Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch pad”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Day of Launch Profile Selection for Pad Abort Guidance

A day of launch selection approach that involves choosing from an array of pitch profiles of varying loft was analyzed with the purpose of reducing the risk of a land landing failure during a pad abort. It was determined that selecting from three pitch profiles can reduce the number of waterline abort performance requirement failures approximately in half without compromising other performance metrics.

Whitley, Ryan J.↗

Single-Point Attachment Wind Damper for Launch Vehicle On-Pad Motion

A single-point-attachment wind-damper device is proposed to reduce on-pad motion of a cylindrical launch vehicle. The device is uniquely designed to attach at only one location along the vehicle and capable of damping out wind gusts from any lateral direction. The only source of damping is from two viscous dampers in the device. The effectiveness of the damper design in reducing vehicle displacements is determined from transient analysis results using an Ares I-X launch vehicle. Combinations of different spring stiffnesses and damping are used to show how the vehicle's displacement response is significantly reduced during a wind gust.

Hrinda, Glenn A.↗

Delta-90 Interplanetary Monitoring Platform-H (IMP-H) flash flight report

The Delta-90 launch vehicle and the IMP-H spacecraft were successfully launched from Pad B, Complex 17, Cape Kennedy Air Force Station, Florida, at 2120:00.559 EDT on September 22, 1972. The countdown proceeded smoothly to liftoff with no major difficulties or unscheduled holds. The Delta-90/IMP-H were launched on a pad azimuth of 115 degrees, the vehicle ten rolled to 95 degrees from the north placing the spacecraft in a highly elliptical transfer orbit. Firing the spacecraft kickmotor at 1136 EDT, September 25, 1972, injected the spacecraft into its final desirable near-circular orbit approximately half way between the planet earth and its moon. Vehicle performance of all stages appeared nominal with all sequenced events occurring at the expected times. Data acquisition from all range stations was very good. Damage to the launch pad caused by liftoff was nominal.

Source record↗

A Flight Dynamics Perspective of the Orion Pad Abort One Flight Test

The Orion Crew Exploration Vehicle is America s next generation of human rated spacecraft. The Orion Launch Abort System will take the astronauts away from the exploration vehicle in the event of an aborted launch. The pad abort mode of the Launch Abort System will be flight-tested in 2009 from the White Sands Missile Range in New Mexico. This paper examines some of the efforts currently underway at the NASA Dryden Flight Research Center by the Controls & Dynamics group in preparation for the flight test. The concept of operation for the pad abort flight is presented along with an overview of the guidance, control and navigation systems. Preparations for the flight test, such as hardware testing and development of the real-time displays, are examined. The results from the validation and verification efforts for the aerodynamic and atmospheric models are shown along with Monte Carlo analysis results.

Idicula, Jinu↗

Developing NDE Techniques for Large Cryogenic Tanks - Year 2 Report

The Shuttle Program requires very large cryogenic ground storage tanks in which to store liquid oxygen and hydrogen. The existing Launch Complex-39 Pad tanks, which will be passed onto future launch programs, are over 40 years old and have received minimal refurbishment and only external inspections over the years. The majority of the structure is inaccessible without a full system drain of cryogenic liquid and insulation in the annular region. It was previously thought that there was a limit to the number of temperature cycles that the tanks could handle due to possible insulation compaction before undergoing a costly and time consuming complete overhaul; therefore the tanks were not drained and performance issues with these tanks, specifically the Pad B LH2 tank, were accepted. There is a need and an opportunity, as the Shuttle program ends and work to upgrade the launch pad progresses, to develop innovative non-destructive evaluation (NDE) techniques to analyze the current tanks. Techniques are desired that can aid in determining the extent of refurbishment required to keep the tanks in service for another 20+ years. A non-destructive technique would also be a significant aid in acceptance testing of new and refurbished tanks, saving significant time and money, if corrective actions can be taken before cryogen is introduced to the systems. Year one of this project concentrated on analysis of the current tanks located at LC-39 while cryogen was present. Year two of this project concentrated on analysis of detectable thermal variations on the outer surface of the tanks as the cryogen was drained and the inner vessel warmed to ambient conditions. Two techniques have been deployed in the field to monitor the tank. The first consisted of a displacement sensor to monitor for any expansions at the base of the tank during warm-up that could indicate a compaction issue with the insulation. The second technique was continued thermal monitoring of the tank through and after warm up. The indications noted in the thermal images were compared to bore-scope images of the annular region taken once the tank was inert and warmed to ambient conditions. Similar thermal imaging was performed on a smaller tank where an insulation void was induced to compare the effectiveness of thermal imagining on a different tank geometry.

