At least 649 records · Page 36

Design and Assembly of an Integrated Metabolic Heat Regenerated Temperature Swing Adsorption (MTSA) Subassembly Engineering Development Unit

Metabolic heat regenerated Temperature Swing Adsorption (MTSA) technology is being developed for thermal and carbon dioxide (CO2) control for a Portable Life Support System (PLSS), as well as water recycling. The core of the MTSA technology is a sorbent bed that removes CO2 from the PLSS ventilation loop gas via a temperature swing. A Condensing Icing Heat eXchanger (CIHX) is used to warm the sorbent while also removing water from the ventilation loop gas. A Sublimation Heat eXchanger (SHX) is used to cool the sorbent. Research was performed to explore an MTSA designed for both lunar and Martian operations. Previously the sorbent bed, CIHX, and SHX had been built and tested individually on a scale relevant to PLSS operations, but they had not been done so as an integrated subassembly. Design and analysis of an integrated subassembly was performed based on this prior experience and an updated transient system model. Focus was on optimizing the design for Martian operations, but the design can also be used in lunar operations. An Engineering Development Unit (EDU) of an integrated MTSA subassembly was assembled based on the design. Its fabrication is discussed. Some details on the differences between the as-assembled EDU and the future flight unit are considered.

Padilla, Sebastian A.↗

Verification of Energy Reduction Effect through Control Optimization of Supply Air Temperature in VRF-OAP System

This paper developed an algorithm that controls the supply air temperature in the variable refrigerant flow (VRF), outdoor air processing unit (OAP) system, according to indoor and outdoor temperature and humidity, and verified the effects after applying the algorithm to real buildings. The VRF-OAP system refers to a heating, ventilation, and air conditioning (HVAC) system to complement a ventilation function, which is not provided in the VRF system. It is a system that supplies air indoors by heat treatment of outdoor air through the OAP, as a number of indoor units and OAPs are connected to the outdoor unit in the VRF system simultaneously. This paper conducted experiments with regard to changes in efficiency and the cooling capabilities of each unit and system according to supply air temperature in the OAP using a multicalorimeter. Based on these results, an algorithm that controlled the temperature of the supply air in the OAP was developed considering indoor and outdoor temperatures and humidity. The algorithm was applied in the test building to verify the effects of energy reduction and the effects on indoor temperature and humidity. Loads were then changed by adjusting the number of conditioned rooms to verify the effect of the algorithm according to various load conditions. In the field test results, the energy reduction effect was approximately 15–17% at a 100% load, and 4–20% at a 75% load. However, no significant effects were shown at a 50% load. The indoor temperature and humidity reached a comfortable level.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design and development of a trace contaminant removal canister for Spacelab

The paper describes the overall approach used by NASA-MSFC to design and develop a trace contaminant removal canister for Spacelab. The elements of this approach include the establishment of a trace contaminant load model, analysis and testing to define a preliminary design, development testing to verify the adequacy of the selected design, and testing to define a suitable canister location in the transfer tunnel ventilation system. The canister utilizes a catalyst material which is effective in removing carbon monoxide at room temperature, as well as plain and acid treated charcoal. The canister alone will control all contaminants in the load model below their maximum allowable concentration (MAC) levels without assistance from the baseline environmental control system (ECS) except for methyl alcohol and ammonia.

Ray, C. D.↗

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ANNULUS CLOSURE TECHNOLOGY DEVELOPMENT INSPECTION/SALT DEPOSIT CLEANING MAGNETIC WALL CRAWLER

