Search NASA⌕ Search

SEARCH · Search NASA

Results for “Unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Low-Cost, Accessible Vaccine Cooler Options

In response to cold chain management requirements for COVID-19 vaccines, Los Alamos National Laboratory has investigated, built, and demonstrated viability for different cryogenic storage options. With ease-of-access and affordability in mind, these cooler units have been built using commercial off-the-shelf (COTS) components. The team was also able to design a testing method for evaluating the performance of the different vaccine cooler options as part of the Technology Evaluation and Demonstration program. The tested cooler units demonstrated compatibility with either dry ice or liquid nitrogen as the cryogen, along with several commercial solvents. This compatibility demonstration would potentially offer sufficient flexibility for temperature control continuity. Next steps are to investigate industry interest in supporting field testing of the cooler units.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Proton Testing of AMD e9173 GPU

Single-Event Effects (SEE) testing was conducted on the AMD e9173 Graphics Processor Unit (GPU). Testing was conducted at Massachusetts General Hospital's (MGH) Francis H. Burr Proton Therapy Center.

Single-Event Effects (SEE)↗

NUCON Vapor Abatement Unit Performance on Hanford Tank Farm Chemicals of Potential Concern

This report provided the results and methods used in the NUCON Vapor Abatement Unit performance testing. The purpose of the Pacific Northwest National Laboratory (PNNL) testing was to assess the performance of the NUCON International, Inc., Vapor Abatement Unit (VAU) prototype for the reduction of Hanford Tank Farm vapors associated chemicals of potential concern (COPC). The testing was conducted in compliance with the PNNL Assessment of NUCON Vapor Abatement Unit for Single-Shell Tank (SST) Farm Off-Gas Chemicals of Potential Concern (COPCs) test plan. Performance testing started on May 4, 2018 and continued through June 13, 2018. Eleven (11) COPCs were chosen for testing out of the 61 identified COPCs. The COPCs were chosen either due to the importance of that COPC measured in Hanford high-level waste single-shell tank (SST) vapor emissions, as a surrogate to represent a class of COPC compounds, or both. Results of the performance tests are included.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An improved waste collection system for space flight

Waste collection systems are a critical part of manned space flight. Systems to date have had a number of deficiencies. A new system, which uses a simple mechanical piston compactor and disposable pads allows a clean area for defecation and maximum efficiency of waste collection and storage. The concept has been extensively tested. Flight demonstration units are being built, tested, and scheduled for flight. A prototype operational unit is under construction. This system offers several advantages over existing or planned systems in the areas of crew interface and operation, cost, size, weight, and maintenance and power consumption.

Thornton, William E.↗

Design and test of a flywheel energy storage unit for spacecraft application

This paper summarizes the design and test of a development flywheel energy storage device intended for spacecraft application. The flywheel unit is the prototype for the rotating assembly portion of an Integrated Power and Attitude Control System (IPACS). The paper includes a general description of the flywheel unit; specific design characteristics for the rotor and bearings, motor-generators, and electronics; an efficiency analysis; and test results for a research unit.

Cormack, A., III↗

A new approach for data acquisition at the JPL space simulators

In 1990, a personal computer based data acquisition system was put into service for the Space Simulators and Environmental Test Laboratory at the Jet Propulsion Laboratory (JPL) in Pasadena, California. The new system replaced an outdated minicomputer system which had been in use since 1980. This new data acquisition system was designed and built by JPL for the specific task of acquiring thermal test data in support of space simulation and thermal vacuum testing at JPL. The data acquisition system was designed using powerful personal computers and local-area-network (LAN) technology. Reliability, expandability, and maintainability were some of the most important criteria in the design of the data system and in the selection of hardware and software components. The data acquisition system is used to record both test chamber operational data and thermal data from the unit under test. Tests are conducted in numerous small thermal vacuum chambers and in the large solar simulator and range in size from individual components using only 2 or 3 thermocouples to entire planetary spacecraft requiring in excess of 1200 channels of test data. The system supports several of these tests running concurrently. The previous data system is described along with reasons for its replacement, the types of data acquired, the new data system, and the benefits obtained from the new system including information on tests performed to date.

