Search NASA⌕ Search

SEARCH · Search NASA

Results for “Fermilab”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

The Design, Construction and Testing of the Straw Tracking Detectors for the E989 Muon g-2 Experiment at Fermilab.

The requirement of science, to stretch the boundaries and our understanding of the standard model,is the driving force for the continuous development of our knowledge of the building blocks of theUniverse. Experiments are designed, built and tested to support the theories of the mathematiciansof the physics community and the theorists help interpret the experimental results, looking foravenues of new physics. However, as is known in both science and human nature, nothing is everperfect - there is always room for improvement.The E989 Muon g-2 Collaboration experiment at Fermi National Accelerator Laboratory (otherwiseknown as Fermilab), aims to quantify the muon anomalous magnetic moment to unprecedentedprecision and looks to increase the accuracy of the measurement by fourfold of the predecessorexperiment - E821 at Brookhaven. The discrepancy between the theoretical prediction of theanomalous magnetic moment of the muon and the experimental results, has given tantalisingindication of new physics, prompting an ”upgrade” for systematic accuracy on the E821.The particular focus of this thesis details the design, construction and quality testing of the strawtracking modules for the E989 experiment. The author was one of the dedicated technicians whobuilt and tested the tracker modules at the University of Liverpool High Energy Physics (HEP)department, she built and quality tested the modules, wrote the procedural document for the buildand subsequently was involved in the Run I startup, shut down and data taking shifts (for Run Iand Run II) which contributed to the recent release of the first unblinded data.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Simulation of Cascaded Longitudinal-Space-Charge Amplifier at the Fermilab Accelerator Science & Technology (Fast) Facility

Cascaded Longitudinal Space Charge Amplifiers (LSCA) have been proposed as a mechanism to generate density modulation over a board spectral range. The scheme has been recently demonstrated in the optical regime and has confirmed the production of broadband optical radiation. In this paper we investigate, via numerical simulations, the performance of a cascaded LSCA beamline at the Fermilab Accelerator Science & Technology (FAST) facility to produce broadband ultraviolet radiation. Our studies are carried out using elegant with included tree-based grid-less space charge algorithm.

43 PARTICLE ACCELERATORS↗

High Spectral Density Compton Back-Scattered Gamma-Ray Sources at Fermilab

A ~1 MeV gamma-ray source is planned to be built at Fermilab following the completion of the ~300 MeV superconducting linac. The high-energy photons are back-scattered from the interactions between electrons and high-intensity IR laser pulses. In this contribution, we discuss some of the experiment design challenges and evaluate the performances of the gamma-ray source. We expect the peak brilliance to be of the order of 10²² photons/s-(mm-mrad)²-0.1\% BW and the spectral density of the radiation in excess of 3x10⁵ photons/s/eV.

43 PARTICLE ACCELERATORS↗

Fermilab - The Proton Improvement Plan (PIP)

The Fermilab Proton Source is composed of three machines: an injector line, a normal conducting Linac and a Booster synchrotron. The proton improvement plan was proposed in 2012 to address the necessary accelerator upgrades and hardware modification to allow an increase in proton throughput, while maintaining acceptable activation levels, ensuring viable operation of the proton source to sustain the laboratory HEP program. A summary of work performed and respective results will be presented.

43 PARTICLE ACCELERATORS↗

Measurement of Stability Diagram at IOTA at Fermilab

Nonlinear focusing elements can enhance the stability of particle beams in high-energy colliders by means of Landau Damping, through the tune spread which is introduced. We propose an experiment at Fermilab’s Integrable Optics Test Accelerator (IOTA) to investigate the influence of nonlinear focusing elements on the transverse stability of the beam. In this experiment, we employ an anti-damper, an active transverse feedback system, as a controlled mechanism to induce coherent beam instability. By utilizing the anti-damper, we can examine the impact of the nonlinear focusing element on the beam’s transverse stability. The stability diagram, a tool used to determine the system’s stability, will be measured using a recently demonstrated method at the LHC. This measurement is carried out experimentally by selecting specific threshold gains and measuring them for a range of phases. The stability diagram is represented by gei¿ on the complex plane. The experiment at IOTA adds insight towards the stability diagram measurement method by supplying a reduced machine impedance, to investigate the impedance’s effect on the stability diagram, as well as a larger range of phase measurements.

