Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Delta XTE Press Briefing

Live coverage of the pre-launch Delta X-Ray Timing Explorer (XTE) press briefing is presented. George Diller, NASA Public Affairs, introduces the panel. The panel consists of Floyd Curington, NASA Launch Manager, Kennedy Space Center; David Mitchell, Launch Vehicle Manager, NASA Goddard Space Flight Center; Dale Schulz, Mission Director, XTE Project Manager Goddard Space Flight Center; Dr. Hale Bradt, XTE Principle Investigator, Massachusetts Institute of Technology (MIT); and Joel Tumbiolo, Launch Weather Officer, Department of the Air Force. The launch of the Delta XTE spacecraft atop the Delta 230 expendable launch vehicle is discussed. Once lofted into orbit, the XTE spacecraft will embark on a two-year mission to carry out an in-depth study of x-ray sources in the universe. Floyd Curington gives the lift-off schedule, fueling, and countdown of the spacecraft. David Mitchell discusses the launch sequence and spacecraft separation. Dale Schulz presents viewcharts of the instrument side of the XTE. Dr. Hale will be studying compact stars such as light dwarfs, neutron stars and quasars. Joel Tumbiolo presents the weather forecast for the December 10, 1995 launch. The press briefing ends with a question and answer period.

Source record↗

Risk Management for the International Space Station

The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.

Sebastian, J.↗

Orion Ascent Abort 2 Test - Benefits of a Digital Collaboration Environment

The Ascent Abort-2 Crew Module and Separation Ring (CSR) were developed internally to NASA, led by the JSC EA Integrated Product Team. The CSR IPT leveraged Sharepoint as an Integrated Data environment to link systems engineering and project management data element, enabling collaborative development and engagement from across the project (NASA-wide). This presentation describes the mission, the development approach, and the benefits of this approach. flight operations

Devolites, Jenny↗

Decommissioning the Belgonucleaire Dessel MOX plant: presentation of the project and situation end august 2013

Belgonucleaire has been operating the Dessel MOX plant at an industrial scale between 1986 and 2006. During this period, 40 metric tons of plutonium (HM) have been processed into 90 reloads of MOX fuel for commercial light water reactors. The decision to stop the production in 2006 and to decommission the MOX plant was the result of the shrinkage of the MOX fuel market due to political and commercial factors. As a significant part of the decommissioning project of the Dessel MOX plant, about 170 medium-sized glove-boxes and about 1.200 metric tons of structure and equipment outside the glove-boxes are planned for dismantling. The license for the dismantling of the MOX plant was granted by Royal Decree in 2008 and the dismantling started in March 2009. The dismantling works are carried out by an integrated organization under leadership and responsibility of Belgonucleaire; this organization includes 3 main contractors, namely Tecnubel N.V., the THV ('Tijdelijke HandelsVereniging') Belgoprocess / SCK-CEN and Studsvik GmbH and Tractebel Engineering as project manager. In this paper, after having described the main characteristics of the project, the authors review the different organizational and technical options considered for the decommissioning of the glove-boxes; thereafter the main decision criteria (qualification of personnel and of processes, confinement, cutting techniques and radiation protection, safety aspects, alpha-bearing waste management) are analyzed as well. Finally the progress, the feedback and the lessons learned at the end of August 2013 are presented, giving the principal's and contractors point of view. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Upper Class E Traffic Management (ETM) and ATM-X

This is a slide set for presentation at the 4th Federal UAS Workshop jointly hosted by NASA and USGS. The contents of the slide cover the work currently being performed with respect to the Upper Class E Traffic Management (ETM) concept, which addresses the needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a cooperative, service-based approach that provides services and capabilities in areas (e.g., Upper E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes an overview and rationale of the ETM concept, a recap of the progress made, the road ahead, and the place of ETM within its parent project: Air Traffic Management-eXploration (ATM-X).

Upper E↗

Power Electronics Thermal Management

This project develops thermal management strategies to enable efficient and high-temperature wide-bandgap (WBG)-based power electronic systems (e.g., emerging inverter and DC-DC converter designs). The use of WBG-based devices in automotive power electronics will improve efficiency and increase driving range in electric-drive vehicles; however, the implementation of this technology is limited, in part, due to thermal issues. This project will develop system-level thermal models to determine the thermal limitations of current automotive power modules under elevated device temperature conditions. Additionally, novel cooling concepts and material selection will be evaluated to enable high-temperature silicon and WBG devices in power electronics components. WBG devices (silicon carbide [SiC], gallium nitride [GaN]) promise to increase efficiency, but will be driven as hard as possible. This creates challenges for thermal management and reliability. This project is a Vehicle Technologies Office, U.S. Department of Energy Office of Energy Efficiency and Renewable Energy funded project.

