Search NASA⌕ Search

SEARCH · Search NASA

Results for “Human Operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

eGridGPT: Trustworthy AI in the Control Room

This report outlines the synergy between human decision making and generative artificial intelligence (GenAI), where GenAI supports power system operators by analyzing procedures, suggesting actions, simulating scenarios with physics-based digital twins, and recommending optimal decisions. This report is the first research effort to apply large language models (LLMs), a type of GenAI, in the power grid control room. The authors describe the Electric Grid Generative Pretrained Transformer (eGridGPT), an LLM that virtually assists system operators. Developed with cybersecurity and regulatory requirements in mind, eGridGPT represents an opportunity to responsibly evolve control room technologies to meet the needs of a rapidly changing grid. As an innovative concept, eGridGPT seeks to spearhead productive discussions about the advanced technologies in the control room of the future amid the transition to clean energy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Reactor Safeguards & Security Program: Cybersecurity Scenarios

The use of digital control systems and automation in advanced nuclear power systems introduces different types of vulnerabilities compared to legacy (i.e. analog) control systems that cyber adversaries can exploit. These vulnerabilities pose a challenge to reactor operators and cyber operations staff due to the dynamic nature of the event in which a human response or a lack of response can potentially evolve into a worsening plant condition. Using the Department of Homeland Security Cyber and Infrastructure Security Agency’s (CISA) critical infrastructure exercise framework, this document presents several cyber security scenarios typical of digital control systems that could be used in advanced reactor designs. These scenarios can be used in tabletop exercises to evaluate cyber security posture or conduct training on different aspects of cyber security, including detection, threat hunting using indicators of compromise, evaluating incident response, risk mitigation, incident reporting, information sharing and recovery.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Key Constructs for Reasonable Confidence in System Validation Programs

This paper presents four key constructs developed in preparing IEEE Std P2411TM, Human Factors Engineering Guide for the Validation of System Designs and Integrated Systems Operations at Nuclear Facilities for submission. These constructs reflect judgments that responsible parties make in order to bring validation to closure. Such judgments weigh competing concerns and cost-benefits for stakeholders. Improved processes and methods may support such judgments but cannot alone eliminate uncertainty. Stating and clarifying these constructs aims to reduce uncertainty in the validation process, to better prepare the implementers and reviewers of future validation programs, both in the nuclear industry and beyond. Reasonable Confidence – A proof standard, as used to reach conclusions in a legal case. Legal proof standards are bounded between “preponderance of evidence” and “beyond reasonable doubt”. Reasonable confidence is comparable to an intermediate legal proof standard of “clear and convincing evidence.” Representative Test Set – A collection of scenarios of sufficient variety to represent the anticipated range of operational conditions, events, evolutions, and activities for validating the system(s) under test. Dispositive vs. Diagnostic Criteria – Relevant performance criteria are placed in one of two categories. Dispositive criteria are assessed, without exception, to determine whether a validation test passes or fails overall. Diagnostic criteria are assessed, subject to justified exception, to evaluate the quality or degree of some particular aspect of performance. Repeatability – Consistency in achieving passing results is to be demonstrated for each scenario in the representative test set; thus, the minimum number of formal repetitions for each scenario is two.

99 GENERAL AND MISCELLANEOUS↗

High Level Waste Remote Handling Equipment in the Melter Cave Support Handling System at the Hanford Waste Treatment Plant

Cold war plutonium production led to extensive amounts of radioactive waste stored in tanks at the Department of Energy's (DOE) Hanford site. Bechtel National, Inc. is building the largest nuclear Waste Treatment Plant in the world located at the Department of Energy's Hanford site to immobilize the millions of gallons of radioactive waste. The site comprises five main facilities; Pretreatment, High Level Waste vitrification, Low Active Waste vitrification, an Analytical Lab and the Balance of Facilities. The pretreatment facilities will separate the high and low level waste. The high level waste will then proceed to the HLW facility for vitrification. Vitrification is a process of utilizing a melter to mix molten glass with radioactive waste to form a stable product for storage. The melter cave is designated as the High Level Waste Melter Cave Support Handling System (HSH). There are several key processes that occur in the HSH cell that are necessary for vitrification and include: feed preparation, mixing, pouring, cooling and all maintenance and repair of the process equipment. Due to the cell's high level radiation, remote handling equipment provided by PaR Systems, Inc. is required to install and remove all equipment in the HSH cell. The remote handling crane is composed of a bridge and trolley. The trolley supports a telescoping tube set that rigidly deploys a TR 4350 manipulator arm with seven degrees of freedom. A rotating, extending, and retracting slewing hoist is mounted to the bottom of the trolley and is centered about the telescoping tube set. Both the manipulator and slewer are unique to this cell. The slewer can reach into corners and the manipulator's cross pivoting wrist provides better operational dexterity and camera viewing angles at the end of the arm. Since the crane functions will be operated remotely, the entire cell and crane have been modeled with 3-D software. Model simulations have been used to confirm operational and maintenance functional and timing studies throughout the design process. Since no humans can go in or out of the cell, there are several recovery options that have been designed into the system including jack-down wheels for the bridge and trolley, recovery drums for the manipulator hoist, and a wire rope cable cutter for the slewer jib hoist. If the entire crane fails in cell, the large diameter cable reel that provides power, signal, and control to the crane can be used to retrieve the crane from the cell into the crane maintenance area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Romans v.0.2.0

