Search NASA⌕ Search

SEARCH · Search NASA

Results for “LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Management. A continuing bibliography with indexes

This bibliography cites 604 reports, articles, and other documents introduced into the NASA scientific and technical information system in 1979 covering the management of research and development, contracts, production, logistics, personnel, safety, reliability and quality control. Program, project, and systems management; management policy, philosophy, tools, and techniques; decision making processes for managers; technology assessment; management of urban problems; and information for managers on Federal resources, expenditures, financing, and budgeting are also covered. Abstracts are provided as well as subject, personal author, and corporate source indexes.

Source record↗

Requirements for predictions and real-time monitoring for the study of travelling interplanetary phenomena

Physical processes within quiescent as well as disturbed flows of solar wind plasma, energetic particles, and magnetic and electric fields from the Sun are considered. Specifically, travelling interplanetary phenomena to be studied during the years of the solar maximum of solar cycle 21 are covered. It is noted that predictions, while needed for long range, logistical planning, is secondary to the requirements of synoptic real time monitoring over a wide range of particle energies and spectral bandwidths.

Dryer, M.↗

A continuation of base-line studies for environmentally monitoring space transportation systems at John F. Kennedy Space Center. Executive summary

Studies conducted in and around John F. Kennedy Space Center, Merrit Island, Florida were designed to establish baseline conditions for various attributes of the biotic and abiotic environment. Features were described and quantitatively measured. Certain condition were found to be appropriate for the detection and assessment of possible environmental perturbations caused by future NASA activities. These include plant communities, mammal populations, rainfall chemistry, fish populations, and the status of rare and endangered species. On the basis of statistical analysis of quantitative data and logistic considerations, it was possible to refine the kinds and amounts of measurements needed to evaluate perturbations in selected environmental components.

Stout, I. J.↗

DUMAND Summer Workshop, University of California, La Jolla, Calif., July 24-September 2, 1978, Proceedings. Volume 3 - Oceanographic and ocean engineering studies

The DUMAND (Deep Underwater Muon and Neutrino Detector) array, a hexagon 800 m on a side, 673 m high, and consisting of 22,698 sensor modules, is designed to detect neutrinos in the TeV range, hadronic cascades, muons and Cerenkov radiation. Its engineering, signal processing, and logistic aspects are considered, as are its optical detection (photomultiplier tubes) system and electronics. Geological and bottom current surveys were made at two proposed sites for the array (the Maui and Keahole Point basins of Hawaii), and a study of the steady-state response of a sensor string to current drag forces is reported. Biological interference with the DUMAND array, including mechanical entanglement by large animals, bioluminescence, and especially biofouling are considered, as well as the deployment, implantment and maintenance of the array.

Wilkins, G.↗

Optimization of space manufacturing systems

Four separate analyses are detailed: transportation to low earth orbit, orbit-to-orbit optimization, parametric analysis of SPS logistics based on earth and lunar source locations, and an overall program option optimization implemented with linear programming. It is found that smaller vehicles are favored for earth launch, with the current Space Shuttle being right at optimum payload size. Fully reusable launch vehicles represent a savings of 50% over the Space Shuttle; increased reliability with less maintenance could further double the savings. An optimization of orbit-to-orbit propulsion systems using lunar oxygen for propellants shows that ion propulsion is preferable by a 3:1 cost margin over a mass driver reaction engine at optimum values; however, ion engines cannot yet operate in the lower exhaust velocity range where the optimum lies, and total program costs between the two systems are ambiguous. Heavier payloads favor the use of a MDRE. A parametric model of a space manufacturing facility is proposed, and used to analyze recurring costs, total costs, and net present value discounted cash flows. Parameters studied include productivity, effects of discounting, materials source tradeoffs, economic viability of closed-cycle habitats, and effects of varying degrees of nonterrestrial SPS materials needed from earth. Finally, candidate optimal scenarios are chosen, and implemented in a linear program with external constraints in order to arrive at an optimum blend of SPS production strategies in order to maximize returns.

Akin, D. L.↗

Space Shuttle

The design of the spacecraft is described. Focus is placed on the external tanks, the solid rocket boosters, the main engine, and the space shuttle orbiter. The logistics of the project were reviewed and included the management plan, the facilities involved in construction and testing of the space shuttle, and the benefits expected from the project.