43 PARTICLE ACCELERATORS↗

Investigation of Tail-dominated Instability in the Fermilab Recycler Ring

In our recent operational run, a single bunch, tail-dominated instability was observed in the Fermilab Recycler ring. This instability exclusively occurs in the vertical plane when the chromaticity is close to zero. In this study, we conduct a detailed analysis of this instability under different operational parameters. We investigate the impact of space charge on the head-tail motion and propose potential interpretations of the underlying mechanism of the instability. Moreover, we explore methods to mitigate this instability in the future.

43 PARTICLE ACCELERATORS↗

Beam Instrumentation at the Fermilab IOTA Ring

The Integrable Optics Test Accelerator (IOTA) is a storage ring located at the end of the Fermilab Accelerator Science and Technology (FAST) facility. The complex is intended to support accelerator R&D for the next generation of particle accelerators. The IOTA ring is currently operating with 100 MeV electrons injected from the FAST Linac and will also receive 2.5 MeV protons from the IOTA Proton Injector currently being installed. The current instrumentation and results from the first electron commissioning run will be presented along with future plans.

43 PARTICLE ACCELERATORS↗

Beam Instrumentation Challenges for the Fermilab PIP-II Accelerator

Fermilab is undertaking the development of a new 800 MeV superconducting RF linac to replace it’s present normal conducting 400 MeV linac. The PIP-II linac warm front-end consists of an ion source, LEBT, RFQ and MEBT which includes an arbitrary pattern bunch chopper, to generate a 2.1 MeV, 2mA H⁻ beam. This is followed immediately by a series of superconducting RF cryomodules to produce a 800 MeV beam. Commissioning, operate and safety present challenges to the beam instrumentation. This paper describes these beam instrumentation challenges and the choices made for PIP-II.

43 PARTICLE ACCELERATORS↗

Beam Position Monitoring System for Fermilab’s Muon Campus

A Beam Position Monitor (BPM) system has been designed for Fermilab Muon Campus. The BPM system measures Turn-by-Turn orbits as well as Closed Orbits (average of multiple turns). While in the early commissioning phase of this program, preliminary measurements have been made using these BPMs. This paper discusses the design and implementation of these BPMs.

43 PARTICLE ACCELERATORS↗

Space-Charge and Other Effects in Fermilab Booster and IOTA Rings’ Ionization Profile Monitors

Ionization profile monitors (IPMs) are widely used in accelerators for non-destructive and fast diagnostics of high energy particle beams. At low beam intensities, initial velocities of the secondaries to collect (ions or electrons) result in the IPM profile smearing. At high beam intensities, the space-charge forces make the measured IPM profiles significantly different from those of the beams. We analyze dynamics of the secondaries in IPMs, describe an effective algorithm to reconstruct the beam sizes from the measured IPM profiles and apply it to the Fermilab 8 GeV proton Booster and 70 MeV/c IOTA ring IPMs.

Shiltsev, Vladimir D.↗

Progress on an Electron Beam Profile Monitor at the Fermilab Main Injector

The current program at Fermilab involves the construction of a new superconducting linear accelerator (LINAC) to replace the existing warm version. The new LINAC, together with other planned improvements, is in support of proton beam intensities in the Main Injector (MI) that will exceed 2 MW. Measuring the transverse profiles of these high intensity beams in a ring requires non-invasive techniques. The MI uses ionization profile monitors as its only profile system. An alternative technique involves measuring the deflection of a probe beam of electrons with a trajectory perpendicular to the proton beam. This type of device was installed in MI and initial studies of it have been previously presented. This paper will present the status and recent studies of the device utilizing different techniques.

43 PARTICLE ACCELERATORS↗

Software Architecture for Next Generation Beam Position Monitors at Fermilab

The Fermilab Accelerator Division / Instrumentation Department develops Beam Position Monitor (BPM) systems in-house to support its sprawling accelerator complex. Two new BPM systems have been deployed and another upgraded over the last two years. These systems are based on a combination of VME and Gigabit Ethernet connected hardware and a common Linux-based embedded software platform with modular components. The architecture of this software platform and the considerations for adapting to future machines or upgrade projects will be described.

