Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Application of quantitative methods for reliability testing of a nuclear power plant digital rod position indication diagnostic system - 391

Obsolescence, aging, reliability, and performance issues are driving nuclear facilities to replace conventional analog Instrumentation and Control (I and C) systems with digital technologies. In addition, the designs of the next generation of nuclear reactors, including Small Modular Reactors (SMRs), will incorporate digital I and C for most, if not all, of their safety and non-safety related functions. As part of an on-going research and development (R and D) effort under the auspices of the U.S. Department of Energy (DOE), Analysis and Measurement Services Corporation (AMS) is developing a platform to provide automated testing of digital I and C systems and create a standard method of evaluation for reliability assessments. This hands-on R and D effort has produced a Software Reliability Tester (SRT), which is a set of software and hardware tools designed to automate the testing of digital I and C systems to measure and quantify how well the systems perform under normal operating conditions and in the presence of faults. Furthermore, the SRT provides the foundation for a practical tool to automate verification and validation (V and V) activities and reduce the amount of testing time of digital I and C systems. When combined with its capabilities of integrating both reliability and fault tolerance quantification, the SRT can be used to ensure that digital I and C implementations are both safe and cost-effective for the nuclear industry. This paper describes the application of the SRT to perform V and V of a new Digital Rod Position Indication (DRPI) diagnostic system. The DRPI diagnostic system is a digital system that monitors the rod address and rod position data bus voltages of typical DRPI systems in nuclear power plants to detect and diagnose faults. For this application, the SRT was configured to exercise the inputs of the DRPI diagnostic system, and test cases were generated for common system faults such as address and data bit errors, bus voltage, and timing problems. These test cases were applied by the SRT hardware as voltage inputs to the DRPI diagnostic system and the outputs were compared to expected values generated by a model of the DRPI diagnostic system. Included in the paper is a description of the overall design of the SRT including the hardware and software architectures. Methodologies for automating test cases are also described. V and V using the SRT demonstrates the benefits of automated testing and qualification to provide a quantitative assessment of reliability and cost effective implementation of digital I and C in existing and next generation nuclear power plants. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of Kapton pyrolysis, arc tracking, and flashover on SiO(x)-coated polyimide insulated samples of flat flexible current carriers for Space Station Freedom

Kapton polyimide wiring insulation was found to be vulnerable to pyrolization, arc tracking, and flashover when momentary short-circuit arcs have occurred on aircraft power systems. Short-circuit arcs between wire pairs can pyrolize the polyimide resulting in a conductive char between conductors that may sustain the arc (arc tracking). Furthermore, the arc tracking may spread (flashover) to other wire pairs within a wire bundle. Polyimide Kapton will also be used as the insulating material for the flexible current carrier (FCC) of Space Station Freedom (SSF). The FCC, with conductors in a planar type geometric layout as opposed to bundles, is known to sustain arc tracking at proposed SSF power levels. Tests were conducted in a vacuum bell jar that was designed to conduct polyimide pyrolysis, arc tracking, and flashover studies on samples of SSF's FCC. Test results will be reported concerning the minimal power level needed to sustain arc tracking and the FCC susceptibility to flashover. Results of the FCC arc tracking tests indicate that only 22 volt amps were necessary to sustain arc tracking (proposed SSF power level is 400 watts). FCC flashover studies indicate that the flashover event is highly unlikely.

Stueber, Thomas J.↗

STANDARDIZATION OF CEBAF 12 GEV UPGRADE CAVITY TESTING

CEBAF 12GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. Each cavity underwent RF qualification at 2.07K using a high power accelerating gradient test and an HOM survey in Jefferson Lab's Vertical Testing Area (VTA) before cavity string assembly. In order to ensure consistently high quality data, updated cavity testing procedures and analysis were implemented and used by a group of VTA operators. For high power tests, a cavity testing procedure was developed and used in conjunction with a LabVIEW program to collect the test data. Additionally while the cavity was at 2.07K, an HOM survey was performed using a network analyzer and a combination of Excel and Mathematica programs. Data analysis was standardized and an online logbook, Pansophy, was used for data storage and mining. The Pansophy system allowed test results to be easily summarized and searchable across all cavity tests. In this presentation, the CEBAF 12GeV upgrade cavity testing procedure, method for data analysis, and results reporting results will be discussed.