Source record↗

Space Operations Center - A concept analysis

The Space Operations Center (SOC) which is a concept for a Shuttle serviced, permanent, manned facility in low earth orbit is viewed as a major candidate for the manned space flight following the completion of an operational Shuttle. The primary objectives of SOC are: (1) the construction, checkout, and transfer to operational orbit of large, complex space systems, (2) on-orbit assembly, launch, recovery, and servicing of manned and unmanned spacecraft, (3) managing operations of co-orbiting free-flying satellites, and (4) the development of reduced dependence on earth for control and resupply. The structure of SOC, a self-contained orbital facility containing several Shuttle launched modules, includes the service, habitation, and logistics modules as well as construction, and flight support facilities. A schedule is proposed for the development of SOC over ten years and costs for the yearly programs are estimated.

Source record↗

Space Operations Center system analysis. Volume 3, book 2: SOC system definition report, revision A

The Space Operations Center (SOC) orbital space station program operations are described. A work breakdown structure for the general purpose support equipment, construction and transportation support, and resupply and logistics support systems is given. The basis for the design of each element is presented, and a mass estimate for each element supplied. The SOC build-up operation, construction, flight support, and satellite servicing operations are described. Detailed programmatics and cost analysis are presented.

Source record↗

Support systems of the orbiting quarantine facility

The physical support systems, the personnel management structure, and the contingency systems necessary to permit the Orbiting Quarantine Facility (OQF) to function as an integrated system are described. The interactions between the subsystems within the preassembled modules are illustrated. The Power Module generates and distributes electrical power throughout each of the four modules, stabilizes the OQF's attitude, and dissipates heat generated throughout the system. The Habitation Module is a multifunctional structure designed to monitor and control all aspects of the system's activities. The Logistics Module stores the supplies needed for 30 days of operation and provides storage for waste materials generated during the mission. The Laboratory Module contains the equipment necessary for executing the protocol, as well as an independent life support system.

Source record↗

Space Operations Center System Analysis: Requirements for a Space Operations Center, revision A

The system and program requirements for a space operations center as defined by systems analysis studies are presented as a guide for future study and systems definition. Topics covered include general requirements for safety, maintainability, and reliability, service and habitat modules, the health maintenance facility; logistics modules; the docking tunnel; and subsystem requirements (structures, electrical power, environmental control/life support; extravehicular activity; data management; communications and tracking; docking/berthing; flight control/propulsion; and crew support). Facilities for flight support, construction, satellite and mission servicing, and fluid storage are included as well as general purpose support equipment.

Woodcock, G. R.↗

Electronic/electric technology benefits study

The benefits and payoffs of advanced electronic/electric technologies were investigated for three types of aircraft. The technologies, evaluated in each of the three airplanes, included advanced flight controls, advanced secondary power, advanced avionic complements, new cockpit displays, and advanced air traffic control techniques. For the advanced flight controls, the near term considered relaxed static stability (RSS) with mechanical backup. The far term considered an advanced fly by wire system for a longitudinally unstable airplane. In the case of the secondary power systems, trades were made in two steps: in the near term, engine bleed was eliminated; in the far term bleed air, air plus hydraulics were eliminated. Using three commercial aircraft, in the 150, 350, and 700 passenger range, the technology value and pay-offs were quantified, with emphasis on the fiscal benefits. Weight reductions deriving from fuel saving and other system improvements were identified and the weight savings were cycled for their impact on TOGW (takeoff gross weight) and upon the performance of the airframes/engines. Maintenance, reliability, and logistic support were the other criteria.

Howison, W. W.↗

Manned space platforms, payloads and tending

A concept has been developed for providing for a permanent manned presence in space for science, applications, and technology plus growth potential to support major future operational missions. An initial crew of two to four is accommodated along with installations for interior, exterior and tended payloads. Tended payloads support includes servicing of remote free-flying spacecraft, basing of reusable orbital transfer vehicles and basing of teleoperator-mounted payloads for near-station excursions. Candidate payloads, plus configuration, flight operation, subsystem and ground logistics aspects are described, as are Shuttle interactions.

