Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations Security”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Control and Non-Payload Communications (CNPC) Prototype Radio - Generation 2 Security Architecture Lab Test Report

NASA Glenn Research Center, in cooperation with Rockwell Collins, is working to develop a prototype Control and Non-Payload Communications (CNPC) radio platform as part of NASA Integrated Systems Research Program's (ISRP) Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) project. A primary focus of the project is to work with the FAA and industry standards bodies to build and demonstrate a safe, secure, and efficient CNPC architecture that can be used by industry to evaluate the feasibility of deploying a system using these technologies in an operational capacity. GRC has been working in conjunction with these groups to assess threats, identify security requirements, and to develop a system of standards-based security controls that can be applied to the current GRC prototype CNPC architecture as a demonstration platform. The security controls were integrated into a lab test bed mock-up of the Mobile IPv6 architecture currently being used for NASA flight testing, and a series of network tests were conducted to evaluate the security overhead of the controls compared to the baseline CNPC link without any security. The aim of testing was to evaluate the performance impact of the additional security control overhead when added to the Mobile IPv6 architecture in various modes of operation. The statistics collected included packet captures at points along the path to gauge packet size as the sample data traversed the CNPC network, round trip latency, jitter, and throughput. The effort involved a series of tests of the baseline link, a link with Robust Header Compression (ROHC) and without security controls, a link with security controls and without ROHC, and finally a link with both ROHC and security controls enabled. The effort demonstrated that ROHC is both desirable and necessary to offset the additional expected overhead of applying security controls to the CNPC link.

Communication Networks↗

Cybersecurity for Distributed Wind: What Operators Need to Know

Few resources exist to address a growing need to secure distributed wind systems. Idaho National Laboratory recently published the Cybersecurity Guide for Distributed Wind, a richly detailed resource outlining a distributed wind system's possible architecture, relevant standards, risk management strategies, and key recommendations for stakeholders. This document highlights key actionable insights from the Guide that operators can use to execute an effective cybersecurity strategy.

17 WIND ENERGY↗

Data-based and secure switched cyber–physical systems

In this work, we develop a completely model-free moving target defense framework for the detection and mitigation of sensor and/or actuator attacks in cyber–physical systems with dynamics that evolve in discrete-time. We incorporate an intrusion detection mechanism based on an approximate dynamic programming technique that learns the policies for optimal regulation and optimal tracking while simultaneously defending against actuator and sensor attacks in a model-free fashion. Switching rules are leveraged to force proactive and reactive defense mechanisms as well as, guarantee the stability of the equilibrium point. Finally, as a case study, we apply the proposed moving target defense framework to a DC–DC converter that is used in electric vehicles.

42 ENGINEERING↗

Ransomware Security Threat Modeling for Photovoltaic Systems

Ransomware attacks are one of the most dangerous cyber-attacks which can disrupt the operation of photovoltaic (PV) systems and incur an enormous economic loss. This paper introduces a ransomware security threat modeling method that identifies potential vulnerabilities, threats, and impacts of ransomware attacks targeting a PV system. Here, the security threat modeling consists of three steps: 1) system identification, 2) threat modeling that finds existing vulnerabilities, 3) attack modeling that designs attack profiles to succeed ransomware attacks, and 4) penetration testing that performs authorized cyber-attacks and analyzes impacts of the ransomware attack profiles using a real-time hardware-in-the-loop (HIL) PV system security testbed.

attack modeling↗

Draft Methodology for Cybersecurity Analysis for Adoption of Wireless Technology in Nuclear Power Plants

The report is delivered as DOE-NE Cybersecurity Program Milestone M2CT-22IN1104014-Industry cybersecurity guidance adoption status. The milestone is specifically to document the process and the status of the efforts towards developing guidance in support of industry’s adoption of wireless communication technologies. To transform the operation of nuclear power plants, including domestic light-water reactors, advanced reactors, microreactors, and fission battery, for grid and non-grid applications, secure and resilient wireless capabilities are required. In addition, to realize new operational concepts such as autonomous operation and remote monitoring, advanced sensor, and instrumentation, wireless technology is essential. However, industry implementation is low, and there is no technical basis for how to understand and address potential risks for wireless communications for critical plant functions. A methodology with a technical basis for implementing secure wireless communication is crucial. This wireless adoption methodology is intended to assist a licensee in identifying an appropriate technological approach for securing wireless communications in nuclear power plant. However, this methodology does not provide guidance for addressing wireless design criteria or for addressing all the cybersecurity commitments in licensees’ cybersecurity plans (CSPs) including addressing security impact analysis that a licensee must perform before an update to a Critical Digital Asset (CDA). This methodology guides a licensee through a process of evaluating a proposed wireless implementation and drafting a plant change notification for an example use case. The example is a generic/nonproprietary version of the first test case of the methodology, which, if successfully implemented, is part of the consideration for protecting other functions’ use of wireless in a cybersecure manner.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Geologic Assessment and Recommended New Well Locations to Improve the Area 25 Potable Water System, Nevada National Security Site