Arens, Ellen↗

NASA's Space Launch System: Secondary Payload Accommodations in Block 1 and Beyond

Launching from pad 39B at Kennedy Space Center no earlier than December 2019, NASA's Space Launch System (SLS) will send the Orion crew vehicle to a distant retrograde lunar orbit in order to test and validate the new systems developed for SLS, Orion and Kennedy Space Center's Exploration Ground Systems (EGS). In addition to these primary mission objectives, the first integrated fight of NASA's new deep space exploration system, Exploration Mission-1 (EM-1), offers accommodations for 13 6U CubeSats, which will be deployed in deep space after Orion separates from the SLS Interim Cryogenic Propulsion Stage (ICPS). In 2017, the SLS Program, managed by NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama, completed the ICPS and delivered it to the EGS Program, which has responsibility for stacking and launch operations. The 13 EM-1 secondary payloads will reside in the Orion Stage Adapter (OSA), which connects the ICPS to Orion's spacecraft adapter. The OSA is essentially complete with preparations being made for transporting the hardware to Kennedy Space Center with accommodations for secondary payload dispensers and with the secondary payload avionics unit installed.

Robinson, Kimberly F.↗

Length of stain dosimeter

Payload customers for the Space Shuttle have recently expressed concerns about the possibility of their payloads at an adjacent pad being contaminated by plume effluents from a shuttle at an active pad as they await launch on an inactive pad. As part of a study to satisfy such concerns a ring of inexpensive dosimeters was deployed around the active pad at the inter-pad distance. However, following a launch, dosimeters cannot be read for several hours after the exposure. As a consequence factors such as different substrates, solvent systems, and possible volatilization of HCl from the badges were studied. This observation led to the length of stain (LOS) dosimeters of this invention. Commercial passive LOS dosimeters are sensitive only to the extent of being capable of sensing 2 ppm to 20 ppm if the exposure is 8 hours. To map and quantitate the HCl generated by Shuttle launches, and in the atmosphere within a radius of 1.5 miles from the active pad, a sensitivity of 2 ppm HCl in the atmospheric gases on an exposure of 5 minutes is required. A passive length of stain dosimeter has been developed having a sensitivity rendering it capable of detecting a gas in a concentration as low as 2 ppm on an exposure of five minutes.

Lueck, Dale E.↗

Apollo 11 Launch

This NASA Kennedy Space Center video release presents the countdown and liftoff of Apollo 11, the first manned journey to the Moon which began at Pad A, Launch Complex 39, Kennedy Space Center, Florida at 9:32 a.m. EDT on July 16, 1969. The crew of Apollo 11 included Commander Neil A. Armstrong, Command Module pilot Michael Collins, and Lunar Module pilot Edwin E. Aldrin, Jr. Several different camera viewpoints of the spacecraft as well as over-head shots of the Kennedy launch control center are presented prior to liftoff. Other footage includes shots of President Lyndon B. Johnson and his wife among the Florida audience viewing liftoff. During the countdown several audio updates from Kennedy launch control are presented as to the status of pre-launch testing and system readiness. Captivating footage from liftoff to the spacecraft nearing the outer Earth atmosphere is shown as the video ends with Neil Armstrong's confirmation of engine skirt separation and launch escape tower separation from the spacecraft.

Source record↗

Tight Fits for Americas Next Moon Rocket, Ares V

America has begun the development of a new heavy lift rocket which will enable humans to return to the moon and reach even farther destinations. Five decades ago, the National Aeronautics and Space Administration designed a system (called Saturn/Apollo) to carry men to the moon and back; the rocket which boosted them to the moon was the Saturn V. Saturn V was huge relative to contemporary rockets and is still the largest rocket ever launched. The new moon rocket is called Ares V. It will insert 40% more payload into low earth orbit than Saturn V; and after docking with the crew spacecraft, it will insert 50% more payload onto the translunar trajectory than Saturn V. The current design of Ares V calls for two liquid-fueled stages and 2 "strap-on" solid rockets. The solid rockets are extended-length versions of the solid rockets used on the Shuttle. The diameter of the liquid stages is at least as large as the first stage of the Saturn V; the height of the lower liquid stage (called the core stage) is longer than the external tank of the Shuttle. Huge rockets require huge infrastructure and, during the Saturn/Apollo era, America invested significantly in manufacturing, assembly and launch facilities which are still in use today. Since the Saturn/Apollo era, America has invested in additional infrastructure for the Shuttle program. Ares V must utilize this existing infrastructure, with reasonable modifications. Building a rocket with 50% more capability in the same buildings, testing it in the same test stands, shipping on the same canals under the same bridges, assembling it in the same building, rolling it to the pad on the same crawler, and launching it from the same launch pad is an engineering and logistics challenge which goes hand-in-hand with designing the structure, tanks, turbines, engines, software, etc. necessary to carry such a large payload to earth orbit and to the moon. This paper quantitatively discusses the significant "tight fits" that are constraining Ares V. The engineers designing and building the infrastructure for the Saturn/Apollo program usually added margins and growth capability; sometimes the size of existing facilities (such as the width of a draw bridge) was not a constraint. Ares V may utilize the "extra" space in the existing facilities and expand other tight fits. Some of the tight fits cannot be overcome without great expense; raising the roof on the Vertical Assembly Building for example. Other tight fits are easily overcome; the transporter at the manufacturing facility for the core stage can pass under low ceilings and later over a dike (without dragging the middle) by retracting or extending the struts which support the stage. Tight fits discussed in this paper include manufacturing (jigs, widths, heights, and local transportation), testing (test stand sizes and crane capability), transportation to the test stands and the launch site (barge, waterway, and rail), assembly (VAB internal dimensions and door size), roll-out limits, and launch pad size.

