Search NASA⌕ Search

SEARCH · Search NASA

Results for “Linear accelerator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Study of beam dynamics of a 100 MeV electron linac

A 100 MeV electron linear accelerator is proposed to be built by APPD, BARC, Mumbai, India for neutron generation purposes. This paper presents the results of electron beam tracking for a 100 MeV standing wave electron linac to determine preferential operation parameters from the results of beam dynamics studies. (author)

43 PARTICLE ACCELERATORS↗

SU-E-J-200: Operation of An Electron Accelerator On An Integrated MR-Linac System

Purpose: An integrated MRI guided radiotherapy system poses a challenge of operating a linear accelerator in the presence of a magnetic field as the magnetic force acting on the electrons could Result in radiation source displacement and subsequent reduction of dose output. It was the purpose of this work to test the performance of a linac in the presence of a 1.5T MRI system. Methods: The first experimental MRI guided radiotherapy system at UMC-Utrecht consisting of an Elekta linac rotating around a 1.5T Magnex magnet was examined. A passive magnetic shield was simulated, designed and installed to reduce the influence of the MRI magnet stray field on the electron beamline. The B field inside the shield was measured as a function of gantry angle and measurements of dose rate constancy upon gantry rotation were performed. Results: The magnitude of the magnetic field on the electron beam path without the shield was as high as 70G. It varied by up to 15G with gantry rotation due to the presence of metal beams in the bunker floor which resulted in dose output drop of up to 70% at certain gantry angles. With the prototype shield, field magnitude was reduced to well below 0.5G everywhere along the electron beam path. Field variation with gantry rotation was decreased to below 0.2G and enabled dose output of the linac to be recovered at all gantry angles. The homogeneity of the field inside the MRI magnet has not been compromised. Conclusion: It was demonstrated that the influence of the 1.5T magnet and the bunker design on the linac operation has been minimised. The performance will be further improved on the Elekta Atlantic system which incorporates a newly developed and optimised Philips magnet design and bunker construction. J Harasimowicz, D Roberts, I Shinton and S Sund are employed by Elekta Limited Crawley, H Wang and M Zhong are employed by Elekta Beijing Medical Systems Co. Ltd., J Overweg is employed by Philips Technologie GmbH Forschungslaboratorien.

60 APPLIED LIFE SCIENCES↗

First results of 28 GHz superconducting electron cyclotron resonance ion source for KBSI accelerator

The 28 GHz superconducting electron cyclotron resonance (ECR) ion source has been developed to produce a high current heavy ion for the linear accelerator at KBSI (Korea Basic Science Institute). The objective of this study is to generate fast neutrons with a proton target via a p(Li,n)Be reaction. The design and fabrication of the essential components of the ECR ion source, which include a superconducting magnet with a liquid helium re-condensed cryostat and a 10 kW high-power microwave, were completed. The waveguide components were connected with a plasma chamber including a gas supply system. The plasma chamber was inserted into the warm bore of the superconducting magnet. A high voltage system was also installed for the ion beam extraction. After the installation of the ECR ion source, we reported the results for ECR plasma ignition at ECRIS 2014 in Russia. Following plasma ignition, we successfully extracted multi-charged ions and obtained the first results in terms of ion beam spectra from various species. This was verified by a beam diagnostic system for a low energy beam transport system. In this article, we present the first results and report on the current status of the KBSI accelerator project.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Th and U fuel photofission study by NTD for AD-MSR subcritical assembly

During the last decade a considerable effort has been devoted for developing energy generating systems based on advanced nuclear technology within the design concepts of GEN-IV. Thorium base fuel systems such as accelerator driven nuclear reactors are one of the often mentioned attractive and affordable options. Several radiotherapy linear accelerators are on the market and due to their reliability, they could be employed as drivers for subcritical liquid fuel assemblies. Bremsstrahlung photons with energies above 5.5MeV, induce (γ,n) and (e,e’n) reactions in the W-target. Resulting gamma radiation and photo or fission neutrons may be absorbed in target materials such as thorium and uranium isotopes to induce sustained fission or nuclear transmutation in waste radioactive materials. Relevant photo driven and photo-fission reaction cross sections are important for actinides {sup 232}Th, {sup 238}U and {sup 237}Np in the radiotherapy machines energy range of 10-20 MV. In this study we employ passive nuclear track detectors (NTD) to determine fission rates and neutron production rates with the aim to establish the feasibility for gamma and photo-neutron driven subcritical assemblies. To cope with these objectives a 20 MV radiotherapy machine has been employed with a mixed fuel target. Results will support further development for a subcritical assembly employing a thorium containing liquid fuel. It is expected that acquired technological knowledge will contribute to the Venezuelan nuclear energy program.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Prompt Gamma Neutron Activation Analysis of Niobium for Characterization of Light Interstitials

