Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Pegasus (trademark) launch operations and the PegaStar integrated spacecraft bus

The Pegasus air launched space booster, which successfully flew its maiden flight on 5 Apr. 1990, provides the international satellite community with a flexible cost effective means for delivering small payloads into low Earth orbit. The vehicle's simple, robust design and horizontal integration methods ensure maximum reliability and significantly reduce launch base infrastructure requirements. The vehicle's air launched approach and ability to launch over open ocean regions provide unmatched flexibility in launch location and approach used to ensure range safety. The PegaStar integrated spacecraft bus, which complements the Pegasus launch system, can provide a turnkey means for delivering instrument and sensor packages into low Earth orbit and providing extended (5 to 10 year) on orbit operational support. Pegasus and PegaStar are described, including payload interfaces, delivery capability; integration methods, facility and ground support equipment requirements; and typical launch operations.

Mosier, Marty↗

Hubble Space Telescope - First Servicing Mission: Down to Earth Logistics - From GSFC to KSC and Back

The Hubble Space Telescope First Servicing Mission is a major accomplishment for NASA and has drawn world-wide attention and interest. The extravehicular servicing and repair activities performed by the STS-61 crew were the most ambitious ever undertaken. Their unprecedented success in performing on-orbit repair and maintenance, particularly in correcting the aberration in the primary mirror, has enabled the HST to provide sensational images and the anticipation of exciting scientific discoveries. Although the whole world watched the televised logistics activities (on-orbit maintenance) that took place in space, few are aware of the time and effort that went into planning and executing the space logistics that takes place with our feet on the ground. This paper addresses a major part of that effort - the packaging, handling, and transportation (PH&T) activities required to ship the GSFC HST space flight hardware and ground support equipment to KSC for launch and the post launch return to GSFC. It addresses the logistics and transportation planning for the containers for the Solar Array Carrier, the Orbital Replacement Unit Carrier, and the Flight Support System and their transporters, and the over land and water portions of the shipments.

Kubicko, Richard M.↗

Experiment module concepts study. Volume 1: Management summary

The minimum number of standardized (common) module concepts that will satisfy the experiment program for manned space stations at least cost is investigated. The module interfaces with other elements such as the space shuttle, ground stations, and the experiments themselves are defined. The total experiment module program resource and test requirements are also considered. The minimum number of common module concepts that will satisfy the program at least cost is found to be three, plus a propulsion slice and certain experiment-peculiar integration hardware. The experiment modules rely on the space station for operational, maintenance, and logistic support. They are compatible with both expendable and shuttle launch vehicles, and with servicing by shuttle, tug, or directly from the space station. A total experiment module program cost of approximately $2319M under the study assumptions is indicated. This total is made up of $838M for experiment module development and production, $806M for experiment equipment, and $675M for interface hardware, experiment integration, launch and flight operations, and program management and support.

Source record↗

Operations Analysis of Space Shuttle System

The space science program at NASA since 1950's has gone through stages of development and implementation in rocketry and scientific advancement. It has become the nation's largest scientific institution of research and innovation for space exploration and military research, and overall a pride of the nation at an exorbitant cost. After placing man on moon, space shuttle program at NASA is an on-going project with a high success rate at an average cost of about $450m per flight. A future endeavor from both government and private sectors needs to be undertaken for commercialization of this expensive mission. In order to attract private enterprises, it needs to boost up its operations with better technology at lower cost to cope with rapid changes in scientific advancement and economic competition. Thus, a second-generation reusable launch vehicle (2GRLV) will play a major role in future operation of NASA centers. Envisioning this potential way of saving the program by reducing the cost, NASA is currently managing an innovative program called the Space Launch Initiative (SLI) to develop key technologies that will support the development of second-generation reusable launch vehicles (RLV) which will be more economical and safer and reliable than the existing space shuttle system. The selection of which technologies to fund for further development is being based on their likelihood to contribute to providing cost reduction or safety improvements. It is envisioned that in the 2006 timeframe, NASA will make a decision as to whether or not to commit to the replacement of the current space shuttle system with a new RLV. The decision to proceed with a new RLV will be partly based on the likelihood that the new system will be better than the existing space shuttle. Government and private entrepreneurs are currently considering four different types of RLV projects: commercial programs, government programs, international concepts, and X Prize competitors. NASA has already commissioned a series of X-programs to study the future RLV program. Today, NASA decision makers need analytical tools to help determine which technologies to fund the development of this technology. In the 2006 timeframe, these same decision makers will need analytical tools to evaluate and compare various RLV architectures, including the existing space shuttle so as to make the best decision for whether or not to proceed with the development of a new RLV, and if so, then which one. A study is conducted here to establish ground level knowledge from the historical data and expertise experiences of the field personnel. Such information is compiled in the form of mission statement, goals, space shuttle operations, payloads and cargo constraints, resource constraints, and bottlenecks to the enhancement vector.

