Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Integrating Water Supply Constraints into Irrigated Agricultural Simulations of California

Simulations of irrigated croplands generally lack key interactions between water demand from plants and water supply from irrigation systems. We coupled the Water Evaluation and Planning system (WEAP) and Decision Support System for Agrotechnology Transfer (DSSAT) to link regional water supplies and management with field-level water demand and crop growth. WEAP-DSSAT was deployed and evaluated over Yolo County in California for corn, rice, and wheat. WEAP-DSSAT is able to reproduce the results of DSSAT under well-watered conditions and reasonably simulate observed mean yields, but has difficulty capturing yield interannual variability. Constraining irrigation supply to surface water alone reduces yields for all three crops during the 1987-1992 drought. Corn yields are reduced proportionally with water allocation, rice yield reductions are more binary based on sufficient water for flooding, and wheat yields are least sensitive to irrigation constraints as winter wheat is grown during the wet season.

Agriculture; Irrigation; Water Resources Managemen↗

Transforming E-Waste Into Strategic Resources: Techno-Economic Analysis of Gallium and By-products Recovery from LEDs via Bioleaching

The growing demand for gallium in optoelectronics and renewable energy applications raises concerns about supply security and production sustainability. This study evaluates the techno-economic feasibility of recovering gallium and by-products (copper and nickel) from waste GaN-based LEDs via bioleaching. A process flowsheet encompassing transportation, robotic disassembly, ball milling, bioleaching, solvent extraction/electrowinning, and refining was modeled. Based on mass balance analysis, more than 53 tons of LED waste are required annually to yield 1 kg of gallium alongside substantial copper and nickel co-products. Preliminary techno-economic analysis (TEA) shows an average total cost (ATC) of 6.84 USD/kg metal when costs are allocated by mass-weighted economic value (market price) fraction, corresponding to 6.75 USD/kg for copper, 15.91 USD/kg for nickel, and 470.95 USD/kg for gallium. For gallium, direct operational costs account for more than 70% of the cost. Monte Carlo simulations further quantify cost uncertainties under market price fluctuations. This work represents the first TEA of gallium recovery from GaN-based LEDs and highlights potential pathways for future cost reduction.

36 MATERIALS SCIENCE↗

Utilization of common pressurized modules on the Space Station Freedom

During the preliminary design review of Space Station Freedom elements and subsystems, it was shown that reductions of cost, weight, and on-orbit integration and verification would be necessary in order to meet program constraints, particularly nominal Orbiter payload launch capability. At that time, the Baseline station consisted of four resource nodes and two 44 ft modules. In this study, the viability of a common module which maintains crew and payload accommodation is assessed. The size, transportation, and orientation of modules and the accommodation of system racks and user experiments are considered and compared to baseline. Based on available weight estimates, a module pattern consisting of six 28 ft. common elements with three radial and two end ports is shown to be nearly optimal. Advantageous characteristics include a reduction in assembly flights, dual egress from all elements, logical functional allocation, no adverse impacts to international partners, favorable airlock, cupola, ACRV (Assured Crew Return Vehicle), and logistics module accommodation, and desirable flight attitude and control characteristics.

Gould, Marston J.↗

Utilization of common pressurized modules on the Space Station Freedom

During the preliminary design review of Space Station Freedom elements and subsystems, it was shown that reductions of cost, weight, and on-orbit integration and verification would be necessary in order to meet program constraints, particularly nominal Orbiter payload launch capability. At that time, the Baseline station consisted of four resource nodes and two 44 ft modules. In this study, the viability of a common module which maintains crew and payload accommodation is assessed. The size, transportation, and orientation of modules and the accommodation of system racks and user experiments are considered and compared to baseline. Based on available weight estimates, a module pattern consisting of six 28 ft common elements with three radial and two end ports is shown to be nearly optimal. Advantageous characteristics include a reduction in assembly flights, dual egress from all elements, logical functional allocation, no adverse impacts to international partners, favorable airlock, cupola, ACRV (Assured Crew Return Vehicle), and logistics module accommodation, and desirable flight attitude and control characteristics.

