Search NASA⌕ Search

SEARCH · Search NASA

Results for “fixture”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Space rescue operations in the early 1980's.

Discussion of planning requirements for space rescue missions in connection with an emergency situation involving a manned satellite with a small crew. A space rescue mission may be divided basically into three major operational phases including the response time phase, the phase concerned with the rescue operations, and the final phase which begins with the casting-off operation from the rendezvous position with the distressed vehicle. The types of possible emergency situations are discussed together with the space rescue equipment, a pressurized emergency module, an unpressurized emergency module, a portable airlock, an attachable docking fixture, a fluid jet type detumble system, a stick-on rocket type detumble system, and an antitumbling space vehicle.

Wild, J. W.↗

Flat-band assembly for toroidal transformer cores

Toroidal transformer cores are often banded together by means of strap. Spot welds secure strap. Proper tension is obtained by use of special fixture in conjunction with winding of wire which is placed temporarily on core; winding is excited by dc current to hold core halves together magnetically during alignment.

Mclyman, W. T.↗

Residual water bactericide monitor development program

A silver-ion bactericidal monitor is considered for the Space Shuttle Potable Water System. Potentiometric measurement using an ion-selective electrode is concluded to be the most feasible of available techniques. Four commercially available electrodes and a specially designed, solid-state, silver-sulfide electrode were evaluated for their response characteristics and suitability for space use. The configuration of the solid-state electrode with its Nernstian response of 10 to 10,000 ppb silver shows promise for use in space. A pressurized double-junction reference electrode with a quartz-fiber junction and a replaceable bellows electrolyte reservoir was designed verification-tested, and paired with a solid-state silver-sulfide electrode in a test fixture.

Source record↗

Ironless armature torque motor

Four iron-less armature torque motors, four Hall device position sensor assemblies, and two test fixtures were fabricated. The design approach utilized samarium cobalt permanent magnets, a large airgap, and a three-phase winding in a stationary ironless armature. Hall devices were employed to sense rotor position. An ironless armature torque motor having an outer diameter of 4.25 inches was developed to produce a torque constant of 65 ounce-inches per ampere with a resistance of 20.5 ohms. The total weight, including structural elements, was 1.58 pounds. Test results indicated that all specifications were met except for generated voltage waveform. It is recommended that investigations be made concerning the generated voltage waveform to determine if it may be improved.

Fisher, R. L.↗

Development of a closed pore insulation material

A closed pore ceramic foam insulation material (CPI) has been developed that offers possibilities for use as a reusable external heat shield for the NASA manned space shuttle. The outstanding characteristics of CPI are: (1) negligible water absorption due to a noninterconnecting network of cells; (2) high emittance at room and elevated temperature; (3) ability to survive at least 10 simulated reentry cycles to 1500 K using radiant heat lamps to simulate the reentry heat fluxes; (4) ability to survive, with no change in properties or appearance, at least 10 simulated plasma arc jet cycles to 1500 K (with the exception of some stress cracks induced either by the unduly severe nature of the initial arc splash heating pulse or by improper mechanical holding of the specimen in the test fixture); (5) strength (flexure); and (6) a low thermal conductivity throughout the temperature range of interest for the space shuttle.

Tobin, A.↗

Computer simulation of temperatures on the Centaur standard shroud during heated jettison tests

A heating fixture for simulating the heating and environment encountered by the Centaur standard shroud (CSS) during its ascent through the earth's atmosphere is discussed. A computer program was developed to provide a means of determining the overall temperature profile of a free-skin model of the CSS during the heating portion of the heated jettison tests. The program treats the energy contribution of each lamp on the heater to various points on the CSS surface. The analytic model was verified by adapting the computer program to the configuration of the hardware used in a series of Intermediate Scale Tests performed on a 2.4 meters by 2.4 meters section of the CSS corrugated structure. A comparison of some predicted versus experimental results from these tests is presented.

Hemminger, J. A.↗

CVT/PCS phase 1 integrated testing

Five breadboard experiments representing three Sortie Lab experiment disciplines were installed in a payload carrier simulator. A description of the experiments and the payload carrier simulator was provided. An assessment of the experiment interface with the simulator and an assessment of the simulator experiment support systems were presented. The results indicate that a hardware integrator for each experiment is essential; a crew chief, or mission specialist, for systems management and experimenter liaison is a vital function; a payload specialist is a practical concept for experiment integration and operation; an integration fixture for a complex experiment is required to efficiently integrate the experiment and carrier; simultaneous experiment utilization of simulator systems caused unexpected problems in meeting individual experiment requirements; experimenter traffic inside the dual-floor simulator did not hamper experiment operations; and the requirement for zero-g operation will provide a significant design challenge for some experiments.

Mcbrayer, R. O.↗

Strapdown system performance optimization test evaluations (SPOT), volume 1

A three axis inertial system was packaged in an Apollo gimbal fixture for fine grain evaluation of strapdown system performance in dynamic environments. These evaluations have provided information to assess the effectiveness of real-time compensation techniques and to study system performance tradeoffs to factors such as quantization and iteration rate. The strapdown performance and tradeoff studies conducted include: (1) Compensation models and techniques for the inertial instrument first-order error terms were developed and compensation effectivity was demonstrated in four basic environments; single and multi-axis slew, and single and multi-axis oscillatory. (2) The theoretical coning bandwidth for the first-order quaternion algorithm expansion was verified. (3) Gyro loop quantization was identified to affect proportionally the system attitude uncertainty. (4) Land navigation evaluations identified the requirement for accurate initialization alignment in order to pursue fine grain navigation evaluations.

Blaha, R. J.↗

Mass property control of a synchronous meteorological satellite scanning experiment.