43 PARTICLE ACCELERATORS↗

Hardware-in-the-loop testing of a hydraulic wave energy power take-off system

This report describes testing conducted related to the development of a “hydrostatic power takeoff” (HPTO) system for a wave energy converter. Tests were conducted with an experimental electric motor rig to provide preliminary results and de-risk future testing. Efficiency mapping tests were conducted as well as hardware-in-the-loop (HIL) testing. The results of the efficiency mapping tests provide good insight into how to systematically perform efficiency mapping tests. The HIL testing indicates good overall performance of the system and provides a stepping stone towards more complete system tests in the future.

16 TIDAL AND WAVE POWER↗

Individual RF Test Results of the Cavities Used in the First US-built ILC-type Cryomodule

Eight 1.3-GHz, nine-cell SRF cavities have been installed in a cryomodule intended to demonstrate the ILC design goal of 31.5 MV/m. These cavities all underwent two types of individual RF testing: a low-power continuous-wave test of the 'bare' cavity and a high-power pulsed test of the 'dressed' cavity. Presented here is a discussion of the results from these tests and a comparison of their performance in the two configurations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Overview and evolution of the LeRC PMAD DC Testbed

Since the beginning of the Space Station Freedom Program (SSFP), the Lewis Research Center (LeRC) has been developed electrical power system test beds to support the overall design effort. Through this time, the SSFP has changed the design baseline numerous times, however, the test bed effort has endeavored to track these changes. Beginning in August 1989 with the baseline and an all DC system, a test bed was developed to support the design baseline. The LeRC power measurement and distribution (PMAD) DC test bed and the changes in the restructure are described. The changes includeed the size reduction of primary power channel and various power processing elements. A substantial reduction was also made in the amount of flight software with the subsequent migration of these functions to ground control centers. The impact of these changes on the design of the power hardware, the controller algorithms, the control software, and a description of their current status is presented. An overview of the testing using the test bed is described, which includes investigation of stability and source impedance, primary and secondary fault protection, and performance of a rotary utility transfer device. Finally, information is presented on the evolution of the test bed to support the verification and operational phases of the SSFP in light of these restructure scrubs.

Soeder, James F.↗

Load converter interactions with the secondary system in the Space Station Freedom power management and distribution DC test bed

The NASA LeRC in Cleveland, Ohio, is responsible for the design, development, and assembly of the Space Station Freedom (SSF) Electrical Power System (EPS). In order to identify and understand system level issues during the SSF Program design and development phases, a system Power Management and Distribution (PMAD) DC test bed was assembled. Some of the objectives of this test bed facility are the evaluation of, system efficiency, power quality, system stability, and system protection and reconfiguration schemes. In order to provide a realistic operating scenario, dc Load Converter Units are used in the PMAD dc test bed to characterize the user interface with the power system. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. This final regulation is required on the actual space station because the majority of user loads will require voltage levels different from the secondary bus voltage. This paper describes the testing of load converters in an end to end system environment (from solar array to loads) where their interactions and compatibility with other system components are considered. Some of the system effects of interest that are presented include load converters transient behavior interactions with protective current limiting switchgear, load converters ripple effects, and the effects of load converter constant power behavior with protective features such as foldback.

Lebron, Ramon C.↗

Load converter interactions with the secondary system in the Space Station Freedom power management and distribution dc test bed

The NASA LeRC in Cleveland, Ohio, is responsible for the design, development, and assembly of the Space Station Freedom (SSF) Electrical Power System (EPS). In order to identify and understand system level issues during the SSF program design and development phases, a system Power Management and Distribution (PMAD) dc test bed was assembled. Some of the objectives of this test bed facility are the evaluation of, system efficiency, power quality, system stability, and system protection and reconfiguration schemes. In order to provide a realistic operating scenario, dc Load Converter Units are used in the PMAD dc test bed to characterize the user interface with the power system. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. This final regulation is required on the actual space station because the majority of user loads will require voltage levels different from the secondary bus voltage. This paper describes the testing of load converters in an end to end system environment (from solar array to loads) where their interactions and compatibility with other system components are considered. Some of the system effects of interest that are presented include load converters transient behavior interactions with protective current limiting switchgear, load converters ripple effects, and the effects of load converter constant power behavior with protective features such as foldback.

