Search NASA⌕ Search

SEARCH · Search NASA

Results for “SHUTDOWN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

3D radiation, density, and MHD structures following neon shattered pellet injection into stable DIII-D Super H-mode discharges

Six nominally repeat neon shattered pellet injection (SPI) shutdowns of stable DIII-D Super H-modes are studied to understand the 3D properties of the radiation and impurity transport. The radiation efficiency and radiation peaking determine whether first wall melting is expected following disruption mitigation in ITER. Previous studies make use of axisymmetric approximations to infer radiation efficiencies, but validating the high efficiency required by ITER necessitates improved accuracy, and this work contributes by exploring the 3D radiation and density structures that will inform forward modeling. When the neon shatter plume produced by the SPI reaches the plasma edge, m/n = 3/1 and 2/1 island O-points are observed to align with the injection trajectory in five out of six cases, suggesting that the injected material seeds the island O-points. Field aligned neon structures emitting Ne-I line radiation drift at 1 km/s in the ion diamagnetic drift direction during the pre-TQ, tracking the motion of the m/n = 2/1 island O-point. Neon fragments penetrate to the q = 2 surface by the time of the TQ. Techniques to constrain the 3D emissivity are explored, and one method constrains a 3D flux tube that is consistent with the radiation data, and when mapped to the interferometers, intersects the lasers that measure the highest density. The resulting structure derived from the radiation measurements exists near the 2/1 island X-point. In five repeatable discharges, the peak of the radiation in the toroidal direction exists in a 120° toroidal sector where the injection occurs, in contrast with the outlier discharge where the toroidal peak exists in the complementary 240° toroidal sector far from the injector, and where a 50% lower density rise is observed. In conclusion, the n = 1 phase behavior is markedly different in the outlier discharge, suggesting a possible dependence of the radiation structure and the assimilation efficiency on MHD.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Advances in physics and applications of 3D magnetic perturbations on the J-TEXT tokamak

In the last two years, three major technical improvements have been made on J-TEXT in supporting of the expanded operation regions and diagnostic capabilities. (1) The successful commission of the 105 GHz/500 kW/1 s electron cyclotron resonance heating (ECRH) system increasing the core electron temperature from 0.9 keV up to around 1.5 keV. (2) The poloidal divertor configuration with an X-point in the high-field side has been achieved. In particular, the 400 kW electron cyclotron wave has also been successfully injected into the diverted plasma. (3) A 256-channel electron cyclotron emission imaging diagnostic system and two sets of four-channel Doppler backscattering diagnostics have been successfully developed on J-TEXT, allowing detailed measurement of the electron temperature and density fluctuations for turbulence and MHD research. The locked mode (LM), especially the 2/1 LM, is one of the biggest threats to the plasma operation. Both the thresholds of 2/1 and 3/1 LM are observed to vary non-monotonically on electron density. The electrode biasing was applied successfully to unlock the LM from either a rotating or static resonant magnetic perturbation (RMP) field. In the presence of 2/1 LM, three kinds of standing wave (SW) structures have been observed to share a similar connection to the island structure, i.e. the nodes of the SWs locate around the O- or X-points of the 2/1 island. The control and mitigation of disruption is essential to the safe operation of ITER, and it has been systematically studied by applying a RMP field, massive gas injection (MGI) and shattered pellet injection on J-TEXT. When the RMP-induced 2/1 LM is larger than a critical width, the MGI shutdown process can be significantly influenced. If the phase difference between the O-point of LM and the MGI valve is +90° (or –90°), the penetration depth and the assimilation of impurities can be enhanced (or suppressed) during the pre-thermal quench (TQ) phase and result in a faster (or slower) TQ. A secondary MGI can also suppress the runaway electron (RE) generation, if the additional high-Z impurity gas arrives at the plasma edge before TQ. When the secondary MGI has been applied after the formation of the RE current plateau, the RE current can be dissipated, and the dissipation rate increases with the injected impurity quantity but saturates with a maximum of 28 MA s –1 . The non-local transport is experimentally observed in the ion transport channel. The electron thermal diffusivity significantly increases with the ECRH power. Theoretical work shows that significant intrinsic current can be driven by electromagnetic turbulence, and the robust formation mechanism of the E × B staircase is identified from the Hasegawa–Wakatani system.