Jaap, John↗

Debris/ice/TPS assessment and integrated photographic analysis for Shuttle Mission STS-62

A pre-launch debris inspection of the pad and Shuttle vehicle was conducted on 2 March 1994. The detailed walkdown of Launch Pad 39B and MLP-1 also included the primary flight elements OV-102 Columbia (16th flight), ET-62 (LWT 55), and BI-064 SRB's. There were no significant facility or vehicle anomalies. After the launch on March 4th, a debris inspection of Pad 39B was performed. Damage to the pad overall was minimal. On-orbit photographs taken by the flight crew and two films from the ET/ORB umbilical cameras of the External Tank after separation from the Orbiter revealed no major damage or lost flight hardware that would have been a safety of flight concern. Orbiter performance on final approach appeared normal. Infrared imagery of landing gear deployment showed the loss of thermal barrier from the nose gear wheel well. The missing thermal barrier material was not recovered. The Solid Rocket Boosters were inspected at Hanger AF after retrieval. Both frustums had a combined total of 44 MSA-2 debonds over fasteners. Significant amounts of BTA had been applied to closeouts on the RH frustum, forward skirt, and aft skirt. Hypalon paint was blistered/missing over the areas were the BTA had been applied. The underlying BTA was not sooted (IFA STS-62-B-1). Investigation of this condition has concluded there was insufficient heat rates to cause blistering of the Hypalon until late in the ascent phase. A post landing inspection of OV-102 was conducted after the landing at KSC. The Orbiter TPS sustained a total of 97 hits, of which 16 had a major dimension of 1 inch or larger. The Orbiter lower surface had a total of 36 hits, of which 7 had a major dimension of 1 inch or larger. Based on these numbers and comparison to statistics from previous missions of similar configuration, both the total number of debris hits and the number of hits 1 inch or larger was less than average. Six thermal barriers, total size approximately 36 in. x 3 in. x 1.5 in., and one corner tile piece 4 in. x 4 in., were missing from the nose landing gear doors. Runway infrared cameras recorded these objects falling from the Orbiter when the nose landing gear doors were opened on final approach. A search of the area under the flight path failed to recover the missing thermal batteries, which may be submerged in the large body of water south of the runway. The cause for the loss of the material was attributed to the way the substrate was prepared for bonding at the vendor. Orbiter post landing microchemical sample results revealed a variety of residuals in the Orbiter window samples. These were attributed to SRB BSM exhaust, Orbiter TPS, window protective covers and processing, natural landing site products, and paints/primers from various sources. The residual sampling data do not indicate a single source of damaging debris and all of these materials have been documented previously in analyses for post landing sample reports. Data from residual sampling also showed no trends when compared to previous mission data. A total of ten Post Launch Anomalies, including one IFA, were observed during the STS-62 mission assessment.