High purity niobium metal is used in the construction of superconducting radio frequency (SRF) cavities in superconducting particle accelerators. The Spallation Neutron Source at Oak Ridge National Laboratory is an example of an SRF linear accelerator (LINAC) that requires this high purity niobium material. For the SRF cavities to function well, it is necessary that the cavity wall have a high thermal conductivity so that the radio frequency (RF) power can be dissipated into the liquid helium coolant. For a high thermal conductivity of the niobium metal to be achieved, it is required to have extremely low levels of impurities. The current industry standard for determining the quality of the high purity niobium material is the residual resistivity ratio (RRR) technique. In this technique, the temperature dependency of a niobium metal sample is determined at temperatures near that of liquid helium in order to establish where the superconducting jump occurs. With this method, it is possible to find the general level of impurity of the metal sample, but not the specific elements that are contributing to the impurity. The impurities that are of particular interest to manufacturers of niobium for SRF use are tantalum and light interstitials, such as hydrogen, carbon, nitrogen, and oxygen. In this research, we focus on determining the analytical sensitivity of the detector system and characterizing the light interstitial content in high purity niobium metal through the use of Prompt Gamma Neutron Activation Analysis (PGNAA). PGNAA is an analytical technique that can be utilized to determine the concentration of elemental components in a wide variety of materials with high precision and reproducibility. In this process, neutrons bombard a sample material, causing the emission of gamma rays from the sample. Each element emits a unique spectrum of gamma radiation, which allows for identification of the elements present in the sample. (authors)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

SU-F-E-18: Training Monthly QA of Medical Accelerators: Illustrated Instructions for Self-Learning

Purpose: To develop and test clear illustrated instructions for training of monthly mechanical QA of medical linear accelerators. Methods: Illustrated instructions were created for monthly mechanical QA with tolerance tabulated, and underwent several steps of review and refinement. Testers with zero QA experience were then recruited from our radiotherapy department (1 student, 2 computational scientists and 8 dosimetrists). The following parameters were progressively de-calibrated on a Varian C-series linac: Group A = gantry angle, ceiling laser position, X1 jaw position, couch longitudinal position, physical graticule position (5 testers); Group B = Group A + wall laser position, couch lateral and vertical position, collimator angle (3 testers); Group C = Group B + couch angle, wall laser angle, and optical distance indicator (3 testers). Testers were taught how to use the linac, and then used the instructions to try to identify these errors. A physicist observed each session, giving support on machine operation, as necessary. The instructions were further tested with groups of therapists, graduate students and physics residents at multiple institutions. We have also changed the language of the instructions to simulate using the instructions with non-English speakers. Results: Testers were able to follow the instructions. They determined gantry, collimator and couch angle errors within 0.4, 0.3, and 0.9degrees of the actual changed values, respectively. Laser positions were determined within 1mm, and jaw positions within 2mm. Couch position errors were determined within 2 and 3mm for lateral/longitudinal and vertical errors, respectively. Accessory positioning errors were determined within 1mm. ODI errors were determined within 2mm when comparing with distance sticks, and 6mm when using blocks, indicating that distance sticks should be the preferred approach for inexperienced staff. Conclusion: Inexperienced users were able to follow these instructions, and catch errors within the criteria suggested by AAPM TG142 for linacs used for IMRT.

60 APPLIED LIFE SCIENCES↗

Ku-band electron linac for battery-powered hand-portable 2-MeV X-ray generator

X-ray generators, producing radiation in MeV range, are a critical tool for radiography, non-destructive testing and security applications. Field operation of such source requires them to be hand-portable, autonomous and allow parameter adjustability. RF linear accelerators can serve as a flexible, reliable, and robust radiation generator alternative to dangerous radioisotopes and bulky betatrons that are currently used for field radiography if their size, weight, cost, and imaging performance are matched to these sources. Here, in this paper, we present the design and test results of a 2 MeV Ku-band electron linac for a hand-portable X-ray generator system for field radiography being developed by RadiaBeam. The dramatic scale of miniaturization and cost-reduction is achieved thanks to the implementation of innovative technologies such as air-cooled Ku-band air-traffic control magnetrons, a split accelerating structure fabrication technique, and solid-state Marx modulators. This paper presents the design of the first prototype of the accelerator, its operation from Li-Ion batteries, as well as high-power and beam measurements.