The Liquid Waste Technology Development organization is investigating technologies to support closure of radioactive waste tanks at the Savannah River Site (SRS). Tank closure includes removal of the wastes that have propagated to the tank annulus. Although amounts and types of residual waste materials in the annuli of SRS tanks vary, simple salt deposits are predominant on tanks with known leak sites. This task focused on developing and demonstrating a technology to inspect and spot clean salt deposits from the outer primary tank wall located in the annulus of an SRS Type I tank. The Robotics, Remote and Specialty Equipment (RRSE) and Materials Science and Technology (MS&T) Sections of the Savannah River National Laboratory (SRNL) collaborated to modify and equip a Force Institute magnetic wall crawler with the tools necessary to demonstrate the inspection and spot cleaning in a mock-up of a Type I tank annulus. A remote control camera arm and cleaning head were developed, fabricated and mounted on the crawler. The crawler was then tested and demonstrated on a salt simulant also developed in this task. The demonstration showed that the camera is capable of being deployed in all specified locations and provided the views needed for the planned inspection. It also showed that the salt simulant readily dissolves with water. The crawler features two different techniques for delivering water to dissolve the salt deposits. Both water spay nozzles were able to dissolve the simulated salt, one is more controllable and the other delivers a larger water volume. The cleaning head also includes a rotary brush to mechanically remove the simulated salt nodules in the event insoluble material is encountered. The rotary brush proved to be effective in removing the salt nodules, although some fine tuning may be required to achieve the best results. This report describes the design process for developing technology to add features to a commercial wall crawler and the results of the demonstration testing performed on the integrated system. The crawler was modified to address the two primary objectives of the task (inspection and spot cleaning). SRNL recommends this technology as a viable option for annulus inspection and salt removal in tanks with minimal salt deposits (such as Tanks 5 and 6.) This report further recommends that the technology be prepared for field deployment by: (1) developing an improved mounting system for the magnetic idler wheel, (2) improving the robustness of the cleaning tool mounting, (3) resolving the nozzle selection valve connections, (4) determining alternatives for the brush and bristle assembly, and (5) adding a protective housing around the motors to shield them from water splash. In addition, SRNL suggests further technology development to address annulus cleaning issues that are apparent on other tanks that will also require salt removal in the future such as: (1) Developing a duct drilling device to facilitate dissolving salt inside ventilation ducts and draining the solution out the bottom of the ducts. (2) Investigating technologies to inspect inside the vertical annulus ventilation duct.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the Indoor Air Quality Procedure for Use in Retail Buildings

California's building efficiency standards (Title 24) mandate minimum prescribed ventilation rates (VRs) for commercial buildings. Title 24 standards currently include a prescriptive procedure similar to ASHRAE’s prescriptive “ventilation rate procedure”, but does not include an alternative procedure, akin to ASHRAE’s non-prescriptive “indoor air quality procedure” (IAQP). The IAQP determines minimum VRs based on objectively and subjectively evaluated indoor air quality (IAQ). The first primary goal of this study was to determine, in a set of California retail stores, the adequacy of Title 24 VRs and observed current measured VRs in providing the level of IAQ specified through an IAQP process, The second primary goal was to evaluate whether several VRs implemented experimentally in a big box store would achieve adequate IAQ, assessed objectively and subjectively. For the first goal, a list of contaminants of concern (CoCs) and reference exposure levels (RELs) were selected for evaluating IAQ. Ventilation rates and indoor and outdoor CoC concentrations were measured in 13 stores, including one “big box” store. Mass balance models were employed to calculate indoor contaminant source strengths for CoCs in each store. Using these source strengths and typical outdoor air contaminant concentrations, mass balance models were again used to calculate for each store the “IAQP” VR that would maintain indoor CoC concentrations below selected RELs. These IAQP VRs were compared to the observed VRs and to the Title 24- prescribed VRs. For the second goal, a VR intervention study was performed in the big box store to determine how objectively assessed indoor contaminant levels and subjectively assessed IAQ varied with VR. The three intervention study VRs included an approximation of the store’s current VR [0.24 air changes per hour (ACH)], the Title 24-prescribed VR [0.69 ACH], and the calculated IAQPbased VR [1.51 ACH]). Calculations of IAQP-based VRs showed that for the big box store and 11 of the 12 other stores, neither current measured VRs nor the Title 24-prescribed VRs would be sufficient to maintain indoor concentrations of all CoCs below RELs. In the intervention study, with the IAQP-based VR applied in the big box store, all CoCs were controlled below RELs (within margins of error). Also, at all three VRs in this store, the percentage of subjects reporting acceptable air quality exceeded an 80% criterion of acceptability. The IAQP allows consideration of outdoor air ventilation as just one of several possible tools for achieving adequate IAQ. In two of the 13 surveyed buildings, applying the IAQP to allow lower VRs could have saved energy whilst still maintaining acceptable indoor air quality. In the remaining 11 buildings, saving energy through lower VRs would require combination with other strategies, either reducing indoor sources of CoCs such as formaldehyde, or use of gas phase air cleaning technologies. Based on the findings from applying the IAQP calculations to retail stores and the IAQP-based intervention study, recommendations are made regarding the potential introduction of a comparable procedure in Title 24.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Impact of Behind-the-Meter Heterogeneous Distributed Energy Resources on Distribution Grids: Preprint