divertor↗

Results from the last DD and DT JET campaigns in the framework of the EUROfusion Tokamak Exploitation Work Package activity

JET, the only tokamak capable of operating with deuterium–tritium (D–T) fuel (since TFTR was shutdown in 1999), has provided essential experimental data to support ITER and DEMO design and operation. Within the EUROfusion Tokamak Exploitation Work Package, JET completed its final campaigns (2022–2023), culminating in the third D–T campaign (DTE3). These experiments addressed key challenges in plasma scenarios, exhaust control, and tritium management under reactor-relevant conditions. Significant progress was achieved in demonstrating ITER-like integrated scenarios with impurity seeding, achieving partial divertor detachment and high confinement ($H_{98}(y,2)$ ≈ 0.85) at 3 MA in D–T plasmas. Advanced exhaust regimes such as quasi-continuous exhaust (QCE) and X-point radiator (XPR) were successfully achieved first in D–D and then extended to D–T operation, confirming their relevance for mixed isotope operation. Operational milestones included a new world record of 69 MJ fusion energy in tritium-rich hybrid plasmas and long-pulse H-mode operation up to 60 s, contributing with unique data to the CICLOP database. Physics studies focused on peeling-limited pedestals in support of ITER and improved understanding of edge stability and impurity screening in metallic environments. Extensive usage of the shattered pellet injector (SPI) on JET provided critical information for the design of the ITER disruption mitigation system (DMS). Real-time control systems for D/T ratio control and plasma exhaust were deployed and demonstrated in D–D and D–T, while energetic particle physics investigations unfolded the role of fast ions in turbulence suppression mechanisms. Comprehensive tritium retention studies using gas balance method, post-mortem analysis, and ITER-relevant laser induced desorption spectroscopy (LIDS) diagnostics provided essential input for tritium accountancy strategies. These results are validating the ITER operational concepts, inform DEMO design, and deliver critical experience in nuclear operation and scenario integration.

disruptions↗

The ATLAS Electron and Photon Triggers

Electron and photon triggers covering transverse energies from 5 GeV to several TeV are essential for signal selection in a wide variety of ATLAS physics analyses to study Standard Model processes and to search for new phenomena. The ATLAS trigger system is divided in a hardware-based Level-1 trigger and a software-based high-level trigger, both of which were upgraded during the LHC shutdown in preparation for Run 2 operation. To cope with the increasing luminosity and more challenging pile-up conditions at a centre-of-mass energy of 13 TeV, the trigger selections at each level are optimised to control the rates and keep efficiencies high. To achieve this goal multivariate analysis techniques are used. The ATLAS electron and photon triggers and their performance with Run 2 data are presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Leading Edge Microspoilers for Load Dumping in Wind Turbine Rotors

As rotor designs have grown in size and flexibility, new design challenges have arisen that could benefit from novel control strategies. Leading edge microspoilers (LEMS) have been shown to effectively reduce forces on airfoils by inducing stall at lower angles of attack. This paper investigates how LEMS can be used to reduce blade loading on large, flexible, downwind rotors during design-limiting design load cases. During shutdown in turbulent flows near cutout speed, LEMS could reduce the tip deflection spikes toward the tower by over 50% and keep flapwise root bending moments below normal operating conditions, thus eliminating these as design-driving load cases. In power producing load cases, deploying LEMS for a short period of time during a load spike can be effective to reduce toward-tower tip deflections without significantly impacting power produced, assuming these load spikes can be identified by a controller. Leveraging this technology could allow for lower specific power machines to be designed.

17 WIND ENERGY↗

Progress of the laser ion source upgrade (LION2) for RHIC and NSRL program at Brookhaven National Laboratory

At Brookhaven National Laboratory (BNL), the LION2 ion source is being constructed to replace an existing laser ion ablation ion source (LIS) at the EBIS facility, which provides heavy ion beams of multiple ion species for the operation of NASA Space Radiation Laboratory (NSRL) and Relativistic Heavy Ion Collider (RHIC). The LION1 ion source currently provides singly charged ions of Li, B, C, O, Al, Si, Ca, Ti, Fe, Cu, Zr, Nb, Ag, Tb, Ta, W, Au, Bi, and Th with a rapid-species-change capability. An electron beam ion source, Extended-EBIS captures, confines, and ionizes the ions to high charge state, suitable for injection and acceleration by an RFQ accelerator. Typically, single pulses of the LIS ion species for NSRL are changed sequentially during Galactic Cosmic Ray experiments, while multiple pulses of a given ion beam are provided quasi-simultaneously for RHIC. LION2 will have the same capability of the rapid-species-change with improved beam performance and reliability. LION2 is being constructed in a remote assembly location and is expected to finish in December 2023. The removal of LION1 and installation of LION2 is planned during the December 2023 or summer 2024 shutdown.

