Search NASASearch

SEARCH · Search NASA

Results for “COMPUTER PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

652 records · Page 37

ARCTRON: A Rapid Experimental Proving Ground for TPS Experiments and Arcjet Technology Development

Innovation in high-enthalpy facilities is fundamentally limited by the cost and risk of experimentation. New concepts for plasma control, diagnostics, facility components, and plasma-material interaction often require repeated iterations that are impractical to perform in production arcjets. As a result, promising ideas may remain unexplored or reach operational facilities only after significant development effort. ARCTRON is being developed as a rapid experimental proving ground where new ideas in plasma science, arcjet engineering, diagnostics, and material response can be conceived, tested, and quantitatively evaluated before transition to large-scale facilities. The platform combines radio-frequency (RF) and DC arc plasma generation, externally applied magnetic fields, configurable gas composition, reduced-pressure operation, laser heating, electrical biasing, and modular diagnostic access. These capabilities permit the plasma source, applied forcing, test article, and measurement configuration to be modified independently, allowing individual physical mechanisms to be isolated more readily than in a traditional test environment. One class of investigations addresses fundamental plasma-surface interaction physics. Conventional material tests often expose a specimen simultaneously to convective heating, reactive species, pressure, shear, radiation, and surface-current effects. The resulting material response may be measured accurately, while the contribution of each mechanism remains difficult to identify. ARCTRON is designed to vary these effects selectively. Plasma chemistry can be changed independently through configurable gas mixtures; magnetic fields and electrical biasing can modify charged-particle transport; laser heating can provide a non-plasma thermal input; and pressure, flow, and discharge mode can be varied over a broad operating space. This enables controlled tests of hypotheses involving surface catalycity, reactive-species transport, plasma-assisted oxidation, electromagnetic effects, shear, and the relative contributions of thermal and chemical loading. A second class of investigations enabled by this approach concerns the engineering of high-enthalpy facilities themselves. Arc-heated facilities are limited by electrode erosion, unstable arc attachment, localized heating, and damage to nozzles and other plasma-facing components. ARCTRON provides a lower-cost environment for testing concepts intended to mitigate these limitations. Candidate investigations include the use of applied magnetic fields to alter current paths and reduce plasma interaction with nozzle walls, ExB forcing to introduce controlled plasma rotation, magnetic or geometric approaches for distributing arc attachment, and alternative electrode or discharge configurations intended to reduce erosion and improve stability. Because the platform is reconfigurable, these concepts can be evaluated through repeated design--build--test cycles before they are considered for implementation in operational facilities. The platform also supports the development and validation of diagnostics that may be difficult to introduce initially into a large arcjet. Current and planned measurements include spatially resolved optical emission spectroscopy, electrostatic probes, fast imaging, pyrometry, calorimetry, laser-induced fluorescence, and absorption spectroscopy. These diagnostics are intended not merely to document a nominal operating condition, but to constrain the local plasma state and its relationship to component or material response. The modular facility geometry allows diagnostic concepts to be tested, calibrated, and compared under repeatable conditions before deployment in more demanding environments. ARCTRON is also supported by an integrated software suite. Automated control and data acquisition allow discharge parameters, gas composition, magnetic fields, diagnostic timing, and test configuration to be recorded as part of each experiment (STARDAC - Software for Testing, Analysis, Research Data, and Control). The Backend for Experiment Analysis, Storage, and Traceability (BEAST) is a database that provides the infrastructure needed to associate heterogeneous measurements with facility configuration, specimen identity, calibration state, geometry, and analysis provenance. This backend is particularly important for exploratory campaigns, in which many related configurations may be tested, and the value of an individual experiment depends on its connection to earlier and subsequent iterations. Complementary analysis capabilities, including computer-vision-based transient response measurements (arcjetCV), three-dimensional surface reconstruction (STARSCAN), and model-based Bayesian inference (SHIELD), and tomography data analysis (TOMATO, PuMA) can be incorporated when required by a specific hypothesis without becoming the focus of every campaign. The central objective of ARCTRON is therefore not to maximize heat flux or reproduce a complete flight environment. Its purpose is to reduce the cost and time required to ask consequential questions about plasma behavior, plasma-facing materials, diagnostics, and arcjet technology. By providing a controlled environment for rapid reconfiguration, mechanism isolation, quantitative measurement, and iterative engineering, ARCTRON can help mature concepts that would otherwise remain too speculative or too risky for evaluation in production facilities. The resulting knowledge can then guide the design of material models, focus test objectives in larger arcjets, reduce facility-development risk, and improve the physical basis of high-enthalpy ground testing. This work will present the ARCTRON architecture, operating modes, diagnostic suite, and digital experimental workflow. Initial experimental results from the first integrated operation of the facility will be presented, including flow characterization, power limitations, and deployment of the initial diagnostic suite. Ongoing development efforts aimed at catalycity characterization, magnetic plasma control, and advanced optical diagnostics will also be discussed, illustrating how the platform supports rapid iteration from concept to experiment.