43 PARTICLE ACCELERATORS↗

Light ion production for a future radiobiological facility at CERN: Preliminary studies

Recent medical applications of ions such as carbon and helium have proved extremely effective for the treatment of human patients. However, before now a comprehensive study of the effects of different light ions on organic targets has not been completed. There is a strong desire for a dedicated facility which can produce ions in the range of protons to neon in order to perform this study. This paper will present the proposal and preliminary investigations into the production of light ions, and the development of a radiobiological research facility at CERN. The aims of this project will be presented along with the modifications required to the existing linear accelerator (Linac3), and the foreseen facility, including the requirements for an ion source in terms of some of the specification parameters and the flexibility of operation for different ion types. Preliminary results from beam transport simulations will be presented, in addition to some planned tests required to produce some of the required light ions (lithium, boron) to be conducted in collaboration with the Helmholtz-Zentrum für Materialien und Energie, Berlin.

43 PARTICLE ACCELERATORS↗

Understanding the Implications of a LINAC’s Microstructure on Devices and Photocurrent Models

Here, the effect of a linear accelerator’s (LINAC’s) microstructure (i.e., train of narrow pulses) on devices and the associated transient photocurrent models are investigated. The data indicate that the photocurrent response of Si-based RF bipolar junction transistors and RF p-i-n diodes is considerably higher when taking into account the microstructure effects. Similarly, the response of diamond, SiO 2 , and GaAs photoconductive detectors (standard radiation diagnostics) is higher when taking into account the microstructure. This has obvious hardness assurance implications when assessing the transient response of devices because the measured photocurrent and dose rate levels could be underestimated if microstructure effects are not captured. Indeed, the rate the energy is deposited in a material during the microstructure peaks is much higher than the filtered rate which is traditionally measured. In addition, photocurrent models developed with filtered LINAC data may be inherently inaccurate if a device is able to respond to the microstructure.

43 PARTICLE ACCELERATORS↗

Three-Dimensional Particle-in-Cell Analysis of Mechanical Design Tolerances of the Scorpius Injector With Warp

Here, this article examines the mechanical design tolerances for the Scorpius injector using a 3-D particle-in-cell (PIC) code. In order to meet its objective as a high-fidelity, multipulse flash X-ray source, the accelerator has requirements for the electron beam in order to minimize the spot size of the beam focused onto a foil target to create high fluence X-rays at energies greater than 10 MeV. The requirements for alignment of the cathode, anode beam pipe, focusing solenoids, and transport solenoids specified using Trak and AMBER are independently verified using a 3-D electrostatic/magnetostatic model of the Scorpius injector, including transverse magnetic field errors that arise from mechanical alignment errors. It is predicted that the injector will meet the performance requirements for radiographic operation and has a design margin to correct for potentially unforeseen operating conditions.

42 ENGINEERING↗

WE-G-17A-09: Novel Magnetic Shielding Design for Inline and Perpendicular Integrated 6 MV Linac and 1.0 T MRI Systems

Purpose: The influence of fringe magnetic fields delivered by magnetic resonance imaging (MRI) on the beam generation and transportation in Linac is still a major challenge for the integration of linear accelerator and MRI (Linac-MRI). In this study, we investigated an optimal magnetic shielding design for Linac-MRI and further characterized the beam trajectory in electron gun. Methods: Both inline and perpendicular configurations were analyzed in this study. The configurations, comprising a Linac-MRI with a 100cm SAD and an open 1.0 T superconductive magnet, were simulated by the 3D finite element method (FEM). The steel shielding around the Linac was included in the 3D model, the thickness of which was varied from 1mm to 20mm, and magnetic field maps were acquired with and without additional shielding. The treatment beam trajectory in electron gun was evaluated using OPERA 3d SCALA with and without shielding cases. Results: When Linac was not shielded, the uniformity of diameter sphere volume (DSV) (30cm) was about 5 parts per million (ppm) and the fringe magnetic fields in electron gun were more than 0.3 T. With shielding, the magnetic fields in electron gun were reduced to less than 0.01 T. For the inline configuration, the radial magnetic fields in the Linac were about 0.02T. A cylinder steel shield used (5mm thick) altered the uniformity of DSV to 1000 ppm. For the perpendicular configuration, the Linac transverse magnetic fields were more than 0.3T, which altered the beam trajectory significantly. A 8mm-thick cylinder steel shield surrounding the Linac was used to compensate the output losses of Linac, which shifted the magnetic fields' uniformity of DSV to 400 ppm. Conclusion: For both configurations, the Linac shielding was used to ensure normal operation of the Linac. The effect of magnetic fields on the uniformity of DSV could be modulated by the shimming technique of the MRI magnet. NIH/NIGMS grant U54 GM104944, Lincy Endowed Assistant Professorship.