30 DIRECT ENERGY CONVERSION↗

Proceedings of the 2007 ANS Topical Meeting on Decommissioning, Decontamination, and Reutilization - DD and R 2007

The American Nuclear Society (ANS) Topical Meeting on Decommissioning, Decontamination, and Reutilization (DD and R 2007), 'Capturing Decommissioning Lessons Learned', is sponsored by the ANS Decommissioning, Decontamination and Reutilization; Environmental Sciences; and Fuel Cycle and Waste Management Divisions. This meeting provides a forum for an international exchange of technical knowledge and project management experience gained from the ongoing process of decommissioning nuclear facilities. Of particular note is the number of projects that are approaching completion. This document gathers 113 presentations given at this meeting.

42 ENGINEERING↗

Visual Impact Assessment of the Energetic Materials Complex Construction Project on Manhattan Project–Era Historic Properties, the TA-06-0037 Concrete Bowl, and the TA-22-0001 Quonset Hut

Concern for potential visual effects to historic Manhattan Project–era properties emerged early in the planning and consultation phase for the upcoming Energetic Materials Complex (EMC) construction project. In initial discussions with project managers and design team members, resource managers became aware of the need to consider potential impacts to the viewsheds of two nearby properties that are eligible for inclusion in the Manhattan Project National Historical Park (MAPR). Resource managers recognized that viewshed characteristics important to the integrity of the Concrete Bowl (Technical Area [TA-]06-0037) and the Quonset Hut (TA-22-0001) conceivably faced the prospect of lasting and irreversible visual impacts. A strategy to gather necessary data soon emerged. The approach presented to the New Mexico State Historic Preservation Officer (SHPO) on April 7, 2021, combined gathering baseline information from field visits with a geographic information system (GIS)-supported viewshed analysis. Accordingly, results from the viewshed analysis would help resource managers determine if a more comprehensive visual impact assessment (VIA) would be needed. If necessitated by the outcome of the GIS viewshed analysis, initial consultation with the SHPO specified the production of a VIA that would explore any potential visual adverse impacts to the Concrete Bowl and the Quonset Hut. Cultural resources and GIS specialists with the Laboratory performed a viewshed analysis shortly after consultation with the SHPO. The analysis indicated a high likelihood that at least one of the two Manhattan Project–era properties would experience at least a minimal level of visual impact and that a VIA would be needed. The resulting analysis provides a description of the undertaking, an account of the properties affected along with an evaluation of historical significance, an examination of potential visual impacts, and a determination of effect to the identified historic properties.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Managemant of NASA's major projects

Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

James, L. B.↗

Qualitative Decision and Risk Assessment Approaches for Managing Nuclear Materials

Qualitative approaches to performing decision analyses and risk assessments have recently been developed at ORNL with the goal of providing simple tools to help manage complex projects that have a variety of drivers, constraints, or both. Many of the DOE’s nuclear materials management projects involve making “keep-or-dispose” decisions for nuclear materials and then developing projects to manage or dispose of the materials. ORNL uses decision analysis tools to identify and rank options for accomplishing nuclear materials management projects, and risk assessment tools to evaluate the preferred option(s) to identify risks and prioritize mitigation actions to reduce risks during implementation. This paper focuses on application of the decision analysis and risk-based planning tool(s) to guide management of projects during the planning and start-up phases when only preliminary project information is likely to be available. Such an analysis seeks to reduce risks, lower costs, and improve chances of project success. Examples showing the use of the tools in nuclear waste management scenarios are provided.

Jubin, Robert↗

Qualitative Decision and Risk Assessment Approaches for Managing Nuclear Materials - 19061

Qualitative approaches to performing decision analyses and risk assessments have recently been developed at ORNL with the goal of providing simple tools to help manage complex projects that have a variety of drivers, constraints, or both. Many of the DoE's nuclear materials management projects involve making 'keep-or-dispose' decisions for nuclear materials and then developing projects to manage or dispose of the materials. ORNL uses decision analysis tools to identify and rank options for accomplishing nuclear materials management projects, and risk assessment tools to evaluate the preferred option(s) to identify risks and prioritize mitigation actions to reduce risks during implementation. This paper focuses on application of the decision analysis and risk-based planning tool(s) to guide management of projects during the planning and start-up phases when only preliminary project information is likely to be available. Such an analysis seeks to reduce risks, lower costs, and improve chances of project success. Examples showing the use of the tools in nuclear waste management scenarios are provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Resilient remediation: Addressing extreme weather and climate change, creating community value

