Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operating experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

A Basic Robotic Excavator (the Glenn Digger): Description, Design, and Initial Operation

This paper describes the design, commercial part selections, fabrication, assembly, installation, and initial operation of a two degree of freedom robotic excavator. Colloquially referred to as "the NASA Glenn Digger," it was designed specifically to be mounted onto, and to operate with, the then newly developed Centaur 2 robotic mobility base. The excavator, when mounted to Centaur 2, is designed to scoop loose regolith from the terrain, raise its loaded bucket up and dump the load into a hopper of at least a 1-m-height. The hopper represents the input to a machine that would process the raw material, such as to produce oxygen from lunar regolith as would be required for long-term lunar habitation. This equipment debuted at the annual Research and Technology Studies ("Desert RATS", Ref. 1) event held north of Flagstaff, Arizona, in September of 2010, when the Digger was successfully joined to Centaur 2 and the shoveling articulation was demonstrated. During 2011, the hardware was modified for added strength, strain gauges were added to measure loads, and the controls were improved in preparation for the 2011 Desert RATS event, where additional "field operations" experience was gained.

backhoe↗

On-Demand Mobility (ODM) Technical Pathway: Enabling Ease of Use and Safety

On-demand mobility (ODM) through aviation refers to the ability to quickly and easily move people or equivalent cargo without delays introduced by lack of, or infrequently, scheduled service. A necessary attribute of ODM is that it be easy to use, requiring a minimum of special training, skills, or workload. Fully-autonomous vehicles would provide the ultimate in ease-of-use (EU) but are currently unproven for safety-critical applications outside of a few, situationally constrained applications (e.g. automated trains operating in segregated systems). Applied to aviation, the current and near-future state of the art of full-autonomy, may entail undesirable trade-offs such as very conservative operational margins resulting in reduced trip reliability and transportation utility. Furthermore, acceptance by potential users and regulatory authorities will be challenging without confidence in autonomous systems in developed in less critical, but still challenging applications. A question for the aviation community is how we can best develop practical ease-of-use for aircraft that are sized to carry a small number of passengers (e.g. 1-9) or equivalent cargo. Such development is unlikely to be a single event, but rather a managed, evolutionary process where responsibility and authority transitions from human to automation agents as operational experience is gained with increasingly intelligent systems. This talk presents a technology road map being developed at NASA Langley, as part of an overall strategy to foster ODM, for the development of ease-of-use for ODM aviation.

Goodrich, Ken↗

Conjunction Assessment Techniques and Operational Results from the Magnetospheric Multiscale Mission

This paper will describe the results that have been obtained to date during the MMS mission concerning conjunction assessment. MMS navigation makes use of a weak-signal GPS-based system: this allows signals to be received even when MMS is flying above the GPS orbits, producing a highly accurate determination of the four MMS orbits. This data is downlinked to the MMS Mission Operations Center (MOC) and used by the Flight Dynamics Operations Area (FDOA) for both maneuver design and conjunction assessment. The MMS fly in tetrahedron formations around apogee, in order to collect simultaneous particles and fields science data. The original plan was to fly tetrahedra between 10 and 160 km in size; however, after Phase 1a of the mission, the science team requested that smaller sizes be flown if feasible. After analysis (to be detailed in a companion paper), a new minimum size of 7 km was decided upon. Flying at this reduced scale size makes conjunction assessment between the MMS spacecraft even more important: the methods that are used by the MMS FDOA to address this problem will be described in the paper, and a summary given of the previous analyses that went into the development of these techniques. Details will also be given of operational experiences to date. Finally, two CA mitigation maneuver types that have been designed (but never yet required to actually be performed) will also be outlined.

conjunction Assessment↗

Workload and Performance in Air Traffic Control: Exploring the Influence of Levels of Automation and Variation in Task Demand