SAND2022-1748 O Romans is a library for implementing compression-based machine learning algorithms and algorithms for Human Constrained Machine Learning. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Bauer, Travis↗

Incidents at nuclear power plants caused by the human factor

Psychological analysis of the causes of incorrect actions by personnel is discussed as presented in the report 'Methodological guidelines for analyzing the causes of incidents in the operation of nuclear power plants.' The types of incorrect actions and classification of the root causes of errors by personnel are analyzed. Recommendations are made for improvements in the psychological analysis of causes of incorrect actions by personnel.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Technical Procedures Writer's Guide

Technical procedures systematically describe a series of steps for the operation, maintenance, or testing of systems or components. They are widely used as a method for ensuring consistency, reducing human error, and improving the quality of the end-product. This guide provides specific guidance to procedure writers to help them generate high-quality technical procedures. The guidance is aimed at reducing confusion or ambiguity on the part of the operator, thereby increasing efficiency and reducing errors and rework. The appendices to this document define key terms associated with the creation of technical procedures, list common error traps, and define a set of action verbs that should be used in technical procedures.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Security and Resilience (ESR) Initiative

Central to achieving reduced carbon emissions and sustained economic recovery from the COVID pandemic is a national energy system based on low-carbon technologies and resistant to disruption from severe weather events and human attacks. NREL’s Energy Security and Resilience (ESR) Initiative applies NREL’s expertise in the design and operation of clean, highly distributed energy systems to the most pressing security and resilience challenges.

cybersecurity↗

Evaluation of the Lawrence Livermore Microbal Detection Array at the Statens Serum Institut CRADA No. TC02189

This was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Statens Serum Institut to evaluate and transition the Lawrence Livermore Microarray Detection Array (LLMDA) analysis software package, the Composite Likelihood Maximization method (CLiMax) to the SSI. The SSI is a public enterprise under the Danish Ministry of Health that operates a microbiology reference laboratory for the Danish population and analyzes tens to thousands of human clinical samples annually. SSI has been collaborating with the LLNL team for several years to use the LLMDA to analyze viral and bacterial infections from human clinical samples. The collaboration has resulted in two joint publications thus far, describing improvements to LLMDA sample preparation, and the utility of the LLMDA for detecting emerging viruses in clinical samples. Under our previous collaboration, SSI has performed LLMDA experiments at their facility and then transferred the raw LLMDA data to LLNL for analysis. SSI had purchased LLMDA microarrays directly from the manufacturer, Roche NimbleGen. The main purpose of the current collaboration was to adapt the CLiMax analysis software so that it could run on a computer located at SSI. Additional effort was budgeted for LLNL staff to assist SSI with the transition and the operation of the software. The primary deliverable is the CLiMax software, installed on a computer at SSI.

59 BASIC BIOLOGICAL SCIENCES↗

Application of Structured Decision Making to Hanford Site Radiological Air Monitoring - 17924

Radiological air monitoring is a component of an Environmental Surveillance (ES) program that has been in operation at the Department of Energy Hanford Site for several decades. The primary objectives of the ES program are protection of human health and the environment (on and off-site) as well as regulatory compliance. The ES program was designed decades ago when the plutonium-production reactors and related facilities at the Hanford Site were operational and air emissions were more widespread and significant than today. We employed a structured decision making (SDM) approach that integrates science with values and preferences to a Hanford Site air monitoring program decision. Specifically, a decision was necessary pertaining to the possible replacement of three air monitoring stations located in the 100 Area of the Hanford Site because the power line that supports these stations was near the end of its lifecycle. Although focused on this specific decision, the SDM model is more broadly applicable to decisions pertaining to adapting the air monitoring network to current Hanford operations. The value focused thinking approach that underlies SDM facilitates transparent and defensible decision making, and aids in communicating monitoring rationale. Some of the fundamental objectives elicited from the decision makers regarding management options for the three air monitoring stations included maximizing the ability to measure releases, minimizing environmental impacts, and maximizing social and economic sustainability. The fundamental objectives were linked to six objectives that could be measured (quantified) to allow a decision-analytic solution to the decision problem. Value functions and preference weights were developed for each of the objectives measures based on information obtained during a project workshop as well as by review and analysis of environmental data. Lastly, a set of five management options was identified that might achieve at least one of the objectives. A Bayes Network was developed as a solution to the decision problem pertaining to the three air stations (the 3 air stations decision). The Bayes Network describes the decision model graphically, and also serves as the computational engine for the decision analysis. The Bayes Network defines the relationship among the five management options and six objectives measures. In addition to the weights and value functions noted above, key inputs to the Bayes Network include a set of probabilities related to the different model states defined by the network. These include the probability of a significant release occurring, the probability that a release would be detected under each of the five management options, and the probability of achieving the other objective measures under each management option. In this manner the Bayesian Network captures the uncertainty in the components of the decision model. Replacing the three air monitoring stations with thermoluminescent dosimeters was identified as the preferred management option. A brief report was developed documenting the SDM model, including the workshop notes and analyses that were used to develop the objectives and model input variable values. This application demonstrates SDM's utility for supporting monitoring program decisions and, critically, providing a transparent and traceable basis for the decision. This relatively simple SDM model also provides a basis for an SDM model for monitoring decisions related to the more complex and holistic goal of achieving ES program objectives. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

A NWB-based dataset and processing pipeline of human single-neuron activity during a declarative memory task

A challenge for data sharing in systems neuroscience is the multitude of different data formats used. Neurodata Without Borders: Neurophysiology 2.0 (NWB:N) has emerged as a standardized data format for the storage of cellular-level data together with meta-data, stimulus information, and behavior. A key next step to facilitate NWB:N adoption is to provide easy to use processing pipelines to import/export data from/to NWB:N. Here, we present a NWB-formatted dataset of 1863 single neurons recorded from the medial temporal lobes of 59 human subjects undergoing intracranial monitoring while they performed a recognition memory task. We provide code to analyze and export/import stimuli, behavior, and electrophysiological recordings to/from NWB in both MATLAB and Python. The data files are NWB:N compliant, which affords interoperability between programming languages and operating systems. This combined data and code release is a case study for how to utilize NWB:N for human single-neuron recordings and enables easy re-use of this hard-to-obtain data for both teaching and research on the mechanisms of human memory.

Science & Technology - Other Topics↗

Automatic Calibration and Health Monitoring of Infrastructure Sensors

Smart transportation infrastructure relies on networks of heterogeneous sensors - cameras, radars, and lidars - continuously monitoring traffic conditions. However, executing the initial spatial calibration of multiple sensors and the subsequent health monitoring presents significant operational challenges. Environmental factors, mechanical vibrations, and gradual drift cause spatial misalignment, degrading fusion performance and tracking accuracy. Traditional calibration approaches require manual intervention with specialized targets or survey equipment, resulting in service interruptions and high maintenance costs. This work presents an automated framework for initial calibration and continuous health monitoring without human intervention or service disruption. Our approach addresses two critical problems: (1) detecting when sensors become miscalibrated during operation, and (2) automatically re-establishing spatial alignment using only operational traffic data. The health monitoring component analyzes measurement innovations - differences between sensor observations and predicted object states - to detect systematic biases indicative of calibration drift. By computing bias magnitude, directional consistency, and rejection rates, the system identifies miscalibrations as small as 0.5 meters. Unlike traditional methods requiring known calibration targets, our diagnostic operates continuously on live traffic observations, enabling early detection before fusion quality degrades. The automatic recalibration algorithm leverages overlapping sensor fields-of-view and temporal correlation of vehicle observations. Using graph-based optimization, the system automatically discovers which sensor pairs observe common regions, estimates pairwise spatial transformations using RANSAC-based robust estimation, and jointly optimizes all sensor poses through bundle adjustment. The framework handles practical deployment challenges, including different sensor sampling rates (1-10 Hz), varying installation positions, unknown orientations, and limited overlap regions (>10%). When approximate sensor positions are available from installation surveys (+/-1m accuracy), the algorithm additionally estimates sensor orientations, refining both position and rotation to sub-meter and sub-degree accuracy. We validate the framework on multi-hour traffic datasets from six heterogeneous sensors with sampling rates ranging from 1 Hz to 10 Hz. Results demonstrate successful calibration even with sparse overlap (<20%) and automatic detection of miscalibrations exceeding 0.8 meters. This work enables a "deploy-and-forget" sensor infrastructure that maintains calibration autonomously, reducing maintenance costs while improving tracking accuracy. The techniques generalize beyond transportation to any multi-sensor monitoring application requiring robust spatial alignment, including smart cities, industrial monitoring, and surveillance systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Human Factors Engineering Design Phase Report for Control Room Modernization