Bhaba R. Sarker↗

Actuated flywheel projectile launcher

Various embodiments include an actuated projectile launcher, including: a base structure; a projectile support, and a holding area from which a projectile launches; propulsion wheels selectively driven to rotate; and support arms, each supporting at a first end thereof a separate one of the propulsion wheels and being supported at an opposed second end thereof by the base structure. The support arms are configured to move the propulsion wheels between an expanded position and a contracted position, in which the propulsion wheels are closer to one another in the contracted position as compared to the expanded position. The movement of the propulsion wheels toward the contracted position brings the propulsion wheels into engagement with the projectile and drives the projectile from the holding area.

Dullea, Kevin J.↗

NASA Space Technology Draft Roadmap Area 13: Ground and Launch Systems Processing

This slide presentation reviews the technology development roadmap for the area of ground and launch systems processing. The scope of this technology area includes: (1) Assembly, integration, and processing of the launch vehicle, spacecraft, and payload hardware (2) Supply chain management (3) Transportation of hardware to the launch site (4) Transportation to and operations at the launch pad (5) Launch processing infrastructure and its ability to support future operations (6) Range, personnel, and facility safety capabilities (7) Launch and landing weather (8) Environmental impact mitigations for ground and launch operations (9) Launch control center operations and infrastructure (10) Mission integration and planning (11) Mission training for both ground and flight crew personnel (12) Mission control center operations and infrastructure (13) Telemetry and command processing and archiving (14) Recovery operations for flight crews, flight hardware, and returned samples. This technology roadmap also identifies ground, launch and mission technologies that will: (1) Dramatically transform future space operations, with significant improvement in life-cycle costs (2) Improve the quality of life on earth, while exploring in co-existence with the environment (3) Increase reliability and mission availability using low/zero maintenance materials and systems, comprehensive capabilities to ascertain and forecast system health/configuration, data integration, and the use of advanced/expert software systems (4) Enhance methods to assess safety and mission risk posture, which would allow for timely and better decision making. Several key technologies are identified, with a couple of slides devoted to one of these technologies (i.e., corrosion detection and prevention). Development of these technologies can enhance life on earth and have a major impact on how we can access space, eventually making routine commercial space access and improve building and manufacturing, and weather forecasting for example for the effect of these process improvements on our daily lives.

Clements, Greg↗

A data distribution strategy for the 1990s (files are not enough)

Virtually all of the data distribution strategies being contemplated for the EOSDIS era revolve around the use of files. Most, if not all, mass storage technologies are based around the file model. However, files may be the wrong primary abstraction for supporting scientific users in the 1990s and beyond. Other abstractions more closely matching the respective scientific discipline of the end user may be more appropriate. JPL has built a unique multimission data distribution system based on a strategy of telemetry stream emulation to match the responsibilities of spacecraft team and ground data system operators supporting our nations suite of planetary probes. The current system, operational since 1989 and the launch of the Magellan spacecraft, is supporting over 200 users at 15 remote sites. This stream-oriented data distribution model can provide important lessons learned to builders of future data systems.

Tankenson, Mike↗

Preliminary Long-term Safety Assessment for the Planned LLW Disposal Facility at Al-Tuwaitha, Iraq - 18142