The increasing integration of distributed energy resources (DERs) on the electric grid brings new challenges and opportunities for utility grid operations. With the rapid deployment of DERs, there is emerging interest in integrating these controllable devices with utility operations at all levels for monitoring and management. Different types of DERs such as Photovoltaics (PV), energy storage, electric vehicles (EVs), etc. have varying effects on the grid based on how and where they are deployed. Again, the DER deployment and its impact are network-dependent, while the traditional electric grids were not designed to host DERs. To understand the challenges with increasing behind-the-meter (BTM) DERs and to identify the needs in deploying advanced controls, a comprehensive grid impact study is indispensable. This paper investigates the impacts of integrating a mix of DERs in the utility distribution network in Colorado, U.S. Firstly, BTM DERs at the residential scale including distributed PV; battery energy storage systems (BESS); heating, ventilation, and air-conditioning (HVAC) load; electric water heater (EWH) load; and EVs are modeled. The impacts of integrating these resources on the distribution network are evaluated by conducting time-series simulations for different scenarios considering different days to capture the worst-case conditions. Monte Carlo simulations are conducted to generate the realistic EV charging profile. The voltage issues, substation transformer loadings, and critical nodes in the network are identified with the incorporation of uncoordinated EV charging loads and other DER in the network. This analysis helps visualize the DER impact on the grid, identify the challenges, and provides an insight into the new distribution management and control needs to enable reliable and resilient distribution grid operations. Additionally, further analysis is performed to estimate the daily residential electricity cost with the inclusion of DERs under time-of-use tariffs. The result shows the daily residential electricity cost reduced by 20:7% on average with DERs compared to the case without DERs.

27 ARPA - Advanced Research Projects Agency-Energy↗

Load Shifting with Space Conditioning Heat Pumps During Heating Season in the Pacific Northwest

Ductless mini- and multi-split heat pumps are commonly deployed in Pacific Northwest residences, which historically have inefficient space heating and no space cooling. Heat pumps provide these residences with more energy-efficient space heating in the winter and space cooling for increasingly warm summer periods. For many of these applications, heat pumps add a new electrical load at the residence, compelling regional utilities to seek to understand their impacts on the electrical grid and opportunities for load management. In coordination with regional utilities, this study examined the winter load-shifting potential of residential multi-split heat pumps with variable capacity technology. The study included nine residential sites with a total of 20 ductless indoor units, which underwent simulated smart grid control. Grid control functionality was provided through the CTA-2045 communication protocol and included offsetting temperature setpoints for individual indoor units in the study. Field data collection included whole-house and heating, ventilation, and air conditioning electrical power consumption; indoor zone temperatures; occupant surveys; and CTA-2045 curtailment data for both baseline and simulated load-shifting events by site. This paper provides an overview of the load-shifting strategies and aggregated results from winter data collection.

