Search NASA⌕ Search

SEARCH · Search NASA

Results for “sludge”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

SDI CFD MODELING ANALYSIS

The Savannah River Remediation (SRR) Organization requested that Savannah River National Laboratory (SRNL) develop a Computational Fluid Dynamics (CFD) method to mix and blend the miscible contents of the blend tanks to ensure the contents are properly blended before they are transferred from the blend tank; such as, Tank 50H, to the Salt Waste Processing Facility (SWPF) feed tank. The work described here consists of two modeling areas. They are the mixing modeling analysis during miscible liquid blending operation, and the flow pattern analysis during transfer operation of the blended liquid. The transient CFD governing equations consisting of three momentum equations, one mass balance, two turbulence transport equations for kinetic energy and dissipation rate, and one species transport were solved by an iterative technique until the species concentrations of tank fluid were in equilibrium. The steady-state flow solutions for the entire tank fluid were used for flow pattern analysis, for velocity scaling analysis, and the initial conditions for transient blending calculations. A series of the modeling calculations were performed to estimate the blending times for various jet flow conditions, and to investigate the impact of the cooling coils on the blending time of the tank contents. The modeling results were benchmarked against the pilot scale test results. All of the flow and mixing models were performed with the nozzles installed at the mid-elevation, and parallel to the tank wall. From the CFD modeling calculations, the main results are summarized as follows: (1) The benchmark analyses for the CFD flow velocity and blending models demonstrate their consistency with Engineering Development Laboratory (EDL) and literature test results in terms of local velocity measurements and experimental observations. Thus, an application of the established criterion to SRS full scale tank will provide a better, physically-based estimate of the required mixing time, and elevation of transfer pump for minimum sludge disturbance. (2) An empirical equation for a tank with no cooling coils agrees reasonably with the current modeling results for the dual jet. (3) From the sensitivity study of the cooling coils, it was found that the tank mixing time for the coiled tank was about two times longer than that of the tank fluid with no coils under the 1/10th scale, while the coiled tank required only 50% longer than the one without coils under the full scale Tank 50H. In addition, the time difference is reduced when the pumping U{sub o}d{sub o} value is increased for a given tank. (4) The blending time for T-shape dual jet pump is about 20% longer than that of 15{sup o} upward V-shape pump under the 1/10th pilot-scale tank, while the time difference between the two pumps is about 12% for the full-scale Tank 50H. These results are consistent with the literature information. (5) A transfer pump with a solid-plate suction screen operating at 130 gpm can be located 9.5 inches above settled sludge for 2 in screen height in a 85 ft waste tank without disturbing any sludge. Detailed results are summarized in Table 13. Final pump performance calculations were made by using the established CW pump design, and operating conditions to satisfy the two requirements of minimum sludge disturbance, and adequate blending of tank contents. The final calculation results show that the blending times for the coiled and uncoiled tanks coupled with the CW pump design are 159 and 83 minutes, respectively. All the results are provided in Table 16.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Qualification of the Nippon Instrumentation for use in Measuring Mercury at the Defense Waste Processing Facility

The Nippon Mercury/RA-3000 system installed in 221-S M-14 has been qualified for use. The qualification was a side-by-side comparison of the Nippon Mercury/RA-3000 system with the currently used Bacharach Mercury Analyzer. The side-by-side testing included standards for instrument calibration verifications, spiked samples and unspiked samples. The standards were traceable back to the National Institute of Standards and Technology (NIST). The side-by-side work included the analysis of Sludge Receipt and Adjustment Tank (SRAT) Receipt, SRAT Product, and Slurry Mix Evaporator (SME) samples. With the qualification of the Nippon Mercury/RA-3000 system in M-14, the DWPF lab will be able to perform a head to head comparison of a second Nippon Mercury/RA-3000 system once the system is installed. The Defense Waste Processing Facility (DWPF) analyzes receipt and product samples from the Sludge Receipt and Adjustment Tank (SRAT) to determine the mercury (Hg) concentration in the sludge slurry. The SRAT receipt is typically sampled and analyzed for the first ten SRAT batches of a new sludge batch to obtain an average Hg concentration. This average Hg concentration is then used to determine the amount of steam stripping required during the concentration/reflux step of the SRAT cycle to achieve a less than 0.6 wt% Hg in the SRAT product solids. After processing is complete, the SRAT product is sampled and analyzed for mercury to ensure that the mercury concentration does not exceed the 0.45 wt% limit in the Slurry Mix Evaporator (SME). The DWPF Laboratory utilizes Bacharach Analyzers to support these Hg analyses at this facility. These analyzers are more than 10 years old, and they are no longer supported by the manufacturer. Due to these difficulties, the Bacharach Analyzers are to be replaced by new Nippon Mercury/RA-3000 systems. DWPF issued a Technical Task Request (TTR) for the Savannah River National Laboratory (SRNL) to assist in the qualification of the new systems. SRNL prepared a task technical and quality assurance (TT&QA) plan that outlined the activities that are necessary and sufficient to meet the objectives of the TTR. In addition, TT&QA plan also included a test plan that provided guidance to the DWPF Lab in collecting the data needed to qualify the new Nippon Mercury/RA-3000 systems.