Before 1991, Iraq had a significant nuclear program which encompassed ten nuclear sites spread out across the country. The largest nuclear site was located at the Al-Tuwaitha site near Baghdad where 18 nuclear facilities were concentrated. During the first Gulf War in 1991, all sites suffered significant damage from bombing and subsequent looting. Currently, the Ministry of Science and Technology is responsible for the ten heavily damaged nuclear sites and for the management of radioactive waste in Iraq in general. The task of decommissioning the damaged nuclear facilities and managing the resulting waste is being supported by the International Atomic Energy Agency (IAEA), the European Commission (EC), and the United States (US). In the framework of its Instrument for Nuclear Safety Cooperation (INSC), the EC has launched a cooperation project to support the planned construction of an engineered repository for short-lived low- and intermediate level waste for the safe disposal of radioactive waste resulting from the decommissioning activities, as well as for waste from the continuing use of radioisotopes in medicine and the oil and gas industry in the country. The main objectives of this project, which was awarded to a Consortium led by NUKEM Technologies Engineering Services GmbH and joined by DBE Technology GmbH of Germany and JAVYS a.s. of Slovakia, are the development of an initial conceptual level basic design and preliminary safety assessment report (PSAR) and the subsequent detailed engineering design and supporting pre-construction safety assessment report (PCSAR). The current paper focuses on the development of the PSAR. Special focus is given to the long-term calculations and difficulties associated with the limited data base in regard to site characterization as well as the expected inventory for the future repository. Because of the ongoing security concerns in Iraq, the Ministry of Science and Technology had already selected the Al-Tuwaitha Site as the best suited location for the planned surface repository at the start of the project. Although some site characterization work had already been carried out prior to the start of the project, certain data for modelling the geology and hydrology of the site are still lacking. Missing data have been compensated by conservative assumptions and the assessment of alternative scenarios. Consequently, for the development of the simplified GoldSim{sup R} computer model used to carry out the long-term calculations supporting the PSAR, existing site information was used and, as appropriate, amended or replaced by conservative assumptions. Due to the nature of the waste, data on the expected inventory are associated with large uncertainties. Although certain estimates related to the future volume of the waste exist, little to no information is available on the expected radionuclide vector and respective activities. Therefore, the long-term calculations were carried out for a generic inventory including a broad range of radionuclides that are to be expected as being important considering the kind of waste to be disposed of in the facility. Based on the results of these calculations, the maximum total capacity of the facility was estimated and converted into activity limits for individual radionuclides that will be integrated into the existing general WAC for the facility. Compliance with these WAC will then guarantee the safety of the repository in regard to potential radionuclide releases via the groundwater pathway. In parallel to the determination of activity limits for the WAC, long-term calculations were carried using different estimates for the expected total activity to determine the general suitability of the proposed technical solution of the repository for receiving the total amount of Iraqi radioactive waste principally acceptable for surface disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tropospheric Wind Monitoring During Day-of-Launch Operations for NASA's Space Shuttle Program

The Environments Group at the National Aeronautics and Space Administration's Marshall Space Flight Center monitors the winds aloft above Kennedy Space Center (KSC) in support of the Space Shuttle Program day-of-launch operations. Assessment of tropospheric winds is used to support the ascent phase of launch. Three systems at KSC are used to generate independent tropospheric wind profiles prior to launch; 1) high resolution jimsphere balloon system, 2) 50-MHz Doppler Radar Wind Profiler (DRWP) and 3) low resolution radiosonde system. All independent sources are compared against each other for accuracy. To assess spatial and temporal wind variability during launch countdown each jimsphere profile is compared against a design wind database to ensure wind change does not violate wind change criteria.

Decker, Ryan↗

Refinements in the Design of the Ares V Cargo Launch Vehicle for NASA's, Exploration Strategy

NASA is developing a new launch vehicle fleet to fulfill the national goals of replacing the shuttle fleet, completing the International Space Station (ISS), and exploring the Moon on the way to eventual exploration of Mars and beyond. Programmatic and technical decisions during early architecture studies and subsequent design activities were focused on safe, reliable operationally efficient vehicles that could support a sustainable exploration program. A pair of launch vehicles was selected to support those goals the Ares I crew launch vehicle and the Ares V cargo launch vehicle. They will be the first new human-rated launch vehicles developed by NASA in more than 30 years (Figure 1). Ares I will be the first to fly, beginning space station ferry operations no later than 2015. It will be able to carry up to six astronauts to ISS or support up to four astronauts for expeditions to the moon. Ares V is scheduled to be operational in the 2020 timeframe and will provide the propulsion systems and payload to truly extend human exploration beyond low-Earth orbit. (LEO).

Creech, Steve↗

Consort 1 flight results: a synopsis

Consort 1 was the first low gravity materials processing payload to be launched by a commercially licensed rocket in the U.S.A. It carried six experiments which operated as planned during approx. 7 min of suborbital, low gravity flight (10(-5) g) and were returned in excellent condition to the investigators within 4 h of launch. Nearly 150 physical samples supported by measurements and photographs made during the flight were obtained for analysis. In addition to the experimental data returned, the success of Consort 1 demonstrated the ability of industry, working with university centers and government agencies, to rapidly prepare and launch payloads. A brief description of the rocket flight and payload configuration is given. Experiment objectives and methods are described and preliminary results and conclusions are presented.

