Search NASA⌕ Search

SEARCH · Search NASA

Results for “Particle accelerator design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Optimization of the Geometric Beta for the SSR2 Cavities of the Project X

Project X based on the 3 GeV CW superconducting Linac and is currently in the R&D phase. The CW SC Linac starts from a low-energy SCRF section (2.1 - 165 MeV) containing three different types of resonators. HWR f = 162.5 MHz (2.1 - 11 MeV) having beta= 0.11, SSR1 f = 325 MHz (11 - 35 MeV) having beta = 0.21. In this paper we present the analysis that lead to the final design of SSR2 f = 325 MHz cavity (35 - 165 MeV). We present the results of optimization of the geometric beta and the comparison between single, double and triple spoke resonators used in Project X frontend. A {beta} optimization has been carried out for the last spoke cavity section of Project X front end. The optimization process of {beta}{sub opt} for a single spoke resonator family SSR2 shown that {beta}{sub opt} = 0.47 looks better than the previous choice, which is {beta}{sub opt} = 0.4. This change can save some cavities and provide the same final energy for this section, 160 MeV. Single double and triple spoke resonator performances have been compared. The best option is the single spoke resonator SSR2 because the NTTF of a multi-spoke resonator is much narrower than a single one. In the energy range considered (40-160 MeV) the most efficient resonator is the single spoke one.

43 PARTICLE ACCELERATORS↗

MI Gap Clearing Kicker Magnet Design Review

The kicker system requirements were originally conceived for the NOvA project. NOvA is a neutrino experiment located in Minnesota. To achieve the desired neutrino flux several upgrades are required to the accelerator complex. The Recycler will be used as a proton pre-injector for the Main Injector (MI). As the Recycler is the same size as the MI, it is possible to do a single turn fill ({approx}11 {micro}sec), minimizing the proton injection time in the MI cycle and maximizing the protons on target. The Recycler can then be filled with beam while the MI is ramping to extract beam to the target. To do this requires two new transfer lines. The existing Recycler injection line was designed for 10{pi} pbar beams, not the 20{pi} proton beams we anticipate from the Booster. The existing Recycler extraction line allows for proton injection through the MI, while we want direct injection from the Booster. These two lines will be decommissioned. The new injection line from the MI8 line into the Recycler will start at 848 and end with injection kickers at RR104. The new extraction line in the RR30 straight section will start with a new extraction kicker at RR232 and end with new MI injection kickers at MI308. Finally, to reduce beam loss activation in the enclosure, a new gap clearing kicker will be used to extract uncaptured beam created during the slip stack injection process down the existing dump line. It was suggested that the MI could benefit from this type of system immediately. This led to the early installation of the gap clearing system in the MI, followed by moving the system to Recycler during NOvA. The specifications also changed during this process. Initially the rise and fall time requirements were 38 ns and the field stability was {+-}1%. The 38 ns is based on having a gap of 2 RF buckets between injections. (There are 84 RF buckets that can be filled from the Booster for each injection, but 82 would be filled with beam. MI and Recycler contain 588 RF buckets.) A rough cost/benefit analysis showed that increasing the number of empty buckets to 3 decreased the kicker system cost by {approx}30%. This could be done while not extending the running time since this is only a 1% reduction in protons per pulse, hence the rise and fall time are now 57 ns. Additionally, the {+-}1% tolerance would have required a fast correction kicker while {+-}3% could be achieved without this kicker. The loosened tolerance was based on experience on wide band damping systems in the MI. A higher power wideband damping system is a better use of the resources as it can be used to correct for multiple sources of emittance growth. Finally, with the use of this system for MI instead of Recycler, the required strength grew from 1.2 mrad to 1.7 mrad. The final requirements for this kicker are listed.

43 PARTICLE ACCELERATORS↗

High luminosity electron-hadron collider eRHIC

We present the design of a future high-energy high-luminosity electron-hadron collider at RHIC called eRHIC. We plan on adding 20 (potentially 30) GeV energy recovery linacs to accelerate and to collide polarized and unpolarized electrons with hadrons in RHIC. The center-of-mass energy of eRHIC will range from 30 to 200 GeV. The luminosity exceeding 10{sup 34} cm{sup -2} s{sup -1} can be achieved in eRHIC using the low-beta interaction region with a 10 mrad crab crossing. We report on the progress of important eRHIC R&D such as the high-current polarized electron source, the coherent electron cooling, ERL test facility and the compact magnets for recirculation passes. A natural staging scenario of step-by-step increases of the electron beam energy by building-up of eRHIC's SRF linacs is presented.

43 PARTICLE ACCELERATORS↗

Design study of a 0.4 THz 100 kW pulsed gyrotron

We present a status of development of a 0.4 THz, 100 kW pulsed gyrotron at UNIST 0.4 THz, 100 kW gyrotron is currently under design for a remote radioactive material detection. A magnetic injection gun (MIG) is used for the electron gun with a beam voltage of 70 kV and beam current of 10 A with a pulse duration of 10 usec. A second harmonic cavity for the gyrotron interaction is considered for the high power THz gyrotron. Numerical optimization of the electron gun design and the cavity is performed in the study. In this paper, we briefly report the design study of the gyrotron. (author)

43 PARTICLE ACCELERATORS↗

CSR for drift

Abstract Not Provided

Accelerator Design, Technology, and Operations↗

SRF Fixture Design and HOM analysis

A particle accelerator can either be a normal conducting or a superconducting accelerator. While a superconducting accelerator is a more energy efficient option, they traditionally use a liquid helium bath to achieve the temperatures needed for superconductivity. This makes superconducting accelerators operationally complex and expensive. To make superconducting accelerators a more commercially viable option IARC is working on a cryogen free accelerator which can be seen below.

43 PARTICLE ACCELERATORS↗

A modular solid state detector for measuring high energy heavy ion fragmentation near the beam axis

A multi-element solid state detector has been designed to measure fluences of fragments produced near the beam axis by high energy heavy ion beams in thick targets. The detector is compact and modular, so as to be readily reconfigured according to the range of fragment charges and energies to be measured. Preamplifier gain settings and detector calibrations are adjustable remotely under computer control. We describe the central detector, its associated detectors and electronics, triggering scheme, data acquisition and particle identification techniques, illustrated by data taken with 600 MeV/u 56Fe beams and thick polyethylene targets at the LBL Bevalac. The applications of this work to space radiation protection are discussed.

NASA Center HQS↗