experimental diagnostics

Water Observations of Flow/No-Flow for the East-Taylor Watershed, Colorado (June-July 2025 and 2026)

This dataset provides multi-year, ground-truth visual observations of surface water flow/no-flow conditions within the East-Taylor Watershed, Colorado, collected during June and July of 2025 and 2026. In June and July 2025, on-the-ground visual observations of flow/no-flow were collected as part of the Watershed Function Scientific Focus Area (SFA) and Rocky Mountain Biological Laboratory (RMBL) Colorado Headwaters Ecological Spectroscopy Study (CHESS) campaign (further details are provided within the CHESS Project Description). We obtained 377 water observations of flow/no-flow within the East-Taylor Watershed, Colorado. These ground-truth observations were collected to validate classification maps from remote sensing data and model results within the East-Taylor Watershed. In 2025, flow/no-flow measurements were collected using a field-based app for the CHESS Campaign (Zerion iForm). Within the field app, a water observation form was created to collect coordinates and metadata about the observation. Information collected for the water observation points included information about visually-assessed streamflow presence/absence (standard question obtained from Colorado State University’s StreamTracker project), flow estimate, stream or ponded area width, canopy cover, manganese films, iron seeps, and beaver activity. For 2025 water observations, this dataset contains: (1) a data file with the water observations and coordinates (2025_Water_Observations.csv); (2) a Keyhole Markup Language Zipped (KMZ) with the water observation locations and metadata (2025_Water_Observations_Locations.kmz); (3) photos (.jpg and .jpeg) of the water observation points, organized by location, contained within 2025_Water_Observations_FieldPhotographs.zip file; and (4) water observation protocols and figures (2025_Water_Observation_Protocols.pdf). In June and July 2026, on-the-ground visual observations of flow/no-flow were collected as part of the Watershed Function SFA project. We obtained 365 water observations of flow/no-flow within the East-Taylor Watershed, Colorado. The 2026 observations focused on collecting repeat measurements at the 2025 flow/no-flow observation locations conducted as part of the CHESS campaign. These ground-truth observations were collected to understand differences in flow/no-flow in 2026, given the unprecedented 2026 drought in Colorado. In 2026, flow/no-flow measurements were collected using ArcGIS (Geographic Information System) Survey123. Within the field app, a water observation form was created to collect coordinates and metadata about the observation. Information collected for the water observation points included repeat information from the 2025 water observation effort, including visually-assessed streamflow presence/absence (standard question obtained from Colorado State University’s StreamTracker project), flow estimate, stream or ponded area width, canopy cover, manganese films, iron seeps, beaver activity, and a new metadata component of estimated stream depth (for select locations). For 2026 water observations, this dataset contains: (1) a data file with the water observations and coordinates (2026_Water_Observations.csv); (2) a Keyhole Markup Language Zipped (KMZ) with the water observation locations and metadata (2026_Water_Observations_Locations.kmz); (3) photos (.jpg) of the water observation points, organized by location, contained within 2026_Water_Observations_FieldPhotographs.zip file; and (4) water observation protocols and figures (2026_Water_Observation_Protocols.pdf). For 2025 and 2026 water observations, this dataset contains: (1) a location metadata file (locations.csv); (6) a file-level metadata (flmd.csv) file that lists each file contained in the dataset with associated metadata; and (7) a data dictionary (dd.csv) file that contains column/row headers used throughout the files along with a definition, units, and data type. CHESS Project Description: The Colorado Headwaters Ecological Spectroscopy Study (CHESS) comprised a multi-week airborne remote sensing and field observation campaign in the Upper Gunnison Basin, Colorado, conducted in June and July of 2025. Airborne remote sensing was conducted by the National Ecological Observatory Network Airborne Observation Platform (NEON AOP), concurrent with a field campaign run by the Rocky Mountain Biological Laboratory (RMBL), the Lawrence Berkeley National Laboratory (LBNL) and SLAC National Accelerator Laboratory Watershed Function Science Focus Area (SFA), and NASA-JPL (Jet Propulsion Laboratory) Earth Surface Mineral Dust Source Investigation (EMIT) program. Between June 10 and July 18, 2025, the NEON AOP flight team collected high-resolution aerial imaging spectroscopy and Light Detection and Ranging (LiDAR) data over three domains: the Upper East River (CRBU), Almont Triangle (ALMO), and the Upper Taylor Basin (UPTA). In coordination with the flights, a field campaign acquired ground-truth observations, including observations of vegetation composition, foliar traits, forest demography, and subsurface properties in 18 core sampling areas within the domains. Additional surface water observations were taken at over 380 point locations. All CHESS campaign datasets can be found within the CHESS ESS-DIVE data portal: https://data.ess-dive.lbl.gov/portals/chess. This work was supported by the Watershed Function Science Focus Area at Lawrence Berkeley National Laboratory funded by the US Department of Energy, Office of Science, Biological and Environmental Research under Contract No. DE-AC02-05CH11231. 2026-09-02: This dataset was updated to include 2026 water observation measurements. The 2025 observation files were also updated to ensure a consistent file naming convention across water observation years.