47 OTHER INSTRUMENTATION↗

K West Basin Sand Filter Backwash Sample Analysis

A sand filter is used to help maintain water clarity at the K West Basin where highly radioactive sludge is stored. Eventually that sand filter will require disposal. The radionuclide content of the solids trapped in the sand filter will affect the selection of the sand filter disposal pathway. The Pacific Northwest National Laboratory (PNNL) was contracted by the K Basin Operations & Plateau Remediation Project (operations contractor CH2M Hill) to analyze the radionuclide content of the solids collected from the backwash of the K West Basin sand filter. The radionuclide composition in the sand filter backwash solids will be used by CH2M Hill to determine if the sand filter media and retained sludge solids will be designated as transuranic waste for disposal purposes or can be processed through less expensive means. On October 19, 2015, K Basin Operations & Plateau Remediation Project staff backwashed the sand filter into the North Load-Out Pit (NLOP) and immediately collected sample slurry from a sampling tube positioned 24 in. above the NLOP floor. The 764 g sand filter backwash slurry sample, KW-105 SFBW-001, was submitted to PNNL for analysis on October 20, 2015. Solids from the slurry sample were consolidated into two samples (i.e., a primary and a duplicate sample) by centrifuging and measured for mass (0.82 g combined – wet centrifuged solids basis) and volume (0.80 mL combined). The solids were a dark brown/orange color, consistent with iron oxide/hydroxide. The solids were dried; the combined dry solids mass was 0.1113 g, corresponding to 0.0146 weight percent (wt%) solids in the original submitted sample slurry. The solids were acid-digested using nitric and hydrochloric acids. Insoluble solids developed upon dilution with 0.5 M HNO 3 , corresponding to an average 6.5 wt% of the initial dry solids content. The acid digestate and insoluble solids were analyzed separately by gamma spectrometry. Nominally, 7.7% of the 60 Co was present in the insoluble solids; less than 1% of other gamma-emitters (i.e., 137 Cs, 154/155 Eu, and 241 Am) were present in the insoluble solids. Aliquots of the acid digestate were analyzed directly using gamma energy analysis (GEA) and after separations for 238 Pu, 239+240 Pu, 237 Np, and 241 Am radioisotopes using alpha energy analysis (AEA). The 90 Sr was measured by liquid scintillation counting (LSC) on the Sr-separated fraction. The plutonium isotopic distribution of the acid digestate was analyzed following Pu separations by thermal ionization mass spectrometry (TIMS). A table summarizes the results for the primary and duplicate samples. The 239+240 Pu concentration (µCi/g dry) relative to 90 Sr and to 137 Cs concentrations (µCi/g dry) was examined. The K West Basin sludge has a 239+240 Pu/ 90 Sr ranging from 0.1 to 1.2 and the 239+240 Pu/ 137 Cs ratio ranging from 0.10 to 0.47. In contrast, the sand filter backwash solids 239+240 Pu/ 90 Sr ratio was 10.6 and the 239+240 Pu/ 137 Cs ratio was 2.0. The ratio differences indicate a relative enhancement of the Pu concentration in the sand filter solids relative to the 137 Cs and 90 Sr sludge concentrations currently in the K West Basin. A dose-to-curie radioisotope evaluation of the sand filter waste form may need to consider this dissimilarity.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLURRY PUMP MIXING EFFECTIVENESS IN TANK 50H

Computational Fluid Dynamics (CFD) models of Tank 50 with different numbers of pumps and operational modes, including pump rotation, have been developed to estimate flow patterns and the resultant sludge mixing. Major solid obstructions including the tank wall, the pump housing, the pump columns, and the 82-in central support column were included in the model. Transient analyses with a two-equation turbulence model were performed with FLUENT{trademark}, a commercial CFD code. All analyses were based on three-dimensional results. Recommended operational guidance was developed assuming that local fluid velocity and characteristic measures of local turbulence could be used as indicators of sludge suspension and spatial mixing. The calculation results show that three pumps, the maximum number of pumps studied, will give acceptable homogeneous mixing in about 6 minutes in terms of flow patterns and turbulent energy dissipation. These qualitative results are consistent with literature results. Sensitivity calculations have also been performed to assess the impact of different operating modes on sludge suspension and mixing. Two-pump operation provides a marginal level of sludge suspension and turbulent mixing, while one pump does not provide acceptable flow patterns and turbulent eddies for good mixing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IMPACT OF SB4 TANK 40 DECANT AND ARP/MCU ADDITIONS WITH/WITHOUT ADDED CAUSTIC ON DWPF CPC PERFORMANCE