Lebron, Ramon C.↗

Multiphysics Simulations of Thermal Shock Testing of Nanofibrous High Power Targets

Increase of primary beam power for neutrino beam-lines leads to a reduced lifespan for production targets. New concepts for robust targets are emerging from the field of High Power Targetry (HPT); one idea being investigated by the HPT R&D Group at Fermilab is an electrospun nanofiber target. As part of their evaluation, samples with different densities were sent to the HiRadMat facility at CERN for thermal shock tests. The samples with the higher density, irradiated under a high intensity beam pulse, exhibit major damage at the impact site whereas those with the lower density show no apparent damage. The exact cause of this failure was unclear at the time. In this paper, we present the results of multiphysics simulations of the thermal shock experienced by the nanofiber targets that suggest the failure originates from the reduced permeability of the high density sample to air flow. The air present in the porous target expands due to heating from the beam, but is unable to flow freely in the high density sample, resulting in a larger back pressure that blows apart the nanofiber mat. We close with a discussion on how to further validate this hypothesis.

43 PARTICLE ACCELERATORS↗

Mobile Uninterruptible Power Supply

Proposed mobile unit provides 20 kVA of uninterruptible power. Used with mobile secondary power-distribution centers to provide power to test equipment with minimal cabling, hazards, and obstacles. Wheeled close to test equipment and system being tested so only short cable connections needed. Quickly moved and set up in new location. Uninterruptible power supply intended for tests which data lost or equipment damaged during even transient power failure.

Mears, Robert L.↗

Review and Performance Testing of the Optical Power Monitor (PMON)

The LISA mission requires a high precision optical power monitoring and control system that combines high reliability and measurement accuracy with extremely low disturbance to the core interferometric detection system. NASA is working with Avo Photonics to design and build this optical power monitor, known as PMON. The high-level design requirements take into account detector redundancy, mechanical rigidity, stability against temperature and input alignment changes, parasitic scatter and reflection artifacts, as well as low magnetic field. Gamma and Proton radiation tests have been performed on the photodiodes from a few vendors to verify radiation tolerance. Engineering development units of the PMON have been fabricated, delivered and evaluated at NASA.

Hua Jiao↗

Pilot testing of CO2 capture from a coal-fired power plant—Part 2: Results from 1-MWe pilot tests

Abstract Using a 1-MWe slipstream pilot plant, solid-sorbent-based post-combustion CO2 capture was tested at a coal-fired power plant. Results from pilot testing were used to develop a preliminary full-scale commercial design. The sorbent selected for pilot-scale evaluation during this project consisted of an ion-exchange resin that incorporated amines covalently bonded to the substrate. A unique temperature-swing-absorption (TSA) process was developed that incorporated a three-stage fluidized-bed adsorber integrated with a single-stage fluidized-bed regenerator. Overall, following start-up and commissioning challenges that are often associated with first-of-a-kind pilots, the pilot plant operated as designed and expected, with a few key exceptions. The two primary exceptions were associated with: (i) handling characteristics of the sorbent, which were sufficiently different at operating temperature than at ambient temperature when design specifications were established with lab-scale testing; and (ii) CO2 adsorption in the transport line between the regenerator and adsorber that preloaded the sorbent with CO2 prior to entering the adsorber. Results from the pilot programme demonstrate that solid-sorbent-based post-combustion capture can be utilized to achieve 90% CO2 capture from coal-fired power plants.