43 PARTICLE ACCELERATORS↗

Trying to predict the future: Resource planning and allocation in CMS

In the large LHC experiments the majority of computing resources are provided by the participating countries. These resource pledges account for more than three quarters of the total available computing. The experiments are asked to give indications of their requests three years in advance and to evolve these as the details and constraints become clearer. In this paper we will discuss the resource planning techniques used in CMS to predict the computing resources several years in advance. We will discuss how we attempt to implement the activities of the computing model in spread-sheets and formulas to calculate the needs. We will talk about how those needs are reflected in the 2012 running and how the planned long shutdown of the LHC in 2013 and 2014 impacts the planning process and the outcome. In the end we will speculate on the computing needs in the second major run of LHC.

Bloom, Kenneth↗

Pooling the resources of the CMS Tier-1 sites

The CMS experiment at the LHC relies on 7 Tier-1 centres of the WLCG to perform the majority of its bulk processing activity, and to archive its data. During the first run of the LHC, these two functions were tightly coupled as each Tier-1 was constrained to process only the data archived on its hierarchical storage. This lack of flexibility in the assignment of processing workflows occasionally resulted in uneven resource utilisation and in an increased latency in the delivery of the results to the physics community.The long shutdown of the LHC in 2013-2014 was an opportunity to revisit this mode of operations, disentangling the processing and archive functionalities of the Tier-1 centres. The storage services at the Tier-1s were redeployed breaking the traditional hierarchical model: each site now provides a large disk storage to host input and output data for processing, and an independent tape storage used exclusively for archiving. Movement of data between the tape and disk endpoints is not automated, but triggered externally through the WLCG transfer management systems.With this new setup, CMS operations actively controls at any time which data is available on disk for processing and which data should be sent to archive. Thanks to the high-bandwidth connectivity guaranteed by the LHCOPN, input data can be freely transferred between disk endpoints as needed to take advantage of free CPU, turning the Tier-1s into a large pool of shared resources. The output data can be validated before archiving them permanently, and temporary data formats can be produced without wasting valuable tape resources. Lastly, the data hosted on disk at Tier-1s can now be made available also for user analysis since there is no risk any longer of triggering chaotic staging from tape.In this contribution, we describe the technical solutions adopted for the new disk and tape endpoints at the sites, and we report on the commissioning and scale testing of the service. We detail the procedures implemented by CMS computing operations to actively manage data on disk at Tier-1 sites, and we give examples of the benefits brought to CMS workflows by the additional flexibility of the new system.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Online Data Handling and Storage at the CMS Experiment

During the LHC Long Shutdown 1, the CMS Data Acquisition (DAQ) system underwent a partial redesign to replace obsolete network equipment, use more homogeneous switching technologies, and support new detector back-end electronics. The software and hardware infrastructure to provide input, execute the High Level Trigger (HLT) algorithms and deal with output data transport and storage has also been redesigned to be completely file- based. All the metadata needed for bookkeeping are stored in files as well, in the form of small documents using the JSON encoding. The Storage and Transfer System (STS) is responsible for aggregating these files produced by the HLT, storing them temporarily and transferring them to the T0 facility at CERN for subsequent offline processing. The STS merger service aggregates the output files from the HLT from ~62 sources produced with an aggregate rate of ~2GB/s. An estimated bandwidth of 7GB/s in concurrent read/write mode is needed. Furthermore, the STS has to be able to store several days of continuous running, so an estimated of 250TB of total usable disk space is required. In this article we present the various technological and implementation choices of the three components of the STS: the distributed file system, the merger service and the transfer system.