The Savannah River National Laboratory (SRNL) was requested to investigate the impact of decanting supernate from the Sludge Batch four (SB4) feed in Tank 40. The specific questions concerned the potential impact on the stoichiometric acid window determined for SB4 with respect to overall hydrogen generation rates, nitrite destruction in the Sludge Receipt and Adjustment Tank (SRAT) and the rheology of the sludge, SRAT product, and Slurry Mix Evaporator (SME) product slurries. The scope included considering an addition of sodium hydroxide to Tank 40 to partially offset the sodium lost during decanting as well as considering the impact of bounding quantities of Actinide Removal Process (ARP) feed and Modular Caustic-Side Solvent Extraction Unit (MCU) feed on these same parameters. Simulated SB4 waste was first adjusted to match the dilution that has occurred in Tank 40 during the initial period of SB4 operations in the DWPF. The adjusted simulant was decanted an equivalent of 100,000 gallons relative to 413,740 gallons projected supernate volume. The decanted simulant was divided into two equal parts. One part received an addition of sodium hydroxide to increase the Na{sub 2}O content of the calcined sludge solids by about 3%. The baseline decanted simulant and caustic adjusted simulant were each tested in three pairs of DWPF process simulations of the SRAT and SME cycles. The simulations were at the nominal SB4 acid stoichiometry of 130% with and without bounding ARP/MCU additions and at 170% of acid without ARP/MCU. The 170% case without ARP/MCU was considered bounding relative to 170% with ARP/MCU based on calculated acid requirements. No significant negative impacts on the proposed acid operating window for the SRAT and SME cycles were noted in the simulations. Nitrite was successfully destroyed and mercury reduced in all six SRAT cycles. Hydrogen was produced in all six SRAT and SME cycles, but the levels were below the DWPF SRAT and SME cycle limits in all cases. Relatively insignificant rheological changes were noted other than the previously established thinning from higher acid additions. SRAT and SME processing at 130% acid stoichiometry with and without ARP/MCU additions were very similar. MCU nitric acid content, however, shifted the normal acid addition prior to boiling toward more formic acid and less nitric acid than without MCU. SRNL found no technical issues processing the proposed Tank 40 decant (with or without added NaOH) from the standpoint of the impact on the DWPF SRAT and SME cycles subject to the inherent uncertainties in modeling the ARP noble metal concentrations. The noble metals in the ARP were set to the same weight percents in the total solids that they were measured at in the SB4 waste, which was considered likely to be bounding on the actual noble metal content of the ARP transfer to DWPF. Assumptions for formate loss and nitrite to nitrate conversion can be left at the current levels.