The Mission Support and Test Services, LLC (MSTS) Geoscience Operations Group performed a hydrogeologic study of an area of interest in Area 25 at the request of the MSTS Enterprise Infrastructure Program to identify potential locations for a new water well to replace J-14 Water Well (J-14 WW). Based on limited subsurface hydrogeologic data for the area, geologists developed two options for construction of a new well. Option 1 is to construct the well within approximately 250 feet (ft) of J-14 WW, and Option 2 is to construct the well approximately 1,550 ft north of J-11 Water Well (J-11 WW). Option 1 may be preferred, as the hydrogeology is better understood adjacent to an existing well. A well drilled at the Option 2 location would not have to be as deep as that at the Option 1 location, but the hydrogeologic setting is more uncertain at this greater distance from a verified subsurface geologic data point.

58 GEOSCIENCES↗

Monitor and Control of the Deep-Space network via Secure Web

(view graph) NASA lead center for robotic space exploration. Operating division of Caltech/Jet Propulsion Laboratory. Current missions, Voyagers, Galileo, Pathfinder, Global Surveyor. Upcoming missions, Cassini, Mars and New Millennium.

Deep-Space Network communications NCP Data Managem↗

Secure Autonomous Automated Scheduling (SAAS)

This report describes network-centric operations, where a virtual mission operations center autonomously receives sensor triggers, and schedules space and ground assets using Internet-based technologies and service-oriented architectures. For proof-of-concept purposes, sensor triggers are received from the United States Geological Survey (USGS) to determine targets for space-based sensors. The Surrey Satellite Technology Limited (SSTL) Disaster Monitoring Constellation satellite, the UK-DMC, is used as the space-based sensor. The UK-DMC's availability is determined via machine-to-machine communications using SSTL's mission planning system. Access to/from the UK-DMC for tasking and sensor data is via SSTL's and Universal Space Network's (USN) ground assets. The availability and scheduling of USN's assets can also be performed autonomously via machine-to-machine communications. All communication, both on the ground and between ground and space, uses open Internet standards

Walke, Jon G.↗

Cyber Resilience and Social Equity: Twin Pillars of a Sustainable Energy Future

This paper examines the intersection of security and accessibility within energy systems amidst the rise of grid modernization and digitization, especially considering the regulatory changes and the imperatives of inclusive energy strategies. It addresses the dual need for secure, resilient infrastructure and a commitment to mitigate energy poverty while maintaining equitable access to energy. Amid escalating cybersecurity and physical threats, the paper advocates for sustainable energy delivery systems that ensure robust defenses without compromising the goals of reducing energy poverty and ensuring energy security. This paper identifies the pressing need for Cyber-Informed Engineering (CIE) and Secure-by-Design (SbD) principles, highlighting how these strategies can protect critical infrastructure and democratize access to secure energy, particularly for disadvantaged communities. The analysis underscores the challenges presented by the expansion of attack surfaces, interoperability requirements, and grid-edge analytics, offering innovative solutions that leverage advanced technologies and data-driven insights. Furthermore, this paper addresses the workforce development gap, emphasizing the necessity for public-private partnerships and vendor engagement in creating a skilled cybersecurity workforce. This paper has a dual focus on both the technological aspect of cybersecurity and the social dimension of equity within the context of sustainable energy development. It suggests a comprehensive examination of how these two critical elements interact and support the overarching goal of a sustainable energy future.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Exponential Backoff and Its Security Implications for Safety-Critical OT Protocols over TCP/IP Networks