2018 NEON and 2025 CHESS Campaigns

Ares I-X Ground Diagnostic Prototype

Automating prelaunch diagnostics for launch vehicles offers three potential benefits. First, it potentially improves safety by detecting faults that might otherwise have been missed so that they can be corrected before launch. Second, it potentially reduces launch delays by more quickly diagnosing the cause of anomalies that occur during prelaunch processing. Reducing launch delays will be critical to the success of NASA's planned future missions that require in-orbit rendezvous. Third, it potentially reduces costs by reducing both launch delays and the number of people needed to monitor the prelaunch process. NASA is currently developing the Ares I launch vehicle to bring the Orion capsule and its crew of four astronauts to low-earth orbit on their way to the moon. Ares I-X will be the first unmanned test flight of Ares I. It is scheduled to launch on October 27, 2009. The Ares I-X Ground Diagnostic Prototype is a prototype ground diagnostic system that will provide anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage thrust vector control (TVC) and for the associated ground hydraulics while it is in the Vehicle Assembly Building (VAB) at John F. Kennedy Space Center (KSC) and on the launch pad. It will serve as a prototype for a future operational ground diagnostic system for Ares I. The prototype combines three existing diagnostic tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool that is commercially produced by Qualtech Systems, Inc. It uses a qualitative model of failure propagation to perform fault isolation and diagnostics. We adapted an existing TEAMS model of the TVC to use for diagnostics and developed a TEAMS model of the ground hydraulics. The second tool, Spacecraft Health Inference Engine (SHINE), is a rule-based expert system developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification. The prototype uses the outputs of SHINE as inputs to TEAMS. The third tool, the Inductive Monitoring System (IMS), is an anomaly detection tool developed at NASA Ames Research Center and is currently used to monitor the International Space Station Control Moment Gyroscopes. IMS automatically "learns" a model of historical nominal data in the form of a set of clusters and signals an alarm when new data fails to match this model. IMS offers the potential to detect faults that have not been modeled. The three tools have been integrated and deployed to Hangar AE at KSC where they interface with live data from the Ares I-X vehicle and from the ground hydraulics. The outputs of the tools are displayed on a console in Hangar AE, one of the locations from which the Ares I-X launch will be monitored. In a previous publication, we discussed how we selected the three tools based primarily on their ability to be certified for human spaceflight and described our plans for the prototype. This abstract is due October 23, 2009, and the Ares I-X launch is currently scheduled for October 27, 2009. If this abstract is accepted, then the full paper will describe how the prototype performed before the launch. It will include an analysis of the prototype's accuracy, including false-positive rates, false-negative rates, and receiver operating characteristics (ROC) curves. It will also include a description of the prototype's computational requirements, including CPU usage, main memory usage, and disk usage. If the prototype detects any faults during the prelaunch period then the paper will include a description of those faults. Similarly, if the prototype has any false alarms then the paper will describe them and will attempt to explain their causes. Also, the paper will describe the three tools and how they are used in the prototype. It will include a description of the TEAMS models of the Ares I-X first-stage TVC and associated ground hydraulics and how we adapted the TVC model for use in real-time diagnostics. It will describe the SHINE rules used for fault detection and mode identification and the software architecture that interfaces the various pieces of existing software that are part of the prototype to one another. It will describe how we selected the sensor values and commands that were used to train the IMS model and how we optimized the number of clusters in the IMS model. It will include screen shots of the graphical display that we developed in Java to display the outputs of the three tools. Because Ares I-X data was not yet available to us while we were developing the prototype, we used historical data from the Space Shuttle's Solid Rocket Booster (SRB) TVCs and the associated ground hydraulics to train IMS and to test the entire prototype. Because most of the failure modes that we modeled have never occurred in the Shuttle we inserted simulated failures into the Shuttle data. The Ares I-X first-stage TVC is very similar to the SRB TVC and we expect the data will be very similar. After the launch, we will determine how similar the data actually is and report how any differences in the data affected the diagnostic accuracy of the prototype. Finally, although we did not get the prototype certified, we designed it in a way that it could be certified and wrote a preliminary certification plan. The paper will include a brief summary of how we considered the need for certification in the design of the prototype, how we tested the prototype before deploying it to Hangar AE, and how we would propose to get it certified if it were deployed as an operational system. The paper will conclude with a description of some of the challenges we faced and some of the lessons learned in developing and deploying the prototype.

International Space Station

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI