Capricious Cables: Understanding the Limitations and Context of Transmission Expansion Planning Models
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
This paper proposes a robust optimization based optimal scheduling model for microgrid operation considering constraints of islanding capability. Our objective is to minimize the total operation cost, including generation cost and spinning reserve cost of local resources as well as purchasing cost of energy from the main grid. In order to ensure the resiliency of a microgrid and improve the reliability of the local electricity supply, the microgrid is required to maintain enough spinning reserve (both up and down) to meet local demand and accommodate local renewable generation when the supply of power from the main grid is interrupted suddenly, i.e., microgrid transitions from grid-connected into islanded mode. Prevailing operational uncertainties in renewable energy resources and load are considered and captured using a robust optimization method. With proper robust level, the solution of the proposed scheduling model ensures successful islanding of the microgrid with minimum load curtailment and guarantees robustness against all possible realizations of the modeled operational uncertainties. Numerical simulations on a microgrid consisting of a wind turbine, a PV panel, a fuel cell, a micro-turbine, a diesel generator and a battery demonstrate the effectiveness of the proposed scheduling model.
Not Available
Here, this paper focuses on scheduling antennas to track satellites using a novel heuristic method. The objectives pursued in developing a schedule are two-fold: (1) minimize the priority weighted number of time periods that satellites are not tracked; and (2) equalize the percent of time each satellite is uncovered. The heuristic method is a population-based local search tailored to the unique characteristics of this problem. In order to validate the performance of the heuristic, bounds are developed using Lagrangian relaxation. The heuristic method and the bounds are applied to several test problems. In all cases, the heuristic identifies a solution that is better than the upper bound and is generally quite close (but obviously larger) than the lower bound with about an order of magnitude reduction in computation time. Lastly, a comparison with CPLEX 12.7 is provided.
Not Available
The self-healing smart grids enable system operators to quickly and efficiently recover transmission and distribution systems from outages and blackouts. The current restoration procedure solves the transmission and distribution system restoration problems separately without considering their impacts on each other, which may prolong the restoration process. However, with the emerging active distribution networks, distributed generators can contribute into the bottom-up restoration strategy. The interaction between the restoration of two interconnected systems should be taken into account. In this paper, a hybrid model of transmission and distribution systems restoration (HTDSR) is proposed by exchanging data of power and voltage between two separate optimization problems. The effectiveness of the HTDSR algorithm is demonstrated through case studies of the integrated IEEE 13-bus distribution network and IEEE 39-bus transmission grid. Simulation results demonstrate that the integrated restoration strategy with optimal scheduling of distributed generation sources can expedite the restoration process.
This paper studies the optimal meter placement problem for distribution system state estimation given limited measurement resources. We formulate the problem as a mixed integer semi-definite programming that minimizes the worst case estimation errors over a set of operating points. To solve the problem, we first relax the problem as a convex optimization problem. Motivated by the lack of scalability of existing solvers, we next leverage the special structure of the cost function and propose an algorithm based on barrier method that solves the problem with significantly better numerical performance. The proposed method has been validated on the IEEE 13-bus, IEEE 123-bus, and IEEE 8,500-bus feeders.
The optimal transmission switching (OTS) problem with AC physics represents a mixed integer non-linear non-convex optimization problem which can provide benefits to transmission level power system operations. In this paper we benchmark a set of open-source mixed integer non-linear programming (MINLP) solvers on the OTS problem with AC physics using the pglib set of power system test cases. Results characterizing the performance of the different solvers are reported and discussed.
Power outages cost American industries and businesses billions of dollars and jeopardize the lives of hospital patients. The losses can be greatly reduced with a fast, reliable, and flexible self-healing tool. This paper is aimed to tackle the challenging task of developing an adaptive restoration decision support system (RDSS). The proposed RDSS determines restoration actions both in planning and real-time phases and adapts to constantly changing system conditions. The comprehensive formulation encompasses practical constraints including ac power flow, dynamic reserve, and load modeling. Here, the combinatorial problem is decomposed into a two-stage formulation solved by an integer L-shaped algorithm. The two stages are then executed online in the RDSS framework employing a sliding window method. The IEEE 39-bus system has been studied under normal and contingency conditions to demonstrate the effectiveness and efficiency of the proposed online RDSS.
In this study, we derive a strengthened MILP formulation for certain gas turbine unit commitment problems, in which the ramping rates are no smaller than the minimum generation amounts. This type of gas turbines can usually start-up faster and have a larger ramping rate, as compared to the traditional coal-fired power plants. Recently, the number of this type of gas turbines increases significantly due to affordable gas prices and their scheduling flexibilities to accommodate intermittent renewable energy generation. In this study, several new families of strong valid inequalities are developed to help reduce the computational time to solve these types of problems. Meanwhile, the validity and facet-defining proofs are provided for certain inequalities. Finally, numerical experiments on a modified IEEE 118-bus system and the power system data based on recent studies verify the effectiveness of applying our formulation to model and solve this type of gas turbine unit commitment problems, including reducing the computational time to obtain an optimal solution or obtaining a much smaller optimality gap, as compared to the default CPLEX, when the time limit is reached with no optimal solutions obtained.
Explore the source record for details and available documents.
When solving the security-constrained unit commitment problem, one of the most complicating factors is handling the large number of transmission constraints, corresponding to both base case and N - 1 line contingency scenarios. Although it is well known that only a few of these constraints need to be enforced, identifying this critical subset of constraints efficiently remains a challenge. In this letter, we propose a novel and simple iterative contingency-screening procedure that is able to eliminate 99.4% of the constraints selected by existing iterative methods, allowing for the solution of much larger-scale problems. We report computational results in realistic instances with up to 6468 buses and 9000 transmission lines. Furthermore, the method was also independently implemented and evaluated at MISO, where it performed faster than alternative methods.
Distributed generators performing black start to form isolated microgrids offer a flexible and resilient solution to service restoration in distribution systems. Employing the dynamic microgrid concept, distributed generators can form isolated microgrids by changing their physical boundaries through smart switches and conventional circuit breakers. However, the flexibility of distributed generators has not been thoroughly investigated and utilised in existing works. To address this issue, this letter presents a new model to the reconfiguration formulation in active distribution networks considering different operation modes of distributed generators. Compared with the existing models, this study provides a new formulation supporting different DGs' operation modes and fully making use of their flexibility. Illustrative results on IEEE 34-test systems verify the effectiveness of the proposed model.
Not Available
The increasing penetration of wind energy poses great challenges to the operation of power systems in normal and emergency states. However, energy storage technologies can help accommodate wind power uncertainty and variability due to their flexible characteristics. This paper focuses on the restoration phase, and provides a novel coordination strategy of wind and pumped-storage hydro (PSH) units for a faster and reliable self-healing process. The wind-PSH assisted power system restoration is formulated as a two-stage adaptive robust optimization problem. The first-stage problem determines the start-up sequence of generators and the energization times of transmission paths; and the second-stage problem decides load pickup sequences, wind power dispatch levels, and PSH units' operating modes. The column-and-constraint generation decomposition algorithm is applied to solve the two-stage adaptive robust optimization problem, which has a mixed-integer optimization in the inner-level problem. The developed coordination strategy is tested on the modified IEEE 39-bus system. Numerical results demonstrate that the coordinated wind and PSH units can increase the total energy served, enhance wind power dispatchability, and reduce wind power curtailment.
Battery energy storage systems (BESSs) can play a key role in mitigating the intermittency and uncertainty associated with adding large amounts of renewable energy to the bulk power system (BPS). Two BESS technologies that have gained prominence in this regard are Lithium-ion (LI) BESS and Vanadium redox flow (VRF) BESS. Here, this paper proposes a fixed-flexible BESS allocation scheme that exploits the complementary characteristics of LI and VRF BESSs to attain optimal techno-economic benefits in a wind-integrated BPS. Studies carried out on relatively large transmission networks demonstrate that benefits such as reduction in system operation cost, wind spillage, voltage fluctuations, and discounted payback period, can be realized by using the proposed scheme.
Explore the source record for details and available documents.