In air traffic control, task demand and workload have important implications for the safety and efficiency of air traffic. Task demand is dynamic, however, research on demand transitions and associated controller perception and performance is limited. In addition, there is a comparatively restricted understanding of the influence of task demand transitions on workload and performance, in association with automation. This study used an air traffic control simulation to investigate the influence of task demand transitions and two conditions of varying automation, on workload and efficiency-related performance. Findings showed that a both the direction of the task demand variation, and the amount of automation, influenced the relationship between workload and performance. Further research is needed to enhance understanding of demand transition and workload history effects on operator experience and performance, in both air traffic control and other safety-critical domains.

air traffic control↗

NASA's Space Launch System: Progress Report

After more than four decades exploring the space environment from low Earth orbit and developing long-duration spaceflight operational experience with the International Space Station (ISS), NASA is once again preparing to send explorers into deep space. Development, test and manufacturing is now underway on the launch vehicle, the crew spacecraft and the ground processing and launch facilities to support human and robotic missions to the moon, Mars and the outer solar system. The enabling launch vehicle for these ambitious new missions is the Space Launch System (SLS), managed by NASA's Marshall Space Flight Center (MSFC). Since the program began in 2011, the design has passed Critical Design Review, and extensive development, test and flight hardware has been produced by every major element of the SLS vehicle. Testing continues on engines, boosters, tanks and avionics. While the program has experienced engineering challenges typical of a new development, it continues to make steady progress toward the first SLS mission in roughly two years and a sustained cadence of missions thereafter. This paper will discuss these and other technical and SLS programmatic successes and challenges over the past year and provide a preview of work ahead before first flight.

Cook, Jerry↗

The Relationship Between Workload and Performance in Air Traffic Control: Exploring the Influence of Levels of Automation and Variation in Task Demand

In an air traffic environment, task demand is dynamic. However, previous research has largely considered the association of task demand and controller performance using conditions of stable task demand. Further, there is a comparatively restricted understanding of the influence of task demand transitions on workload and performance in association with different types and levels of automation that are available to controllers. This study used an air traffic control simulation to investigate the influence of task demand transitions, and two conditions of automation, on workload and efficiency-related performance. Findings showed that both the direction of the task demand variation and the amount of automation influenced the relationship between workload and performance. Findings are discussed in relation to capacity and arousal theories. Further research is needed to enhance understanding of demand transition and workload history effects on operator experience and performance, in both air traffic control and other safety-critical domains.

function allocation↗

NASA CA Operations Devolution: Status Update

What is Devolution? Devolution is a spreading of CA (Conjunction Assessment) operations responsibilities to mission FOTs (Flight Operations Teams): Permits efficiencies in handling the increased workload caused by Space Fence and large constellations; Missions given more flexibility in choosing specific approach to CA requirements that resonates best with their particular needs; CARA (Conjunction Assessment Risk Analysis) retains Agency oversight through an established NASA Standard - will establish requirements for devolved CA preparations, processing, and operations conduct. Devolution is a PROPOSED paradigm under consideration by SMD (Space Missions Directorate): Number of activities required before Agency-level decision can be rendered; Agency requirements established via approved CA Standard; Operational experience testimony from two separate pilot programs; After these activities complete, decision will be made whether devolution is a feasible option for missions; CARA is recommending devolution to exist as an option for missions.

conjunction↗

Task Demand Variation in Air Traffic Control: Implications for Workload, Fatigue, and Performance

In air traffic control, task demand and workload have important implications for the safety and efficiency of air traffic, and remain dominant considerations. Within air traffic control, task demand is dynamic. However, research on demand transitions and subsequent controller perception and performance is limited. This research uses an air traffic control simulation to investigate the effect of task demand transitions, and the direction of those transitions, on workload and fatigue and one efficiency performance measure. Results indicate that a change in task demand appears to affect both workload and fatigue ratings, although not necessarily performance. In addition, participants' workload and fatigue ratings in equivalent task demand periods appear to change depending on the demand period preceding the time of the current ratings. Further research is needed to enhance understanding of demand transition and workload history effects on operator experience and performance, in both air traffic control and other safety-critical domains.