08 HYDROGEN↗

DWPF CATALYTIC HYDROGEN GENERATION PROGRAM - REVIEW OF CURRENT STATUS

Significant progress has been made in the past two years in improving the understanding of acid consumption and catalytic hydrogen generation during the Defense Waste Processing Facility (DWPF) processing of waste sludges in the Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME). This report reviews issues listed in prior internal reviews, describes progress with respect to the recommendations made by the December 2006 external review panel, and presents a summary of the current understanding of catalytic hydrogen generation in the DWPF Chemical Process Cell (CPC). Noble metals, such as Pd, Rh, and Ru, are historically known catalysts for the conversion of formic acid into hydrogen and carbon dioxide. Rh, Ru, and Pd are present in the DWPF SRAT feed as by-products of thermal neutron fission of {sup 235}U in the original waste. Rhodium appears to become most active for hydrogen as the nitrite ion concentration becomes low (within a factor of ten of the Rh concentration). Prior to hydrogen generation, Rh is definitely active for nitrite destruction to N{sub 2}O and potentially active for nitrite to NO formation. These reactions are all consistent with the presence of a nitro-Rh complex catalyst, although definite proof for the existence of this complex during Savannah River Site (SRS) waste processing does not exist. Ruthenium does not appear to become active for hydrogen generation until nitrite destruction is nearly complete (perhaps less nitrite than Ru in the system). Catalytic activity of Ru during nitrite destruction is significantly lower than that of either Rh or Pd. Ru appears to start activating as Rh is deactivating from its maximum catalytic activity for hydrogen generation. The slow activation of the Ru, as inferred from the slow rate of increase in hydrogen generation that occurs after initiation, may imply that some species (perhaps Ru itself) has some bound nitrite on it. Ru, rather than Rh, is primarily responsible for the hydrogen generation in the SME cycle when the hydrogen levels are high enough to be noteworthy. Mercury has a role in catalytic hydrogen generation. Two potentially distinct roles have been identified. The most dramatic effect of Hg on hydrogen generation occurs between runs with and without any Hg. When a small amount of Hg is present, it has a major inhibiting effect on Rh-catalyzed H{sub 2} generation. The Rh-Ru-Hg matrix study showed that increasing mercury from 0.5 to 2.5 wt% in the SRAT receipt total solids did not improve the inhibiting effect significantly. The next most readily identified role for Hg is the impact it has on accelerating NO production from nitrite ion. This reaction shifts the time that the ideal concentration of nitrite relative to Rh occurs, and consequently causes the most active nitro-Rh species to form sooner. The potential consequences of this shift in timing are expected to be a function of other factors such as amount of excess acid, Rh concentration, etc. Graphical data from the Rh-Ru-Hg study suggested that Hg might also be responsible for partially inhibiting Ru-catalysis initially, but that the inhibition was not sustained through the SRAT and SME cycles. Continued processing led to a subsequent increase in hydrogen generation that was often abrupt and that frequently more than doubled the hydrogen generation rate. This phenomenon may have been a function of the extent of Hg stripping versus the initial Ru concentration in these tests. Palladium is an active catalyst, and activates during (or prior to) nitrite destruction to promote N{sub 2}O formation followed by a very small amount of hydrogen. Pd then appears to deactivate. Data to date indicate that Pd should not be a species of primary concern relative to Rh and Ru for hydrogen generation. Pd was a very mild catalyst for hydrogen generation compared to Rh and Ru in the simulated waste system. Pd was comparable to Rh in enhancing N{sub 2}O production when present at equal concentration. Pd, however, is almost always present at less than a quarter of the Rh concentration in SRS sludge waste. Ag did not appear to ever become active for hydrogen generation. Data from two tests spiked with silver were comparable to the data from two tests with no noble metals. All significant technical gaps and inconsistencies with historical data in the prior two internal reviews of catalytic hydrogen generation work at SRS have been resolved. About 90% of the recommended work from the external technical review panel has been completed. Work planned or in progress could bring progress on the review panel recommendations up to about 95% by the end of calendar 2009. This primarily covers the sludge simulant matrix study on bulk compositional factors plus some follow-up work on X-ray absorption spectroscopy and improved acid equations.

08 HYDROGEN↗

SELECTION AND PRELIMINARY EVALUATION OF ALTERNATIVE REDUCTANTS FOR SRAT PROCESSING

Defense Waste Processing Facility - Engineering (DWPF-E) has requested the Savannah River National Laboratory (SRNL) to perform scoping evaluations of alternative flowsheets with the primary focus on alternatives to formic acid during Chemical Process Cell (CPC) processing. The reductants shown below were selected for testing during the evaluation of alternative reductants for Sludge Receipt and Adjustment Tank (SRAT) processing. The reductants fall into two general categories: reducing acids and non-acidic reducing agents. Reducing acids were selected as direct replacements for formic acid to reduce mercury in the SRAT, to acidify the sludge, and to balance the melter REDuction/OXidation potential (REDOX). Non-acidic reductants were selected as melter reductants and would not be able to reduce mercury in the SRAT. Sugar was not tested during this scoping evaluation as previous work has already been conducted on the use of sugar with DWPF feeds. Based on the testing performed, the only viable short-term path to mitigating hydrogen generation in the CPC is replacement of formic acid with a mixture of glycolic and formic acids. An experiment using glycolic acid blended with formic on an 80:20 molar basis was able to reduce mercury, while also targeting a predicted REDuction/OXidation (REDOX) of 0.2 expressed as Fe{sup 2+}/{Sigma}Fe. Based on this result, SRNL recommends performing a complete CPC demonstration of the glycolic/formic acid flowsheet followed by a design basis development and documentation. Of the options tested recently and in the past, nitric/glycolic/formic blended acids has the potential for near term implementation in the existing CPC equipment providing rapid throughput improvement. Use of a non-acidic reductant is recommended only if the processing constraints to remove mercury and acidify the sludge acidification are eliminated. The non-acidic reductants (e.g. sugar) will not reduce mercury during CPC processing and sludge acidification would require large amounts of nitric acid (and subsequently larger reductant additions) unless a reducing acid is also used.

