Search NASA⌕ Search

SEARCH · Search NASA

Results for “RESOURCE ASSESSMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

An improved global wind resource estimate for integrated assessment models

This study summarizes initial steps to improving the robustness and accuracy of global renewable resource and techno-economic assessments for use in integrated assessment models. We outline a method to construct country-level wind resource supply curves, delineated by resource quality and other parameters. Using mesoscale reanalysis data, we generate estimates for wind quality, both terrestrial and offshore, across the globe. Because not all land or water area is suitable for development, appropriate database layers provide exclusions to reduce the total resource to its technical potential. We expand upon estimates from related studies by: using a globally consistent data source of uniquely detailed wind speed characterizations; assuming a non-constant coefficient of performance for adjusting power curves for altitude; categorizing the distance from resource sites to the electric power grid; and characterizing offshore exclusions on the basis of sea ice concentrations. The product, then, is technical potential by country, classified by resource quality as determined by net capacity factor. Additional classifications dimensions are available, including distance to transmission networks for terrestrial wind and distance to shore and water depth for offshore. We estimate the total global wind generation potential of 560 PWh for terrestrial wind with 90% of resource classified as low-to-mid quality, and 315 PWh for offshore wind with 67% classified as mid-to-high quality. These estimates are based on 3.5 MW composite wind turbines with 90 m hub heights, 0.95 availability, 90% array efficiency, and 5 MW/km 2 deployment density in non-excluded areas. We compare the underlying technical assumption and results with other global assessments.

17 WIND ENERGY↗

An Improved Global Wind Resource Estimate for Integrated Assessment Models: Preprint

This paper summarizes initial steps to improving the robustness and accuracy of global renewable resource and techno-economic assessments for use in integrated assessment models. We outline a method to construct country-level wind resource supply curves, delineated by resource quality and other parameters. Using mesoscale reanalysis data, we generate estimates for wind quality, both terrestrial and offshore, across the globe. Because not all land or water area is suitable for development, appropriate database layers provide exclusions to reduce the total resource to its technical potential. We expand upon estimates from related studies by: using a globally consistent data source of uniquely detailed wind speed characterizations; assuming a non-constant coefficient of performance for adjusting power curves for altitude; categorizing the distance from resource sites to the electric power grid; and characterizing offshore exclusions on the basis of sea ice concentrations. The product, then, is technical potential by country, classified by resource quality as determined by net capacity factor. Additional classifications dimensions are available, including distance to transmission networks for terrestrial wind and distance to shore and water depth for offshore. We estimate the total global wind generation potential of 560 PWh for terrestrial wind with 90% of resource classified as low-to-mid quality, and 315 PWh for offshore wind with 67% classified as mid-to-high quality. These estimates are based on 3.5 MW composite wind turbines with 90 m hub heights, 0.95 availability, 90% array efficiency, and 5 MW/km2 deployment density in non-excluded areas. We compare the underlying technical assumption and results with other global assessments.

17 WIND ENERGY↗

Assessment of Geothermal Resource Potential at a High-Priority Area on the Utah Testing and Training Range–South (UTTR–S)