In this report, we review recent work performed at the Human System Simulation Laboratory (HSSL) at the Idaho National Laboratory. The U.S. Department of Energy has sponsored work under the Light Water Reactor Sustainabilty (LWRS) program to assist U.S. utilities in extending the operating life of the U.S. fleet of commercial reactors. Control room modernization is a key research and demonstration area within LWRS. The U.S. Nuclear Regulatory Commission’s Human Factors Engineering Program Review Model (NUREG-0711) outlines four phases of developing a new human-system interface (HSI). One of the key steps in NUREG-0711 is the design phase. In this report, we outline the process and findings from several simulator workshops, which centered on early design phase activities. Prototypes for a turbine control system upgrade for a main control room at a commercial nuclear power plant were developed and evaluated using licensed reactor operators at the HSSL. This iterative design-evaluation cycle succeeded in refining the design of the HSI and readying it for final implementation and formal validation and verification exercises. This report serves as a useful template to explicate design steps that are not currently required by NUREG-0711 but that ensure a usable and safe control room replacement system.

99 GENERAL AND MISCELLANEOUS↗

Briefing Human Reliability Analysis Tasks in the KINS-INL Project

Under the SPP with Korea Institute of Nuclear Safety (KINS) (SPP No. 24SP91), INL research team has a plan to visit KINS on December 3, 2024 and have a project meeting with KINS in-person. INL researchers will give this presentation about what we have done on Task 2 under the contract as below. Task 2: Support KINS in the treatment of human actions. INL efforts consist of: Provide technical expertise on recovery analysis based on INL’s methods or recent research Provide technical expertise on dependency analysis based on INL’s methods or recent research Provide technical expertise on analyzing the effects of HSI degradation on operator actions

99 - GENERAL AND MISCELLANEOUS↗

An Empirical Study on the Use of the Rancor Microworld Simulator to Support Full-scope Data Collection

A lack of data has been identified as a major challenge in human reliability analysis (HRA). Accordingly, several institutes and researchers have tried to collect HRA data from different data sources such as actual historical measurements, expert judgements, or simulator studies. While the most recent studies predominantly focus on collecting data using full-scope simulators with actual operators, Idaho National Laboratory (INL) has begun to collect HRA data using a simplified simulator, i.e., the Rancor Microworld simulator, with student participants. Full-scope studies have been known to have several intrinsic challenges to securing enough quantity of the data due to many reasons like the high cost for performing experiments or requiring actual operators’ cooperation. The ultimate goal of INL’s effort aims to infer actual operators’ data collected from a full-scope simulator on the basis of microworld data with student subjects as well as collect additional data that could be missed in the full-scope research. As a first step to achieve this goal, this paper projects an experimental plan for investigating the differences in human performance between individuals in two groups: 1) an actual operator and 2) a student when using the Rancor Microworld simulator. A randomized factorial experiment design has been developed with two independent variables, i.e., type of scenario and type of subject. Six human performance measures, i.e., 1) time, 2) error, 3) workload, 4) situation awareness, 5) patterns of attention and 6) the number of manipulations were selected. A couple of scenarios and their procedures available to the Rancor Microworld simulator have been developed.