54 ENVIRONMENTAL SCIENCES↗

DWPF COAL CARBON WASTE ACCEPTANCE CRITERIA LIMIT EVALUATION

A paper study was completed to assess the impact on the Defense Waste Processing Facility (DWPF)'s Chemical Processing Cell (CPC) acid addition and melter off-gas flammability control strategy in processing Sludge Batch 10 (SB10) to SB13 with an added Fluidized Bed Steam Reformer (FBSR) stream and two Salt Waste Processing Facility (SWPF) products (Strip Effluent and Actinide Removal Stream). In all of the cases that were modeled, an acid mix using formic acid and nitric acid could be achieved that would produce a predicted Reducing/Oxidizing (REDOX) Ratio of 0.20 Fe{sup +2}/{Sigma}Fe. There was sufficient formic acid in these combinations to reduce both the manganese and mercury present. Reduction of manganese and mercury are both necessary during Sludge Receipt and Adjustment Tank (SRAT) processing, however, other reducing agents such as coal and oxalate are not effective in this reduction. The next phase in this study will be experimental testing with SB10, FBSR, and both SWPF simulants to validate the assumptions in this paper study and determine whether there are any issues in processing these streams simultaneously. The paper study also evaluated a series of abnormal processing conditions to determine whether potential abnormal conditions in FBSR, SWPF or DWPF would produce melter feed that was too oxidizing or too reducing. In most of the cases that were modeled with one parameter at its extreme, an acid mix using formic acid and nitric acid could be achieved that would produce a predicted REDOX of 0.09-0.30 (target 0.20). However, when a run was completed with both high coal and oxalate, with minimum formic acid to reduce mercury and manganese, the final REDOX was predicted to be 0.49 with sludge and FBSR product and 0.47 with sludge, FBSR product and both SWPF products which exceeds the upper REDOX limit.

01 COAL, LIGNITE, AND PEAT↗

IMPACT OF REDUCING THE 100 C LIQUIDUS TEMPERATURE OFFSET ON WASTE LOADING TARGETS

The objective of this report is to assess the potential impact of reducing conservatism in the implementation of the current liquidus temperature (TL) model in the Product Composition Control System (PCCS) on the ability to target higher waste loadings (WLs) for future sludge batches. No changes to the TL model or the associated uncertainties (model or measurement) are proposed, rather only changes in the magnitude of the offset used between the nominal melt pool temperature (1150 C) and the Property Acceptance Region (PAR) value (1050 C). This strategy is consistent with that outlined and initially assessed by Brown et al. (2001). In that report, the authors stated even a fairly conservative change in this safety factor could have a significant impact on waste loading. The results of this study clearly indicate that the implementation of an 1100 C TL PAR criterion (which translates into a reduction in the TL offset from 100 C to 50 C) can have significantly positive impacts on the ability to gain access to WLs exceeding 45%. This is especially true for those frit and sludge systems that are TL limited using the current 1050 C TL criterion, and are not limited by a second constraint (such as viscosity, nepheline, or durability) until much higher WLs. Examples of various glass forming systems are provided that are currently limited to maximum WLs in the mid-40s, but could be processed in the lower 50s through implementation of this new strategy. One example is in the Sludge Batch 10 (SB10) system, where for a specific glass forming system the projected operating window of 38-41% WL (using the current constraints) became 38-52% WL with the use of an 1100 C TL PAR value. This change both provided access to significantly higher WLs, and transitioned a once infeasible flowsheet to a system that could potentially be processed in the Defense Waste Processing Facility (DWPF). This potential change in the TL constraint also provides access to frit compositions (or glass forming regions) that are not accessible under the current limitations. These new composition regions not only provide access to higher WLs, but may also allow frit development efforts to target other specific properties to support enhanced melter operations. It should be noted that under certain flowsheet conditions, the implementation of the 1100 C TL PAR must be accompanied by a shifting categorization of what is deemed an acceptable operating window for DWPF operation. For example, the use of a 50 C offset may not be effective if access to WLs < 30% are still required. Assuming the intent of implementing the 1100 C PAR criterion is to gain access to higher WLs (> 45%), the need to identify frit and sludge systems that are predicted to form acceptable glasses at these lower WLs (< 30%) should no longer be of concern. Although this strategy could have a significant impact on DWPF's ability to target higher WLs (> 45%), its implementation is not risk free. The reduction in the TL offset does reduce the conservatism currently implemented, which is aimed at minimizing or eliminating the potential for massive devitrification within the melt pool. Prior to implementation of this alternative strategy, DWPF should perform a risk-based assessment or review of this alternative approach to ensure it aligns with needs and processing strategies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MIXING MODELING ANALYSIS FOR SRS SALT WASTE DISPOSITION

