet and economic considerations have caused the permanent shutdown of a fourth plant. Additionally, several utilities have cancelled power uprate projects citing economic concerns. For the past several years net electrical generation from U.S. nuclear power plants has been declining. One of few remaining areas where significant improvements in plant capacity factors can be made is in minimizing the duration of refueling outages. Managing nuclear power plant outages is a complex and difficult task. Due to the large number of complex tasks and the uncertainty that accompanies them, outage durations routinely exceed the planned duration. The ability to complete an outage on or near schedule depends upon the performance of the outage management organization. During an outage, the outage control center (OCC) is the temporary command center for outage managers and provides several critical functions for the successful execution of the outage schedule. Essentially, the OCC functions to facilitate information inflow, assist outage management in processing information and to facilitate the dissemination of information to stakeholders. Currently, outage management activities primarily rely on telephone communication, face to face reports of status and periodic briefings in the OCC. Much of the information displayed in OCCs is static and out of date requiring an evaluation to determine if it is still valid. Several advanced communication and collaboration technologies have shown promise for facilitating the information flow into, across and out of the OCC. Additionally, advances in the areas of mobile worker technologies, computer based procedures and electronic work packages can be leveraged to improve the availability of real time status to outage managers.

99 GENERAL AND MISCELLANEOUS↗

Optimal Traffic Signal Control Using Priority Metric Based on Real-Time Measured Traffic Information

Optimizing traffic control systems at traffic intersections can reduce network-wide fuel consumption as well as improve traffic flow. While traffic signals have conventionally been controlled based on predetermined schedules, various adaptive control systems have been developed recently using advanced sensors such as cameras, radars, and LiDARs. By utilizing rich traffic information enabled by the advanced sensors, more efficient or optimal traffic signal control is possible in response to varying traffic conditions. This paper proposes an optimal traffic signal control method to minimize network-wide fuel consumption utilizing real-time traffic information provided by advanced sensors. This new method employs a priority metric calculated by a weighted sum of various factors, including the total number of vehicles, total vehicle speed, vehicle waiting time, and road preference. Genetic Algorithm (GA) is used as a global optimization method to determine the optimal weights in the priority metric. In order to evaluate the effectiveness of the proposed method, a traffic simulation model is developed in a high-fidelity traffic simulation environment called SUMO, based on a real-world traffic network. The traffic flow within this model is simulated using actual measured traffic data from the traffic network, enabling a comprehensive assessment of the novel optimal traffic signal control method in realistic conditions. The simulation results show that the proposed priority metric-based real-time traffic signal control algorithm can significantly reduce network-wide fuel consumption compared to the conventional fixed-time control and coordinated actuated control methods that are currently used in the modeled network. Additionally, incorporating truck priority in the priority metric leads to further improvements in fuel consumption reduction.

47 OTHER INSTRUMENTATION↗