99 GENERAL AND MISCELLANEOUS↗

Demonstration and Evaluation of the Human-Technology Integration Guidance for Plant Modernization

The significance of nuclear power in its role producing carbon-free electricity to the U.S. cannot be overstated. However, with changes in the energy market coupled with changes in incentives given to certain resources like solar and wind, the operating and maintenance costs for these sources have seen a significant reduction, which has consequently negatively impacted the economic viability of the existing U.S. nuclear power plant fleet. Digital instrumentation and control (I&C) and control room modernization is a major critical work domain to reduce operating and maintenance costs. Existing nuclear power plants are commonly configured with mostly legacy analog I&C as well as isolated pockets of digital I&C (a plant process computer, digital recorders, etc.). One challenge with this analog I&C is that replacement parts are becoming prohibitively more expensive and difficult to obtain. Moreover, a significant challenge with the existing analog I&C is that the way in which plants are currently operated and maintained is no longer competitive with other electricity generating sources, like natural gas, where advanced digital I&C technologies are commonplace. This gap between the waynuclear power plants are operated compared to other electricity generating sources significantly challenges the economic viability of the nuclear industry. Indeed, digital I&C systems can fundamentally change the way the plant is operated (i.e., the concept of operation). The introduction of digital I&C technologies offers a wealth of benefits to the nuclear industry. However, it is important to emphasize that, to realize these benefits, a careful understanding of how to integrate technology in a collaborative way that leverages the capabilities of people and technologies is necessary. Human-technology integration applies human factors engineering methods and tools to ensure the safe and reliable use of these technologies while ensuring that the inherent features of the technologies that provide economic value are not missed. The scope of this work documents the demonstration of the recently developed human and technology integration methodology, as applied to developing a new vision and concept of operations for a major U.S. nuclear power plant fleet. This report focuses on the methodological aspects of developing a vision and concept of operations. This report shares the tools, activities, and lessons learned during a modernization currently underway for industry as a whole to consider when planning any significant digital modification and developing a new vision and concept of operations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Early implementation of digital upgrades on simulators - 347

An important aspect of successful Nuclear Power Plant (NPP) digital control system upgrade projects is to upgrade the Operator Training Simulator (OTS) or a related Engineering Simulator (ES), prior to installation of the Distributed Control System (DCS) on the plant allowing for early testing of the digital controls/HMI and for early training of the plant operators while maintaining OTS configuration management (i.e. OTS in sync with the plant's current design). Experience has shown that early implementation of digital upgrades on the OTS and/or an ES can reduce plant startup duration (related to digital systems commissioning) and ensure operators are proficient with the new digital systems to ensure safe and reliable plant operation. Including simulators in the design process offers many benefits including early identification of design deficiencies, testing deficiency fixes, developing and validating plant procedures and supporting human factors engineering, to name a few. Implementing digital upgrades on the OTS is also a regulatory requirement driven by the ANSI/ANS-3.5-2009 standard (Nuclear Power Plant Simulators for Use in Operator Training and Examination) if the new DCS affects actions to be taken by the plant operator in the main control room. This paper presents the benefits of implementing digital upgrades on the OTS and/or ES prior to plant implementation. The various simulator implementation strategies (stimulation, emulation, simulation or a hybrid solution) and selection factors are discussed. The paper also covers four (4) case studies demonstrating how digital upgrades can be implemented on simulators. The first case study covers the implementation of a Siemens offgas Programmable Logic Controller (PLC) system on the Enrico Fermi OTS (Michigan). The second case study covers the implementation of a GE main generator excitation system on the Cernavoda OTS (Romania). The third case study covers the implementation of a Siemens main feedwater control system on the Callaway OTS and ES (Missouri). The final case study covers the implementation of the non-safety related and safety related DCS on the Nuclear New Build (NNB) Hongyanhe Phase I dual-purpose OTS/ES (China). (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Resourcing Strategies for the NRU Reactor Shutdown Planning and Execution - 19218

The National Research Universal Reactor (NRU) was commissioned in 1957. The NRU was fundamental for the development of the Candu reactors and, until 2016, quietly responsible for producing 40 percent of the world's supply of medical isotopes for diagnosis and cancer therapy. The Government of Canada decided in 2015 to discontinue operation as of March 31, 2018 due to challenges associated with running a 60-year old nuclear reactor. Anticipating this closing date allowed the Permanent Safe Shutdown Project (PSSP) to transition the NRU from an operating reactor to a state suitable for Storage with Surveillance. One of the biggest challenges to address was human resource management, which was rightly identified as the key to keeping the project within schedule and budget. The dilemma was, how to keep the work force motivated to contribute with the preparation of the shutdown while addressing job security concerns. This paper summarises Canadian Nuclear Laboratories (CNL) challenges and strategies to secure specialized subject matter experts, trades and operators for planning and executing the NRU reactor shutdown Project. The discussion also includes the solutions and lessons learned to date. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