Nuclear waste at Savannah River Site (SRS) waste tanks consists of three different types of waste forms. They are the lighter salt solutions referred to as supernate, the precipitated salts as salt cake, and heavier fine solids as sludge. The sludge is settled on the tank floor. About half of the residual waste radioactivity is contained in the sludge, which is only about 8 percentage of the total waste volume. Mixing study to be evaluated here for the Salt Disposition Integration (SDI) project focuses on supernate preparations in waste tanks prior to transfer to the Salt Waste Processing Facility (SWPF) feed tank. The methods to mix and blend the contents of the SRS blend tanks were evalutaed to ensure that the contents are properly blended before they are transferred from the blend tank such as Tank 50H to the SWPF feed tank. The work consists of two principal objectives to investigate two different pumps. One objective is to identify a suitable pumping arrangement that will adequately blend/mix two miscible liquids to obtain a uniform composition in the tank with a minimum level of sludge solid particulate in suspension. The other is to estimate the elevation in the tank at which the transfer pump inlet should be located where the solid concentration of the entrained fluid remains below the acceptance criterion (0.09 wt% or 1200 mg/liter) during transfer operation to the SWPF. Tank 50H is a Waste Tank that will be used to prepare batches of salt feed for SWPF. The salt feed must be a homogeneous solution satisfying the acceptance criterion of the solids entrainment during transfer operation. The work described here consists of two modeling areas. They are the mixing modeling analysis during miscible liquid blending operation, and the flow pattern analysis during transfer operation of the blended liquid. The modeling results will provide quantitative design and operation information during the mixing/blending process and the transfer operation of the blended liquid in the Salt Disposition Integration (SDI) facility. The results will also help validate the anticipated performance of the pump vendor's design.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Graphite Waste Tank Cleanup and Decontamination under the Marcoule UP1 D and D Program - 13166

The UP1 plant in Marcoule reprocessed nearly 20,000 tons of used natural uranium gas cooled reactor fuel coming from the first generation of civil nuclear reactors in France. During more than 40 years, the decladding operations produced thousands of tons of processed waste, mainly magnesium and graphite fragments. In the absence of a French repository for the graphite waste, the graphite sludge content of the storage pits had to be retrieved and transferred into a newer and safer pit. After an extensive R and D program, the equipment and process necessary for retrieval operations were designed, built and tested. The innovative process is mainly based on the use of two pumps (one to capture and the other one to transfer the sludge) working one after the other and a robotic arm mounted on a telescopic mast. A dedicated process was also set up for the removal of the biggest fragments. The retrieval of the most irradiating fragments was a challenge. Today, the first pit is totally empty and its stainless steel walls have been decontaminated using gels. In the second pit, the sludge retrieval and transfer operations have been almost completed. Most of the non-pumpable graphite fragments has been removed and transferred to a new storage pit. After more than 6 years of operations in sludge retrieval, a lot of experience was acquired from which important 'lessons learned' could be shared. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decontamination of Radioactive Cesium Released from Fukushima Daiichi Nuclear Power Plant - 13277

Peculiar binding of Cesium to the soil clay minerals remained the major obstacle for the immediate Cs-decontamination of soil and materials containing clay minerals like sludge. Experiments for the removal of Cesium from soil and ash samples from different materials were performed in the lab scale. For soil and sludge ash formed by the incineration of municipal sewage sludge, acid treatment at high temperature is effective while washing with water removed Cesium from ashes of plants or burnable garbage. Though total removal seems a difficult task, water-washing of wood-ash or garbage-ash at 40 deg. C removes >90% radiocesium, while >60% activity can be removed from soil and sludge-ash by acid washing at 95 deg. C. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Mercury-Contaminated Storm Sewer Sediments from the West End Mercury Area at the Y-12 National Security Complex in Oak Ridge, Tennessee - 12061