Andre, J. M.↗

File-Based Data Flow in the CMS Filter Farm

During the LHC Long Shutdown 1, the CMS Data Acquisition system underwent a partial redesign to replace obsolete network equipment, use more homogeneous switching technologies, and prepare the ground for future upgrades of the detector front-ends. The software and hardware infrastructure to provide input, execute the High Level Trigger (HLT) algorithms and deal with output data transport and storage has also been redesigned to be completely file- based. This approach provides additional decoupling between the HLT algorithms and the input and output data flow. All the metadata needed for bookkeeping of the data flow and the HLT process lifetimes are also generated in the form of small “documents” using the JSON encoding, by either services in the flow of the HLT execution (for rates etc.) or watchdog processes. These “files” can remain memory-resident or be written to disk if they are to be used in another part of the system (e.g. for aggregation of output data). We discuss how this redesign improves the robustness and flexibility of the CMS DAQ and the performance of the system currently being commissioned for the LHC Run 2.

Andre, J. M.↗

A new event builder for CMS Run II

The data acquisition system (DAQ) of the CMS experiment at the CERN Large Hadron Collider (LHC) assembles events at a rate of 100 kHz, transporting event data at an aggregate throughput of 100 GB/s to the high-level trigger (HLT) farm. The DAQ system has been redesigned during the LHC shutdown in 2013/14. The new DAQ architecture is based on state-of-the-art network technologies for the event building. For the data concentration, 10/40 Gbps Ethernet technologies are used together with a reduced TCP/IP protocol implemented in FPGA for a reliable transport between custom electronics and commercial computing hardware. A 56 Gbps Inniband FDR CLOS network has been chosen for the event builder. This paper discusses the software design, protocols, and optimizations for exploiting the hardware capabilities. In conclusion, ee present performance measurements from small-scale prototypes and from the full-scale production system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The CMS Data Acquisition - Architectures for the Phase-2 Upgrade

The upgraded High Luminosity LHC, after the third Long Shutdown (LS3), will provide an instantaneous luminosity of 7.5 × 10 34 cm -2 s -1 (levelled), at the price of extreme pileup of up to 200 interactions per crossing. In LS3, the CMS Detector will also undergo a major upgrade to prepare for the phase-2 of the LHC physics program, starting around 2025. The upgraded detector will be read out at an unprecedented data rate of up to 50 Tb/s and an event rate of 750 kHz. Complete events will be analysed by software algorithms running on standard processing nodes, and selected events will be stored permanently at a rate of up to 10 kHz for offline processing and analysis. Here in this paper we discuss the baseline design of the DAQ and HLT systems for the phase-2, taking into account the projected evolution of high speed network fabrics for event building and distribution, and the anticipated performance of general purpose CPU. Implications on hardware and infrastructure requirements for the DAQ “data center” are analysed. Emerging technologies for data reduction are considered. Novel possible approaches to event building and online processing, inspired by trending developments in other areas of computing dealing with large masses of data, are also examined. We conclude by discussing the opportunities offered by reading out and processing parts of the detector, wherever the front-end electronics allows, at the machine clock rate (40 MHz). This idea presents interesting challenges and its physics potential should be studied.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A new ATLAS muon CSC readout system with system on chip technology on ATCA platform

The ATLAS muon Cathode Strip Chamber (CSC) backend readout system has been upgraded during the LHC 2013-2015 shutdown to be able to handle the higher Level-1 trigger rate of 100 kHz and the higher occupancy at Run-2 luminosity. The readout design is based on the Reconfigurable Cluster Element (RCE) concept for high bandwidth generic DAQ implemented on the Advanced Telecommunication Computing Architecture (ATCA) platform. The RCE design is based on the new System on Chip XILINX ZYNQ series with a processor-centric architecture with ARM processor embedded in FPGA fabric and high speed I/O resources. Together with auxiliary memories, all of these components form a versatile DAQ building block that can host applications tapping into both software and firmware resources. The Cluster on Board (COB) ATCA carrier hosts RCE mezzanines and an embedded Fulcrum network switch to form an online DAQ processing cluster. More compact firmware solutions on the ZYNQ for high speed input and output fiberoptic links and TTC allowed the full system of 320 input links from the 32 chambers to be processed by 6 COBs in one ATCA shelf. The full system was installed in September 2014. In conclusion, we will present the RCE/COB design concept, the firmware and software processing architecture, and the experience from the intense commissioning for LHC Run 2.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The conversion of CESR to operate as the Test Accelerator, CesrTA. Part 3: Electron cloud diagnostics

