Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Integrated Ground Operations Demonstration for Responsive Space Access

Integrated Ground Operations Demonstration Units (IGODU) project developed to mature, integrate and demonstrate advancements in cryogenics, system health management and command and control technologies. Two Distinct Testing Environments: a) GODU Integrated Refrigeration and Storage - GODU LH2; b) GODU Autonomous Control - GODU LO2. Scope: I. GODU LH2: a) Investigate alternative storage and distribution architecture for future cryogenic propellant operations. b) Demonstrate advanced cryogenic propellant handling operations (liquefaction, storage and distribution) of normal boiling point and sub-cooled cryogenic propellants. II. GODU L02: a) Develop and demonstrate advanced control and health management technologies and techniques to autonomously control cryogenic propellant servicing operations. b) Investigate modern COTS hardware and control systems in an effort to reduce the "standing army" of engineers associated with maintaining and operating ground systems through the use of health management and autonomous control technologies. Goals: a) Raise Technology Readiness Levels (TRL) and Integration Readiness Levels (IRL) of several key technology development areas. b) Reduce operations lifecycle costs of future test programs and launch complexes. c) Demonstrate technologies for future exploration beyond low earth orbit. d) Serve as test environments for extraterrestrial surface operations.

Johnson, Robert G.↗

Enhanced Flight Vision Systems and Synthetic Vision Systems for NextGen Approach and Landing Operations

Synthetic Vision Systems and Enhanced Flight Vision System (SVS/EFVS) technologies have the potential to provide additional margins of safety for aircrew performance and enable operational improvements for low visibility operations in the terminal area environment with equivalent efficiency as visual operations. To meet this potential, research is needed for effective technology development and implementation of regulatory standards and design guidance to support introduction and use of SVS/EFVS advanced cockpit vision technologies in Next Generation Air Transportation System (NextGen) operations. A fixed-base pilot-in-the-loop simulation test was conducted at NASA Langley Research Center that evaluated the use of SVS/EFVS in NextGen low visibility approach and landing operations. Twelve crews flew approach and landing operations in a simulated NextGen Chicago O'Hare environment. Various scenarios tested the potential for using EFVS to conduct approach, landing, and roll-out operations in visibility as low as 1000 feet runway visual range (RVR). Also, SVS was tested to evaluate the potential for lowering decision heights (DH) on certain instrument approach procedures below what can be flown today. Expanding the portion of the visual segment in which EFVS can be used in lieu of natural vision from 100 feet above the touchdown zone elevation to touchdown and rollout in visibilities as low as 1000 feet RVR appears to be viable as touchdown performance was acceptable without any apparent workload penalties. A lower DH of 150 feet and/or possibly reduced visibility minima using SVS appears to be viable when implemented on a Head-Up Display, but the landing data suggests further study for head-down implementations.

Kramer, Lynda J.↗

Launch Vehicle Production and Operations Cost Metrics

Traditionally, launch vehicle cost has been evaluated based on $/Kg to orbit. This metric is calculated based on assumptions not typically met by a specific mission. These assumptions include the specified orbit whether Low Earth Orbit (LEO), Geostationary Earth Orbit (GEO), or both. The metric also assumes the payload utilizes the full lift mass of the launch vehicle, which is rarely true even with secondary payloads.1,2,3 Other approaches for cost metrics have been evaluated including unit cost of the launch vehicle and an approach to consider the full program production and operations costs.4 Unit cost considers the variable cost of the vehicle and the definition of variable costs are discussed. The full program production and operation costs include both the variable costs and the manufacturing base. This metric also distinguishes operations costs from production costs, including pre-flight operational testing. Operations costs also consider the costs of flight operations, including control center operation and maintenance. Each of these 3 cost metrics show different sensitivities to various aspects of launch vehicle cost drivers. The comparison of these metrics provides the strengths and weaknesses of each yielding an assessment useful for cost metric selection for launch vehicle programs.