The Y-12 National Security Complex in Oak Ridge, TN has faced an ongoing challenge from mercury entrapped in soils beneath and adjacent to buildings, storm sewers, and process pipelines. Previous actions to reduce the quantity and/or mobilization of mercury-contaminated media have included plugging of building floor drains, cleaning of sediment and sludge from sumps, manholes, drain lines, and storm sewers, lining/relining of storm sewers and replacement of a portion of the storm sewer trunk line, re-routing and removal of process piping, and installation of the Central Mercury Treatment System to capture and treat contaminated sump water. Despite the success of these actions, mercury flux in the storm sewer out-falls that discharge to Upper East Fork Poplar Creek (UEFPC) continues to pose a threat to long-term water quality. A video camera survey of the storm sewer network revealed several sections of storm sewer that had large cracks, separations, swells, and accumulations of sediment/sludge and debris. The selected remedy was to clean and line the sections of storm sewer pipe that were determined to be primary contributors to the mercury flux in the storm sewer out-falls. The project, referred to as the West End Mercury Area (WEMA) Storm Sewer Remediation Project, included cleaning sediment and debris from over 2,460 meters of storm sewer pipe followed by the installation of nearly 366 meters of cure-in-place pipe (CIPP) liner. One of the greatest challenges to the success of this project was the high cost of disposal associated with the mercury-contaminated sludge and wastewater generated from the storm sewer cleaning process. A contractor designed and operated an on-site wastewater pre-treatment system that successfully reduced mercury levels in 191 cubic meters of sludge to levels that allowed it to be disposed at Nevada Nuclear Security Site (NNSS) disposal cell as a non-hazardous, low-level waste. The system was also effective at pre-treating over 1,514,000 liters of wastewater to levels that met the waste acceptance criteria for the on-site West End [wastewater] Treatment Facility (WETF). This paper describes the storm sewer cleaning and lining process and the methods used to process the mercury-contaminated sludge and wastewater, as well as several 'lessons learned' that would be relevant to any future projects involving storm sewer cleaning and debris remediation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Chemical Precipitation of Radioactive Liquid Waste - 12492

This paper presented in-situ chemical precipitation for radioactive liquid waste by using chemical agents. Results are reported on large-scale implementation on the removal of {sup 137}Cs, {sup 134}Cs and {sup 60}Co from liquid radioactive waste generating from Nuclear Research and Training Centre. Total amount of liquid radioactive waste was 35 m{sup 3} and main radionuclides were Cs-137, Cs- 134 and Co-60. Initial radioactivity concentration of the liquid waste was 2264, 17 and 9 Bq/liter for Cs-137, Cs-134 and Co-60 respectively. Potassium ferro cyanide was selected as chemical agent at high pH levels 8-10 according to laboratory tests. After the process, radioactive sludge precipitated at the bottom of the tank and decontaminated clean liquid was evaluated depending on discharge limits. By this precipitation method decontamination factors were determined as 60, 9 and 17 for Cs-137, Cs-134 and Co-60 respectively. At the bottom of the tank radioactive sludge amount was 0.98 m{sup 3}. It was transferred by sludge pumps to cementation unit for solidification. By in situ chemical processing 97% of volume reduction was achieved. Using the optimal concentration of 0.75 M potassium ferro cyanide about 98% of the {sup 137}Cs can be removed at pH 8. The Potassium ferro cyanide precipitation method could be used successfully in large scale applications with nickel and ferrum agents for removal of Cs-137, Cs-134 and Co- 60. Although DF values of laboratory test were much higher than in-situ implementation, liquid radioactive waste was decontaminated successfully by using potassium ferro cyanide. Majority of liquid waste were discharged as clean liquid. %97.2 volumetric amount of liquid waste was cleaned and discharged at the original site. Reduced amount of sludge transportation in drums is more economical and safer method than liquid transportation. Although DF values could be different for each of applications related to main specifications of original liquid waste, this study shows that in-situ treatment of liquid waste by using potassium ferro cyanide is not only a cost effective method but also reduce radiological risks as well. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Novel Technology for Complex Rheological Measurements - 16471

As the UK nuclear industry embarks on a second phase of nuclear power generation, the industry is faced with numerous sludge and slurry challenges associated with the decommissioning and clean-up of historical nuclear sites. The remediation of Sellafield, the largest nuclear site in the UK, is anticipated to cost GBP 53 bn over the next 100 years. Substantial cost is associated with the clean-up, transfer and safe storage of legacy particulate wastes encountered in ponds, silos, highly active storage tanks and many more large tanks on site. To develop suitable design strategies for the mobilization and transfer of sludge, the rheology of the sludge should be accurately determined. The current work demonstrates the use of a Quartz Crystal Microbalance to measure sludge rheology, specifically the shear yield stress. The device is simple to operate with no mechanical parts, small and portable enabling deployment into limited access areas, and eliminates the need for operator sampling and laboratory measurement. The measurement principle relates to the resonance frequency and motional resistance of a piezo-electric sensor as the sensor is submerged in the desired test material. The air-to-sample frequency and resistance shifts are shown to correlate with the shear yield stress of the suspension as measured by conventional vane viscometry. As the particle network stiffens (increased yield stress), the sensor motional resistance and its resonant frequency become more positive. These characteristic responses and their correlation to the shear yield stress have been confirmed for a range of particle suspensions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The DISTINCTIVE University Consortium: Legacy Ponds and Silo Wastes - 18135