Mazanek, Daniel D.↗

Breaking the Vicious Start-Stop-Restart Cycle

NASA's history is built on a foundation of can-do strength, while pointing to the Apollo Moon missions in the 1960s and 1970s as its apex a sentiment that often overshadows the potential in store. The chronicle of America s civil space adventure is scattered with programs that got off to good starts with adequate resources and vocal political support but that never made it past a certain milestone review, General Accountability Office report, or Congressional budget appropriation. Over the decades since the fielding of the Space Shuttle in the early 1980s, a start-stop-restart cycle has intervened due to many forces. Despite this impediment, the workforce has delivered feats such as the International Space Station and numerous Shuttle and science missions, which reflect a trend in the early days of the Exploration Age that called for massive infrastructure and matching capital allocations. In the new millennium, the aerospace industry must respond to transforming economic climates, the public will, national agendas, and international possibilities relative to scientific exploration beyond Earth's orbit. Two pressing issues workforce transition and mission success are intertwined. As this briefing will show, U.S. aerospace must confront related workforce development and industrial base issues head on to take space exploration to the next level. This briefing also will formulate specific strategies to equip space engineers to move beyond the seemingly constant start-stop-restart mentality to plan and execute flight projects that actually fly.

Singer, Christopher E.↗

Getting to First Flight: Equipping Space Engineers to Break the Start-Stop-Restart Cycle

The National Aeronautics and Space Administration s (NASA s) history is built on a foundation of can-do strength, while pointing to the Saturn/Apollo Moon missions in the 1960s and 1970s as its apex a sentiment that often overshadows the potential that lies ahead. The chronicle of America s civil space agenda is scattered with programs that got off to good starts with adequate resources and vocal political support but that never made it past a certain milestone review, General Accountability Office report, or Congressional budget appropriation. Over the decades since the fielding of the Space Shuttle in the early 1980s, a start-stop-restart cycle has intervened due to many forces. Despite this impediment, the workforce has delivered engineering feats such as the International Space Station and numerous Shuttle and science missions, which reflect a trend in the early days of the Exploration Age that called for massive infrastructure and matching capital allocations. In the new millennium, the aerospace industry must respond to transforming economic climates, the public will, national agendas, and international possibilities relative to scientific exploration beyond Earth s orbit. Two pressing issues - workforce transition and mission success - are intertwined. As this paper will address, U.S. aerospace must confront related workforce development and industrial base issues head on to take space exploration to the next level. This paper also will formulate specific strategies to equip space engineers to move beyond the seemingly constant start-stop-restart mentality to plan and execute flight projects that actually fly.