Fisher, Terry C.↗

Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12-60-01, Drilling/Welding Shop Outfalls, contains no COCs above action levels. No further action is required for this site; however, as a BMP, three drain pipe openings will be sealed with grout.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Pre-Combustion CO 2 Capture Process Using High-Temperature PBI Hollow-Fiber Membranes

The overall objective of this project was to evaluate the advantages of transformational polybenzimidazole (PBI) polymer hollow-fiber membrane (HFM)-based, carbon dioxide (CO 2 ) capture and purification technology at bench-scale using an actual coal-derived syngas stream from a coal gasification facility. The project was carried out over two budget periods. The technical objectives in Budget Period 1 (BP1) included preparing HFs and modules and upgrading the available skid for field testing. The technical objectives for BP2 were to field-test the skid unit with actual coal-derived syngas from an oxygen-blown gasifier to obtain performance data, update the Techno-Economic Analysis (TEA) that would assist with future process scale-up, and provide information on the design of a small pilot-scale test unit. The goal was to advance the PBI-HFM CO 2 capture and gas separation system for pre-combustion applications beyond second-generation economic performance predictions and make progress toward meeting overall fossil energy performance goals of CO 2 capture with 95% CO 2 purity at a cost of electricity (COE) 30% less than baseline capture approaches. The research program was designed with progressive technical tasks leading to both dynamic and steady-state testing of the PBI-HFM skid with actual coal-derived syngas. The work plan was to: (1) fabricate sufficient Generation-2 (GEN-2) fibers for module fabrication; (2) upgrade the fiber skid to accommodate large fiber modules for bench-scale field testing; (3) conduct dynamic and steady-state testing with coal-derived syngas from an oxygen-blown gasifier and obtain system performance data; (4) perform a TEA and environmental, health, and safety (EH&S) assessment; (5) update the State-Point Data Table, Technology Gap Analysis (TGA), and Technology Maturation Plan (TMP); (6) uninstall and return the test skid to the Recipient’s facilities; and (7) submit a Final Report that describes the results and analysis of the project research effort.

03 NATURAL GAS↗

Closure Report for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada

Corrective Action Unit (CAU) 166 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Storage Yards and Contaminated Materials' and consists of the following seven Corrective Action Sites (CASs), located in Areas 2, 3, 5, and 18 of the Nevada Test Site: CAS 02-42-01, Condo Release Storage Yd - North; CAS 02-42-02, Condo Release Storage Yd - South; CAS 02-99-10, D-38 Storage Area; CAS 03-42-01, Conditional Release Storage Yard; CAS 05-19-02, Contaminated Soil and Drum; CAS 18-01-01, Aboveground Storage Tank; and CAS 18-99-03, Wax Piles/Oil Stain. Closure activities were conducted from March to July 2009 according to the FF ACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 166 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action and Clean Closure. Closure activities are summarized. CAU 166, Storage Yards and Contaminated Materials, consists of seven CASs in Areas 2, 3, 5, and 18 of the NTS. The closure alternatives included No Further Action and Clean Closure. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 166 as documented in this CR: (1) At CAS 02-99-10, D-38 Storage Area, approximately 40 gal of lead shot were removed and are currently pending treatment and disposal as MW, and approximately 50 small pieces of DU were removed and disposed as LLW. (2) At CAS 03-42-01, Conditional Release Storage Yard, approximately 7.5 yd{sup 3} of soil impacted with lead and Am-241 were removed and disposed as LLW. As a BMP, approximately 22 ft{sup 3} of asbestos tile were removed from a portable building and disposed as ALLW, approximately 55 gal of oil were drained from accumulators and are currently pending disposal as HW, the portable building was removed and disposed as LLW, and accumulators, gas cylinders, and associated debris were removed and are currently pending treatment and disposal as MW. (3) At CAS 05-19-02, Contaminated Soil and Drum, as a BMP, an empty drum was removed and disposed as sanitary waste. (4) At CAS 18-01-01, Aboveground Storage Tank, approximately 165 gal of lead-impacted liquid were removed and are currently pending disposal as HW, and approximately 10 gal of lead shot and 6 yd{sup 3} of wax embedded with lead shot were removed and are currently pending treatment and disposal as MW. As a BMP, approximately 0.5 yd{sup 3} of wax were removed and disposed as hydrocarbon waste, approximately 55 gal of liquid were removed and disposed as sanitary waste, and two metal containers were grouted in place. (5) At CAS 18-99-03, Wax Piles/Oil Stain, no further action was required; however, as a BMP, approximately l.5 yd{sup 3} of wax were removed and disposed as hydrocarbon waste, and one metal container was grouted in place.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada: (CY2017 January 2017–December 2017, Rev. 0)

Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are monitored to determine whether the URs remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Monitoring data will be used in the future, once multiple years of data are available, to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries calculated with the models are the primary basis of the UR boundaries. Six wells were sampled for water-quality monitoring in 2017. Contaminants of concern were detected only in the two source/plume wells already known to contain contamination as a result of a radionuclide migration experiment. The 86,000-picocuries-per-liter (pCi/L) tritium concentration in one of the wells is about 12 percent higher than measured in 2016 but is over an order of magnitude less than the peak value measured in the well in 1980. The concentration in the other source/plume well is lower than measured in 2016. The water-level monitoring network includes 16 wells. Depth to water measured in 2017 is generally consistent with recent measurements for most wells. Water-level declines differing from long-term trends were observed in four wells. Three of these (WW-4, WW-4A, and WW-5B) are water-supply wells that experienced increases in pumping during the year. No definitive cause for the sharp decline in the fourth well (ER-5-3-2) in 2016 is known as yet. Institutional control monitoring confirmed the URs are recorded in U.S. Department of Energy and U.S. Air Force land management systems, and that no activities within Frenchman Flat basin are occurring that could potentially affect the contaminant boundaries. Survey of groundwater resources in basins surrounding Frenchman Flat similarly identify no current or pending development that would indicate the need to increase monitoring activities or would otherwise cause concern for the closure decision. The URs continue to prevent exposure of the public, workers, and the environment to contaminants of concern by preventing use of potentially contaminated groundwater.

54 ENVIRONMENTAL SCIENCES↗

Flight test configuration for verifying inertial sensor redundancy management techniques

The Redundant Strapdown Inertial Measurement Unit presently tested in flight configuration consists of a semioctahedral array of four dynamically tuned, two-degree-of-freedom (TDOF) gyros and four TDOF accelerometers which can provide dual, fail-operational performance for integrated avionics systems. Attention is given to the multilevel algorithm used for the detection and isolation of three ranges of sensor failure in an integrated avionics context. A technique for the generation of accelerometer and gyro error thresholds which is sensitive to dynamic sensor errors and separation effects is presented, together with simulation results. Emphasis is placed on the ensuring of highly reliable data for flight control/navigation functions, while minimizing false or missed alarms.