Runge, F. C.↗

The elements of a space operations system

The Space Shuttle has completed its flight test program and is entering operational service with its fifth flight in November 1982. With the completion of Shuttle development, its entry to operational service, and delivery of additional units into field service, it is timely to initiate development of the next elements of the system. The elements of a Space Operations System are the Shuttle, a Station in low earth orbit, and upper stages for low and high energy orbit delivery. To design these elements properly will require a substantial operations analysis effort to characterize the most effective performance tradeoffs among the discrete elements. The Shuttle establishes a new context for the design and execution of operations in space. The components of the Shuttle, Space Station, and upper stages will need to share technology and components to minimize the cost and complexity of the logistics of ownership and operation.

Loftus, J. P., Jr.↗

Automation of the longwall mining system

Cost effective, safe, and technologically sound applications of automation technology to underground coal mining were identified. The longwall analysis commenced with a general search for government and industry experience of mining automation technology. A brief industry survey was conducted to identify longwall operational, safety, and design problems. The prime automation candidates resulting from the industry experience and survey were: (1) the shearer operation, (2) shield and conveyor pan line advance, (3) a management information system to allow improved mine logistics support, and (4) component fault isolation and diagnostics to reduce untimely maintenance delays. A system network analysis indicated that a 40% improvement in productivity was feasible if system delays associated with all of the above four areas were removed. A technology assessment and conceptual system design of each of the four automation candidate areas showed that state of the art digital computer, servomechanism, and actuator technologies could be applied to automate the longwall system.

Zimmerman, W.↗

LANDSAT-D Mission Operations Review (MOR)

Portions of the LANDSAT-D systems operation plan are presented. An overview of the data processing operations, logistics and other operations support, prelaunch and post-launch activities, thematic mapper operations during the scrounge period, and LANDSAT-D performance evaluation is given.

Source record↗

Low-level gust gradient program and avialtion workshop effort

The Proceedings of the Workshop on Meteorological and Environmental Inputs to Aviation Systems, hosted by the University of Tennessee Space Institute, October 26-28, 1982, were prepared for publication. The Proceedings were submitted to FAA and will be distributed by August. Also, the proceedings of a one day workshop devoted specifically to wind shear and hosted during the same time frame were prepared and distributed. Plans for the 1983 workshop are proceeding extremely well. The workshop theme was established, the committee topics identified, and all ten committee chairmen contacted have agreed to accept their respective assignments. Additional logistics for the workshop are being carried out. The 1983 workshop is scheduled for October 26-28, 1983. Data gathered with the B-57B during the Joint Airport Weather Studies Project in Denver, Colorado, were analyzed. All runs for Flight 6 on July 16, 1982, were analyzed. Spectra, cross spectra and probability distributions were computed for each run. Also, Runs 10-14 of Flight 7 on July 15, 1982, were analyzed in similar detail.

Frost, W.↗

The reusable Space Shuttle Main Engine prepares for long life

Attention is given to Space Shuttle Main Engine (SSME) life extension and logistical systems that support launch and ground operations. The operations and maintenance tasks involved in this aspect of SSME development include turnaround requirements, ground support equipment, and control documentation. A discussion is presented on the spare parts provisioning system, which emphasizes the source of decision-making data and encompasses the hardware tracking system, usage data from ground testing and launch operations, and current and projected life limits. The life extension test program leads the launch program, offering comfortable life limit margins. Planned overhauls for the extension of useful hardware life beyond the 55-mission requirement, a turnabout improvement program, and a continuous training program contribute to launch cost reductions, reliable operations, and long life.

Klatt, F. P., Jr.↗

Historical review and current plans

A space station concept published in Colliers Magazine in 1952 was the result of a proposal made by a group of visionary scientists and engineers. NASA began studies regarding the concepts and technology needed for a space station in 1959 during its first year of existence. Formative studies regarding the design and the construction of a space station are discussed, taking into account the 1960 space station design of an American aerospace company, the scale model of a hexagonal self-deploying space station, the concept of the Manned Orbiting Research Laboratory (MORL), MORL with Apollo Logistics System, the MORL Brayton Cycle power system, MORL with nuclear power, a manned orbiting telescope, the 1967 Large Space Station concept, the phase B modular space station, the MOSC configuration 1975, a basic manned platform with resupply, and a concept for a space operations center studied in 1979. A Soviet space station program began with Salyut 1 in April 1971. The U.S. Skylab was launched in May 1973. Attention is also given to military stations and current planning.

Hook, W. R.↗