Search NASA⌕ Search

SEARCH · Search NASA

Results for “replacement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Hydronic Heating Retrofits for Low-Rise Multifamily Buildings - Phase 1: Boiler Control Replacement and Monitoring

The ARIES Collaborative, a Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, MA to implement and study improvements to the heating system in one of the non-profit's housing developments. The heating control systems in the 42-unit Columbia CAST housing development were upgraded in an effort projected toreduce heating costs by 15 to 25 percent.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Progammatic mission transformation - chemistry and metallurgy research replacement (CMRR) project

Nuclear posture and policy objectives are: (1) Preventing nuclear proliferation and nuclear terrorism; (2) Reducing the role of nuclear weapons in US national security strategy; (3) Maintaining strategic deterrence and stability at reduced nuclear force levels; (4) Strengthening regional deterrence and reassuring US allies and partners; and (5) Sustaining a safe, secure, and effective nuclear arsenal.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Development of a lithium-glass based composite neutron detector for 3 He replacement

We are fabricating two Li-glass based composite neutron detectors, cylindrical in shape (one 2” in diameter, 3” in height and another 5” by 5”), made of dye-loaded polyvinyltoluene embedded with 1.5-mm lithium-glass cubes composing 7% of the total mass. Initial simulation results of a 252 Cf source suggest that the 2” x 3” and 5” x 5” detectors will be roughly 1% and 10% efficient, respectively, for detection of unmoderated fission neutrons. Experimental evaluation of the detectors will be carried out in late summer 2012.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