Bryant, W. H.↗

Delivery of Colloid Micro-Newton Thrusters for the Space Technology 7 Mission

Two flight-qualified clusters of four Colloid Micro-Newton Thruster (CMNT) systems have been delivered to the Jet Propulsion Laboratory (JPL). The clusters will provide precise spacecraft control for the drag-free technology demonstration mission, Space Technology 7 (ST7). The ST7 mission is sponsored by the NASA New Millennium Program and will demonstrate precision formation flying technologies for future missions such as the Laser Interferometer Space Antenna (LISA) mission. The ST7 disturbance reduction system (DRS) will be on the ESA LISA Pathfinder spacecraft using the European gravitational reference sensor (GRS) as part of the ESA LISA Technology Package (LTP). Developed by Busek Co. Inc., with support from JPL in design and testing, the CMNT has been developed over the last six years into a flight-ready and flight-qualified microthruster system, the first of its kind. Recent flight-unit qualification tests have included vibration and thermal vacuum environmental testing, as well as performance verification and acceptance tests. All tests have been completed successfully prior to delivery to JPL. Delivery of the first flight unit occurred in February of 2008 with the second unit following in May of 2008. Since arrival at JPL, the units have successfully passed through mass distribution, magnetic, and EMI/EMC measurements and tests as part of the integration and test (I&T) activities including the integrated avionics unit (IAU). Flight software sequences have been tested and validated with the full flight DRS instrument successfully to the extent possible in ground testing, including full functional and 72 hour autonomous operations tests. Delivery of the cluster assemblies along with the IAU to ESA for integration into the LISA Pathfinder spacecraft is planned for the summer of 2008 with a planned launch and flight demonstration in late 2010.

Precision Formation Flying↗

Special Form Testing of Sealed Source Encapsulation for High-Alpha-Activity Actinide Materials

In the United States all transportation of radioactive material is regulated by the U.S. Department of Transportation (DOT). Beginning in 2008 a new type of sealed-source encapsulation package was developed and tested by Oak Ridge National Laboratory (ORNL). These packages contain high-alpha-activity actinides and are regulated and transported in accordance with the requirements for DOT Class 7 hazardous material. The DOT provides specific regulations pertaining to special form encapsulation designs. The special form designation indicates that the encapsulated radioactive contents have a very low probability of dispersion even when subjected to significant structural events. The special form designs have been shown to simplify the delivery, transport, acceptance, and receipt processes. It is intended for these sealed-source encapsulations to be shipped to various facilities making it very advantageous for them to be certified as special form. To this end, DOT Certificates of Competent Authority (CoCAs) have been sought for the design suitable for containing high-alpha-activity actinide materials. This design consists of the high-alpha-activity material encapsulated within a triangular zirconia canister, referred to as a ZipCan, tile that is then enclosed by a spherical shell. The spherical shell design, with ZipCan tile inside, was tested for compliance with the special form regulations found in 49 CFR 173.469. The spherical enclosure was subjected to 9-m impact, 1 m percussion, and 10-minute thermal tests at the Packaging Evaluation Facility located at the National Transportation Research Center in Knoxville, TN USA and operated by ORNL. Before and after each test, the test units were subjected to a helium leak check and a bubble test. The ZipCan tiles and core were also subjected to the tests required for ISO 2919:2012(E), including a Class IV impact test and heat test and subsequently subjected to helium leakage rate tests [49 CFR 173.469(a)(4)(i)]. The impact-tile test unit contained a nonradioactive surrogate; however, the thermal test unit contained a radioactive source. This paper describes the regulatory special form tests and presents detailed impact and leak test results that demonstrate that the sealed source encapsulation designs satisfy the regulatory tests.

Martinez, Oscar A↗

Calendar Year 2020 Post-Closure Monitoring Report for Corrective Action Unit 99: Rainier Mesa/Shoshone Mountain, Underground Test Area, Nevada National Security Site, Nevada (Rev. 1)