workload history↗

Task Demand Variation in Air Traffic Control: Implications for Controller Workload, Fatigue, and Performance

In air traffic control, task demand and workload have important implications for the safety and efficiency of air traffic, and remain dominant considerations. Within air traffic control, task demand is dynamic. However, research on demand transitions and subsequent controller perception and performance is limited. This research uses an air traffic control simulation to investigate the effect of task demand transitions, and the direction of those transitions, on workload and fatigue and one efficiency performance measure. Results indicate that a change in task demand appears to affect both workload and fatigue ratings, although not necessarily performance. In addition, participants workload and fatigue ratings in equivalent task demand periods appear to change depending on the demand period preceding the time of the current ratings. Further research is needed to enhance understanding of demand transition and workload history effects on operator experience and performance, in both air traffic control and other safety-critical domains.

workload history↗

NASA’s Space Launch System: Enabling a New Generation of Lunar Exploration

Following two decades of operational experience in low-Earth orbit (LEO), NASA has turned its focus once again to deep space exploration. The Agency is building the Space Launch System (SLS) to take astronauts and cargo to the Moon and send robotic spacecraft deep into the solar system. Offering unmatched performance, departure energy and payload capacity, SLS is designed to evolve into progressively more powerful configurations, enabling a new generation of human exploration of the Moon in preparation for future missions to Mars. The first build of the Block 1 vehicle is nearly complete for Exploration Mission-1 (EM-1), the first integrated flight of SLS and the Orion crew vehicle. EM-1 will send an uncrewed Orion to a distant retrograde lunar orbit in order to test and verify new systems, and along the way will deploy 13 6U-class CubeSats in deep space along the upper stage disposal trajectory after separation from Orion. The Agency’s current plans call for the first three missions on the SLS manifest to utilize the Block 1 vehicle in crew and cargo configurations. A more powerful evolved vehicle, Block 1B, will provide additional mass and volume performance using a new Exploration Upper Stage (EUS). Block 1B will lift 34 to 40 metric tons (t) to trans-lunar injection (TLI), depending on crew or cargo configuration. The Block 1B crew configuration will offer as much payload volume as industry-standard 5 m-diameter fairings to co-manifested payloads in a Universal Stage Adapter (USA). The Block 1B cargo variant will accommodate 8.4 meter-diameter fairings in 62.7-foot (19.1 meter) or 90-foot (27.4 meter) lengths. Adding smallsat secondary payloads to ride along with primary and co-manifested payloads on future flights may be possible, depending on mass margins. Leveraging a flight-proven, well-understood propulsion system, SLS’s flexible architecture, unmatched performance and expansive payload accommodations will open exciting new mission possibilities in deep space. Launches of habitat modules for NASA’s new Gateway lunar outpost, the next generation of robotic spacecraft to the far reaches of the solar system, large-aperture deep space telescopes, probes to interstellar space and the return of astronauts to the Moon are all possible with SLS.

Creech, Stephen D.↗

TPSAS-NF1676L-11132-DND

The Orion Pad Abort 1 Flight Test occurred on May 6th, 2010 at White Sands Missile Range in New Mexico. The test was the first for the Orion vehicle and was primarily a test of the Orion Launch Abort System’s ability to execute an abort from the launch pad. The test was successful, and, in most cases, results were well within predicted outcomes. For this test, the thermal control subsystem was an inherent part of the flight operations team. The thermal team provided pre-launch predictions of component temperatures, set component temperature limits, and monitored those limits during the flight operations process as part of the primary flight operations team. The thermal team was also responsible for day-of-flight predictions of the main abort motor’s propellant mean bulk temperature, a key launch constraint for the test. After the test, thermal data was collected, reviewed, and compared against pre-launch predictions showing very good agreement in most areas. Based on the pre-test and flight operations experience, a detailed list of lessons learned has been developed and will be reviewed prior to potential future Orion or other such flight tests.

