Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator Design, Technology, Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Design Study of a 16-T Block Dipole for FCC

© 2016 IEEE. The Future Circular Collider (FCC) study at CERN is investigating the design of a proton-proton collider with a center of mass energy of 100 TeV and a tunnel circumference of 100 km (FCC-hh). Nb3Sn arc dipoles with 50-mm aperture and 16-T operating field are required for this application. Among the possible magnetic layouts, block coils offer attractive features, in terms of conductor packing, separation between high-field and high-stress locations, use of flat cables, and simpler geometries for windings and parts. In order to assess these potential advantages, the HD series of block-coil models was developed at LBNL. These models achieved fields of 15-16 T in technology tests, and 13-14 T in accelerator relevant configurations, with bore diameters of 36-43 mm. In this paper, we discuss the implications of increasing the bore diameter to 50 mm, which is consistent with the latest FCC-hh design targets. A detailed quench protection analysis is performed using the new coupling-loss-based CLIQ system, expanding the safe parameter space with respect to the traditional approach based on quench heaters. Finally, alternative magnet design options, and further studies required to select among them, are outlined.

Sabbi, Gianluca↗

Experimental laser wakefield acceleration scalings exceeding 100 TW

Understanding the scaling of laser wakefield acceleration (LWFA) is crucial to the design of potential future systems. A number of computational and theoretical studies have predicted scalings with laser power for various parameters, but experimental studies have typically been limited to small parameter ranges. Here, we detail extensive measurements of LWFA experiments conducted over a considerable range in power from 20 to 110 TW, which allows for a greater plasma density range and for a large number of data points. These measurements include scalings of the electron beam charge and maximum energy as functions of density as well as injection threshold density, beam charge, and total beam energy as functions of laser power. The observed scalings are consistent with theoretical understandings of operation in the bubble regime.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Magnetic and Mechanical Analysis of a Large Aperture 15 T Cable Test Facility Dipole Magnet

The US Department of Energy (DOE) Office of Science (SC), is funding a large bore “Cable Test Facility Magnet” for testing advanced cables and inserts in high transverse field. This is a joint effort between the Office of High Energy Physics (HEP) and the Office of Fusion Energy Sciences (FES). The background field magnet for this facility is being developed at Lawrence Berkeley National Laboratory (LBNL) while the cryostat and test facility will be located and operated by Fermi National Accelerator Laboratory (FNAL). The Nb 3 Sn dipole magnet, which will provide the transverse background field, is designed to generate a field of 15 T in a 100 × 150 mm bore at 1.9 K. The conceptual design of a block-type dipole with flared ends and a structure based on key-and-bladder technology will be introduced. The results of the magnetic and mechanical analysis will be presented.

43 PARTICLE ACCELERATORS↗

Topical Group on Application and Industry Community Engagement Frontier Snowmass 2021 (Summary Report)

HEP community leads and operates cutting-edge experiments for the DOE Office of Science which have challenging sensing, data processing, and computing requirements that far surpass typical industrial applications. To make necessary progress in the energy, material, and fundamental sciences, development of novel technologies is often required to enable these advanced detector and accelerator programs. Our capabilities include efficient co-design, which is a prerequisite to enable the deployment of advanced techniques in a scientific setting where development spans from rapid prototyping to robust and reliable production scale. This applies across the design spectrum from the low level fabrication techniques to the high level software development. It underpins the requirement for a holistic approach of innovation that accelerates the cycle of technology development and deployment. The challenges set by the next generation of experiments requires a collaborative approach between academia, industry and national labs. Just a single stakeholder will be unable to deliver the technologies required for the success of the scientific goals. Tools and techniques developed for High Energy Physics (HEP) research can accelerate scientific discovery more broadly across DOE Office of Science and other federal initiatives and also benefit industry applications.