43 PARTICLE ACCELERATORS↗

EPICS Deployment at Fermilab

Fermilab has traditionally not been an EPICS house, as such expertise in EPICS is limited and scattered. However, PIP-II will be using EPICS for its control system. Furthermore, when PIP-II is operating, it must to interface with the existing, though modernized (see ACORN) legacy control system. We have developed and deployed a software pipeline that addresses these needs and presents to developers a tested and robust software framework, including template IOCs from which new developers can quickly gain experience. In this presentation, we will discuss the motivation for this work, the implementation of a continuous integration/continuous deployment pipeline, testing, template IOCs, and the deployment of user applications. We will also discuss how this is used with the current PIP-II teststand and lessons learned.

43 PARTICLE ACCELERATORS↗

Realistic Modeling of the Muon g-2 Experiment Beamlines at Fermilab

The main goal of the Muon g-2 Experiment at Fermilab (E989) is to measure the muon anomalous magnetic moment (a, also dubbed as the "anomaly’’) to unprecedented precision. This new measurement will allow to test the completeness of the Standard Model (SM) and to validate other theoretical models beyond the SM. Simulations of the beamlines from the pion production target to the entrance of the g-2 Storage Ring using COSY INFINITY contribute to the understanding and characterization of the muon beam production in relation to the statistical and systematics uncertainties of the E989 measurement. The effect of nonlinearites from fringe fields and high-order contributions on the beam delivery system performance are considered, as well as interactions with the beamline elements apertures, particle decay channels, spin dynamics, and beamline misalignments.

43 PARTICLE ACCELERATORS↗

SRF Systems for ASTA at Fermilab

The Advanced Superconducting Test Accelerator (ASTA) at Fermilab now being commissioned is comprised of a number of superconducting RF systems including single-cavity cryomodules and a TESLA/ILC style 8-cavity cryomodule. Two of them, 'Capture Cavity 2' and 'Cryomodule 2', have been cooled to 2 Kelvin and brought into operation. We provide an overview of the unique characteristics of each of the systems, commissioning experience, and latest results including their respective operating characteristics.

43 PARTICLE ACCELERATORS↗

First Beam and High-Gradient Cryomodule Commissioning Results of the Advanced Superconducting Test Accelerator at Fermilab

The advanced superconducting test accelerator at Fermilab has accelerated electrons to 20 MeV and, separately, the International Linear Collider (ILC) style 8-cavity cryomodule has achieved the ILC performance milestone of 31.5 MV/m per cavity. When fully completed, the accelerator will consist of a photoinjector, one ILC-type cryomodule, multiple accelerator R&D beamlines, and a downstream beamline to inject 300 MeV electrons into the Integrable Optics Test Accelerator (IOTA). We report on the results of first beam, the achievement of our cryomodule to ILC gradient specifications, and near-term future plans for the facility.

43 PARTICLE ACCELERATORS↗

Resonant Control for Fermilab's PXIE RFQ

The RFQ for Fermilab's PXIE test program is designed to accelerate a < 10 mA H⁻ CW beam to 2.1 MeV. The RFQ has a four-vane design, with four modules brazed together for a total of 4.45 m in length. The RF power required is < 130 kW at 162.5 MHz. A 3 kHz limit on the maximum allowable frequency error is imposed by the RF amplifiers. This frequency constraint must be managed entirely through differential cooling of the RFQ's vanes and outer body and associated material expansion. Simulations indicate that the body and vane coolant temperature should be controlled to within 0.1 degrees C. We present the design of the cooling network and the resonant control algorithm for this structure, as well as results from initial operation.

43 PARTICLE ACCELERATORS↗

Estimating the Transverse Impedance in the Fermilab Recycler

Impedance could represent a limitation of running high intensity bunches in the Fermilab recycler. With high intensity upgrades foreseen, it is important to quantify the impedance. To do this, studies have been performed measuring the tune shift as a function of bunch intensity allowing the transverse impedance to be derived.

43 PARTICLE ACCELERATORS↗