Joseph F Gasbarre↗

TPSAS-NF1676L-11021-DND

The Orion Pad Abort 1 Flight Test occurred on May 6th, 2010 at White Sands Missile Range in New Mexico. The test was the first for the Orion vehicle and was primarily a test of the Orion Launch Abort System’s ability to execute an abort from the launch pad. The test was successful and in most cases results were well within predicted outcomes. For this test, the thermal control subsystem was an inherent part of the flight operations team. The thermal team provided pre-launch predictions of component temperatures, set component temperature limits, and monitored those limits during the flight operations process as part of the primary flight operations team. The thermal team was also responsible for day-of-flight predictions of the main abort motor’s propellant mean bulk temperature, a key launch constraint for the test. After the test, thermal data was collected, reviewed, and compared against pre-launch predictions showing very good agreement in most areas. Based on the pre-test and flight operations experience, a detailed list of lessons learned has been developed and will be reviewed prior to potential future Orion or other such flight tests.

Joseph F Gasbarre↗

Cassini In-Flight Navigation Adaptations

In the nearly two decades of Cassini flight, adaptations to navigation processes were applied as characteristics unique to Cassini were identified and spacecraft configuration changes were implemented. Additionally, operational experience was leveraged into more efficient processes, better modeling, and more robust contingency strategies. Trajectory adjustments were implemented to allow further investigation of surprising science discoveries meriting more attention. Unique analyses were performed to determine how to best accomplish atypical science observations while maintaining acceptable risk levels. Descriptions of the most significant adaptations are organized according to the affected navigation subsystems: trajectory design, orbit determination, optical navigation, and maneuver design.

Wagner, Sean↗

Preparing to Assure Mission Success

Space flight missions are inherently risky. The mission operations assurance discipline grew out of strategies to control error and evolved into what today is an independent technical authority dedicated to achieving mission success. After the Mars Climate Orbiter loss, NASA made a set of recommendations for missions. Two of those recommendations led to the creation of today’s Mission Operations Assurance Manager role: (1) require an independent Mission Assurance representative during the operational phase of every flight project, and (2) require all flight projects to report and track post-launch anomalies. Since then, the MOAM role has been continually refined by lessons learned from its practice on more than 20 concurrent missions. The MOAM role requires significant operations experience as well as an additional set of skills. In the interests of developing a cadre of potential MOAMs, the MOAM training program was developed. It is a 14-unit set of presentations/discussions covering the 11 categories of MOAM tasks. It is offered to new MOAMs and interested systems engineers with an eye to preparing both types of personnel for present and future assignments, as well as building relationships among personnel of different organizations. MOAM training sessions include presentations on the various tools and processes employed by MOAMs, interspersed with mindset lessons illustrated via “war story” discussions of previous missions.

Bryant, Larry↗

Evaluating the SAGE III/ISS Version 5.2 Water Vapor Retrieval in the Presence of Aerosol Loading

The Stratospheric Aerosol and Gas Experiment operating on the International Space Station (SAGE III/ISS) is an occultation instrument that retrieves aerosol extinction and ozone, water vapor, and other trace gas concentrations. Water vapor in the stratosphere plays a role in ozone depletion and global temperature regulation making it an important species to monitor. The SAGE III/ISS instrument provides high quality, vertically resolved profiles of water vapor throughout the stratosphere and upper troposphere. In previous versions of SAGE water vapor products, a dry bias was noted in comparison to other satellite retrievals in the presence of elevated aerosol optical depth. Several updates for the version 5.2 water vapor algorithm will be presented and compared with previous versions of the data and other satellite products during different periods of aerosol loading.

