Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launching”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Measurements of cloud nuclei in the effluents from launches of liquid- and solid-fueled rockets

Airborne measurements of two types of cloud nuclei, cloud condensation nuclei (CCN) and ice nuclei (IN), were conducted in the stabilized ground clouds which resulted from the launches of a liquid-fueled ATLAS/Centaur rocket and a solid-fueled TITAN III rocket. Results show that the concentrations of CCN in both types of clouds were greater than ambient values for the 2 hours duration of the measurements. The initial production of CCN active at 0.5% supersaturation in the ATLAS and TITAN clouds was found to be equivalent to a 20 and 700 sec emission, respectively, by the city of Denver, Colorado. After the initial production, the clouds continued to generate CCN at a rate of about 1/cu cm sec. However, concentrations of IN in the ATLAS cloud were greater than ambient values for only a short period after launch, and it appears that the nuclei resulted from entrained launch pad and ground debris. The concentrations of IN in the TITAN cloud were found to be at or below ambient levels until about 2 hours after launch when they increased substantially above ambient values.

Hindman, E. E.↗

Intelsat communications satellite scheduled for launch

To be placed into a highly elliptical transfer orbit by the Atlas Centaur (AC-61) launch vehicle, the INTELSAT V-F satellite has 12,000 voice circuits and 2 color television channels and incorporates a maritime communication system for ship to shore communications. The stages of the launch vehicle and the launch operations are described. A table shows the launch sequence.

Source record↗

Launch processing system concept to reality

The Launch Processing System represents Kennedy Space Center's role in providing a major integrated hardware and software system for the test, checkout and launch of a new space vehicle. Past programs considered the active flight vehicle to ground interfaces as part of the flight systems and therefore the related ground system was provided by the Development Center. The major steps taken to transform the Launch Processing System from a concept to reality with the successful launches of the Shuttle Programs Space Transportation System are addressed.

Bailey, W. W.↗

Assessment of candidate-expendable launch vehicles for large payloads

In recent years the U.S. Air Force and NASA conducted design studies of 3 expendable launch vehicle configurations that could serve as a backup to the space shuttle--the Titan 34D7/Centaur, the Atlas II/Centaur, and the shuttle-derived SRB-X--as well as studies of advanced shuttle-derived launch vehicles with much larger payload capabilities than the shuttle. The 3 candidate complementary launch vehicles are judged to be roughly equivalent in cost, development time, reliability, and payload-to-orbit performance. Advanced shuttle-derived vehicles are considered viable candidates to meet future heavy lift launch requirements; however, they do not appear likely to result in significant reduction in cost-per-pound to orbit.

Source record↗

Heavy Lift Launch Vehicles for 1995 and Beyond

A Heavy Lift Launch Vehicle (HLLV) designed to deliver 300,000 lb to a 540 n mi circular polar orbit may be required to meet national needs for 1995 and beyond. The vehicle described herein can accommodate payload envelopes up to 50 ft diameter by 200 ft in length. Design requirements include reusability for the more expensive components such as avionics and propulsion systems, rapid launch turnaround time, minimum hardware inventory, stage and component flexibility and commonality, and low operational costs. All ascent propulsion systems utilize liquid propellants, and overall launch vehicle stack height is minimized while maintaining a reasonable vehicle diameter. The ascent propulsion systems are based on the development of a new liquid oxygen/hydrocarbon booster engine and liquid oxygen/liquid hydrogen upper stage engine derived from today's SSME technology. Wherever possible, propulsion and avionics systems are contained in reusable propulsion/avionics modules that are recovered after each launch.

Toelle, R.↗

The structuring of NASA launch contracts

The designing of STS Launch Services Agreements (LSAs) in order to balance the U.S. public policy concerns and the needs of domestic and foreign users is described. The subject matter of an LSA is defined by the customer's needs; when and what will be launched is also stated in the LSA. The technical requirements of the launch are contained in the Payload Integration Plan. The price for launching payloads is determined based on factors such as payload control weight and length. The allocation of risks and liability for damage to person and property involved in STS operations is examined; a cross-policy waiver governs property damage, and third-party liability coverage is required. Consideration is given to the policy governing reflying of a commercial mission in the event of an initial failure and to modified LSAs.

O'Brien, John E.↗

Orbital Spacecraft Consumables Resupply System (OSCRS): Monopropellant application to space station and OMV automatic refueling impacts of an ELV launch, volume 4

The use of orbital spacecraft consumables resupply system (OSCRS) at the Space Station is investigated, its use with the orbital maneuvering vehicle, and launch of the OSCRS on an expendable launch vehicles. A system requirements evaluation was performed initially to identify any unique requirements that would impact the design of OSCRS when used at the Space Station. Space Station documents were reviewed to establish requirements and to identify interfaces between the OSCRS, Shuttle, and Space Station, especially the Servicing Facility. The interfaces between OSCRS and the Shuttle consists of an avionics interface for command and control and a structural interface for launch support and for grappling with the Shuttle Remote Manipulator System. For use of the OSCRS at the Space Station, three configurations were evaluated using the results of the interface definition to increase the efficiency of OSCRS and to decrease the launch weight by Station-basing specific OSCRS subsystems. A modular OSCRS was developed in which the major subsystems were Station-based where possible. The configuration of an OSCRS was defined for transport of water to the Space Station.