Field investigations conducted during 2011 support and expand the conclusion of the original Preliminary Report that discovery of a viable geothermal system is possible in the northwestern part of the Utah Testing and Training Range-South (UTTR-S), referred to henceforth as Focus Area 1. The investigations defined the southward extent of the Wendover graben into and near Focus Area 1, enhanced the understanding of subsurface conditions, and focused further geothermal exploration efforts towards the northwestern-most part of Focus Area 1. Specifically, the detailed gravity survey shows that the Wendover graben, first defined by Cook et al. (1964) for areas north of Interstate Highway 80, extends and deepens southwest-ward to the northwest corner of Focus Area 1. At its deepest point, the intersection with a northwest-trending graben there is favorable for enhanced permeability associated with intersecting faults. Processing and modeling of the gravity data collected during 2011 provide a good understanding of graben depth and distribution of faults bounding the graben and has focused the interest area of the study. Down-hole logging of temperatures in wells made available near the Intrepid, Inc., evaporation ponds, just north of Focus Area 1, provide a good understanding of the variability of thermal gradients in that area and corroborate the more extensive temperature data reported by Turk (1973) for the depth range of 300-500 m. Moderate temperature gradients in the northern part of the Intrepid area increase to much higher gradients and bottom-hole temperatures southeastward, towards graben-bounding faults, suggesting upwelling geothermal waters along those faults. Water sampling, analysis, and temperature measurements of Blue Lakes and Mosquito Willey's springs, on the western boundary of Focus Area 1, also show elevated temperatures along the graben-bounding fault system. In addition, water chemistry suggests origin of those waters in limestone rocks beneath the graben in areas with temperatures as high as 140 C (284 F). In conclusion, all of the field data collected during 2011 and documented in the Appendices of this report indicate that there is reasonable potential for a viable geothermal resource along faults that bound the Wendover graben. Prospects for a system capable of binary electrical generation are especially good, and the possibility of a flash steam system is also within reason. The next steps should focus on securing the necessary funding for detailed geophysical surveys and for drilling a set of temperature gradient wells to further evaluate the resource, and to focus deep exploration efforts in the most promising areas.

15 GEOTHERMAL ENERGY↗

Assessment of geothermal resources near Elim, Alaska

The village of Elim, Alaska is 96 miles west of Nome, on the Seward Peninsula. The Darby Mountains north of the village are rich with hydrothermal systems associated with the Darby granitic pluton(s). In addition to the hot springs that have been recorded and studied over the last 100 years, additional hot springs exist. They are known through a rich oral history of the region, though they are not labeled on geothermal maps. This research primarily focused on Kwiniuk Hot Springs, Clear Creek Hot Springs and Molly’s Hot Springs. The highest recorded surface temperatures of these resources exist at Clear Creek Hot Springs (67°C). Repeated water sampling of the resources shows that maximum temperatures at all of the systems are below boiling.

15 GEOTHERMAL ENERGY↗

Cooperative efforts by industry and government to develop geothermal resources

The Federal government's current plans for participation in the geothermal field appear to affect four major areas of interest: (1) resources exploration and assessment, (2) resources utilization projects, (3) advanced research and technology, and (4) environmental, legal, and institutional research. Private industry is also actively involved in these same areas of interest. Because of lack of coordination and communication between the private and public sector, it appears that there will be considerable duplication of effort, and, in some cases, serious conflict. It is also likely that this lack of coordination and communication may result in lack of effort in some key areas. Close coordination and communication between government and industry may resolve some of the major problems that are clearly evident.

Butler, D. R.↗

Remote Sensing Assessment of Lunar Resources: We Know Where to Go to Find What We Need

The utilization of space resources is necessary to not only foster the growth of human activities in space, but is essential to the President s vision of a "sustained and affordable human and robotic program to explore the solar system and beyond." The distribution of resources will shape planning permanent settlements by affecting decisions about where to locate a settlement. Mapping the location of such resources, however, is not the limiting factor in selecting a site for a lunar base. It is indecision about which resources to use that leaves the location uncertain. A wealth of remotely sensed data exists that can be used to identify targets for future detailed exploration. Thus, the future of space resource utilization pre-dominantly rests upon developing a strategy for resource exploration and efficient methods of extraction.