Devastating hurricanes experienced in recent years demonstrated that extreme weather and climate change can jeopardize contaminated land remediation and harm public health and the environment. Since early 2016, the Sustainable Remediation Forum (SURF) has led research and organized knowledge exchanges to examine (1) the impacts of climate change and extreme weather events on hazardous waste sites, and (2) how we can mitigate these impacts and create value for communities. The SURF team found that climate change and extreme weather events can undermine the effectiveness of the approved site remediation, and can also affect contaminant toxicity, exposure, organism sensitivity, fate and transport, long-term operations, management, and stewardship of remediation sites. Further, failure to consider social vulnerability to climate change could compromise remediation and adaptation strategies. SURF's recommendations for resilient remediation build on resources and drivers from state, national, and international sources, and marry the practices of sustainable remediation and climate change adaptation. They outline both general principles and site-specific protocols and provide global examples of mitigation and adaptation strategies. Opportunities for synergy include vulnerability assessments that benefit and build on established hazardous waste management law, policy, and practices. SURF's recommendations can guide owners and project managers in developing a site resiliency strategy. Resilient remediation can help expedite cleanup and redevelopment, decrease public health risks, and create jobs, parks, wetlands, and resilient energy sources. Resilient remediation and redevelopment can also positively contribute to achieving international goals for sustainable land management, climate action, clean energy, and sustainable cities.

54 ENVIRONMENTAL SCIENCES↗

Design, Fabrication and Testing of a Superconducting Fault Current Limiter (SFCL)

The purpose of this project was to conduct R&D on specified components and provide technical design support to a SuperPower team developing a high temperature superconducting Fault Current Limiter (SFCL). ORNL teamed with SuperPower, Inc. on a Superconductivity Partnerships with Industry (SPI) proposal for the SFCL that was submitted to DOE and approved in FY 2003. A contract between DOE and SuperPower, Inc. was signed on July 14, 2003 to design, fabricate and test the SFCL. This device employs high temperature superconducting (HTS) elements and SuperPower's proprietary technology. The program goal was to demonstrate a device that will address a broad range of the utility applications and meet utility industry requirements. This DOE-sponsored Superconductivity Partnership with Industry project would positively impact electric power transmission reliability and security by introducing a new element in the grid that can significantly mitigate fault currents and provide lower cost solutions for grid protection. The project will conduct R&D on specified components and provide technical design support to a SuperPower-led team developing a SFCL as detailed in tasks 1-5 below. Note the SuperPower scope over the broad SPI project is much larger than that shown below which indicates only the SuperPower tasks that are complementary to the ORNL tasks. SuperPower is the Project Manager for the SFCL program, and is responsible for completion of the project on schedule and budget. The scope of work for ORNL is to provide R&D support for the SFCL in the following four broad areas: (1) Assist with high voltage subsystem R&D, design, fabrication and testing including characterization of the general dielectric performance of LN2 and component materials; (2) Consult on cryogenic subsystem R&D, design, fabrication and testing; (3) Participate in project conceptual and detailed design reviews; and (4) Guide commercialization by participation on the Technical Advisory Board (TAB). SuperPower's in-kind work for the SFCL will be provided in the following areas: (1) Work with ORNL to develop suitable test platforms for the evaluation of subsystems and components; (2) Provide cryogenic and high voltage subsystem designs for evaluation; (3) Lead the development of the test plans associated with the subsystem and components and participate in test programs at ORNL; and (4) Based on the test results, finalize the subsystem and component designs and incorporate into the respective SFCL prototypes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Thermal Hydraulic Computational Fluid Dynamics Simulations and Experimental Investigation of Deformed Fuel Assemblies

The project, Toward a Longer Life Core: Thermal Hydraulic CFD Simulations and Experimental Investigation of Deformed Fuel Assemblies, DOE Project code DE-NE0008321, was a verification and validation project for flow and heat transfer through wire wrapped simulated liquid metal fuel assemblies that included both experiments and computational fluid dynamics simulations of those experiments. This project was a two year collaboration between AREVA, TerraPower, Argonne National Laboratory and Texas A&M University. Experiments were performed by AREVA and Texas A&M University. Numerical simulations of these experiments were performed by TerraPower and Argonne National Lab. Project management was performed by AREVA Federal Services. The first of a kind project resulted in the production of both local point temperature measurements and local flow mixing experiment data paired with numerical simulation benchmarking of the experiments. The project experiments included the largest wire-wrapped pin assembly Mass Index of Refraction (MIR) experiment in the world, the first known wire-wrapped assembly experiment with deformed duct geometries and the largest numerical simulations ever produced for wire-wrapped bundles.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Y-12 Lean Six Sigma Marketing Plan 2018