short duration↗

Behavioral Health and Performance Operations During the Space Shuttle Program

Prior to the Columbia STS 107 disaster in 2003, the Johnson Space Center s Behavioral Health and Performance Group (BHP) became involved in Space Shuttle Operations on an as needed basis, occasionally acting as a consultant and primarily addressing crew-crew personality conflicts. The BHP group also assisted with astronaut selection at every selection cycle beginning in 1991. Following STS 107, an event that spawned an increased need of behavioral health support to STS crew members and their dependents, BHP services to the Space Shuttle Program were enhanced beginning with the STS 114 Return to Flight mission in 2005. These services included the presence of BHP personnel at STS launches and landings for contingency support, a BHP briefing to the entire STS crew at L-11 months, a private preflight meeting with the STS Commander at L-9 months, and the presence of a BHP consultant at the L-1.5 month Family Support Office briefing to crew and family members. The later development of an annual behavioral health assessment of all active astronauts also augmented BHP s Space Shuttle Program specific services, allowing for private meetings with all STS crew members before and after each mission. The components of each facet of these BHP Space Shuttle Program support services will be presented, along with valuable lessons learned, and with recommendations for BHP involvement in future short duration space missions

Beven, G.↗

BLSS: A Contribution to Future Life Support

The problem of the supply of basic life supporting ingredients was analyzed. Storage volume and launch weight of water, oxygen and food in a conventional nonregenerable life support system are directly proportional to the crew size and the length of the mission. Because of spacecraft payload limitations this requires that the carbon, or food, recycling loop, the third and final part in the life support system, be closed to further reduce logistics cost. Advanced life support systems need to be developed in which metabolic waste products are regenerated and food is produced. Biological life support systems (BLSS) satisfy the space station environmental control functions and close the food cycle. Numerous scientific space experiments were delineated, the results of which are applicable to the support of BLSS concepts. Requirements and concepts are defined and the feasibility of BLSS for space application are analyzed. The BLSS energy mass relation, and the possibilities to influence it to achieve advantages for the BLSS are determined. A program for the development of BLSS is proposed.

Skoog, A. I.↗

Mars Transit Life Support, Open, Closed, or Mixed?

Brief human space missions such as Apollo and shuttle used material storage to provide life support but long missions such as a trip to Mars and back are expected to use a recycling life support system similar to the one on the International Space Station (ISS). Mars transit life support design is investigated considering requirements, performance, reliability, cost, and risk. The launch cost, crew size, and reliability are variable parameters that affect the life support design choice. Greater launch cost and larger crew size tend to make recycling more cost-effective than resupply. A higher reliability requirement tends to favor resupply over recycling. A mixed system combining direct supply of minimal survival materials for very high reliability with additional materials provided by recycling systems seems the best choice.

Mars life support↗

International Space Station (ISS) Environmental Control and Life Support (ECLS) System Overview of Events: 2010-2014

Nov 2, 2014 marked the completion of the 14th year of continuous human presence in space on board the International Space Station (ISS). After 42 expedition crews, over 115 assembly & utilization flights, over 180 combined Shuttle/Station, US & Russian Extravehicular Activities (EVAs), the post-Assembly-Complete ISS continues to fly and the engineering teams continue to learn from operating its systems, particularly the life support equipment. Problems with initial launch, assembly and activation of ISS elements have given way to more long term system operating trends. New issues have emerged, some with gestation periods measured in years. Major events and challenges for each U.S. Environmental Control and Life Support (ECLS) subsystem occurring during calendar years 2010 through 2014 are summarily discussed in this paper, along with look-aheads for what might be coming in the future for each U.S. ECLS subsystem.

Gentry, Gregory J.↗

Small Payload Integration and Testing Project Development

The National Aeronautics and Space Administration's (NASA) Kennedy Space Center (KSC) has mainly focused on large payloads for space flight beginning with the Apollo program to the assembly and resupply of the International Space Station using the Space Shuttle. NASA KSC is currently working on contracting manned Low Earth Orbit (LEO) to commercial providers, developing Space Launch System, the Orion program, deep space manned programs which could reach Mars, and providing technical expertise for the Launch Services Program for science mission payloads/satellites. KSC has always supported secondary payloads and smaller satellites as the launch provider; however, they are beginning to take a more active role in integrating and testing secondary payloads into future flight opportunities. A new line of business, the Small Payload Integration and Testing Services (SPLITS), has been established to provide a one stop shop that can integrate and test payloads. SPLITS will assist high schools, universities, companies and consortiums interested in testing or launching small payloads. The goal of SPLITS is to simplify and facilitate access to KSC's expertise and capabilities for small payloads integration and testing and to help grow the space industry. An effort exists at Kennedy Space Center to improve the external KSC website. External services has partnered with SPLITS as a content test bed for attracting prospective customers. SPLITS is an emerging effort that coincides with the relaunch of the website and has a goal of attracting external partnerships. This website will be a "front door" access point for all potential partners as it will contain an overview of KSC's services, expertise and includes the pertinent contact information.

report↗