The UK Engineering and Physical Sciences Research Council (EPSRC) sponsored DISTINCTIVE consortium (Decommissioning, Immobilisation and Storage Solutions for Nuclear Waste Inventories) is undertaking 22 science and engineering projects across 11 universities related to the decommissioning of the Legacy Ponds and Silos at Sellafield. These are grouped into three work packages that focus on wasteform durability, effluent treatment and pond and silo sludges. Specific challenges include understanding the durability of intermediate level waste (ILW) glass-ceramic waste forms, studying thermally treated Pu-containing materials, producing and testing new inorganic ion exchange materials including derivatized magnetic nanoparticles for Cs, Sr and U removal from effluent, developing micro- and ultra-filtration methods, providing improved modelling and simulation of sludge disturbance, mobilisation and transport, developing a better understanding of gas hold-up in sludges, exploring methods for sludge characterisation including the use of acoustic backscatter and quartz crystal microbalance techniques and Raman spectroscopy and computer modelling of the interaction of cations with brucite surfaces. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Readiness Process and Transition to Operation for a Remote-Handled Transuranic Packaging Facility at Hanford - 19298

CH2M Hill Plateau Remediation Company manages the Sludge Retrieval Project, which has the mission to develop and deploy technologies to safely retrieve and package remote-handled transuranic sludge that is currently stored in the 105K West Reactor Fuel Storage Basin located in the 100-K Area of the U.S. Department of Energy's Hanford Site near Richland, Washington. In 2017, CH2M Hill Plateau Remediation Company installed and commissioned a process for removal of the sludge. A contractor Operational Readiness Review was completed in March 2018, and a U.S. Department of Energy, Richland Operations Office Operational Readiness Review was completed in May. The first sludge transfer was successfully completed on June 12, 2018, proving that the Engineered Container Retrieval and Transfer System process equipment worked as intended. This paper will describe the issues and successes along the path of readiness and startup, as well as the challenges that remain and CH2M Hill Plateau Remediation Company's plan to overcome them. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of New Antifoam for High Level Waste Processing in DWPF

During processing in the Defense Waste Processing Facility (DWPF), the evaporation of sludge leads to large amounts of foaming. This foaming can cause a foam-over, which contaminates other parts of the facility, most importantly the condensate. Currently, the antifoam being used is not sufficient at more extreme pH values and relatively high concentrations are required to minimize foaming. This means that a foam-over is more likely in parts of the process where the pH moves away from the neutral point and antifoam is needed in large quantities to prevent such occurrences. Adding this antifoam can also double processing time. The current antifoam also degrades into flammable byproducts, which creates a hazard in the processing. There are two main ideas proposed in order to solve the problems with the current antifoam: A new antifoam; A mechanical solution (sprays, agitator, etc). The focus of this summer was to develop a new antifoam that works across a broader range of pH values, can be added in lower concentrations, and does not degrade into flammable byproducts. This solution was pursued by obtaining different superspreaders and antifoams from companies across the country in order to perform a series of tests on them; these tests include superspreader testing, Foamscan testing, boiling testing, and Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME) process testing. To begin testing, four different superspreaders were tested on their ability to spread. The four superspreaders include: Y-17112, Y-17309, Antifoam 747 (the old antifoam), and Silwet L77 (the main component in Antifoam 747). These superspreaders were tested across a range of pH values and concentrations from 100 ppm to 5000 ppm. After completion of the tests, the results indicated that Y-17112 spread across a wider pH range than the others, even at lower concentrations. This is ideal for developing a new antifoam, as the pH throughout processing in DWPF varies and the lower the necessary concentration, the less antifoam that must be added per cycle. In order to test whether or not the superspreaders work as an antifoam, they have to be tested on real foam. In order to test this, a foamy simulant similar to the foaminess of the sludge in DWPF needed to be developed. This required testing many different sludges and designing our own simulant with different concentrations of insoluble solids. Eventually, a simulant similar enough to what is seen in DWPF was identified. Each superspreader will be tested on the simulant at different pH values and at different concentrations. The simulant will be allowed to foam and small amounts of the superspreader will be added while the Foamscan software tracks the height of the foam column; this allows us to know if the superspreader decreased the foam or not. Next, boiling testing in the Foamscan will be completed. This is testing identical to the Foamscan testing at room temperature, only at boiling conditions similar to DWPF. After boiling testing, the superspreader that is deemed most successful will be tested in a real, scaled-down SRAT/SME cycle. This will ensure it works with all the real chemicals that are added in DWPF and that it will remain successful in all the conditions that it may face. After the SRAT/SME testing, a decision will be made on whether or not the superspreader is successful and it may or may not be chosen as the new antifoam for DWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