Gillis, J. J.↗

Novel Approach for Considering Ecosystem Services at Industrial Sites near Agricultural Lands

Natural resource damages from industrial operations have been studied for years at legacy sites, including the U.S. Department of Energy Hanford site in southeastern Washington State. Encompassing nearly 1,500 km2 (600 mi2), this site represents one of the world’s largest cleanup projects with an estimated cost exceeding $320 billion and perhaps double that. The site includes an extensive buffer zone beyond the relatively limited portion (15%) used for nuclear materials production and associated waste storage and disposal. Before Hanford existed, most of the local lands were used for agriculture, and that use has continued nearby. Historical data relevant to the natural resource damage assessment process include location-specific irrigation practices, rates of groundwater withdrawal, and sustainable yields. The potential for considering the benefit of an ecosystem service is also being explored. Undeveloped areas of the site have long provided natural habitat for a wide variety of species, including pollinators. Thus, adjacent agricultural lands have benefited from pollinator services for years. This study describes a novel approach for considering the benefit of increased crop value due to this pollinator service. The approach combines spatial data for local pollinator-dependent crops with pollinator abundance data. A production function is then applied to estimate the agro-economic value resulting from crop pollination. A preliminary analysis indicates that the increased value for apple crops alone near Hanford could be on the order of $80 million a year. The benefits from this ecosystem service could offer practical context as a complement to the assessment of natural resource damages.

MacDonell, Margaret M.↗

Novel Approach for Considering Ecosystem Services at Industrial Sites near Agricultural Lands - 19482

Natural resource damages from industrial operations have been studied for years at legacy sites, including the U.S. Department of Energy Hanford site in southeastern Washington State. Encompassing nearly 1,500 km{sup 2} (600 mi{sup 2}), this site represents one of the world's largest cleanup projects with an estimated cost exceeding $320 billion and perhaps double that. The site includes an extensive buffer zone beyond the relatively limited portion (15%) used for nuclear materials production and associated waste storage and disposal. Before Hanford existed, most of the local lands were used for agriculture, and that use has continued nearby. Historical data relevant to the natural resource damage assessment process include location-specific irrigation practices, rates of groundwater withdrawal, and sustainable yields. The potential for considering the benefit of an ecosystem service is also being explored. Undeveloped areas of the site have long provided natural habitat for a wide variety of species, including pollinators. Thus, adjacent agricultural lands have benefited from pollinator services for years. This study describes a novel approach for considering the benefit of increased crop value due to this pollinator service. The approach combines spatial data for local pollinator-dependent crops with pollinator abundance data. A production function is then applied to estimate the agro-economic value resulting from crop pollination. A preliminary analysis indicates that the increased value for apple crops alone near Hanford could be on the order of $80 million a year. The benefits from this ecosystem service could offer practical context as a complement to the assessment of natural resource damages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Myth of Fungible FTE: A Quantitative Assessment of Matrixed Resource Allocation

Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.

Bai, Mei [SLAC National Accelerator Laboratory (SL↗

Grid Strength Assessment for High Levels of Inverter-based Resources in the Puerto Rico Power

A system-wide assessment of the Puerto Rico power system grid strength is studied when considering high levels of inverter-based resource penetration. This study is carried out in PSSE and assesses the impact of inverter-based resource (IBR) contributions in response to three-phase ground faults. A hypothetical 100% inverter-based generation scenario is created to assess the extreme impact on short circuit levels and a realistic scenario is considered to assess the impact to short circuit ratios. The overall conclusion is that short circuit capacity and current will drastically decrease in a high IBR scenario, an effect that is quantified in this paper. The short circuit ratio metric is typically used to assess the impact of IBR but generally overestimates grid strength due to not accounting for the impact from multiple IBRs. Other methods such as equivalent circuit based short circuit ratio and weighted short circuit ratio offer a more comprehensive consideration for multiple IBRs and can better account for their mutual interactions. The work presented in this paper is part of the PR100 study.

inverter based resources, PR100, grid strength↗

Task 2 Report - A GIS-Based Technical Potential Assessment of Domestic Energy Resources for Electricity Generation