Singer, Christopher E.↗

FORCE Update 2024

The Framework for Optimization of Resources and Economics (FORCE) tool suite is the U.S. Department of Energy’s Nuclear Integrated Energy Systems (IES) Program flagship tool suite for technoeconomic IES analysis of IES. This tool suite is useful for analysis designed to evaluate and improve the technoeconomics of energy production systems, particularly for systems including nuclear technology. In this report, we document the development activity for the FORCE tool suite to extend its capabilities as performed during fiscal year 2024. In addition to reliability and accessibility, capability is one of the three standards guiding the development of the FORCE tool suite and the software codes that are its constituent parts. Extending the capabilities of the FORCE tool suite allows analysis both within the IES program as well as industry, university, and laboratory partners to perform analysis with more accuracy, insight, and impactful narrative. Four areas of capability development were the focus of activity this year: economic parameter uncertainty quantification, multiresolution analysis, components-to-optimization workflow automation, and statespace construction workflows for real-time optimal control. In economic parameter uncertainty quantification, the ability of HERON to capture risk due to scenarios (weather and energy demand uncertainty) was expanded to also include uncertainties in financial parameters such as capital cost or operation and maintenance costs. By including these sources of uncertainty, which are sometimes very large compared with scenario uncertainty, HERON is better able to capture the risk posed by investment in various IES technology. Because of this, analysts can also consider the reduction in risks that can be realized by choice of some technologies. In multiresolution analysis, development activity extended on work completed previously. In fiscal year 2023, methods for decomposing time series signals, such as demand, solar and wind availability, and price profiles, were analyzed and down-selected to those most effective at splitting signals into different resolutions. These resolutions allow considering the influence of different energy demand and supply behaviors across different time scales. For example, energy demand might be divided into seasonal, weekly, and hourly profiles. In fiscal year 2024, this preliminary work was extended and implemented within the Risk Analysis Virtual Environment (RAVEN) risk and uncertainty analysis platform, which is used throughout the FORCE framework. This development of the “multi-resolution time series analysis” (MR-TSA) module in RAVEN allows training synthetic history generators on complex time series. These synthetic history generators can then be used in HERON for generating scenarios that represent possible market and weather scenarios that can be analyzed on different time scales. We envision completing this work in the future, implementing multiresolution dispatch optimization strategies that can make the most beneficial use of these stratified time histories. In components-to-optimization workflow development, workflows for translating user inputs of components into algorithms for algebraic optimization were selected and implemented. Similar algorithms within the Holistic Energy Resource Optimization Network (HERON) were separated from the main code base of HERON and gathered with the components-to-optimization workflows in the new Dispatch Optimization Variable Engine (DOVE) software library. This modularization allows FORCE users to analyze dispatch optimization and energy system duty cycles independently of HERON, which previously was a burdensome task. Additionally, these dispatch optimization algorithms, set up in an independent library, can now be used across all software applications within FORCE, especially including the real-time optimal control software Optimization of Real-time Capacity Allocation (ORCA). Allowing FORCE software to share dispatch optimization algorithms within a single library allows for improved software maintenance and reliability. In statespace characterization workflow development, alternative workflows for optimizing dispatch with additional technical accuracy was the focus, particularly to improve the real-time optimization decision making in ORCA. Using algorithms and workflows initially developed for the Feasible Actuator Range Modifier (FARM), workflows for determining the statespace representation of IES were identified and demonstrated. The resulting dispatch optimization required a more robust optimization algorithm than that originally used in HERON (and moved to DOVE), which required adding an alternate workflow to DOVE that can more accurately match the behavior of physical systems using a partial differential equation representation. In conclusion, capability developments in the FORCE tool suite in fiscal year 2024 have improved the ability of the FORCE tool suite to perform

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluating Lunar Water Processing System Model Configurations for Small Scale Oxygen and Hydrogen Production Within JAXA'S ISRU Technology