Watson, Michael D.↗

Grid Resolution Study over Operability Space for a Mach 1.7 Low Boom External Compression Inlet

This paper presents a statistical methodology whereby the probability limits associated with CFD grid resolution of inlet flow analysis can be determined which provide quantitative information on the distribution of that error over the specified operability range. The objectives of this investigation is to quantify the effects of both random (accuracy) and systemic (biasing) errors associated with grid resolution in the analysis of the Lockheed Martin Company (LMCO) N+2 Low Boom external compression supersonic inlet. The study covers the entire operability space as defined previously by the High Speed Civil Transport (HSCT) High Speed Research (HSR) program goals. The probability limits in terms of a 95.0% confidence interval on the analysis data were evaluated for four ARP1420 inlet metrics, namely (1) total pressure recovery (PFAIP), (2) radial hub distortion (DPH/P), (3) ) radial tip distortion (DPT/P), and (4) ) circumferential distortion (DPC/P). In general, the resulting +/-0.95 delta Y interval was unacceptably large in comparison to the stated goals of the HSCT program. Therefore, the conclusion was reached that the "standard grid" size was insufficient for this type of analysis. However, in examining the statistical data, it was determined that the CFD analysis results at the outer fringes of the operability space were the determining factor in the measure of statistical uncertainty. Adequate grids are grids that are free of biasing (systemic) errors and exhibit low random (precision) errors in comparison to their operability goals. In order to be 100% certain that the operability goals have indeed been achieved for each of the inlet metrics, the Y+/-0.95 delta Y limit must fall inside the stated operability goals. For example, if the operability goal for DPC/P circumferential distortion is ≤0.06, then the forecast Y for DPC/P plus the 95% confidence interval on DPC/P, i.e. +/-0.95 delta Y, must all be less than or equal to 0.06.

Grid↗

Lessons Learned in the First Year Operating Software Defined Radios in Space

Operating three unique software defined radios (SDRs) in a space environment aboard the Space Communications and Navigation (SCaN) Testbed for over one year has provided an opportunity to gather knowledge useful for future missions considering using software defined radios. This paper provides recommendations for the development and use of SDRs, and it considers the details of each SDRs approach to software upgrades and operation. After one year, the SCaN Testbed SDRs have operated for over 1000 hours. During this time, the waveforms launched with the SDR were tested on-orbit to assure that they operated in space at the same performance level as on the ground prior to launch to obtain an initial on-orbit performance baseline. A new waveform for each SDR has been developed, implemented, uploaded to the flight system, and tested in the flight environment. Recommendations for SDR-based missions have been gathered from early development through operations. These recommendations will aid future missions to reduce the cost, schedule, and risk of operating SDRs in a space environment. This paper considers the lessons learned as they apply to SDR pre-launch checkout, purchasing space-rated hardware, flexibility in command and telemetry methods, on-orbit diagnostics, use of engineering models to aid future development, and third-party software. Each SDR implements the SCaN Testbed flight computer command and telemetry interface uniquely, allowing comparisons to be drawn. The paper discusses the lessons learned from these three unique implementations, with suggestions on the preferred approach. Also, results are presented showing that it is important to have full system performance knowledge prior to launch to establish better performance baselines in space, requiring additional test applications to be developed pre-launch. Finally, the paper presents the issues encountered with the operation and implementation of new waveforms on each SDR and proposes recommendations to avoid these issues.