43 PARTICLE ACCELERATORS↗

{sup 99}Mo Production at KIPT Neutron Source Facility

Argonne National Laboratory (ANL) and Kharkov Institute of Physics and Technology (KIPT) have cooperated on the construction of the Neutron Source Facility (NSF) at KIPT, Kharkov (Ukraine). The NSF facility consists of an electron accelerator driven system (ADS) generating 300 kW of thermal power for multiple applications, including medical isotope production. ANL performed extensive analyses including medical isotopes production, reactivity monitoring, operations and control, refueling, cold neutron source design, target design,and radiation shielding. The present study focuses on the use of the KIPT NSF for medical isotope production. Medical isotopes are radioactive isotopes with short half-lives used in diagnostic and therapeutic medical procedures. For example, brain cancer is difficult to treat by ordinary surgery and only brachytherapy with {sup 131}Cs, which has 9.7 days half-life, has shown effective results on the patients. {sup 99m}Tc is the most common medical isotope used in medical diagnoses because the wavelength of its gamma radiation (8.8 pm) is about the same as the conventional X-ray diagnostic devices. {sup 99m}Tc has 6 hours half-life, therefore it cannot be stored because it decays into {sup 99}Tc. The parent of {sup 99m}Tc is {sup 99}Mo, which has 66 hours half-life. Consequently, the delivery of {sup 99m}Tc occurs through shipping {sup 99}Mo samples to the medical facilities. The Neutron Source Facility of KIPT is the first ADS in the world operating at non-zero power and allows producing several isotopes for medical applications. The total power of the facility is about 300 kW, including ∼200 kW from fission reactions. The construction of the NSF has been already completed and operations will start during year 2016. After 20 irradiation days, {sup 82}Br, {sup 64}Cu, {sup 165}Dy, {sup 166}Ho, {sup 192}Ir, {sup 194}Ir, {sup 186}Re, {sup 188}Re and {sup 153}Sm have specific activities, larger than 100 MBq/mg without taking into account the self-shielding effect and therefore they are good candidates for production. The self-shielding effect plays an important role for all nuclide parents that have a large microscopic capture cross section. This effect reduces the reaction rate and therefore the specific activity. For instance, the analyses of molybdenum trioxide (MoO{sub 3}) irradiation samples have shown that the self-shielding effect may reduce the specific activity by a factor 1.4. The metallic form of natural molybdenum produces a higher specific activity, relative to the trioxide form. Analyses on the 6-day Ci {sup 99}Mo activity have shown that is possible to perform between 40 to 310 {sup 99m}Tc medical procedures per MoO{sub 3} irradiation week. The number of medical procedures depends on the diagnosed organ and the weight of the patient. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

KIPT ADS Target Cooling Analyses by MCNP/Fluent

This report presents multi-physics analyses of the target cooling system of the accelerator driven system (ADS) of the Kharkiv Institute of Physics and Technology (KIPT) using MCNP and Fluent computer programs. MCNP has been used to transport electrons, gammas, and neutrons, and to calculate the energy deposition in the target using a mesh-tally. The mesh-tally data have been imported in Fluent by a C subroutine that has been compiled and linked to Fluent as a user defined function. The KIPT ADS is in operation and Fluent used the CAD model from the manufacturing process of the target. The Fluent results for the reference case match very well the literature results obtained by STAR-CCM+ during the design phase. Other cases that differ from the reference one have been analyzed; in these cases, it is assumed a malfunction of the electron accelerator control or the primary water coolant pump. The target cooling system operates normally for all the analyzed cases except when the inlet water mass flow rate is decreased. If the water coolant mass flow decreases to 25%, the water maximum temperature exceeds the boiling point. However, the transient analysis showed that the target cooling system can operate for 180 seconds when the inlet water mass flow rate is decreased down by 50%.