The Lean Six Sigma (LSS) organization at Y-12 sponsors the deployment of Performance Enterprise System (PES) and provides continuous improvement facilitation and training for the Y-12 site. The Lean Six Sigma organization is comprised of Subject Matter Experts (SME) who are passionate about continuous improvement and helping organizations improve their processes. The LSS group includes Support Leads, who perform various PES deployment activities, and Black Belts who use Lean, Six Sigma, and other leadership and project management tools to scope, analyze, and expertly facilitate teams on multifaceted improvement projects to meet safety, security, quality, timeliness, and/or cost savings goals. LSS is a group of change agents who help initiate continuous improvement throughout the Y-12 site. The ultimate goal of this marketing plan is to build a consistent, positive, and influential brand throughout Y-12. This brand will provide employees with information about the Lean Six Sigma organization, generate desire for employees to take the Performance Enterprise System training course, and to improve continuously.

99 GENERAL AND MISCELLANEOUS↗

Meals for the Elderly

NASA is drawing upon its food-preparation expertise to assist in solving a problem affecting a large segment of the American population. In preparation for manned space flight programs, NASA became experienced in providing astronauts simple, easily-prepared, nutritious meals. That experience now is being transferred to the public sector in a cooperative project managed by Johnson Space Center. Called Meal System for the Elderly, the project seeks to fill a gap by supplying nutritionally balanced meal packages to those who are unable to participate in existing meal programs. Many such programs are conducted by federal, state and private organizations, including congregate hot meal services and home-delivered "meals on wheels." But more than 3.5 million elderly Americans are unable to take advantage of these benefits. In some cases, they live in rural areas away from available services; in others, they are handicapped, temporarily ill, or homebound for other reasons. Meal System for the Elderly, a cooperative program in which the food-preparation expertise NASA acquired in manned space projects is being utilized to improve the nutritional status of elderly people. The program seeks to fill a gap by supplying nutritionally-balanced food packages to the elderly who are unable to participate b existing meal service programs.

Source record↗

NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations

The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning tools included Kaizen/Lean events, mockups and human factors analysis. The majority of products developed by this team are applicable as KSC prepares 21st Century Ground Systems for the Orion Multi-Purpose Crew Vehicle and Space Launch System.

Letchworth, Gary↗

Reducing Subjectivity in Geothermal Exploration Decision Making (Presentation); NREL(National Renewable Energy Laboratory)

Geothermal exploration projects have a significant amount of risk associated with uncertainties encountered in the discovery of the geothermal resource. Two of the largest challenges for increased geothermal deployment are 1) understanding when and how to proceed in an exploration program, and 2) when to walk away from a site. Current methodologies for exploration decision-making are formulatedby subjective expert opinion which can be incorrectly biased by expertise (e.g. geochemistry, geophysics), geographic location of focus, and the assumed conceptual model. The aim of this project is to develop a methodology for more objective geothermal exploration decision making at a given location, including go/no-go decision points to help developers and investors decide when to give up on alocation. In this scope, two different approaches are investigated: 1) value of information analysis (VOIA) which is used for evaluating and quantifying the value of a data before they are purchased, and 2) enthalpy-based exploration targeting based on reservoir size, temperature gradient estimates, and internal rate of return (IRR). The first approach, VOIA, aims to identify the value of aparticular data when making decisions with an uncertain outcome. This approach targets the pre-drilling phase of exploration. These estimated VOIs are highly affected by the size of the project and still have a high degree of subjectivity in assignment of probabilities. The second approach, exploration targeting, is focused on decision making during the drilling phase. It starts with a basicgeothermal project definition that includes target and minimum required production capacity and initial budgeting for exploration phases. Then, it uses average temperature gradient, reservoir temperature estimates, and production capacity to define targets and go/no-go limits. The decision analysis in this approach is based on achieving a minimum IRR at each phase of the project. This secondapproach was determined to be less subjective, since numerical inputs come from the collected data. And it helps to facilitate communication between project managers and exploration geologists in making objective go/no-go decisions throughout the different project phases.

15 GEOTHERMAL ENERGY↗