Introduction: In-Situ Resource Utilization (ISRU) refers to novel methods of extracting and processing local resources for use in life support and propulsion systems, reducing or eliminating the required consumables to be transferred from Earth. Current estimates of water-ice availability embedded in regolith within the Moon’s permanently shadowed regions (PSR’s) range between 1-5% by weight. However, the composition and characteristics of the “wet” regolith is unknown. Alternate ISRU excavation techniques and Concept of Operations (ConOps) must be explored to optimize surface system operations based on these factors. To assess the feasibility of different ISRU subsystem technologies and compare system architecture configurations, an interchangeable system model was generated to incorporate technologies spanning excavation of raw materials to storage of products and determine optimal arrangement of total system processing needs. Total Mass, Volume, and Power (M/V/P) requirements were computed for 168 design iterations of this water processing plant. System Model: In FY24, the System Engineering and Integration (SE&I) ISRU Modeling and Analysis (SIMA) team developed a lunar water processing system model using the Mission Analysis and Integration Tool (MAIT) to estimate the M/V/P for ISRU subsystems operating under a wide range of Hydrogen (H2) and Oxygen (O2) production targets for the Space Technology Mission Directorate (STMD) [1]. Based on Japan Aerospace Exploration Agency’s (JAXA) surface operational requirements, this system architecture was modified to include the ability to excavate consolidated icy regolith (versus granular ice excavation using Kennedy Space Center’s (KSC) ISRU Pilot Excavator, IPEx) and explore the feasibility of processing the lunar water both inside and outside of the PSR. For the consolidated icy regolith case study, excavation was performed via a mobility transport chassis outfitted with The Regolith Ice Drill for Exploring New Terrain (TRIDENT) for drilling [2] and the Cold Operable Lunar Deployable Arm (COLDArm) [3] for regolith transfer. The system model determines the required rover and payload. M/V/P to handle the required regolith processing rates. The regolith is then sorted and heated to sublimate the ice (via an auger dryer). The exiting high temperature, low pressure vapor is cleaned of volatiles (via cold trap) and electrolyzed to produce H2 and O2. These products are then dried, liquified with 20 K and 90 K cryocoolers (for H2 and O2, respectively), and stored in cylindrical tanks. Study Goals: Due to the different ConOps options of regolith transport to the ridge for processing versus processing it directly inside the PSR, as well as the unknown regolith/water-ice composition, new excavation techniques and their power configurations are being evaluated within a ISRU system architecture for production targets less than NASA’s pilot plant (1 mT). This analysis investigates the feasibility of numerous excavation techniques, power architectures, and logistical operations and determines an optimal system configuration with regards to M/V/P. It aims to investigate which parameters, both locally and globally, have the greatest effect on each subsystem within the plant. This can be used to identify the most critical components of the plant, and guide future decisions on allocating funding for research and development. The results from this study may provide subsystem developers with appropriate interfaces with excavation subsystems and downstream processes, and assessing the overall feasibility of each excavation technique, power architecture, and logistical timeframe. References: [1] Carlson, A. et. al. (2024) ICES. [2] Zacny, K., et. al. (2024) “ASCE Earth and Space”. [3] McCormick, R., et. Al. (2024) IEEE Xplore.

ISRU↗

A Conceptual Design of a Departure Planner Decision Aid

Terminal area Air Traffic Management handles both arriving and departing traffic. To date, research work on terminal area operations has focused primarily on the arrival flow and typically departures are taken into account only in an approximate manner. However, arrivals and departures are highly coupled processes especially in the terminal airspace, with complex interactions and sharing of the same airport resources between arrivals and departures taking place in practically every important terminal area. Therefore, the addition of automation aids for departures, possibly in co-operation with existing arrival flow automation systems, could have a profound contribution in enhancing the overall efficiency of airport operations. This paper presents the conceptual system architecture for such an automation aid, the Departure Planner (DP). This architecture can be used as a core in the development of decision-aiding systems to assist air traffic controllers in improving the performance of departure operations and optimize runway time allocation among different operations at major congested airports. The design of such systems is expected to increase the overall efficiency of terminal area operations and yield benefits for all stakeholders involved in Air Traffic Management (ATM) operations, users as well as service providers.

Anagnostakis, Ioannis↗

A Measurement-Based Adaptive Voltage Regulation Method Considering Topology Changes

This paper proposes an online adaptive data-driven distributed energy resource (DER) dispatch optimization method for voltage control considering topology changes. By using a local sensitivity factor (LSF)-enabled voltage control, traditional DER control can be reformulated into a linear programming (LP) problem, leading to faster computation speeds. Power injection alteration and topology changes are two common operational changes in the distribution network that can affect the LSF and voltage control performance. To address this issue, a robust estimation method is developed to adjust the sensitivity matrix at each time step for the time-varying power injection changes. When topology changes occur, only the allocated predominant LSF submatrices are updated based on measurement data, allowing for a fast adaptation to the system reconfiguration. Results obtained from a real distribution feeder in Southern California demonstrate its robustness as compared to traditional volt-var control and constant LSF matrix dispatch control methods.