42 ENGINEERING↗

MOC Automation with GMSEC and the Generic Extendable Message Utility (GEMU)

Automation has become critical for ground systems, improving efficiency and reliability while reducing costs across mission operations. The Goddard Mission Services Evolution Center (GMSEC) software suite has played a significant role in enabling this automation, leveraging its publish/subscribe paradigm through a message bus architecture to facilitate seamless communication and data flow. Historically, the GMSEC suite, through components like Criteria Action Table (CAT) has been pivotal in automating ground system capabilities. However, as technology advances, limitations in automation with CAT have emerged, creating an opportunity to enhance ground system automation through the introduction of GEMU. This new GMSEC component brings new capabilities and addresses specific automation constraints that CAT could not overcome, allowing for more sophisticated, flexible, and efficient message processing. GEMU, at its core, is designed to accelerate the development of custom GMSEC-compliant applications. It enables users to construct automated message processing pipelines quickly, supporting both drag-and-drop web-based configuration and scripting through a simple domain-specific language. This advancement not only simplifies the process but also reduces the time needed for implementing automated solutions. This presentation will outline GEMU’s potential value in improving mission operations automation. It will highlight the benefits of transitioning from CAT to GEMU and offer insights into how GEMU can drive operational efficiencies. We will also provide an overview of the automation capabilities of GEMU and its potential impact on mission operations centers (MOCs).

GMSEC↗

Plans for an ERL Test Facility at CERN

The baseline electron accelerator for LHeC and one option for FCC-he is an Energy Recovery Linac. To prepare and study the necessary key technologies, CERNhas started – in collaboration with JLAB and Mainz University – the conceptual design of an ERL Test Facility (ERL-TF). Staged construction will allow the study under different conditions with up to 3 passes, beam energies of up to about 1 GeV and currents of up to 50 mA. The design and development of superconducting cavity modules, including coupler and HOM damper designs, are also of central importance for other existing and future accelerators and their tests are at the heart of the current ERL-TF goals. However, the ERL-TF could also provide a unique infrastructure for several applications that go beyond developing and testing the ERL technology at CERN. In addition to experimental studies of beam dynamics, operational and reliability issues in an ERL, it could equally serve for quench tests of superconducting magnets, as physics experimental facility on its own right or as test stand for detector developments. This contribution will describe the goals and the concept of the facility and the status of the R&D.

Jensen, Erik↗

Implementation and Analysis for APR1400 Soft Control System

Due to the rapid advancement of digital technology, the definite technical advantages of digital control system compared to analog control system are accelerating the implementation of advanced distributed digital control system in the nuclear power plant. One of the major advantages of digital control system is the capability of Soft Control System. The design of Soft Control System for Advanced Power Reactor 1400 (APR1400) plant of Man-Machine Interface System (MMIS) is based on full digital technologies to enhance reliability, operability and maintainability. Computer-based compact workstation has been adopted in the APR1400 Main Control Room (MCR) to provide convenient working environment. This paper introduces the approaches and methodologies of Soft Control System for the Advanced Control Room (ACR). This paper also explains major design features for operation and display of the Soft Control System and its implementation to cope with regulatory requirements. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Low-Charge, Hard X-Ray Free Electron Laser Driven with an X-Band Injector and Accelerator

After the successful operation of the Free Electron Laser in Hamburg (FLASH) and the Linac Coherent Light Source (LCLS), soft and hard x-ray free electron lasers (FELs) are being built, designed, or proposed at many accelerator laboratories. Acceleration employing lower frequency rf cavities, ranging from L-band to C-band, is usually adopted in these designs. In the first stage bunch compression, higher-frequency harmonic rf system is employed to linearize the beam's longitudinal phase space, which is nonlinearly chirped during the lower frequency rf acceleration process. In this paper, a hard x-ray FEL design using an all X-band accelerator at 11.424 GHz (from photocathode rf gun to linac end) is presented, without the assistance of any harmonic rf linearization. It achieves LCLS-like performance at low charge using X-band linac drivers, which is more versatile, efficient, and compact than ones using S-band or C-band rf technology. It employs initially 42 microns long (rms), low-charge (10 pC) electron bunches from an X-band photoinjector. An overall bunch compression ratio of roughly 100 times is proposed in a two stage bunch compressor system. The start-to-end macroparticle 3D simulation employing several computer codes is presented in this paper, where space charge, wakefields, and incoherent and coherent synchrotron radiation effects are included. Employing an undulator with a short period of 1.5 cm, a Genesis FEL simulation shows successful lasing at a wavelength of 0.15 nm with a pulse length of 2 fs and a power saturation length as short as 20 meters, which is equivalent to LCLS low-charge mode. Its overall length of both accelerators and undulators is 180 meters (much shorter than the effective LCLS overall length of 1230 meters, including an accelerator length of 1100 meters and an undulator length of 130 meters), which makes it possible to be built in places where only limited space is available.