The convergence of Operational Technology (OT) and Information Technology (IT) networks has become increasingly prevalent with the growth of Industrial Internet of Things (IIoT) applications. This shift, while enabling enhanced automation, remote monitoring, and data sharing, also introduces new challenges related to communication latency and cybersecurity. Oftentimes, legacy OT protocols were adapted to the TCP/IP stack without an extensive review of the ramifications to their robustness, performance, or safety objectives. To further accommodate the IT/OT convergence, protocol gateways were introduced to facilitate the migration from serial protocols to TCP/IP protocol stacks within modern IT/OT infrastructure. However, they often introduce additional vulnerabilities by exposing traditionally isolated protocols to external threats. This study investigates the security and reliability implications of migrating serial protocols to TCP/IP stacks and the impact of protocol gateways, utilizing two widely used OT protocols: Modbus TCP and DNP3. Our protocol analysis finds a significant safety-critical vulnerability resulting from this migration, and our subsequent tests clearly demonstrate its presence and impact. A multi-tiered testbed, consisting of both physical and emulated components, is used to evaluate protocol performance and the effects of device-specific implementation flaws. Through this analysis of specifications and behaviors during communication interruptions, we identify critical differences in fault handling and the impact on time-sensitive data delivery. The findings highlight how reliance on lower-level IT protocols can undermine OT system resilience, and they inform the development of mitigation strategies to enhance the robustness of industrial communication networks.

DNP3↗

Test & Measurement System Security in an IT World

Automated test and measurement systems are coming under increased cybersecurity scrutiny. Most of these systems fall under the “Operational Technology” designation, as defined by NIST, and often have unique requirements that conflict with enterprise security policy. These systems are typically not well understood by traditional enterprise IT personnel, which leaves them ill-supported or invalidated.▪This presentation attempts to help Test System owners recognize the security landscape, determine their unique system requirements and concerns, and negotiate a peer-level working arrangement with an existing IT department while maintaining a NIST-recommended level of autonomy and sovereignty.

automated test↗

Securing and Auto-Synchronizing Communication over Free-Space Optics Using Quantum Key Distribution and Chaotic Systems

Free-Space Optical (FSO) communication provides very large bandwidth, relatively low cost, low power, low mass of implementation, and improved security when compared to conventional Free-Space Radio-Frequency (FSRF) systems. In this paper, we demonstrate a communication protocol that demonstrates improved security and longer-range FSO communication, compared to existing FSO security techniques, such as N-slit interferometers. The protocol integrates chaotic communications with Quantum Key Distribution (QKD) techniques. A Lorenz chaotic system, which is inherently secure and auto-synchronized, is utilized for secure data communications over a classical channel, while QKD is used to exchange crucial chaotic system parameters over a secure quantum channel. We also provide a concept of operations for a NASA mission combining chaotic communications and QKD operating synergistically in an end-to-end space communications link. The experimental simulation results and analysis are favorable towards our approach.

Chaotic Communication↗

LLNL Macroscopic Anisotropic Explosives Research at INL National Security Test Range - Test Results

A select team of 23 engineers, scientists, and explosives specialists from LLNL, LANL, INL, and Marine Raiders from Marine Special Operations Command (MARSOC) and U.S. Special Operations Command (SOCOM) assembled during the second week of November at the INL National Security Test Range near Idaho Falls to investigate and demonstrate fundamental principles of explosives anisotropy. Today's explosives are isotropic in their detonation performance. That is, no matter what direction a detonation runs through bulk explosive, the performance is the same; whereas, anisotropic explosives exhibit different performance, depending on which direction the detonation wave moves through the explosive. The ANISO Team worked in subfreezing temperatures on the Snake River Plain, carrying out 55 experimental explosives shots in four days that lead to a clear understanding of the performance and behavior of an assembly of small, linerless, C4 shaped charges. These shots clearly demonstrated, for the first time, on a macroscopic scale, the principle of anisotropy in measured progression of the detonation through the explosive assembly. The outputs of nine piezo timing pins in the explosive assembly clearly showed detonation progressing through the assembly faster than nominal detonation velocity and moving slower than nominal detonation velocity in the opposite direction. Basic data from these experiments will be used to design and construct explosives assemblies that will be shot in the LLNL High Explosives Applications Facility's (HEAF). These experimental tests will provide refined basic data that will then be used by modelers to develop high explosives models. Computer simulations using these models will then be run to predict performance and design inhomogeneous, anisotropic bulk explosive charges that will be tested at LLNL.