ASHRAE, Heat pump, energy effciency, residential b↗

Analysis and Design of Crew Sleep Station for ISS

This paper details the analysis and design of the Temporary Sleep Station (TeSS) environmental control system for International Space Station (ISS). The TeSS will provide crewmembers with a private and personal space, to accommodate sleeping, donning and doffing of clothing, personal communication and performance of recreational activities. The need for privacy to accommodate these activities requires adequate ventilation inside the TeSS. This study considers whether temperature, carbon dioxide, and humidity within the TeSS remain within crew comfort and safety levels for various expected operating scenarios. Evaluation of these scenarios required the use and integration of various simulation codes. An approach was adapted for this study, whereby results from a particular code were integrated with other codes when necessary. Computational Fluid Dynamics (CFD) methods were used to evaluate the flow field inside the TeSS, from which local gradients for temperature, velocity, and species concentration such as CO (sub 2) could be determined. A model of the TeSS, containing a human, as well as equipment such as a laptop computer, was developed in FLUENT, a finite-volume code. Other factors, such as detailed analysis of the heat transfer through the structure, radiation, and air circulation from the TeSS to the US Laboratory Aisle, where the TeSS is housed, were considered in the model. A complementary model was developed in G189A, a code which has been used by NASA/JSC for environmental control systems analyses since the Apollo program. Boundary conditions were exchanged between the FLUENT and G189A TeSS models. G189A provides human respiration rates to the FLUENT model, while the FLUENT model provides local convective heat transfer coefficients to G189A model. An additional benefit from using an approach with both a systems simulation and CFD model, is the capability to verify the results of each model by comparison to the results of the other model. The G189A and FLUENT models were used to evaluate various ventilation designs for the TeSS over a range of operating conditions with varying crew metabolic load, equipment operating modes, ventilation flow rates, and with the TeSS doors open and closed. Results from the study were instrumental in the optimization of a design for the TeSS ventilation hardware. A special case was considered where failure of the TeSS ventilation system occurred. In this case, a study was conducted in order to determine the time required for the CO (sub 2) concentration inside the TeSS to increase to ISS limit values under transient conditions. A lumped-capacitance code, SINDA-FLUINT was used in this case to provide accurate predictions of the human reaction to the TeSS cabin conditions including core and skin temperatures and body heat storage. A simple two-dimensional CFD model of a crewmember inside the TeSS was developed in FLUENT in order to determine the volume envelope of the respired air from the human, which maintained a minimum velocity profile. This volume was then used in the SINDA-FLUINT model to facilitate the calculations of CO (sub 2) concentrations, dry bulb temperatures and humidity levels inside the TeSS.

Keener, John F.↗

Low Carbon Technology Strategies: Midrise Apartment

This document includes steps that building owners and operators can implement to achieve smart, healthy, and low-carbon midrise apartment buildings within their existing building portfolios. Midrise apartments may use packaged rooftop units for heating, cooling, and ventilation or central plant systems for larger buildings.

analytics↗

Demand Response and Open Automated Demand Response Opportunities for Data Centers

This study examines data center characteristics, loads, control systems, and technologies to identify demand response (DR) and automated DR (Open Auto-DR) opportunities and challenges. The study was performed in collaboration with technology experts, industrial partners, and data center facility managers and existing research on commercial and industrial DR was collected and analyzed. The results suggest that data centers, with significant and rapidly growing energy use, have significant DR potential. Because data centers are highly automated, they are excellent candidates for Open Auto-DR. 'Non-mission-critical' data centers are the most likely candidates for early adoption of DR. Data center site infrastructure DR strategies have been well studied for other commercial buildings; however, DR strategies for information technology (IT) infrastructure have not been studied extensively. The largest opportunity for DR or load reduction in data centers is in the use of virtualization to reduce IT equipment energy use, which correspondingly reduces facility cooling loads. DR strategies could also be deployed for data center lighting, and heating, ventilation, and air conditioning. Additional studies and demonstrations are needed to quantify benefits to data centers of participating in DR and to address concerns about DR's possible impact on data center performance or quality of service and equipment life span.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Aspects of the mechanisms of smoke generation by burning materials

An investigation of smoke generation during the burning of natural and synthetic solid materials (relevant to fire safety problems), under simulated fire conditions, is presented. Smoke formation mechanisms, including flaming and nonflaming combustion, are reviewed, and the complex physical, chemical, and electrical processes, important in smoke particulate production, are identified. With reference to the smoke formation mechanisms, measured experimental data are discussed, and include effects of ventilation gas temperature, dependence on material composition, and chemical analysis of smoke particulates. Significant differences in smoke characteristics are observed between flaming and nonflaming conditions, which is attributed to specific differences in controlling mechanisms and resultant ways leading to particulate formation. The effects of polymer substrate properties and effects of additives for a given substrate on smoke properties are also discussed in terms of basic processes. It is shown that many of the measured trends can be interpreted by considering postulated mechanisms of particulate formation.