43 PARTICLE ACCELERATORS↗

Spaceliner Class Operability Gains Via Combined Airbreathing/ Rocket Propulsion: Summarizing an Operational Assessment of Highly Reusable Space Transports

In discussing a new NASA initiative in advanced space transportation systems and technologies, the Director of the NASA Marshall Space Flight Center, Arthur G. Stephenson, noted that, "It would use new propulsion technology, air-breathing engine so you don't have to carry liquid oxygen, at least while your flying through the atmosphere. We are calling it Spaceliner 100 because it would be 100 times cheaper, costing $ 100 dollars a pound to orbit." While airbreathing propulsion is directly named, rocket propulsion is also implied by, "... while you are flying through the atmosphere." In-space final acceleration to orbital speed mandates rocket capabilities. Thus, in this informed view, Spaceliner 100 will be predicated on combined airbreathing/rocket propulsion, the technical subject of this paper. Interestingly, NASA's recently concluded Highly Reusable Space Transportation (HRST) study focused on the same affordability goal as that of the Spaceliner 100 initiative and reflected the decisive contribution of combined propulsion as a way of expanding operability and increasing the design robustness of future space transports, toward "aircraft like" capabilities. The HRST study built on the Access to Space Study and the Reusable Launch Vehicle (RLV) development activities to identify and characterize space transportation concepts, infrastructure and technologies that have the greatest potential for reducing delivery cost by another order of magnitude, from $1,000 to $100-$200 per pound for 20,000 lb. - 40.000 lb. payloads to low earth orbit (LEO). The HRST study investigated a number of near-term, far-term, and very far-term launch vehicle concepts including all-rocket single-stage-to-orbit (SSTO) concepts, two-stage-to-orbit (TSTO) concepts, concepts with launch assist, rocket-based combined cycle (RBCC) concepts, advanced expendable vehicles, and more far term ground-based laser powered launchers. The HRST study consisted of preliminary concept studies, assessments and analysis tool development for advanced space transportation systems, followed by end-to-end system concept definitions and trade analyses, specific system concept definition and analysis, specific key technology and topic analysis, system, operational and economics model development, analysis, and integrated assessments. The HRST Integration Task Force (HITF) was formed to synthesize study results in several specific topic areas and support the development of conclusions from the study: Systems Concepts Definitions, Technology Assessment, Operations Assessment, and Cost Assessment. This paper summarizes the work of the Operations Assessment Team: the six approaches used, the analytical tools and methodologies developed and employed, the issues and concerns, and the results of the assessment. The approaches were deliberately varied in measures of merit and procedure to compensate for the uncertainty inherent in operations data in this early phase of concept exploration. In general, rocket based combined cycle (RBCC) concepts appear to have significantly greater potential than all-rocket concepts for reducing operations costs.

Nix, Michael B.↗

Cryogenic storage technology readiness for First Lunar Outpost

The topics are presented in viewgraph form and include the following: an assessment of cryogenic storage technology; cryogenic boiloff predictions; Space Shuttle/Centaur thermodynamic vent system; zero-g thermodynamic vent system; heat exchanger/mixer pump module; the thick multilayer insulation (MLI) development program; blanket geometry concept evaluations; four-inch thick MLI system on 1/4-scale test tank; combined environments of vibration, acceleration, and temperature testing (CEVAT); Centaur fixed foam insulation; insulation system design; and fixed foam on operational Atlas 2.