DERs↗

Experimental investigation of flow distribution in enhanced geothermal systems with deep eutectic solvent

Geothermal energy has been recognized as a valuable alternative to fossil fuels and nuclear power, as it is renewable and reliable. Enhanced Geothermal Systems (EGSs) have the potential to expand geothermal energy production by enabling access to previously untapped geothermal resources. Geothermal short-circuiting poses a significant challenge to EGS development, leading to reduced heat extraction. Deep Eutectic Solvent (DES) exhibits favorable thermal and rheological properties, making it a candidate for geothermal applications. Here, this paper examines Choline Chloride-Based Deep Eutectic Solvent (DES) as a working fluid in geothermal applications and its potential to mitigate geothermal short-circuiting. Hydraulic experiments using a dual fracture flow loop were conducted at high temperatures. The results showed that DES exhibited higher differential pressure behavior compared to water. Flow distribution results revealed that DES enhances flow allocation within the small fracture, particularly when a temperature difference exists between fractures. Specifically, DES increased flow distribution by an average of 11% when the temperature difference was 85°C, and by 13% when the difference was 45°C, relative to water. These findings suggest that DES responds to thermal fracture differences, making it a potential remedy to address geothermal short-circuiting.

15 GEOTHERMAL ENERGY↗

System Modeling of a Lunar Molten Regolith Electrolysis Plant

Introduction: In-Situ Resource Utilization (ISRU) is the process of extracting local resources to produce commodities for propulsion, life support systems, and off-planet construction rather than transporting consumables from Earth. Molten Regolith Electrolysis (MRE) is a novel ISRU method of extracting oxygen gas and metal alloy from lunar regolith. The MRE process involves placing lunar regolith between two electrodes, through which current is passed, to melt the regolith and reduce the metal oxide constituents by direct electrolysis (e.g. FeO, SiO2, MgO, Al2O3) into oxygen gas and metal alloys. The oxygen is liquefied and used as propellant for landers, while the metals (e.g. Ferro-alloys) are further processed and used in structural building materials and parts manufacturing. A system model was developed that accounted for the major processes of an MRE plant (from excavation of raw materials to storage of products) to assess the feasibility of a lunar MRE plant. The System Engineering and Integration (SE&I) ISRU Modeling and Analysis (SIMA) team utilized its previously documented system sizing model, the Mission Analysis and Integration Tool (MAIT) [1] as framework of the system model. MAIT uses MATLAB/Simulink to integrate subsystem models into a complete system model of the MRE plant. Total mass, volume, and power requirements were computed for numerous iterations of a MRE plant. System Model: Figure 1: MRE Plant Block Diagram The regolith excavation model determines the mass and power needed to excavate sufficient regolith. The preheating auger initiates the regolith heating process before regolith enters the MRE re-actor to reduce the energy required to turn the solid into a molten liquid. The MRE reactor is modeled in COMSOL Multiphysics and based on the research by Dominguez, Sibille, and Schreiner [2, 3, 4]. This preliminary reactor model provides an accurate calculation of thermal equilibrium during electrochemical operation of the reactor system to assess the optimal mass and power required to process the inlet flow of regolith. The model also computes the outlet flowrates of oxygen and molten products. For this analysis, the primary components of the metal alloy considered were iron and silicon. The oxygen is then purified using an Yttrium Stabilized Zirconia (YSZ) electrode, followed by liquefaction using a 90K cryocooler to be stored as liquid oxygen in insulated cylindrical tanks. In future iterations of the system model, the molten metal tapped from the MRE reactor will undergo additional processing or refinement. However, downstream handling of metals is currently a technology gap that is missing a high TRL subsystem model. Therefore, for this analysis, the accumulated metal alloy stream terminates after leaving the MRE reactor. Study Goals: This analysis investigates multiple input variables to the system to determine the sensitivity of a (near) complete plant at full-scale. This preliminary investigation ran parametric sweeps on the MRE reactor geometry, electrical current supply, layers of multi-layer insulation (MLI) on the reactor, size of the electrodes in the oxygen purification model, and regolith composition (based on landing site location). Three production targets of oxygen (1,000, 10,000, and 50,000 kg/yr) were investigated for this analysis. The parametric sweeps conducted in this analysis provide valuable insight into the expected impact of the various model inputs on plant size. This information can be used to identify the most critical components of the plant and guide future decisions on allocating funding for research and development, providing subsystem developers with appropriate interfaces with downstream and upstream processes, and assessing the overall feasibility of MRE when compared to other ISRU plants. References: [1] Carlson, A. et al. (2024) ICES, ICES-2024-53. [2] Dominguez, D.A., and Sibille, L. (2011) AIAA, AIAA-2011-700. [3] Schreiner, S.S. (2015) MIT, Dissertation. [4] Schreiner, S.S. et al. (2016) ASR, 57(7), pp.1585-1603.