43 PARTICLE ACCELERATORS↗

SU-F-T-487: On-Site Beam Matching of An Elekta Infinity with Agility MLC with An Elekta Versa HD

Purpose: Historically, beam matching of similar Linear Accelerators has been accomplished by sending beam data to the manufacturer to match at their factory. The purpose of this work is to demonstrate that fine beam matching can be carried out on-site as part of the acceptance test, with similar or better results. Methods: Initial scans of a 10 × 10 Percent depth dose (PDD) and a 40 × 40 beam profile at the depth of Dmax, for 6MV and 10 MV were taken to compare with the standard beam data from the Versa. The energy was then adjusted and the beam steered to achieve agreement between the depth dose and the horns of the beam profile. This process was repeated until the best agreement between PDD and profiles was achieved. Upon completion, all other clinical data were measured to verify match. This included PDD, beam profiles, output factors and Wedge factors. For electron beams PDD’s were matched and the beam profiles verified for the final beam energy. Confirmatory PDD and beam profiles for clinical field sizes, as well as Output Factors were measured. Results: The average difference in PDD’s for 6MV and 10MV were within 0.4% for both wedged and open fields. Beam profile comparisons over the central 80% of the field, at multiple depths, show agreement of 0.8% or less for both wedged and open fields. Average output factor agreement over all field sizes was 0.4% for 6MV and 0.2 % for 10MV. Wedge factors agreement was less than 0.6% for both photon energies over all field sizes. Electron PDD agreed to 0.5mm. Cone ratios agreed to 1% or less. Conclusion: This work indicates that beam matching can be carried out on-site simply and quickly. The results of this beam matching can achieve similar or better results than factory matching.

43 PARTICLE ACCELERATORS↗

RPI LINAC refurbishment and upgrade project

The Electron Linear Accelerator at Rensselaer Polytechnic Institute (RPI) was constructed in the late 1950s and started operation in 1961 [1]. The facility was designed and used primarily for measurements of Nuclear Data (ND) with emphasis on the resonance energy region. As such it was designed to produce short pulses of neutrons (5-5000 ns) and equipped with detection stations at different neutron flight path distances from the source (15 m-250 m). When the LINAC started operation it was one of the most powerful accelerators in the world for high energy-resolution measurements in the resonance region. The original LINAC with some upgrades is still in operation but no longer provides world class capabilities for measurements with short pulses. In 2011 discussions between the RPI ND group, Naval Reactors, and the Nuclear Criticality Safety Program about the future of the LINAC concluded that maintaining the capability to perform world-class nuclear data measurements at RPI was desirable. To that end, it was decided to refurbish the facility and upgrade the accelerator capabilities to enable high accuracy measurement in the resonance region with narrow neutron pulse and high electron beam power. Located at a major US technical university, this project provides a needed US nuclear data capability for both research and education, and also includes external users and industrial applications.

43 PARTICLE ACCELERATORS↗

Spiral 2 cryogenic system overview: Design, construction and performance test

The new particle accelerator project Spiral 2 at GANIL (“Grand Accélérateur d’Ions Lourds, i.e. National Large Heavy Ion Accelerator) in Caen (France) is a very large installation, intended to serve fundamental research in nuclear physics. The heart of the future machine features a superconductor linear accelerator, delivering a beam until 20Mev/A, which are then used to bombard a matter target. The resulting reactions, such as fission, transfer, fusion, etc. will generate billions of exotic nuclei. To achieve acceleration of the beam, 26 cavities which are placed inside cryomodules at helium cryogenic temperature will be used. AL-AT (Air Liquide Advanced Technologies) takes part to the project by supplying cryogenic plant. The plant includes the liquefier associated to its compressor station, a large dewar, a storage tank for helium gas and transfer lines. In addition, a helium recovery system composed of recovery compressor, high pressure storage and external purifier has been supplied. Customized HELIAL LF has been designed, manufactured and tested by AL-AT to match the refrigeration power need for the Spiral 2 project which is around 1300 W equivalent at 4.5 K.