John R. Schuster↗

Accelerator-driven X-ray Sources

After an introduction which mentions x-ray tubes and storage rings and gives a brief review of special relativity, the subject is treated under the following topics and subtopics: synchrotron radiation (bending magnet radiation, wiggler radiation, undulator radiation, brightness and brilliance definition, synchrotron radiation facilities), x-ray free-electron lasers (linac-driven X-ray FEL, FEL interactions, self-amplified spontaneous emission (SASE), SASE self-seeding, fourth-generation light source facilities), and other X-ray sources (energy recovery linacs, Inverse Compton scattering, laser wakefield accelerator driven X-ray sources. In summary, accelerator-based light sources cover the entire electromagnetic spectrum. Synchrotron radiation (bending magnet, wiggler and undulator radiation) has unique properties that can be tailored to the users’ needs: bending magnet and wiggler radiation is broadband, undulator radiation has narrow spectral lines. X-ray FELs are the brightest coherent X-ray sources with high photon flux, femtosecond pulses, full transverse coherence, partial temporal coherence (SASE), and narrow spectral lines with seeding techniques. New developments in electron accelerators and radiation production can potentially lead to more compact sources of coherent X-rays.

43 PARTICLE ACCELERATORS↗

Large area, high spatial resolution tracker for new generation of high luminosity experiments in Hall A at Jefferson Lab

In 2014 the CEBAF electron accelerator at Jefferson Lab (JLab) will deliver a longitudinally polarized (up to 85%), high intensity (up to 100 μA) beam with maximum energy of 12 GeV, twice the present value. To exploit the new opportunities that the energy upgrade will offer, a new spectrometer (Super BigBite - SBS) is under development, featuring very forward angle, large acceptance and ability to operate in high luminosity environment. The tracking system of SBS will consist of large area (40×150 cm2 and 50×200 cm2), high spatial resolution (better than 100 μm) chambers based on the GEM technology and 2 small (10×20 cm) Silicon Strip Detector planes. The design of the GEM chambers and its sub-components such as the readout electronics is resented here.

43 PARTICLE ACCELERATORS↗

A Full-scale Demonstration of Pressurized Water Reactor Core Design Optimization using Multi-Cycle Optimization Methodology

The U.S. nuclear sector encounters a difficulty in upholding essential safety standards while also securing economic viability for continued operation. Safety stands as a pivotal factor across all facets of operations within light-water reactor nuclear power plants. Achieving economic feasibility alongside safety can be facilitated through the utilization of a risk-informed framework, exemplified by the ongoing development within the Risk-Informed Systems Analysis Pathway under the auspices of the U.S. Department of Energy's LWRS Program. This initiative advocates for a diverse array of research and development endeavors aimed at optimizing both safety and economic efficacy within nuclear power plants, particularly pertinent as many plants contemplate second license renewals. The Risk-Informed Systems Analysis Pathway has two main goals: deploy methodologies and technologies that better represent safety margins and cost and safety factors and develop advanced applications that enable cost-effective plant operation. This report assesses the potential for resolving multi-cycle plant reload challenges through real-world scenarios utilizing the Plant ReLoad Optimization (PRLO) framework. This framework offers reactor core design developers analytic tools of reactor safety and fuel performance with the assistance of artificial intelligence (AI) to enhance core design solutions. Multi-objective genetic algorithm alongside acceleration techniques is explored as an enabling technology for improving fuel efficiency while upholding safety thresholds. The demonstration of multi-cycle core design optimization is performed. This report investigates the practical application of the PRLO platform in addressing real-world core design challenges, supporting AI efforts, and contrasting outcomes with those derived from heuristic or conventional algorithms.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