ISRU↗

Modulation of lignin and anthocyanin homeostasis by GTP cyclohydrolase1 in maize

Summary Maize is a key biomass resource with wide agricultural applications. Anthocyanins, potent antioxidants, offer health benefits like reducing oxidative stress. The biosynthesis of anthocyanins competes with that of lignin for shared metabolic precursors, which can lead to trade‐offs in plant growth and feed quality. Higher lignin content can decrease silage digestibility, posing challenges for livestock feed. The maizebrown midrib 6(bm6) mutant, known for reduced lignin, has an unclear genetic basis. Here, we identifyZmGCH1as the candidate gene forbm6through fine mapping. Mutations inZmGCH1shift precursors from lignin to anthocyanin biosynthesis. Furthermore, we show that ZmGCH1 interacts with ZmPEBP15 to modulate chalcone synthase activity, thereby stabilizing the allocation of precursors between lignin and anthocyanin pathways. To evaluate the practical implications of our findings, we introduced thebm6mutation into Zhengdan958 and Xianyu335. In vitro rumen digestion assays confirmed that the introduction of thebm6mutation significantly improved silage digestibility. This discovery not only holds great potential for enhancing silage digestibility but also provides a broader strategy for optimizing maize production to better meet the increasing demands of both the food and livestock feed.

Biotechnology & Applied Microbiology↗

Portable, heterogeneous ensemble workflows at scale using libEnsemble

libEnsemble is a Python-based toolkit for running dynamic ensembles, developed as part of the DOE Exascale Computing Project. The toolkit utilizes a unique generator–simulator–allocator paradigm, where generators produce input for simulators, simulators evaluate those inputs, and allocators decide whether and when a simulator or generator should be called. The generator steers the ensemble based on simulation results. Generators may, for example, apply methods for numerical optimization, machine learning, or statistical calibration. libEnsemble communicates between a manager and workers. Flexibility is provided through multiple manager–worker communication substrates each of which has different benefits. These include Python’s multiprocessing, mpi4py, and TCP. Multisite ensembles are supported using Balsam or Globus Compute. We overview the unique characteristics of libEnsemble as well as current and potential interoperability with other packages in the workflow ecosystem. We highlight libEnsemble’s dynamic resource features: libEnsemble can detect system resources, such as available nodes, cores, and GPUs, and assign these in a portable way. These features allow users to specify the number of processors and GPUs required for each simulation; and resources will be automatically assigned on a wide range of systems, including Frontier, Aurora, and Perlmutter. Such ensembles can include multiple simulation types, some using GPUs and others using only CPUs, sharing nodes for maximum efficiency. We also describe the benefits of libEnsemble’s generator–simulator coupling, which easily exposes to the user the ability to cancel, and portably kill, running simulations based on models that are updated with intermediate simulation output. We demonstrate libEnsemble’s capabilities, scalability, and scientific impact via a Gaussian process surrogate training problem for the longitudinal density profile at the exit of a plasma accelerator stage. In conclusion, the study uses gpCAM for the surrogate model and employs either Wake-T or WarpX simulations, highlighting efficient use of resources that can easily extend to exascale.