Source record↗

Artificial intelligent decision support for low-cost launch vehicle integrated mission operations

The feasibility, benefits, and risks associated with Artificial Intelligence (AI) Expert Systems applied to low cost space expendable launch vehicle systems are reviewed. This study is in support of the joint USAF/NASA effort to define the next generation of a heavy-lift Advanced Launch System (ALS) which will provide economical and routine access to space. The significant technical goals of the ALS program include: a 10 fold reduction in cost per pound to orbit, launch processing in under 3 weeks, and higher reliability and safety standards than current expendables. Knowledge-based system techniques are being explored for the purpose of automating decision support processes in onboard and ground systems for pre-launch checkout and in-flight operations. Issues such as: satisfying real-time requirements, providing safety validation, hardware and Data Base Management System (DBMS) interfacing, system synergistic effects, human interfaces, and ease of maintainability, have an effect on the viability of expert systems as a useful tool.

Szatkowski, Gerard P.↗

Launch vehicle operations cost reduction through artificial intelligence techniques

NASA's Kennedy Space Center has attempted to develop AI methods in order to reduce the cost of launch vehicle ground operations as well as to improve the reliability and safety of such operations. Attention is presently given to cost savings estimates for systems involving launch vehicle firing-room software and hardware real-time diagnostics, as well as the nature of configuration control and the real-time autonomous diagnostics of launch-processing systems by these means. Intelligent launch decisions and intelligent weather forecasting are additional applications of AI being considered.

Davis, Tom C., Jr.↗

Liquid Rocket Booster (LRB) for the Space Transportation System (STS) systems study. Appendix F: Performance and trajectory for ALS/LRB launch vehicles

By simply combining two baseline pump-fed LOX/RP-1 Liquid Rocket Boosters (LRBs) with the Denver core, a launch vehicle (Option 1 Advanced Launch System (ALS)) is obtained that can perform both the 28.5 deg (ALS) mission and the polar orbit ALS mission. The Option 2 LRB was obtained by finding the optimum LOX/LH2 engine for the STS/LRB reference mission (70.5 K lb payload). Then this engine and booster were used to estimate ALS payload for the 28.5 deg inclination ALS mission. Previous studies indicated that the optimum number of STS/LRB engines is four. When the engine/booster sizing was performed, each engine had 478 K lb sea level thrust and the booster carried 625,000 lb of useable propellant. Two of these LRBs combined with the Denver core provided a launch vehicle that meets the payload requirements for both the ALS and STS reference missions. The Option 3 LRB uses common engines for the cores and boosters. The booster engines do not have the nozzle extension. These engines were sized as common ALS engines. An ALS launch vehicle that has six core engines and five engines per booster provides 109,100 lb payload for the 28.5 deg mission. Each of these LOX/LH2 LRBs carries 714,100 lb of useable propellant. It is estimated that the STS/LRB reference mission payload would be 75,900 lb.

Source record↗

A view toward future launch vehicles - A civil perspective

Prospective NASA launch vehicle development efforts, which in addition to follow-on developments of the Space Shuttle encompass the Shuttle-C cargo version, various possible Advanced Launch System (ALS) configurations, and various Heavy Lift Launch System (HLLS) design options. Fully and partially reusable manned vehicle alternatives are also under consideration. In addition to improving on the current Space Shuttle's reliability and flexibility, ALS and HLLV development efforts are expected to concentrate on the reduction of operating costs for the given payload-launch capability.

Darwin, Charles R.↗

Some tether applications with small launch vehicles

This paper describes four potentially useful tether applications that are best suited to or even limited to small launch vehicles and their payloads. The first application uses a Small Expendable-tether Deployment System (SEDS) to deploy a 20-40 km tether which transfers momentum from the spent final stage to its payload. This de-orbits the stage and boosts the payload. The other concepts are endo-atmospheric applications specific to various kinds of boosters. In one, a large helicopter gently recovers a reusable booster while it is descending by parachute. Another improves the performance of a small single-stage-to-orbit launch vehicle, by lifting it by helicopter to an altitude of about 3 kilometers before ignition. The last tows an air-breathing launch vehicle to high speed behind a supersonic aircraft, to eliminate any need for low-speed propulsion on the launch vehicle.