WIRE-21 Sensor Irradiation Experiment Ready for HFIR Insertion

The ability to deploy new nuclear fuels for current or future reactor concepts requires a wealth of data regarding fuel performance during normal operation, anticipated operational occurrences, and design-basis accidents. Most of these data have historically been collected during experiments in materials test reactors, ideally with online instrumentation to collect as much data as possible. However, advanced instrumentation could also allow for in situ monitoring of fuel operating conditions during commercial reactor operation to maximize fuel utilization, reduce unnecessary conservativism in design margins, and improve operator understanding of limiting peaking factors. The latter approach would complicate fuel handling, particularly during refueling, unless the instrumentation could be placed inside the fuel rods and transmitted wirelessly to a receiver located outside the fuel’s primary pressure boundary. To this end, Westinghouse Electric Company (WEC) developed wireless sensors based on inductive coupling that can transmit information regarding fuel centerline temperatures and rod internal pressures wirelessly from within a fuel rod to a nearby instrument thimble. After testing these sensors in lower-power university research reactors, the next step is to perform high neutron fluence testing to characterize the performance of these wireless sensors under conditions that are more representative of the intended application—in this case, light-water reactors (LWRs). The removable Be (RB) positions of the High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) provide the neutron flux, experiment volume, and access to instrument leads required to achieve these sensor testing goals. This report summarizes the design, analysis, and assembly of the Wireless Instrumented RB Experiment 2021 (WIRE-21). This is the most highly instrumented irradiation experiment ever performed in HFIR. The experiment will use seven different sensing techniques to measure temperature, pressure, neutron flux, and neutron fluence during reactor operation. In addition to WEC’s wireless temperature and pressure sensors, WIRE-21 includes an array of thermocouples, self-powered neutron detectors, spatially distributed fiber optic temperature sensors, passive SiC temperature monitors, and flux wires. The design of WIRE-21 and the cabling that was installed in HFIR also provide the infrastructure to enable accelerated, economical testing of advanced sensor technologies while leveraging the extremely high neutron flux that is available in HFIR. The containment for WIRE-21 is similar to previous RB irradiation vehicles but includes a few modifications, most notably the use of integrated compression seals to pass a larger number of sensor leads through the experiment’s pressure boundary. In addition to the sensor leads, inert gas lines are passed into the experiment to enable active temperature control and the ability to pneumatically actuate a bellows-driven pressure sensor. WIRE-21 is targeting component temperatures (300–350°C) and neutron fluence levels (~10 22 n/cm 2 ) that would be expected in the plenum region of LWR fuels, except for the active sensing region of the wireless temperature sensor, which is targeting LWR fuel centerline temperatures (~800–1,100°C). WIRE-21 was successfully assembled, passed all nondestructive examination, and was delivered to HFIR for insertion during upcoming cycle 498 (April 2022).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Well-to-wheels analysis of energy use and greenhouse gas emissions of plug-in hybrid electric vehicles.