Bankston, C. P.↗

International Space Station (ISS) Bacterial Filter Elements (BFEs): Filter Efficiency and Pressure Testing of Returned Units

The air revitalization system aboard the International Space Station (ISS) provides the vital function of maintaining a clean cabin environment for the crew and the hardware. This becomes a serious challenge in pressurized space compartments since no outside air ventilation is possible, and a larger particulate load is imposed on the filtration system due to lack of sedimentation due to the microgravity environment in Low Earth Orbit (LEO). The ISS Environmental Control and Life Support (ECLS) system architecture in the U.S. Segment uses a distributed particulate filtration approach consisting of traditional High-Efficiency Particulate Adsorption (HEPA) media filters deployed at multiple locations in each U.S. Segment module; these filters are referred to as Bacterial Filter Elements, or BFEs. These filters see a replacement interval, as part of maintenance, of 2-5 years dependent on location in the ISS. In this work, we present particulate removal efficiency, pressure drop, and leak test results for a sample set of 8 BFEs returned from the ISS after filter replacement. The results can potentially be utilized by the ISS Program to ascertain whether the present replacement interval can be maintained or extended to balance the on-ground filter inventory with extension of the lifetime of ISS beyond 2024. These results can also provide meaningful guidance for particulate filter designs under consideration for future deep space exploration missions.

Filtration↗

Methodology for interpretable reinforcement learning model for HVAC energy control

Deep reinforcement learning (DRL) approaches have been used in various application areas to improve efficiency, optimization, or automation. However, very little is known about how the DRL algorithms make decisions and what features affect their performance. Using a case study of a DRL based Heating, Ventilation and Air Conditioning (HVAC) optimization methodology, we demonstrate how we can address these challenges by applying interpretability tools and systematically exploring the model inputs for better understanding the DRL behaviour and decision making process. We developed a methodology for interpretable reinforcement learning and evaluated our approach in real-world house located in Knoxville, TN. Our findings explain the reasoning behind DRL-based optimization decisions under different circumstances which has been discussed and confirmed by the experts in the field.

Kotevska, Olivera↗

ACCELERATED PILOT PROJECT FOR U CANYON DEMOLITION

At the U.S. Department of Energy's Hanford Site in southeast Washington State, CH2M HILL Plateau Remediation Company (CH2M HILL) is underway on a first-of-a-kind project with the decommissioning and demolition of the U Canyon. Following the U.S. Environmental Protection Agency's Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Record of Decision for the final remediation of the canyon, CH2M HILL is combining old and new technology and techniques to prepare U Canyon for demolition. The selected remedial action called first for consolidating and grouting equipment currently in the canyon into lower levels of the plant (openings called cells), after which the cell galleries, hot pipe trench, ventilation tunnel, drains and other voids below the operating deck and crane-way deck levels will be filled with approximately 20,000 cubic yards of grout and the canyon roof and walls demolished down to the approximate level of the canyon deck. The remaining canyon structure will then be buried beneath an engineered barrier designed to control potential contaminant migration for a 500-year life. Methods and lessons learned from this project will set the stage for the future demolition of Hanford's four other canyon-type processing facilities.

