Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

TAS: 89 0227: TAS Recovery Act - Optimization and Control of Electric Power Systems: ARRA

The name SuperOPF is used to refer several projects, problem formulations and soft-ware tools intended to extend, improve and re-define some of the standard methods of optimizing electric power systems. Our work included applying primal-dual interior point methods to standard AC optimal power flow problems of large size, as well as extensions of this problem to include co-optimization of multiple scenarios. The original SuperOPF problem formulation was based on co-optimizing a base scenario along with multiple post-contingency scenarios, where all AC power flow models and constraints are enforced for each, to find optimal energy contracts, endogenously determined locational reserves and appropriate nodal energy prices for a single period optimal power flow problem with uncertainty. This led to example non-linear programming problems on the order of 1 million constraints and half a million variables. The second generation SuperOPF formulation extends this by adding multiple periods and multiple base scenarios per period. It also incorporates additional variables and constraints to model load following reserves, ramping costs, and storage resources. A third generation of the multi-period SuperOPF, adds both integer variables and a receding horizon framework in which the problem type is more challenging (mixed integer), the size is even larger, and it must be solved more frequently, pushing the limits of currently available algorithms and solvers. The consideration of transient stability constraints in optimal power flow (OPF) problems has become increasingly important in modern power systems. Transient stability constrained OPF (TSCOPF) is a nonlinear optimization problem subject to a set of algebraic and differential equations. Solving a TSCOPF problem can be challenging due to (i) the differential-equation constraints in an optimization problem, (ii) the lack of a true analytical expression for transient stability in OPF. To handle the dynamics in TSCOPF, the set of differential equations can be approximated or converted into equivalent algebraic equations before they are included in an OPF formulation. In Chapter 4, a rigorous evaluation of using a predefined and fixed threshold for rotor angles as a mean to determine transient stability of the system is developed. TSCOPF can be modeled as a large-scale nonlinear programming problem including the constraints of differential-algebraic equations (DAE). Solving a TSCOPF problem can be challenging due to (i) the differential-equation constraints in an optimization problem, (ii) the lack of a true analytical expression for transient stability constraint in OPF. Unfortunately, even the current best TSCOPF solvers still suffer from the curse of dimensionality and unacceptable computational time, especially for large-scale power systems with multiple contingencies. In chapter 5, thse issues will be addressed and a new method to incorporate the transient stability constraints will be presented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimization and Control of Electric Power Systems

The analysis and optimization needs for planning and operation of the electric power system are challenging due to the scale and the form of model representations. The connected network spans the continent and the mathematical models are inherently nonlinear. Traditionally, computational limits have necessitated the use of very simplified models for grid analysis, and this has resulted in either less secure operation, or less efficient operation, or both. The research conducted in this project advances techniques for power system optimization problems that will enhance reliable and efficient operation. The results of this work appear in numerous publications and address different application problems include optimal power flow (OPF), unit commitment, demand response, reliability margins, planning, transmission expansion, as well as general tools and algorithms.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operation and Dynamic Control of Hybrid Power Systems

Poster describing the planned startup process of a solid oxide gas turbine hybrid power system to be constructed at a 20 kW scale. The work is part of the ARPA-E project award to NETL under the INTEGRATE program.

Harun, Nor Farida↗

Mechanical Solutions Scan Report

Power lines, poles, and towers are the backbone of the United States (U.S.) electric-power grid. These transmission and distribution networks route electricity from generator to loads. The characteristics of these routes are rapidly changing -- trending towards decentralized renewable generation, electric heating, vehicle charging, and large data-center loads. Coupled with aging infrastructure and the increased frequency of extreme weather events, there is concern about the future reliability and transmission capacity of conductors and adjacent components. This scan report seeks to provide an overview of mechanical solutions to challenges caused by extreme weather events associated with components of transmission and distribution infrastructure, including conductor heat sag, ice accumulation, wind, and wildfire. Many options could increase transmission capacity or reliability, and these are at various stages of technological readiness. Some have only been lab tested, while some have been widely deployed in the U.S. or overseas for decades. The solution categories and providers featured in this report are intended to be comprehensive at the time of publication and to serve as a reference for decision-makers concerned about transmission and distribution reliability. There are two other categories of large, complex solutions, which are not covered in this report: replacing existing conductors with advanced conductors and implementing digital grid enhancing technologies. A separate scan report titled “Advanced Conductor Scan Report,” which discusses advanced carbon-core conductors, was published by the Idaho National Laboratory (INL) in 2023. Information on digital technologies, such as dynamic line ratings, power-flow controllers, and other power electronics and communications-based devices, can be found on the Grid- Enhancing Technologies landing page. Mechanical grid-enhancing technologies, or solutions covered in this report, often do not require full equipment replacement and do not rely on digital components. Mechanical technologies are overlooked because they may be older, simpler, or seemingly “more obvious” than digital or carbon-core technologies. However, it is wise to consider mechanical solutions in a thorough evaluation of grid enhancing technology solutions.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Columbia River Treaty 2014/2024 Review • Phase 1 Report

Under the Columbia River Treaty (Treaty or CRT) of 1964, Canada and the United States (U.S.) jointly regulate and manage the Columbia River as it flows from British Columbia into the U.S. The Treaty has provided substantial flood control and power generation benefits to both nations. The Treaty established Canadian and U.S. Entities as implementing agents for each government. British Columbia Hydro and Power Authority (BC Hydro) was designated as the Canadian Entity. The Bonneville Power Administration (BPA) Administrator and the U.S. Army Corps of Engineers (Corps) Division Engineer, Northwestern Division, were designated as the U.S. Entity. The Canadian and U.S. Entities are empowered by their respective governments with broad discretion to implement the existing Columbia River Treaty. They are not, however, authorized to terminate, renegotiate, or otherwise modify the Treaty. In the U.S., authority over international treaties rests with the President, assisted in foreign relations and international negotiations by the Department of State and subject in certain cases to the advice and consent of the U.S. Senate. In Canada, international treaties are within the prerogative of the executive branch of the federal government. Under current policy, treaties are tabled in the House of Commons, and are subject to a waiting period before the executive branch brings the treaty into effect. In the case of the Columbia River Treaty, Canada has assigned certain rights and obligations relating to the Treaty to British Columbia pursuant to the Canada-B.C. Agreement. The Phase 1 report is provided to those respective governmental bodies to support possible independent and/or joint decisions that may be made with respect to the future of the Treaty. The Treaty contains two important provisions that take effect on and after September 16, 2024, that could impact the current power and flood control benefits: 1. Canadian flood control obligations automatically change from a pre-determined annual operation to a “Called Upon” operation. 2. The year 2024 is the earliest date that either Canada or the U.S. can terminate most of the provisions of the Treaty, with a minimum 10-years advance written notice. Hence, September 16, 2014, is the latest date that either nation could provide notice of intent to terminate and still have the termination effective at its earliest possible date in 2024. While termination would end most Treaty obligations, Called Upon flood control and Libby coordination provisions will continue regardless of termination. However, it is important to note that the Treaty has no end date and absent either country using the termination option will continue indefinitely.

Columbia River Treaty, Canada, United States, Brit↗