Carroll, Joseph A.↗

Evaluation of abort capabilities of rocket-powered single-stage-to-orbit launch vehicles

Application of advanced technologies to future launch vehicle designs would allow the introduction of a rocket-powered, single-stage-to-orbit (SSTO) launch system early in the next century. A fully reusable SSTO vehicle would be quite desirable from an operational standpoint; however, such a vehicle cannot be designed without accompanying technological advances in structure, propulsion, and subsystems. The conceptual design of such a vehicle has recently been completed. This paper examines the abort capabilities of an advanced SSTO launch vehicle which has five main engines. In the event of a single or dual main engine shutdown it was determined when the vehicle could execute return-to-launch-site, abort-to-orbit, or down-range abort maneuvers. Throughout each abort maneuver, vehicle loads are kept within nominal ascent and entry design values.

Stanley, Douglas O.↗

National launch strategy vehicle data management system

The national launch strategy vehicle data management system (NLS/VDMS) was developed as part of the 1990 NASA Summer Faculty Fellowship Program. The system was developed under the guidance of the Engineering Systems Branch of the Information Systems Office, and is intended for use within the Program Development Branch PD34. The NLS/VDMS is an on-line database system that permits the tracking of various launch vehicle configurations within the program development office. The system is designed to permit the definition of new launch vehicles, as well as the ability to display and edit existing launch vehicles. Vehicles can be grouped in logical architectures within the system. Reports generated from this package include vehicle data sheets, architecture data sheets, and vehicle flight rate reports. The topics covered include: (1) system overview; (2) initial system development; (3) supercard hypermedia authoring system; (4) the ORACLE database; and (5) system evaluation.

Cordes, David↗

Advanced Launch Development Program status

The Advanced Launch System is a joint NASA - Air Force program originally directed to define the concept for a modular family of launch vehicles, to continue development programs and preliminary design activities focused primarily on low cost to orbit, and to offer maturing technologies to existing systems. The program was restructed in the spring of 1990 as a result of funding reductions and renamed the Advanced Launch Development Program. This paper addresses the program's status following that restructuring and as NASA and the Air Force commence a period of deliberation over future space launch needs and the budgetary resources available to meet those needs. The program is currently poised to protect a full-scale development decision in the mid-1990's through the appropriate application of program resources. These resources are concentrated upon maintaining the phase II system contractor teams, continuing the Space Transportation Engine development activity, and refocusing the Advanced Development Program demonstrated activities.

Colgrove, Roger↗

The Personnel Launch System

NASA has begun to study candidate vehicles for manned access to space in support of the Space Station or other future missions requiring on-demand transportation of people to and from earth orbit. One such system, which would be used to complement the present Shuttle or an upgraded version, is the Personnel Launch System (PLS), which is envisioned as a reusable priority vehicle to place people and small payloads into orbit using an experimental launch vehicle. The design of the PLS is based on a Space Station crew changeout requirement whereby eight passengers and two crew members are flown to the station and a like number are returned within a 72 hour mission duration. Experimental and computational aerothermodynamic heating studies have been conducted using a new two-color thermographic technique that involved coating the model with a phosphor that radiates at varying color intensities as a function of temperature when illuminated with UV light. A full-scale model, the HL-20, has been produced and will be used for man-machine research. Three launch vehicle concepts are being considered, a Titan IV, the Advanced Launch System, and a Shuttle equipped with liquid rocket boosters.

Piland, William M.↗

The cost of unreliability in the avionics suite of a launch vehicle

The main objective of the Advanced Launch System (ALS) program is to realize a substantial reduction in recurring launch costs over present launch systems. A methodology is presented for assessing the impact of the reliability of the avionics suite on the recurring launch cost of the ALS. The methodology is illustrated by focusing on two architectures. The first is a distillation of a typical architecture for this type of application. The second is a simplified implementation of the Advanced Information Processing System (AIPS) technology developed at the Charles Stark Draper Laboratory, Inc. Both architectures utilize redundancy of hardware to tolerate faults. the key contributors to the cost of unreliability are identified and modeled utilizing Markov modeling techniques for each of the two architectures. The results are presented along with the more traditional costs for these avionics suites.

Rosch, Gene↗

An Outlook for the Twenty First Century as to Launch Operations, Facilities, and Systems

A discussion of launch systems for the 21st century is presented. The following launch systems are mentioned: the European Ariane family; the Japanese H-1 and H-2; the U.S.'s Titan, Delta, Atlas, and Space Shuttle; the Chinese Long March 4; and the USSR's Mir, Proton, and Zenit. Systems currently under investigation, including the Assured Crew Return Vehicle, Personnel Launch Systems, and Single Stage to Orbit (SSTO), are discussed. Automated operations, low Earth orbit, and reliability are addressed. Standards that were acceptable for ballistic missiles will not be acceptable for future launch vehicles. The achievement of significantly higher levels of reliability is seen as the challenge.

Loftus, Joseph P., Jr.↗