Plug-in hybrid electric vehicles (PHEVs) are being developed for mass production by the automotive industry. PHEVs have been touted for their potential to reduce the US transportation sector's dependence on petroleum and cut greenhouse gas (GHG) emissions by (1) using off-peak excess electric generation capacity and (2) increasing vehicles energy efficiency. A well-to-wheels (WTW) analysis - which examines energy use and emissions from primary energy source through vehicle operation - can help researchers better understand the impact of the upstream mix of electricity generation technologies for PHEV recharging, as well as the powertrain technology and fuel sources for PHEVs. For the WTW analysis, Argonne National Laboratory researchers used the Greenhouse gases, Regulated Emissions, and Energy use in Transportation (GREET) model developed by Argonne to compare the WTW energy use and GHG emissions associated with various transportation technologies to those associated with PHEVs. Argonne researchers estimated the fuel economy and electricity use of PHEVs and alternative fuel/vehicle systems by using the Powertrain System Analysis Toolkit (PSAT) model. They examined two PHEV designs: the power-split configuration and the series configuration. The first is a parallel hybrid configuration in which the engine and the electric motor are connected to a single mechanical transmission that incorporates a power-split device that allows for parallel power paths - mechanical and electrical - from the engine to the wheels, allowing the engine and the electric motor to share the power during acceleration. In the second configuration, the engine powers a generator, which charges a battery that is used by the electric motor to propel the vehicle; thus, the engine never directly powers the vehicle's transmission. The power-split configuration was adopted for PHEVs with a 10- and 20-mile electric range because they require frequent use of the engine for acceleration and to provide energy when the battery is depleted, while the series configuration was adopted for PHEVs with a 30- and 40-mile electric range because they rely mostly on electrical power for propulsion. Argonne researchers calculated the equivalent on-road (real-world) fuel economy on the basis of U.S. Environmental Protection Agency miles per gallon (mpg)-based formulas. The reduction in fuel economy attributable to the on-road adjustment formula was capped at 30% for advanced vehicle systems (e.g., PHEVs, fuel cell vehicles [FCVs], hybrid electric vehicles [HEVs], and battery-powered electric vehicles [BEVs]). Simulations for calendar year 2020 with model year 2015 mid-size vehicles were chosen for this analysis to address the implications of PHEVs within a reasonable timeframe after their likely introduction over the next few years. For the WTW analysis, Argonne assumed a PHEV market penetration of 10% by 2020 in order to examine the impact of significant PHEV loading on the utility power sector. Technological improvement with medium uncertainty for each vehicle was also assumed for the analysis. Argonne employed detailed dispatch models to simulate the electric power systems in four major regions of the US: the New England Independent System Operator, the New York Independent System Operator, the State of Illinois, and the Western Electric Coordinating Council. Argonne also evaluated the US average generation mix and renewable generation of electricity for PHEV and BEV recharging scenarios to show the effects of these generation mixes on PHEV WTW results. Argonne's GREET model was designed to examine the WTW energy use and GHG emissions for PHEVs and BEVs, as well as FCVs, regular HEVs, and conventional gasoline internal combustion engine vehicles (ICEVs). WTW results are reported for charge-depleting (CD) operation of PHEVs under different recharging scenarios. The combined WTW results of CD and charge-sustaining (CS) PHEV operations (using the utility factor method) were also examined and reported. According to the utility factor method, the share of vehicle miles traveled during CD operation is 25% for PHEV10 and 51% for PHEV40. Argonne's WTW analysis of PHEVs revealed that the following factors significantly impact the energy use and GHG emissions results for PHEVs and BEVs compared with baseline gasoline vehicle technologies: (1) the regional electricity generation mix for battery recharging and (2) the adjustment of fuel economy and electricity consumption to reflect real-world driving conditions. Although the analysis predicted the marginal electricity generation mixes for major regions in the United States, these mixes should be evaluated as possible scenarios for recharging PHEVs because significant uncertainties are associated with the assumed market penetration for these vehicles. Thus, the reported WTW results for PHEVs should be directly correlated with the underlying generation mix, rather than with the region linked to that mix.

02 PETROLEUM↗

Design, construction and commissioning of the proximity cryogenics systems serving two large-scale prototypes of the future DUNE neutrino detector

In the context of the Neutrino Platform, CERN has designed, constructed, and commissioned the proximity cryogenics systems that serve two CERN based large-scale prototypes of future neutrino detectors. Each of these prototypes features a high voltage time projection chamber placed inside a membrane cryostat being submerged in 600m3 of liquid argon at about 1.0 bar. A copper and molecular sieve based cryogenic purification system has to ensure that the argon in the cryostat has a contamination level below 100 ppt oxygen equivalent. The two proximity cryogenics systems provide the purging, cool-down, filling, normal operation and emptying modes for each cryostat. This paper reports on the design, construction and commissioning of the ProtoDUNE proximity cryogenics facilities.

43 PARTICLE ACCELERATORS↗