radio equipment↗

Lessons Learned in the First Year Operating Software Defined Radios in Space

Operating three unique software defined radios (SDRs) in a space environment aboard the Space Communications and Navigation (SCaN) Testbed for over one year has provided an opportunity to gather knowledge useful for future missions considering using software defined radios. This paper provides recommendations for the development and use of SDRs, and it considers the details of each SDR's approach to software upgrades and operation. After one year, the SCaN Testbed SDRs have operated for over 1000 hours. During this time, the waveforms launched with the SDR were tested on-orbit to assure that they operated in space at the same performance level as on the ground prior to launch to obtain an initial on-orbit performance baseline. A new waveform for each SDR has been developed, implemented, uploaded to the flight system, and tested in the flight environment. Recommendations for SDR-based missions have been gathered from early development through operations. These recommendations will aid future missions to reduce the cost, schedule, and risk of operating SDRs in a space environment. This paper considers the lessons learned as they apply to SDR pre-launch checkout, purchasing space-rated hardware, flexibility in command and telemetry methods, on-orbit diagnostics, use of engineering models to aid future development, and third-party software. Each SDR implements the SCaN Testbed flight computer command and telemetry interface uniquely, allowing comparisons to be drawn. The paper discusses the lessons learned from these three unique implementations, with suggestions on the preferred approach. Also, results are presented showing that it is important to have full system performance knowledge prior to launch to establish better performance baselines in space, requiring additional test applications to be developed pre-launch. Finally, the paper presents the issues encountered with the operation and implementation of new waveforms on each SDR and proposes recommendations to avoid these issues.

space communication↗

Operation of Direct Drive Systems: Experiments in Peak Power Tracking and Multi-Thruster Control

Direct-drive power and propulsion systems have the potential to significantly reduce the mass of high-power solar electric propulsion spacecraft, among other advantages. Recent experimental direct-drive work has significantly mitigated or retired the technical risks associated with single-thruster operation, so attention is now moving toward systems-level areas of interest. One of those areas is the use of a Hall thruster system as a peak power tracker to fully use the available power from a solar array. A simple and elegant control based on the incremental conductance method, enhanced by combining it with the unique properties of Hall thruster systems, is derived here and it is shown to track peak solar array power very well. Another area of interest is multi-thruster operation and control. Dualthruster operation was investigated in a parallel electrical configuration, with both thrusters operating from discharge power provided by a single solar array. Startup and shutdown sequences are discussed, and it is shown that multi-thruster operation and control is as simple as for a single thruster. Some system architectures require operation of multiple cathodes while they are electrically connected together. Four different methods to control the discharge current emitted by individual cathodes in this configuration are investigated, with cathode flow rate control appearing to be advantageous. Dual-parallel thruster operation with equal cathode current sharing at total powers up to 10 kW is presented.

solar electric propulsion (SEP) vehicles↗

In-Flight Operation of the Dawn Ion Propulsion System: Status at One Year from the Vesta Rendezvous

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer among Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer among Ceres science orbits. The Dawn ion thruster [I thought we only called it a thruster. Both terms are used in the paper, but I think a replacement of every occurrence of "engine" with "thruster" would be clearer.] design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. Since resumption of cruise to Vesta IPS has been operated at throttled power levels, most of the time at full power, and with a duty cycle of approximately 93%, leading to an arrival at Vesta in July of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through one year from the spacecraft's rendezvous with Vesta.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Start of the Vesta Cruise Phase

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. IPS will be operated for over two years at throttled power levels leading to arrival at Vesta in September of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of deterministic thrusting to Vesta.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System - The First Nine Months

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta-V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion engine design is based on the design validated on NASA's Deep Space 1 mission. However, because of the very substantial (11 km/s) delta-V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are also based on the DS1 design. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft prior to the initiation of long-term thrusting for the heliocentric transfer to Vesta. The IPS hardware, consisting of three ion thrusters and TGAs, two PPUs and DCIUs, xenon feed system, and spacecraft control software, was investigated extensively. Thrust measurements, roll torque measurements, pointing capabilities, control characteristics, and thermal behavior of the spacecraft and IPS were carefully evaluated. The Dawn IPS fully met all its initial checkout performance objectives. Deterministic thrusting for cruise began on December 17, 2007. Over the subsequent approximately 330 days the IPS will be operated virtually continuously at full power thrusting (approximately 91 mN) leading to a Mars flyby in February 2009. The encounter with Mars provides a gravity assist for a plane change and is the only source of post-launch delta-V apart from the IPS. Following the Mars gravity assist IPS will be operated for approximately one year at full power and for 1.3 years at throttled power levels leading to rendezvous with Vesta in August of 2011. Following nine months of orbital operations with IPS providing the propulsion needed for orbit capture, science orbit transfer and orbit maintenance and Vesta escape, Dawn will transit to Ceres with an expected arrival date of February 2015. As of June 16, 2008 the ion thrusters on Dawn have operated for close to 3,846 hours and have delivered nearly 1 km/s of delta-V to the spacecraft. Dawn IPS operation has been almost flawless during the initial checkout and six months of cruise. This paper provides an overview of Dawn's mission objectives, mission and system design, and the results of the post-launch Dawn IPS mission operations through June 2008