Dynamic ensembles↗

Multiple Uplinks Per Antenna (MUPA) Signal Acquisition Schemes

The Deep Space Network (DSN) currently makes use of the technique of Multiple Spacecraft per Antenna (MSPA) where a single antenna is used to track multiple spacecraft downlinks within its beam, such as in the case of multiple spacecraft orbiting Mars at 8.4 GHz (X-band). It is desired to extend this technique to the uplink where a single station is used to send a signal to multiple spacecraft in order to make more efficient use of ground resources. This would be applicable to numerous smallsat constellations being considered for future missions or to future spacecraft at Venus, Mars, or more distant destinations that are all within the half-power beamwidth of a single 34-m diameter antenna. In one scheme, each spacecraft’s command sequences would be time multiplexed onto a single uplink frequency. Each spacecraft would lock onto the uplink signal and would accept only commands intended for it via special identifier codes. Each spacecraft would also emit a downlink signal to the ground that is coherent with the uplink signal but would have its own allocated frequency channel and identifier information. A couple of key challenges associated with using this technique need to be addressed. Because of the single uplink frequency, coherent turnaround for two-way Doppler and ranging would not conform to established ratios, thus the radios employed by the spacecraft would need to be capable of variable turnaround ratios. In addition, because of the different orbits or spacecraft trajectories, the relative Doppler shifts and rates can be large with respect to the common uplink signal whose frequency would lie at the centroid of the frequencies of the expected received signals of the constellation. This would be problematic with standard analog spacecraft radios whose acquisition bandwidths are relatively small (~1.7 kHz) relative to the large frequency offsets (~100 kHz) expected using the single frequency uplink technique. With the advent of software defined radios (SDRs), signal frequency search algorithms can be utilized within the flight software and/or programmable hardware (e.g., FPGAs) that can easily acquire and track signals with large frequency offsets and varying dynamics. Such techniques could include FFT search algorithms, step-and-sweep search algorithms, or onboard frequency steering making use of trajectory vectors uplinked to each member spacecraft. Other challenges include mitigation of potential interference between received signals. We have identified several software defined radios that are in different stages of development and whose key parameters have been tabulated. We have examined each radio’s capabilities with respect to acquiring and tracking signals with large frequency offsets. Such analyses made use of previous studies supplemented with specially designed tests using both simulation tools and/or existing testbeds. We have compared signal acquisition times computed from provided algorithms along with measured values derived from tests using existing hardware and simulation tools for the purpose of conducting tradeoff studies between the various radio designs and software/firmware programming approaches.

Abraham, Douglas S.↗

Down-Selection of Four Common Habitat Variants

The Common Habitat is a large habitat developed as an alternative architecture study, not part of the current NASA baseline, that uses the SLS core stage liquid oxygen tank as its primary structure. It has a gravity-independent internal architecture, such that identical units can be used on the lunar surface, Mars surface, and in microgravity. In developing the habitat, two key architectural questions emerged. Should the internal layout use a vertical or horizontal orientation of the tank? Should the crew size be four or eight? This led to the design of four variants: a four-crew horizontal, four-crew vertical, eight-crew horizontal, and eight-crew vertical. The four-crew variants use a shortened version of the tank while the eight-crew variants use the entire tank. The primary consideration applied for down-selection is the crew experience living and working in the habitat, inclusive of crew productivity, well-being, and survivability. Based on this consideration, a series of seven assessments were performed to compare the variants. This analysis was performed as an unfunded, volunteer activity leveraging civil servants across multiple field centers, most with expertise working in various Artemis teams. Additionally, the evaluation was limited to the use of CAD models, images, and spreadsheet data, with no resources available for mockups or Virtual Reality. A logistics analysis developed a standard logistics module and then estimated how much stowage could be carried onboard each Common Habitat and how many logistics modules are required by each variant for a given mission duration. It also considered the amounts of water to be stored in each variant. A functional analysis identified and compared the living and working functions across the habitats, ranking them relative to each other. A crew time assessment first estimated the total crew time, building a weekly crew timeline for both four and eight-person crews. It then allocated time to activities linked to living and working functions, comparing how much time was available for each function in each variant. A science productivity assessment developed a relative metric using crew time, science stowage, and assumed rates of experiment consumables use to analytically compare the four variants. It also comparatively ranked the habitats with respect to a number of subjective parameters and a workstation acceptability rating. A maintenance capacity assessment identified and compared eleven generic maintenance capabilities across the variants and also ranked them for their predicted ability to complete twelve fabrication, maintenance, and repair scenarios. A contingency responsiveness analysis examined twelve serious in-flight contingencies. For each scenario, the number of crew needed to respond were predicted and acceptability of various aspects of contingency response were evaluated, comparing the variants against each other. Finally, in a habitability assessment, 120 habitability characteristics reflecting 13 major categories were evaluated for each habitat. These results were compared to identify the most acceptable habitat in each category. Ultimately, the data favored the horizontal orientation over the vertical and an eight-person crew over four. Implications of selecting this variant are discussed, including specific architectural challenges that result from the use of the full tank.