Katnik, Gregory N.↗

Design, Development and Test Challenges: Separation Mechanisms for the Orion Pad Abort-1 Flight Test

On May 6, 2010, NASA launched the first successful integrated flight test, Pad Abort-1, of the Orion Project from the White Sands Missile Range in Las Cruces, New Mexico. This test demonstrated the ability to perform an emergency pad abort of a full-scale 4.8 m diameter, 8200 kg crew capsule. During development of the critical separation mechanisms for this flight test, various challenges were overcome related to environments definition, installation complications, separation joint retraction speed, thruster ordnance development issues, load path validation and significant design loads increases. The Launch Abort System retention and release (LAS R&R) mechanism consisted of 6 discrete structural connections between the LAS and the crew module (CM) simulator, each of which had a preloaded tension tie, Superbolt torque-nut and frangible nut. During the flight test, the frangible nuts were pyrotechnically split, permitting the CM to separate from the LAS. The LAS separation event was the driving case in the shock environment for many co-located hardware items. During development testing, it was necessary to measure the source shock during the separation event so the predicted shock environment could be validated and used for certification testing of multiple hardware items. The Lockheed Martin test team measured the source separation shock due to the LAS R&R function, which dramatically decreased the predicted environment by 90% at 100 Hz. During development testing a hydraulic tensioner was used to preload the joint; however, the joint relaxation with the tensioner proved unsatisfactory so the design was modified to include a Superbolt torque-nut. The observed preload creep during lab testing was 4% after 30 days, with 2.5% occurring in the first 24 hours. The conversion of strain energy (preload) to kinetic energy (retraction) was measured to be 50-75%. Design features and careful monitoring of multiple strain gauges on each tension tie allowed a pure tensile load to be applied after stacking at the launch pad. Following installation, preload in each joint was monitored for 24 hours. Due to unforeseen complications and the influence of temperature on the portable data acquisition system, the team encountered difficulty in tracking the joint relaxation. In some cases, bond-line failure of the strain gauges occurred.

Dinsel, Alison↗

Apollo 12 Mission Summary and Splashdown

This NASA Kennedy Space Center (KSC) video release presents footage of the November 14, 1969 Apollo-12 space mission begun from launch complex pad 39-A at Kennedy Space Center, Florida. Charles Conrad, Jr., Richard F. Gordon, Jr., and Alan L. Bean make up the three-man spacecrew. The video includes the astronaut's pre-launch breakfast, President Nixon, his wife, and daughter arriving at Cape Kennedy in time to see the launch, as well as countdown and liftoff. After the launch, President Nixon gives a brief congratulatory speech to the members of launch control at KSC. The video also presents views of the astronauts and spacecraft in space as well as splashdown of the command module on November 24, 1969. The video ends with the recovery, by helicopter and additional personnel, of the spacecrew from the command module floating in the waters of the Atlantic.

Source record↗

Developing NDE Techniques for Large Cryogenic Tanks

The Shuttle Program requires very large cryogenic ground storage tanks in which to store liquid oxygen and hydrogen. The existing Pads A and B Launch Complex-39 tanks, which will be passed onto future launch programs, are 45 years old and have received minimal refurbishment and only external inspections over the years. The majority of the structure is inaccessible without a full system drain of cryogenic liquid and granular insulation in the annular region. It was previously thought that there was a limit to the number of temperature cycles that the tanks could handle due to possible insulation compaction before undergoing a costly and time consuming complete overhaul; therefore the tanks were not drained and performance issues with these tanks, specifically the Pad B liquid hydrogen tank, were accepted. There is a needind an opportunity, as the Shuttle program ends and work to upgrade the launch pads progresses, to develop innovative non-destructive evaluation (NDE) techniques to analyze the current tanks. Techniques are desired that can aid in determining the extent of refurbishment required to keep the tanks in service for another 20+ years. A nondestructive technique would also be a significant aid in acceptance testing of new and refurbished tanks, saving significant time and money, if corrective actions can be taken before cryogen is introduced to the systems.

Parker, Don↗

Characterization of soil and postlaunch pad debris from Cape Canaveral launch complex and analysis of soil interaction with aqueous HCl

Soil samples were fractionated and analyzed in order to assess the physical and chemical interactions of entrained soil with solid-rocket exhaust clouds. The sandy soil consisted primarily of quartz (silica) particles, 30 to 500 microns in diameter, and also contained seashell fragments. Differential and cumulative soil-mass size distributions are presented along with mineralogy, elemental compositions, and solution pH histories. About 90 percent of the soil mass consisted of particles 165 microns in diameter. Characteristic reaction times in aqueous HC1 slurries varied from a few minutes to several days, and capacities for reaction under acidic conditions varied from 10 to 40 g HCl/kg soil, depending on particle size. Airborne lifetimes of particles 165 microns are conservatively 30 min, and this major grouping is predicted to represent a small short-term chemical sink for up to 5% of the total HC1. The smaller and more minor fractions, below a 165 micron diameter, may act as giant cloud condensation nuclei over much longer airborne lifetimes. Finally, the demonstrated time dependency of neutralization is a complicating factor; it can influence the ability to deduce in-cloud HCl scavenging with reaction and can affect the accuracy of measured chemical compositions of near-field wet deposition.

Pellett, G. L.↗