Garner, Charles E.↗

SiC Field Effect Transistor Technology Demonstrating Prolonged Stable Operation at 500 C

While there have been numerous reports of short-term transistor operation at 500 degree C or above, these devices have previously not demonstrated sufficient long-term operational durability at 500 degree C to be considered viable for most envisioned applications. This paper reports the development of Silicone Carbi field effect transistors capable of long-term electrical operation at 500 degree C. A 6H-SiC MESFET was packaged and subjected to continuous electrical operation while residing in a 500 degree C oven in oxidizing air atmosphere for over 2400 hours. The transistor gain, saturation current (IDSS), and on-resistance (RDS) changed by less than 20% from initial values throughout the duration of the biased 500 degree C test. Another high-temperature packaged 6H-SiC MESFET was employed to form a simple one-stage high-temperature low-frequency voltage amplifier. This single-stage common-source amplifier demonstrated stable continuous electrical operation (negligible changes to gain and operating biases) for over 600 hours while residing in a 500 degree C air ambient oven. In both cases, increased leakage from annealing of the Schottky gate-to-channel diode was the dominant transistor degradation mechanism that limited the duration of 500 degree C electrical operation.

Neudeck, Philip G.↗

SPHERES: From Ground Development to Operations on ISS

SPHERES (Synchronized Position Hold Engage and Reorient Experimental Satellites) is an internal International Space Station (ISS) Facility that supports multiple investigations for the development of multi-spacecraft and robotic control algorithms. The SPHERES Facility on ISS is managed and operated by the SPHERES National Lab Facility at NASA Ames Research Center (ARC) at Moffett Field California. The SPHERES Facility on ISS consists of three self-contained eight-inch diameter free-floating satellites which perform the various flight algorithms and serve as a platform to support the integration of experimental hardware. To help make science a reality on the ISS, the SPHERES ARC team supports a Guest Scientist Program (GSP). This program allows anyone with new science the possibility to interface with the SPHERES team and hardware. In addition to highlighting the available SPHERES hardware on ISS and on the ground, this presentation will also highlight ground support, facilities, and resources available to guest researchers. Investigations on the ISS evolve through four main phases: Strategic, Tactical, Operations, and Post Operations. The Strategic Phase encompasses early planning beginning with initial contact by the Principle Investigator (PI) and the SPHERES program who may work with the PI to assess what assistance the PI may need. Once the basic parameters are understood, the investigation moves to the Tactical Phase which involves more detailed planning, development, and testing. Depending on the nature of the investigation, the tactical phase may be split into the Lab Tactical Phase or the ISS Tactical Phase due to the difference in requirements for the two destinations. The Operations Phase is when the actual science is performed; this can be either in the lab, or on the ISS. The Post Operations Phase encompasses data analysis and distribution, and generation of summary status and reports. The SPHERES Operations and Engineering teams at ARC is composed of experts who can guide the Payload Developer (PD) and Principle Investigator (PI) in reaching critical milestones to make their science a reality using the SPHERES platform. From performing integrated safety and verification assessments, to assisting in developing crew procedures and operations products, to organizing, planning, and executing all test sessions, to helping manage data products, the SPHERES team at ARC is available to support microgravity research with the SPEHRES Guest Scientist Program.