Habitability↗

Second Generation RLV Space Vehicle Concept

NASA has a long history of conducting development programs and projects in a consistent fashion. Systems Engineering within those programs and projects has also followed a given method outlined by such documents as the NASA Systems Engineering Handbook. The relatively new NASA Space Launch Initiative (SLI) is taking a new approach to developing a space vehicle, with innovative management methods as well as new Systems Engineering processes. With the program less than a year into its life cycle, the efficacy of these new processes has yet to be proven or disproven. At $776M for phase 1, SLI represents a major portion of the NASA focus; however, the new processes being incorporated are not reflected in the training provided by NASA to its engineers. The NASA Academy of Program and Project Leadership (APPL) offers core classes in program and project management and systems engineering to NASA employees with the purpose of creating a "knowledge community where ideas, skills, and experiences are exchanged to increase each other's capacity for strong leadership". The SLI program is, in one sense, a combination of a conceptual design program and a technology program. The program as a whole doesn't map into the generic systems engineering project cycle as currently, and for some time, taught. For example, the NASA APPL Systems Engineering training course teaches that the "first step in developing an architecture is to define the external boundaries of the system", which will require definition of the interfaces with other systems and the next step will be to "define all the components that make up the next lower level of the system hierarchy" where fundamental requirements are allocated to each component. Whereas, the SLI technology risk reduction approach develops architecture subsystem technologies prior to developing architectures. The higher level architecture requirements are not allowed to fully develop and undergo decomposition and allocation down to the subsystems before the subsystems must develop allocated requirements based on the highest level of requirements. In the vernacular of the project cycles prior to the mid 1990's, the architecture definition portion of the program appears to be at a generic Phase A stage, while the subsystems are operating at Phase B. Even the management structure of the SLI program is innovative in its approach to Systems Engineering and is not reflected in the APPL training modules. The SLI program has established a Systems Engineering office as an office separate from the architecture development or the subsystem technology development, while that office does have representatives within these other offices. The distributed resources of the Systems Engineering Office are co-located with the respective Project Offices. This template is intended to provide systems engineering as an integrated function at the Program Level. the program management of SLI and the MAT agree that "program/project managers and the systems engineering team must work closely together towards the single objective of delivering quality products that meet the customer needs". This paper will explore the differences between the methods being taught by NASA, which represent decades of ideas, and those currently in practice in SLI. Time will tell if the innovation employed by SLI will prove to be the model of the future. For now, it is suggested that the training of the present exercise the flexibility of recognizing the new processes employed by a major new NASA program.

Bailey, Michelle↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into useful knowledge that equips the team to design and develop superior products for customers and stakeholders. It has been more than 30 years since the Space Shuttle was designed; therefore, the current aerospace workforce has limited experience with developing new designs for human-rated spaceflight hardware. To accomplish these activities, NASA is using a wide range of state-of-the-art information technology tools that connect its diverse, decentralized teams and provide timely, accurate information for decision makers. In addition, business professionals are assisting technical managers with planning, tracking, and forecasting resource use against an integrated master schedule that horizontally and vertically interlinks hardware elements and milestone events. Furthermore, NASA is employing a wide variety of strategies to ensure that it has the motivated and qualified staff it needs for the tasks ahead. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates its resources to create an engineering business environment that promotes mission success, which is defined by replacing the Space Shuttle by 2014 and returning to the Moon by 2020.

Kidd, Luanne↗