M Heitz↗

Regenerative Life Support Systems for Exploration Habitats: Unique Capabilities and Challenges to Enable Long-Duration-Mission Habitats Beyond Low Earth Orbit

The Artemis I launch of NASA’s Space Launch System and Orion crew vehicle will mark a major milestone in the agency’s efforts to return humans to the Moon. Work is underway on the Human Landing System that will carry the next astronauts to the lunar surface, and the lunar orbiting Gateway that will host science and serve as a platform to support sustained human presence on the Moon and ultimately crewed missions to Mars. Two decades of continuous human presence on the International Space Station has provided a wealth of experience operating, upgrading, and demonstrating advanced Regenerative Environmental Control and Life Support Systems (Regen ECLSS). However, habitats that enable sustained lunar surface presence and transit to Mars will encounter many unique conditions and challenges. System characteristics including reliability, maintainability, mass, and power become significantly more critical. Operating environments associated with lower total pressure, low gravity, contingency protocols, and extensive un-crewed and dormant periods impose additional functionality requirements and alter the performance of certain critical systems. Integration and combined operations with other elements such as orbiting outposts, logistics suppliers, and mobility platforms impact capability and interface requirements. Limits on allocated water and oxygen consumable mass influence the need for higher levels of water and oxygen recovery from waste products. Impacts and challenges these unique exploration circumstances impose on the suite of Regen ECLSS systems are explored and discussed herein.

David F Howard↗

Deep-Space Conjunction Assessment: Recent Developments and Future Evolution

The Multi-mission Automated Deep-space Conjunction Assessment Process (MADCAP) is a NASA Jet Propulsion Laboratory (JPL) capability used to perform conjunction assessment in shared deep-space environments. MADCAP began performing conjunction assessment at Mars and the Moon in 2011, with the Sun/Earth libration points added to its functionality in 2020. There has been an increasing number of missions operating in these environments in recent years, leading to an elevated frequency of close conjunction events, especially in the Lunar orbital environment. MADCAP provides this service not only to NASA missions, but to any operator who is willing to share ephemerides. Since there is no space surveillance network for deep space environments, ephemeris sharing is the only way in which spacecraft operators can ensure the safety of their spacecraft from collision in these orbit regimes. NASA published a set of conjunction assessment best practices in 2020 that cover the MADCAP process. This paper details recent MADCAP operational experience in the deep space environments, including statistics and process improvements. Updates to the MADCAP software and automation framework implemented to handle the recent growth in the number of deep space missions are also discussed. Future enhancements planned in anticipation of increasingly crowded deep-space environments, such as non-standard runs based on exploratory scenarios, are also discussed.

conjunction assessment↗

Assistive Detect and Avoid Technology in Urban Air Mobility Environments

The use of Assistive Detect and Avoid (Assistive DAA or ADAA) technology in Urban Air Mobility (UAM) environments poses potential benefits as well as challenges. Assistive DAA refers to the leveraged use of DAA technology, originally developed to replace see-and-avoid capabilities for remotely piloted aircraft, in onboard-piloted aircraft to augment (rather than replace) pilots’ see-and-avoid abilities and thus enhance the safety and efficiency of visual flight operations. ADAA is anticipated to be especially safety-enhancing in airspace where traffic density is high or traditional air traffic services are limited, such as in future UAM environments. ADAA may also enable higher-tempo UAM operations than with only see-and-avoid capabilities, while still maintaining acceptable levels of safety. UAM concepts under development by the FAA, NASA, and industry focus on operations moving people and cargo in urban and suburban areas using innovative technologies, operations, and aircraft, including electric vertical takeoff and landing (eVTOL) aircraft. Researchers at NASA Langley Research Center, in collaboration with FAA researchers at the William J. Hughes Technical Center in Atlantic City, NJ, have conducted a series of medium-fidelity, human-in-the-loop research simulations of potential future UAM operations and concepts in both Class C and Class B airspace environments. These simulations have included use of a Langley-developed ADAA research tool called DANTi, which enables configurable ADAA displays to be presented to pilots of simulated eVTOL aircraft participating in higher-density and higher-tempo UAM operations. Experience and observations made during testing of the NASA-developed DANTi ADAA capability in the UAM NFLITE simulation environment will be reported in this paper together with a discussion of airspace integration and regulatory topics.

Detect and Avoid↗