ISS Research↗

Prototype Tool and Focus Group Evaluation for an Advanced Trajectory-Based Operations Concept

Trajectory-based operations (TBO) is a key concept in the Next Generation Air Transportation System transformation of the National Airspace System (NAS) that will increase the predictability and stability of traffic flows, support a common operational picture through the use of digital data sharing, facilitate more effective collaborative decision making between airspace users and air navigation service providers, and enable increased levels of integrated automation across the NAS. NASA has been developing trajectory-based systems to improve the efficiency of the NAS during specific phases of flight and is now also exploring Advanced 4-Dimensional Trajectory (4DT) operational concepts that will integrate these technologies and incorporate new technology where needed to create both automation and procedures to support gate-to-gate TBO. A TBO Prototype simulation toolkit has been developed that demonstrates initial functionality of an Advanced 4DT TBO concept. Pilot and controller subject matter experts (SMEs) were brought to the Air Traffic Operations Laboratory at NASA Langley Research Center for discussions on an Advanced 4DT operational concept and were provided an interactive demonstration of the TBO Prototype using four example scenarios. The SMEs provided feedback on potential operational, technological, and procedural opportunities and concerns. This paper describes an Advanced 4DT operational concept, the TBO Prototype, the demonstration scenarios and methods used, and the feedback obtained from the pilot and controller SMEs in this focus group activity.

Guerreiro, Nelson M.↗

Flight Deck Surface Trajectory-Based Operations

Surface Trajectory-Based Operations (STBO) is a future concept for surface operations where time requirements are incorporated into taxi operations to support surface planning and coordination. Pilot-in-the-loop flight deck simulations have been conducted to study flight deck displays algorithms to aid pilots in complying with the time requirements of time-based taxi operations (i.e., at discrete locations in 3 12 D operations or at all points along the route in 4DT operations). The results of these studies (conformance, time-of-arrival error, eye-tracking data, and safety ratings) are presented. Flight deck simulation work done in collaboration with DLR is described. Flight deck research issues in future auto-taxi operations are also introduced.

flight deck↗

Automated Impact Assessment: A New Approach to ISS Payload Operations Anomaly Response

The International Space Station (ISS) Payload Operations and Integration Center (POIC) is undergoing rapid growth as the space station program focuses on science and commercial activities. The ISS is expanding its onboard capabilities to support additional science activities. In parallel, the POIC is expanding the capabilities of our operations tools to support the higher pace of payload activities being executed each week. An effect of these changes is that anomaly resolution has become more challenging. In the event of a real-time system fault, operators are responsible for analyzing telemetry displays, anomaly monitoring tools, documentation, and system models in order to produce failure impacts and recovery strategies. This approach to operations relies on the operator to ingest, process, and analyze information from an array of deterministic sources to provide actionable data on impacted systems and activities. Changing the existing approach of anomaly response is necessary if the ISS community is to succeed in the age of science and commercialization of space. The creation of a tool that captures deterministic technical systems knowledge and integrates existing telemetry, documentation, and planning information will allow the burden of impact assessment to be automated, thereby allowing the operator to focus on non-deterministic tasks, such as recovering failed systems and restoring critical payload operations.

Hall, R. Mason↗

Unmanned Aircraft System Traffic Management (UTM) Concept of Operations

Many applications of small Unmanned Aircraft System (sUAS) have been envisioned. These include surveillance of key assets such as pipelines, rail, or electric wires, deliveries, search and rescue, traffic monitoring, videography, and precision agriculture. These operations are likely to occur in the same airspace in presence of many static and dynamic constraints such as airports, and high wind areas. Therefore, small UAS, typically 55 pounds and below, operations need to be managed to ensure safety and efficiency of operations is maintained. This paper will describe the Concept of Operations (ConOps) for NASA's UAS Traffic Management (UTM) research initiative. The UTM ConOps is focused on safely enabling large-scale small UAS (sUAS) operations in low altitude airspace. The UTM construct supports large-scale visual line of sight and beyond visual line of sight operations. It is based on two primary mantras: (1) flexibility where possible and structure where necessary (2) a risk-based approach where geographical needs and use case indicate the airspace performance requirements. Preliminary stakeholder feedback and initial UTM tests conducted by NASA show promise of UTM to enable large-scale low altitude UAS operations safely.