A scanning mirror assembly which is part of a Synchronous Orbit Meteorological Satellite is an example where mission objectives required measurement and control of weight, mass center, principal moments of inertia, and products of inertia. The scanning mirror oscillates within the spin stabilized spacecraft, and both the scanning motor torque and perturbation of spacecraft attitude and spin rate have to be reduced to low levels. A theoretically ideal solution would be to make the mirror inertia constant about all axes in a plane perpendicular to the oscillation axis. A practically attainable compromise is to locate principal axes preferentially and make the difference between two of them acceptably small. Methods for making the necessary mass property measurements and deriving and applying minimum weight ballast correction to achieve the necessary mass distribution are discussed. It is noted that mass property control operations are typically subject to practical constraints such as geometry and functional operation of the system and capability of available measurement facilities and fixtures.

Lang, W. E.↗

Test of LOX compatibility for asphalt and concrete runway materials

A literature survey and a telephone canvass of producers and users of LOX is reported which yielded one report of an accident resulting from a LOX spill on asphalt, one discussion of hazardous conditions, and an unreferenced mention of an incident. Laboratory tests using standard LOX impact apparatus yielded reactions with both old and new alphalt, but none with concrete. In the final test, using a larger sample of asphalt, the reaction caused extensive damage to equipment. Initial field experiments using 2-meter square asphalt slabs covered with LOX, conducted during rainy weather, achieved no reaction with plummets, and limited reaction with a blasting cap as a reaction initiator. In a final plummet-initiated test on a dry slab, a violent reaction, which appeared to have propagated over the entire slab surface, destroyed the plummet fixture and threw fragments as far as 48 meters.

Moyers, C. V.↗

Strapdown system Performance Optimization Test evaluations (SPOT), volume 2

A three axis inertial system is packaged in an Apollo gimbal fixture for fine grain evaluation of strapdown system performance in dynamic environments. These evaluations have provided information to assess the effectiveness of real-time compensation techniques and to study system performance tradeoffs to factors such as quantization iteration rate. The strapdown performance and tradeoff studies conducted in this program are discussed.

Blaha, R. J.↗

First heated jettison test on the Centaur standard shroud

The first in a planned series of heated jettison tests on the Centaur Standard Shround was conducted at NASA Plum Brook Station's Space Power Facility on November 19, 1973. The first 250-second portion of the test sequence involved heating the shroud with a specially-built fixture designed to provide a simulation of the heating environment encountered by the shroud during its ascent through the earth's atmosphere. The two heater halves, which were mounted on a rail system, were then retracted. This was followed by the jettison of the two shroud halves into catch nets positioned at 90 deg to the heater rails. The condition which made this test unique compared to the planned subsequent tests was the location of the maximum thermal line at 32 deg from the shroud separation plane. Information on the test hardware, configuration, and sequence is presented. Shroud thermal and deflection data encountered during the heating portion of the test sequence is compared with free-skin design temperatures in various graphical formats.

Source record↗

Spacelab soft mockup comparative evaluation

An assessment of two proposed Spacelab configurations with diameters of 14 and 12 feet was conducted by using two inexpensive wooden mockups containing cardboard fixtures. Also examined was an alternate mounting arrangement for the 12-foot diameter configuration, taking advantage of conforming equipment racks to the cylinder walls. A volume comparison of the three configurations was made using a life sciences payload which is considered to be one of the more voluminous payloads. It was found that crew volume in the 12-foot baseline configuration appeared marginal for the life sciences payload, especially where crewmen were engaged in activities with competing demands. The 12-foot configurations of life sciences payloads offered little margin for stowage or equipment growth. Increased demands would necessitate longer module lengths. Similar results could be expected with other large volume payloads.

Watters, H.↗

Second heated jettison test on the Centaur standard shroud

The second in a planned series of heated jettison tests on the Centaur Standard Shroud was conducted on January 16, 1974. The first 250-second portion of the test sequence involved heating the shroud with a specially-built fixture designed to provide a simulation of the heating environment encountered by the shroud during its ascent through the earth's atmosphere. The two heater halves, which were mounted on a rail system, were then retracted. This was followed by the jettison of the two shroud halves into catch nets positioned at 90 deg to the heater rails. The condition which made this test unique compared to the others in the test series was the alignment of the maximum thermal line with the shroud separation plane. Information on the test hardware, configuration, and sequence is presented. Shroud thermal and deflection data encountered during the heating portion of the test sequence are compared with free-skin design temperatures in various graphical formats.

Source record↗

Draw forming of scale shuttle external tank dome gores

The process for manufacturing external tank dome gores is discussed. The test fixture and test procedure are described. The characteristics of the draw forming die are analyzed. The specific subjects included are: (1) forming, (2) trimming, (3) cleaning, and (4) heat treatment.

Garfield, G.↗

Evaluation of coated columbium alloy heat shields for space shuttle thermal protection system application. Volume 3, phase 3: Full size TPS evaluation

The thermal protection system (TPS), designed for incorporation with space shuttle orbiter systems, consists of one primary heat shield thermally and structurally isolated from the test fixture by eight peripheral guard panels, all encompassing an area of approximately 12 sq ft. TPS components include tee-stiffened Cb 752/R-512E heat shields, bi-metallic support posts, panel retainers, and high temperature insulation blankets. The vehicle primary structure was simulated by a titanium skin, frames, and stiffeners. Test procedures, manufacturing processes, and methods of analysis are fully documented. For Vol. 1, see N72-30948; for Vol. 2, see N74-15660.

Baer, J. W.↗

Shock and vibration isolation mount for small electronic components

Mount includes metallic cup and support ring placed in mold fixture. Viscoelastic material is injected between these parts by means of large hypodermic needle. Circular projections on cup and ring extend into material and are kept in place without dependence on quality of adhesion between material and metal.

Dillon, R. F.↗