54 ENVIRONMENTAL SCIENCES↗

D and D of a Large Waste Treatment Plant in Germany - 18458

With its 40 years of nuclear experience, GNS, the world leading supplier of casks for spent fuel, ILW and HLW, also offers services for conditioning and management of all types of radioactive waste, especially for the German NPP. Since 1985, GNS treats and packages ILW and LLW from the operations and phase-out of German NPP in its Duisburg plant. To enable its permanent safe final disposal, solid wastes are compacted and dried before being shipped to an interim storage facility or - later - the Konrad repository. The total premises cover 20.000 m{sup 2} (215.000 sq ft), of which 9000 m{sup 2} (97.000 sq ft) is controlled area. The Duisburg Plant has three large industrial warehouses (each 25 m x 136 m or 82 ft x 446 ft) with a total capacity of 10.200 m{sup 2} or 110.000 sqft. For the treatment of open contaminated waste, six enclosures were built. These enclosures have a special ventilation system including a specific filtration plant. In one enclosure a high compaction plant was used, in another enclosures a drying facility for drums was in operation. During peak periods, more than 900 tonne of waste were treated annually. One enclosure was mainly used for maintenance, restoration and extension of mobile facilities, which were normally used for campaigns in NPP. Due to the decreasing amount of operational waste during the nuclear phase out in Germany, GNS has decided to close the Duisburg Plant. In the first half-year of 2017, the last waste packages were treated but around 80 20'-containers are still located on site. The D and D started in January 2017. The presentation will show the first experience of decommission processes of the first three enclosures. The following steps including the techniques used will be explained in detail: - Dismantling and removal of the high compaction facility; - Dismantling and removal of the drying facility; - Cleaning and wipe tests of the empty enclosures; - Removal of the stainless steel plates of the floor; - Investigations of the lower floor parts for contamination; - Removal of contaminated underground drainpipes; - Decontamination of the concrete floor; - Dismantling of the ventilation system in three enclosures; - Dismantling of the steel constructions. An important aim during the dismantling is to reduce the amount of nuclear waste and maximize the fraction material for free release. Next to the first three enclosures, in one of the enclosure IV - VI, a 150 tons scrap shear had been installed before the construction of the enclosure building. The scrap shear has to be dismantled and handled by heavy duty lifting equipment. Only afterwards is it possible to start the decommissioning of the last three enclosures. Our goal is to transfer this very large controlled area and the whole plant to the site owner, the Duisburg Port company, after 2 years and 5 months and doing so in a way so that the industrial warehouses can be used again for all possible types of industries. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

guideline36_conformance_test 0.1

The American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) has established a set of standardized high performance sequences of operation for Heating, Ventilation and Air Conditioning (HVAC) systems in buildings through their "Guideline 36". In order to achieve the intended performance, these sequences must be translated and programmed accurately in the Building Automation System (BAS) controllers. Standardizing these sequences will allow for a more efficient product delivery mechanism where the sequences are programmed and tested centrally by each manufacturer, and then distributed to their dealers/engineering contractors. This approach would minimize the need for each installer to re-interpret and program the sequences, reduces risk of errors, and reduces the time required for commissioning in the field. To achieve this goal, a performance validation method is needed to provide independent confirmation that each manufacturer has programmed the Guideline 36 sequences accurately. A standardized method of test would also avoid the need for manual interpretation (and the associated human variability) that is required with typical functional testing approaches by automating the inputs and the range of expected responses. This software "guideline36_conformance_test" has been developed to conduct standardized, repeatable and manufacturer independent tests to validate that a BAS controller has been programmed in conformance with Guideline 36. Manufacturers would provide the controller (or the control program) and the software would run a suite of tests by setting a set of inputs to the controller and verifying the output signals from the controller matches the expected output as set by Guideline 36.

Pritoni, Marco↗

Metabolic and cardiovascular adaptation, monkey. NASA SMD 3, project 76, experiment 44 conducted at NASA/JSC, 14-25 May 1977

The biomedical results from an experiment on a monkey subjected to space flight conditions are reported. A background history of the development and testing of an experiment system designed to permit measurement of physiological parameters in subhuman primates during continuous, comfortable, couch restraint for periods of up to 30 days is reviewed. Of major importance in the experimental design of the system was the use of a fiberglass pod, which could be sealed and subdivided into upper and lower parts, to monitor and control the physiological responses for various parts of the animal's body. The experiment was conducted within the Spacelab Simulator for a period of 11 days. Data recorded includes: Spacelab Simulator cabin temperature; ventilation rate; pod internal temperature; fraction percent oxygen; fraction percent carbon dioxide; oxygen consumption rate; carbon dioxide production rate; respiratory quotient; intrathoracic temperature; heart rate; mean aortic pressure; mean ventricular pressure; diurnal variation of parameters measured; comparison of mean preflight, flight, and postflight values of the parameters measured; and correlation matrix for the parameters measured.

Pace, N.↗