43 PARTICLE ACCELERATORS↗

The Tandem-ALPI-PIAVE accelerator complex of LNL

Heavy ion beams are delivered at the Laboratori Nazionali di Legnaro by the accelerator complex Tandem-ALPI-PIAVE. The Tandem XTU is a Van de Graaff accelerator normally operated at terminal voltages of up to about 15 MV. The Tandem accelerator can be operated in stand-alone mode or as an injector for the linac booster ALPI. The linear accelerator ALPI is built of superconducting resonant cavities and consists of a low-beta branch, particularly important for the acceleration of the heavier mass ions, a medium-beta branch, and a high-beta branch. ALPI can be operated also with the PIAVE injector that consists of a superconducting linac and an ECR source. The PIAVE source was mainly used for the acceleration of intense noble gas beams but most recently also a first metallic beam was delivered to the users. The accelerator complex delivers beams of ions from protons to gold in three experimental areas on 11 different beam lines. A rich scientific activity is ongoing at the Tandem-ALPI-PIAVE accelerator complex, beam time being shared between nuclear physics research and applied and interdisciplinary physics research. An overview of the present status and perspectives of the Tandem-ALPI-PIAVE complex and its physics program is given in the present paper.

43 PARTICLE ACCELERATORS↗

Cryogenic supply for accelerators and experiments at FAIR

In the coming years the new international accelerator facility FAIR (Facility for Antiproton and Ion Research), one of the largest research projects worldwide, will be built at GSI. In the final construction FAIR consists of synchrotrons and storage rings with up to 1,100 meters in circumference, two linear accelerators and about 3.5 kilometers beam transfer lines. The existing GSI accelerators serve as pre-accelerators. Partly the new machines will consist of superconducting magnets and therefore require a reliable supply with liquid helium. As the requirements for the magnets is depending on the machine and have a high variety, the cooling system is different for each machine; two phase cooling, forced flow cooling and bath cooling respectively. In addition the cold mass of the individual magnets varies between less than 1t up to 80t and some magnets will cause a dynamic heat load due to ramping that is higher than the static loads. The full cryogenic system will be operated above atmospheric pressure. The refrigeration and liquefaction power will be provided by two main cryogenic plants of 8 and 25 kW at 4K and two smaller plants next to the experiments.

43 PARTICLE ACCELERATORS↗

SU-E-T-406: Evaluation of the Stealth Chamber by IBA Under Large Field Conditions

Purpose: To evaluate the performance of the stealth chamber by IBA under large field conditions. Methods: Measurement of PDDs and profiles for fields of 10×10, 15×15, 20×20 and 25×25 cm2 were acquired in a blue phantom2 scanning system for 6 and 15 MV beams in a Varian TrueBeam linear accelerator. The stealth chamber has a field size limit of 25×25 cm2. Measurements with two different detector set were performed. First a cc13 chamber as field and reference chamber was acquired. And with a cc13 chamber as field detector and the stealth chamber as the reference chamber. PDDs for the fields mentioned above were conducted and profiles with the same fields at depth of dmax, 5, 10 and 20 cm were acquired for comparison. Results: Examination of the PDDs and profile comparison with a criterion of 1% and 1 mm agreement was performed. Very good agreement between the cc13 and stealth chamber set was observed within the chosen criterion. Conclusion: This work indicates the comparable results obtained with the use of the stealth chamber and cc13 as the reference chamber in relative dosimetry measurements.

43 PARTICLE ACCELERATORS↗

Amplitude-dependent orbital period in alternating gradient accelerators

Orbital period in a ring accelerator and time of flight in a linear accelerator depend on the amplitude of betatron oscillations. The variation is negligible in ordinary particle accelerators with relatively small beam emittance. In an accelerator for large emittance beams like muons and unstable nuclei, however, this effect cannot be ignored. In this study, we measured orbital period in a linear non-scaling fixed-field alternating-gradient accelerator, which is a candidate for muon acceleration, and compared it with the theoretical prediction. The good agreement between them gives important ground for the design of particle accelerators for a new generation of particle and nuclear physics experiments.

43 PARTICLE ACCELERATORS↗