Sjostrom, Sharon↗

A Review of Quantum Computing Technologies in Power System Optimization

As modern power grids increasingly integrate variable renewable generation, distributed energy resources, and energy storage systems, classical optimization techniques are facing unprecedented challenges. This review examines the emerging application of quantum computing to overcome these challenges in power system optimization, including optimal power flow (OPF), unit commitment (UC), economic dispatch (ED), and intelligent switching and topology optimization (IS-TO). Recent research has introduced various quantum methodologies—such as gate-based, annealing-based, variational algorithms, and quantum-inspired algorithms—to address the combinatorial complexity inherent in grid reconfiguration and energy management. The review summaries the quantum algorithms, quantum devices and the power system test cases, highlighting hybrid quantum–classical strategies that leverage the complementary strengths of both paradigms. Some quantum advantages have been observed, including theoretical speedup, accurate simulation results, scalable qubit usage, efficient QUBO mapping. In particular, the review emphasizes the importance of integrating quantum optimization techniques with classical control frameworks, these hybrid approaches demonstrate the potential to improve real-time grid management and operational reliability. A significant portion of the analysis is devoted to the practical limitations of current quantum devices. Present-day quantum hardware, operating in the noisy intermediate-scale quantum (NISQ) era, remains highly sensitive to noise and limited in qubit connectivity, which constrains the scale and accuracy of implemented algorithms. The review delves into specific challenges such as the need for qubit-efficient encoding techniques and error mitigation strategies that are critical for handling real-world grid optimization problems. In addition, the work draws attention to the performance discrepancies between theoretical quantum speedups and experimental validations, underscoring the importance of rigorous benchmark studies using representative power grid test cases. In summary, this review highlights both the promise and limitations of quantum computing for power system optimization. It provides a comprehensive overview of the state-of-the-art technologies, categorizes recent advancements in algorithm design, and discusses practical considerations for implementation, and serves as an informative resource on current research. Future research directions include developing robust hybrid frameworks, advancing qubit-efficient formulations, and scaling up experimental demonstrations to confirm the theoretical advantages of quantum methods in large-scale power system operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Review of Wave Energy Converter Power Take-Off Systems, Testing Practices, and Evaluation Metrics: Preprint

While the field of wave energy has been the subject of numerical simulation, scale model testing, and precommercial project testing for decades, wave energy technologies remain in the early stages of development and must continuing proving themselves as a promising modern renewable energy field. One of the difficulties that wave energy systems have been struggling to overcome is the design of highly efficient energy conversion systems that can convert the mechanical power, derived from the oscillation of wave activated bodies, into another useful product. Often the power take-off (PTO) is defined as the single unit responsible for converting mechanical power into another usable form such as electricity, pressurized fluid, compressed air, and others. The PTO, and the entire power conversion chain (PCC), is of great importance as it affects not only how efficient wave power is converted into electricity, but also contributes to the mass, size, structural dynamics, and levelized cost of energy (LCOE) of the wave energy converter (WEC). Unlike wind and solar, there is no industrial standard device, or devices, for wave energy conversion and this diversity is transferred to the PTO system. The majority of current WEC PTO systems incorporate a mechanical or hydraulic drive train, power generator, and an electrical control system. The challenge of WEC PTO designs is designing a mechanical-to-electrical component that can efficiently convert irregular, bi-directional, low frequency and low alternating velocity wave motions. While gross average power levels can be predicted in advance, the variable wave elevation input has to be converted into smooth electrical output and hence usually necessitates some type of energy storage system, such as battery storage, accumulator super capacitors, etc., or other means of compensation such as an array of devices. One of the primary challenges for wave energy converter systems is the fluctuating nature of wave resources, which require WEC components to be designed to handle loads (i.e. torques, forces, and powers) that are many times greater than the average load. This approach requires a much greater PTO capacity than the average power output and indicates a higher cost. In addition, supporting mechanical coupling and or gearing can be added to the PCC to help alleviate the difficulties with transmission and control of fluctuating large loads with low frequencies (indicative of wave forcing) into smaller loads at higher frequencies (optimum for conventional electrical machine design) can quickly increase the complexity of the PCC which could result in a greater number of failure modes and increased maintenance costs. All of the previous points demonstrate how the PTO influences WEC dynamics, reliability, performance and cost which are critical design factors. This paper further explores these topics by providing a review of the state-of-the-art PTO systems currently under development, how these novel PTO systems are tested and derisked prior to precommercial deployment, and the evaluation metrics historically used to differentiate between PTO designs and how they can be improved to support control co-design focused development of wave energy systems.

laboratory testing↗

Baseline tests of the power-train electric delivery van

Vehicle maximum speed, range at constant speed, range over stop-and-go driving schedules, maximum acceleration, gradeability, gradeability limit, road energy consumption, road power, indicated energy consumption, braking capability, battery charger efficiency, and battery characteristics were determined for a modified utility van powered by sixteen 6-volt batteries connected in series. A chopper controller actuated by a foot accelerator pedal changes the voltage applied to the 22-kilowatt (30-hp) series-wound drive motor. In addition to the conventional hydraulic braking system, the vehicle has hydraulic regenerative braking. Cycle tests and acceleration tests were conducted with and without hydraulic regeneration.

Lumannick, S.↗