The purpose of this report is to support the Lao Ministry of Energy and Mines (MEM) in assessing the technical potential of domestic energy resources for utility scale electricity generation in the Lao PDR. Specifically, this work provides assessments of technical potential, and associated maps of developable areas, for energy technologies of interest. This report details the methodology, assumptions, and datasets employed in this analysis to provide a transparent, replicable process for future analyses. The methodology and results presented are intended to be a fundamental input to subsequent decision making and energy planning-related analyses. This report is the second output of the Energy Alternatives Study for the Lao PDR (Energy Alternatives Study), a collaboration led by MEM and the United States Agency for International Development under the auspices of the Smart Infrastructure for the Mekong program.1 The Energy Alternatives Study is composed of five successive tasks that collectively support the project’s goals as shown in FIGURE ES-1. This work is focused on Task 2 – Assess technical potential of domestic energy resources for electricity generation . The work was carried out by a team from the U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) in collaboration with MEM and other Lao power sector stakeholders. This work concentrates on domestic energy resources for utility-scale electricity generation and considers solar photovoltaic (PV), wind, biomass, and coal resources. This work does not consider potentially imported energy resources (e.g., natural gas) or domestic energy resources that are not present in sufficient quantity for utility-scale generation (e.g., geothermal resources). A technical potential assessment of hydropower resources is currently not feasible due to the absence of required data including site-level assessments of multiple characteristics (e.g., geology environment and access) as well as spatial data on estimated non-exploited hydropower resources (Lee et al. 2018). Previous studies estimated total hydropower resource potential to be between 23,000 and 26,000 MW, of which approximately 3,894 MW has been developed (IES and MKE 2016; MEM 2015b, 2011). MEM and Électricité du Laos have gained significant experience in the evaluation and development of hydropower resources and expect to develop close to 10,034 MW of additional capacity by 2025 (MEM 2017).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modeling Assessment of Tidal Energy Extraction in the Western Passage

Numerical models have been widely used for the resource characterization and assessment of tidal instream energy. The accurate assessment of tidal stream energy resources at a feasibility or project-design scale requires detailed hydrodynamic model simulations or high-quality field measurements. This study applied a three-dimensional finite-volume community ocean model (FVCOM) to simulate the tidal hydrodynamics in the Passamaquoddy–Cobscook Bay archipelago, with a focus on the Western Passage, to assist tidal energy resource assessment. IEC Technical specifications were considered in the model configurations and simulations. The model was calibrated and validated with field measurements. Energy fluxes and power densities along selected cross sections were calculated to evaluate the feasibility of the tidal energy development at several hotspots that feature strong currents. When taking both the high current speed and water depth into account, the model results showed that the Western Passage has great potential for the deployment of tidal energy farms. The maximum extractable power in the Western Passage was estimated using the Garrett and Cummins method. Different criteria and methods recommended by the IEC for resource characterization were evaluated and discussed using a sensitivity analysis of energy extraction for a hypothetical tidal turbine farm in the Western Passage.

16 TIDAL AND WAVE POWER↗

Probabilistic Deliverability Assessment of Distributed Energy Resources via Scenario-Based AC Optimal Power Flow

As electric grids decarbonize and distributed energy resources (DERs) become increasingly prevalent, interconnection assessments must evolve to reflect operational variability and control flexibility. This paper highlights key modeling limitations observed in practice and reviews approaches for modeling uncertainty. It then introduces a Probabilistic Deliverability Assessment (PDA) framework designed to complement and extend existing procedures. The framework integrates scenario-based AC optimal power flow (AC OPF), corrective dispatch, and optional multi-temporal constraints. Together, these form a structured methodology for quantifying DER utilization, deliverability, and reliability under uncertainty in load, generation, and topology. Outputs include interpretable metrics with confidence intervals that inform siting decisions and evaluate compliance with reliability thresholds across sampled operating conditions. A case study on Puerto Rico’s publicly available bulk power system model demonstrates the framework’s application using minimal input data, consistent with current interconnection practice. Across staged fossil generation retirements, the PDA identifies high-value DER sites and regions requiring additional reactive power support. Results are presented through mean dispatch signals, reliability metrics, and geospatial visualizations, demonstrating how the framework provides transparent, data-driven siting recommendations. The framework’s modular design supports incremental adoption within existing workflows, encouraging broader use of AC OPF in interconnection and planning contexts.

14 SOLAR ENERGY↗