autonomy↗

An Exploratory Evaluation of UAS Detect and Avoid Operations in the Terminal Environment

New technical standards for Unmanned Aircraft Systems (UAS) detect and avoid (DAA) systems mark recent progress toward realizing the goal of full integration of UAS into the National Airspace System (NAS). The DAA system is intended to provide a means of compliance with operating regulations that required pilots on board manned aircraft to remain "well clear" of other aircraft which is accomplished through out-the-window visual acquisition of other aircraft and application of a subjective judgment of safe separation. The requirements for the DAA system, including the specification of a DAA well clear threshold as well as functional requirements for detecting, tracking, alerting and guidance processing, and displays, are specified in DO-365, Minimum Operational Performance Standards (MOPS) for DAA Systems developed within RTCA (Radio Technical Commission for Aeronautics) Special Committee 228 (SC-228). Intended as the first in a series of phased versions, these requirements are frequently referred to as the "Phase 1" DAA system. The Phase 1 DAA system is limited for use by aircraft transitioning to and from Class A or special use airspace, through Class D, E, and G airspace. In particular, the Phase 1 DAA MOPS are not intended for terminal airspace operations, a critical gap for enabling a full range of UAS operations. The application of the Phase 1 DAA system and DAA well clear threshold within the terminal area is predicted to result in a high number of unnecessary alerts when the UAS is safely separated from other traffic. The goal of the present study was to examine pilot performance and operational issues related to the operation of the Phase 1 DAA system in a terminal area. This experiment was intended as an exploratory study that would be used to inform the development of a new terminal area-specific DAA well clear definition, and associated alerting and guidance requirements. The two main objectives of this study were to: 1) characterize pilot behavior in the terminal environment with the Phase 1 DAA system, and 2) investigate the effect of modifications to the Phase 1 DAA alerting and guidance structure. In particular, the authors were interested in determining whether the removal of specific alerting and guidance levels, without changing the DAA well clear definition or alerting thresholds, would impact pilot performance while conducting terminal operations. The results indicate that the Phase 1 well clear definition and alerting and guidance resulted in frequent alerting that degraded pilots' ability to discriminate between encounters where another aircraft was safely separated versus when a maneuver was necessary. The resulting impact on pilot performance was slower response times and higher frequency and severity of losses of DAA well clear compared to those observed for experiments examining pilot performance in the en route environment. There was no significant effect of alerting and guidance display configuration on pilot performance.

terminal area↗

Biocybernetic Adaptation Strategies: Machine Awareness of Human Engagement for Improved Operational Performance

Human operators interacting with machines or computers continually adapt to the needs of the system ideally resulting in optimal performance. In some cases, however, deteriorated performance is an outcome. Adaptation to the situation is a strength expected of the human operator which is often accomplished by the human through self-regulation of mental state. Adaptation is at the core of the human operator's activity, and research has demonstrated that the implementation of a feedback loop can enhance this natural skill to improve training and human/machine interaction. Biocybernetic adaptation involves a “loop upon a loop,” which may be visualized as a superimposed loop which senses a physiological signal and influences the operator’s task at some point. Biocybernetic adaptation in, for example, physiologically adaptive automation employs the “steering” sense of “cybernetic,” and serves a transitory adaptive purpose – to better serve the human operator by more fully representing their responses to the sys- tem. The adaptation process usually makes use of an assessment of transient cog- nitive state to steer a functional aspect of a system that is external to the operator’s physiology from which the state assessment is derived. Therefore, the objective of this paper is to detail the structure of biocybernetic systems regarding the level of engagement of interest for adaptive systems, their processing pipeline, and the adaptation strategies employed for training purposes, in an effort to pave the way towards machine awareness of human state for self-regulation and improved operational performance.

Stephens, Chad↗