33 ADVANCED PROPULSION SYSTEMS↗

Emergency Lighting

A lighting system originally developed for NASA's Apollo and Skylab manned spacecraft resulted in a industrial spinoff and creation of a whole new company to produce and market the product line. The company is UDEC Corp., Waltham, Mass. UDEC's "Multi-Mode" electronic lighting systems are designed for plant emergency and supplemental use, such as night lighting, "always-on" stairwell lights and illuminated exit signs. Their advantages stem from the qualities demanded for spacecraft installation: extremely high fight output with very low energy drain, compactness, light weight, and high reliability. The Multi-Mode system includes long-life fluorescent lamps operated by electronic circuitry, a sealed battery that needs no maintenance for 10 years, and a solid-state battery charger. A typical emergency installation consists of a master module with battery and an eight watt lamp, together with four remote "Satellight" modules powered by the master's battery. As a night lighting system for maintenance or I security, UDEC fixtures can bypass the battery and 1 operate on normal current at a fraction of the energy 1 demand of conventional night lighting. Industrial customers have realized savings of better than ninety percent with UDEC night lights. UDEC started as a basement industry in 1972 but the company has already sold more than 1,000 lighting systems to building operators.

Source record↗

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions (FAST-DERMS)

This document provides system-level specifications for a federated architecture for secure and transactive distributed energy resource management solutions (FAST-DERMS), presents a solution, and describes operational concepts for the proposed solution. FAST-DERMS enables the provision of reliable, resilient, and secure transmission and distribution (T&D) grid services through the scalable aggregation and near-real-time management of utility-scale and small-scale distributed energy resources (DERs). We first present the principles and objectives of FAST-DERMS. Then, after discussing important system concepts, we present the specifications for FAST-DERMS and a solution that employs a distributed and federated control methodology in which the DERs connected to a single point of common coupling with the rest of the system, such as individual substations, are optimized coordinately to provide system-level grid services. FAST-DERMS aims to aggregate and coordinate the operations of DERs to support T&D grid operations. The key optimization and control component of this FAST-DERMS reference implementation is a flexible resource scheduler (FRS) that aggregates the DERs within a substation service area. These FRSs operate at the substation level and perform constrained economic dispatch of DERs, either directly or through a transactive market or aggregator, as shown in Figure ES-1. An FRS Coordinator at the distribution system operator (DSO) level aggregates distribution substations operated by FRSs and interfaces with the transmission system operator (TSO) to provide transmission services. FAST-DERMS also allows for the integration of the FRS Coordinator with an existing distribution utility management system that could be employed by the DSO to enhance distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mars Relay Operations Service (MaROS): A Present Service Preparing for the Future

The Mars Relay Operations Service (MaROS) has been deployed by NASA's Mars Program Office and the Multimission Ground Systems and Services (MGSS) Project into mission operations to aid in the coordination of relay activities at Mars. This live system presents standardized interfaces and a centralized infrastructure to current and future participants in the Mars Relay Network for the purpose of reliably and securely exchanging and storing all relay-related planning and operations data. The initial development of this system leveraged over eight years of experience performing relay operations between the various spacecraft at Mars. Now, four years after its initial deployment, MaROS continues to undergo further refinement to better meet the needs of the Mars Relay Network. The most substantial, recent update was focused on providing capabilities needed by the Mars Science Laboratory project, which landed on Mars in August of 2012. This paper will describe the nature of that update and describe additional features being added to the system to better serve the needs of current and future Mars missions.

Gladden, Roy E.↗

NASA Electronic Library System (NELS): The system impact of security

This paper discusses security issues as they relate to the NASA Electronic Library System which is currently in use as the repository system for AdaNET System Version 3 (ASV3) being operated by MountainNET, Inc. NELS was originally designed to provide for public, development, and secure collections and objects. The secure feature for collections and objects was deferred in the initial system for implementation at a later date. The NELS system is now 9 months old and many lessons have been learned about the use and maintenance of library systems. MountainNET has 9 months of experience in operating the system and gathering feedback from the ASV3 user community. The user community has expressed an interest in seeing security features implemented in the current system. The time has come to take another look at the whole issue of security for the NELS system. Two requirements involving security have been put forth by MountainNET for the ASV3 system. The first is to incorporate at the collection level a security scheme to allow restricted access to collections. This should be invisible to end users and be controlled by librarians. The second is to allow inclusion of applications which can be executed only by a controlled group of users; for example, an application which can be executed by librarians only. The requirements provide a broad framework in which to work. These requirements raise more questions than answers. To explore the impact of these requirements a top down approach will be used.

Mcgregor, Terry L.↗