This report presents the results of monitoring conducted for water quality, water levels, and institutional controls in calendar year (CY) 2020 by the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity at Corrective Action Unit (CAU) 99, Rainier Mesa/Shoshone Mountain (RM/SM), at the Nevada National Security Site (NNSS), Nevada. This report also presents analytical laboratory results (including results of quality assurance/quality control samples, such as field duplicates [FDs]), and verification of use restrictions (URs), institutional controls, and water usage. Groundwater samples were collected; water levels were measured; and well site surveillance was conducted in support of the Underground Test Area Closure Report (CR) for Corrective Action Unit 99: Rainier Mesa/Shoshone Mountain, Nevada National Security Site, Nevada (DOE/EMNV, 2020). Rainier Mesa (RM) was the site of 61 underground nuclear tests, and Shoshone Mountain (SM) was the site of 6 underground nuclear tests. As a result of these activities, which took place from 1957 to 1992, radionuclides (RNs) were released in the subsurface in the vicinity of the detonations. These 67 underground nuclear tests are associated with 66 specific corrective action site (CAS) numbers, as listed in the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). Two tests, HURON LANDING and DIAMOND ACE (conducted simultaneously), are included within one CAS. The CR (DOE/EMNV, 2020) establishes the regulatory boundaries and regulatory boundary objectives, monitoring program, UR boundaries and URs, and other institutional controls agreed to by EM Nevada Program and the Nevada Division of Environmental Protection (NDEP) for closure of CAU 99. Regulatory boundaries for the RM/SM CAU were established to protect receptors of groundwater from RN contamination within the three downgradient groundwater basins that receive recharge from RM. The SM regulatory boundary was established to verify that RN contamination does not reach the lower carbonate aquifer below SM. The UR boundaries were established based on contaminant simulation forecasts from the flow and transport simulations with consideration of site-specific topographical controls. The URs associated with the UR boundaries were identified to protect onsite workers and the public from inadvertent exposure to contaminated groundwater as forecasted to occur assuming current conditions. The UR is intended to restrict activities that might expose workers to contaminated groundwater within the UR area. In addition to the URs, other institutional controls are established to monitor and limit access to groundwater. These include federal ownership and management in perpetuity, controlled access of the NNSS and surrounding areas, and reporting water use on the NNSS and surrounding hydrographic basins.

54 ENVIRONMENTAL SCIENCES↗

Progressive TDI Measurements with the PACE OCI ETU

The Plankton Aerosol Cloud ocean Ecosystem (PACE) Ocean Color Instrument (OCI) has completed the ground test program for its engineering unit (ETU) and testing of the flight unit will begin in the near future. OCIis a grating spectrometer with hyperspectral coverage from about 340 nm to 885 nm with 9 additional filtered channels in the SWIR. Two CCDs are used as detectors for the hyperspectral channels. One important operating mode of the CCDs on OCI is progressive time delay integration (or PTDI). In this mode, the charge in the CCD can be held for multiples of the nominal integration times. A series of these measurements can be made with progressively increasing multiples of the nominal integration time as the instrument scans across a uniform source. Ground testing with this operating mode on OCI ETU has shown promising results. This work will present measurements taken with the PTDI mode and the analysis of OCI ETU linearity and dynamic range

PACE↗

Pre-Installation Acceptance (PIA) Functional Performance of the Design Verification Test (DVT) Exploration Extra-vehicular Mobility Unit (xEMU)

In an effort that began with technology investment by NASA in a few key components during the Constellation Program and then evolved to demonstrate a packaged Portable Life Support System (PLSS) as part of the Advanced Exploration Systems (AES) Program, the next evolution of the PLSS is now a key component of the Exploration Extra-vehicular Mobility Unit (xEMU) and is assembled as a Design Verification Test (DVT) unit. The xEMU has been detailed with respect to completing a demonstration on the International Space Station (ISS) with support of units for initial lunar capability. The xEMU completed the Preliminary Design Review (PDR) with subsequent Safety Review Panel (SRP) Phase I reviews in 2019-2020. The objectives for DVT are to validate requirements, train the team, learn how to fabricate the hardware with appropriate process controls, assemble the hardware, test the hardware, determine the failure mechanisms/limits of the hardware design and buy down the most risk possible for the qualification and flight phases of the development. With completion of the assembly and initial functional testing of the DVT PLSS in laboratory ambient conditions and vacuum conditions the xEMU has progressed significantly into the DVT objectives. A key part of the test sequences for DVT and all future phases is the Pre-Installation Acceptance (PIA) functional testing which validates the performance of integrated systems including: primary thermal control, auxiliary thermal control, suit ventilation, primary oxygen, secondary oxygen, power distribution, as well as caution and warning all with respect to the applied requirements. This discussion will include an overview of the assembly, summary of the PIA functional testing, lessons learned, and corrective actions implemented moving forward into the remainder of the DVT phase for xEMU.

Colin Campbell↗