Cornell's electron/positron storage ring (CESR) was modified over a series of accelerator shutdowns beginning in May 2008, which substantially improves its capability for research and development for particle accelerators. CESR's energy span from 1.8 to 5.6 GeV with both electrons and positrons makes it ideal for the study of a wide spectrum of accelerator physics issues and instrumentation related to present light sources and future lepton damping rings. Additionally a number of these are also relevant for the beam physics of proton accelerators. This paper is the third in a series of four describing the conversion of CESR to the test accelerator, CESRTA. The first two papers discuss the overall plan for the conversion of the storage ring to an instrument capable of studying advanced accelerator physics issues [1] and the details of the vacuum system upgrades [2]. This paper focuses on the necessary development of new instrumentation, situated in four dedicated experimental regions, capable of studying such phenomena as electron clouds (ECs) and methods to mitigate EC effects. The fourth paper in this series describes the vacuum system modifications of the superconducting wigglers to accommodate the diagnostic instrumentation for the study of EC behavior within wigglers. Lastly, while the initial studies of CESRTA focused on questions related to the International Linear Collider damping ring design, CESRTA is a very versatile storage ring, capable of studying a wide range of accelerator physics and instrumentation questions.

43 PARTICLE ACCELERATORS↗

The upgrade of the CMS hadron calorimeter with silicon photomultipliers

The upgrade of the hadron calorimeter of the CMS experiment at the CERN Large Hadron Collider is currently underway. The endcap sections will be upgraded in the winter of 2016–2017 and the barrel sections during the second LHC long shutdown in 2019. The existing photosensors will be replaced with about 16 000 new silicon photomultipliers (SiPMs), resulting in the first large installation of SiPMs in a radiation environment. All associated front-end electronics will also be upgraded. Here, this paper discusses the motivation for the upgrade and provides a description 17 of the new system, including the SiPMs with associated control electronics and the front-end readout cards.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The construction of the phase-1 upgrade of the CMS pixel detector

The innermost layers of the original CMS tracker were built out of pixel detectors arranged in three barrel layers and two forward disks in each endcap. The original CMS detector was designed for the nominal instantaneous LHC luminosity of 1×10 34 cm -2 s -1 . Under the conditions expected in the coming years, which will see an increase of a factor two of the instantaneous luminosity, the CMS pixel detector would have seen a dynamic inefficiency caused by data losses due to buffer overflows. For this reason the CMS collaboration has installed a replacement pixel detector during the recent extended end of year shutdown. The phase-1 upgrade of the CMS pixel detector will operate at high efficiency at an instantaneous luminosity of 2×10 34 cm -2 s -1 with increased detector acceptance and additional redundancy for the tracking, while at the same time reducing the material budget. These goals are achieved using a new read-out chip and modified powering and read-out schemes, one additional tracking layer both in the barrel and in the disks, and new detector supports including a CO 2 based evaporative cooling system, that contribute to the reduction of the material in the tracking volume. This contribution will review the design and technological choices of the phase-1 detector.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Study of the material of the ATLAS inner detector for Run 2 of the LHC

The ATLAS inner detector comprises three different sub-detectors: the pixel detector, the silicon strip tracker, and the transition-radiation drift-tube tracker. The Insertable B-Layer, a new innermost pixel layer, was installed during the shutdown period in 2014, together with modifications to the layout of the cables and support structures of the existing pixel detector. The material in the inner detector is studied with several methods, using a low-luminosity √s=13 TeV pp collision sample corresponding to around 2.0 nb -1 collected in 2015 with the ATLAS experiment at the LHC. In this paper, the material within the innermost barrel region is studied using reconstructed hadronic interaction and photon conversion vertices. For the forward rapidity region, the material is probed by a measurement of the efficiency with which single tracks reconstructed from pixel detector hits alone can be extended with hits on the track in the strip layers. The results of these studies have been taken into account in an improved description of the material in the ATLAS inner detector simulation, resulting in a reduction in the uncertainties associated with the charged-particle reconstruction efficiency determined from simulation.

47 OTHER INSTRUMENTATION↗