Search NASA⌕ Search

SEARCH · Search NASA

Results for “baseline program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Overview of Aircraft Noise Prediction Tools Assessment

The acoustic assessment task for both the Subsonic Fixed Wing and the Supersonic projects under NASA s Fundamental Aeronautics Program was designed to assess the current state-of-the-art in noise prediction capability and to establish baselines for gauging future progress. The documentation of our current capabilities included quantifying the differences between predictions of noise from computer codes and measurements of noise from experimental tests. Quantifying the accuracy of both the computed and experimental results further enhanced the credibility of the assessment. This presentation gives sample results from codes representative of NASA s capabilities in aircraft noise prediction at the system level and at the component level. These include semi-empirical, statistical, analytical, and numerical codes. An example of system level results is shown for an aircraft. Component level results are shown for airframe flaps and landing gear, for jet noise from a variety of nozzles, and for broadband fan noise. Additional results are shown for modeling of the acoustic behavior of duct acoustic lining and the attenuation of sound in lined ducts with flow.

Dahl, Milo D.↗

Apollo Spacesuit Modifications for the Apollo-Soyuz Test Project (ASTP) Spacesuit

With over 50 years of experience with NASA spacesuit development and operations, as well as for early U.S. Air Force pressure suits, Jim McBarron shared his significant knowledge about modifications to the Apollo spacesuit for use in the Apollo-Soyuz Test Project (ASTP). This included requirements and design changes implemented to establish the ASTP spacesuit design baseline. Additionally, he identified Apollo spacesuit contact details including quantity of spacesuits delivered to support the Apollo and Skylab Programs, and the ASTP. He concluded by identifying a summary of noteworthy lessons learned with recommendations for future spacesuit development.

McBarron, James W., II↗

Development of an Accepted Medical Condition List for Exploration Medical Capability Scoping

The Accepted Medical Conditions List (AMCL) is a product designed to provide a traceable, repeatable, evidence-based consensus process for scoping the medical capability needs for future design reference missions (DRMs) and upcoming programs. These include a Mars transit DRM and a shorter duration cis-lunar DRM. The development of a baseline AMCL by the Exploration Medical Capability (ExMC) Element will assist the effort to identify high priority medical capabilities for inclusion in mission and vehicle planning and provide traceable and documented clinical needs to the Systems Engineering teams tasked with requirements development and design work.

Medical Condition List↗

Optimizing Power Line Undergrounding Decisions under Varying Wildfire Risk and Weather Scenarios

Abstract—The threat of wildfire ignitions from electric power equipment has led utilities to increasingly turn to preemptive power shutoffs, which, while effective in reducing grid-induced wildfire risk, can cause significant load loss. Undergrounding power lines is an alternative strategy for preventing grid-induced wildfires. However, undergrounding lines is costly, so an efficient undergrounding plan must balance reductions in wildfire risk and load loss with the cost of undergrounding lines. We propose a robust optimization model to identify which power lines to underground to maximize load served while limiting wildfire risk across a range of wildfire risk and weather scenarios. Since solving this problem may be computationally heavy for large power grids and many operating scenarios, we present a delayed constraint generation algorithm to iteratively add scenarios until an optimal solution is found. We evaluate the performance of this framework on the RTS-GMLC with scenarios representing a year of operating conditions and compare it with a stochastic programming formulation. Our results indicate that our undergrounding model is successful in reducing load shed and risk compared to baseline cases in which no mitigation action is taken and only power shutoffs are implemented (no undergrounding). The robust formulation also reduces more load shed than the stochastic formulation in the most extreme scenarios. Index Terms—grid resilience, optimization, transmission systems, underground power lines, wildfire risk.

Taylor, S. [Department of Electrical and Computer ↗

Comparative performance tests on the Mod-2, 2.5-mW wind turbine with and without vortex generators

A test program was conducted on the third Mod-2 unit at Goldendale, Washington, to systematically study the effect of vortex generators (VG's) on power performance. The subject unit was first tested without VG's to obtain baseline data. Vortex generators were then installed on the mid-blade assemblies, and the resulting 70% VG configuration was tested. Finally, vortex generators were mounted on the tip assemblies, and data was recorded for the 100% VG configuration. This test program and its results are discussed in this paper. The development of vortex generators is also presented.

Miller, G. E.↗

Preliminary Analysis of Acoustic Measurements from the NASA-Gulfstream Airframe Noise Flight Test

The NASA-Gulfstream joint Airframe Noise Flight Test program was conducted at the NASA Wallops Flight Facility during October, 2006. The primary objective of the AFN flight test was to acquire baseline airframe noise data on a regional jet class of transport in order to determine noise source strengths and distributions for model validation. To accomplish this task, two measuring systems were used: a ground-based microphone array and individual microphones. Acoustic data for a Gulfstream G550 aircraft were acquired over the course of ten days. Over twenty-four test conditions were flown. The test matrix was designed to provide an acoustic characterization of both the full aircraft and individual airframe components and included cruise to landing configurations. Noise sources were isolated by selectively deploying individual components (flaps, main landing gear, nose gear, spoilers, etc.) and altering the airspeed, glide path, and engine settings. The AFN flight test program confirmed that the airframe is a major contributor to the noise from regional jets during landing operations. Sound pressure levels from the individual microphones on the ground revealed the flap system to be the dominant airframe noise source for the G550 aircraft. The corresponding array beamform maps showed that most of the radiated sound from the flaps originates from the side edges. Using velocity to the sixth power and Strouhal scaling of the sound pressure spectra obtained at different speeds failed to collapse the data into a single spectrum. The best data collapse was obtained when the frequencies were left unscaled.

Khorrami, Mehdi R.↗

Adaptive Augmenting Control Flight Characterization Experiment on an F/A-18

This paper summarizes the Adaptive Augmenting Control (AAC) flight characterization experiments performed using an F/A-18 (TN 853). AAC was designed and developed specifically for launch vehicles, and is currently part of the baseline autopilot design for NASA's Space Launch System (SLS). The scope covered here includes a brief overview of the algorithm (covered in more detail elsewhere), motivation and benefits of flight testing, top-level SLS flight test objectives, applicability of the F/A-18 as a platform for testing a launch vehicle control design, test cases designed to fully vet the AAC algorithm, flight test results, and conclusions regarding the functionality of AAC. The AAC algorithm developed at Marshall Space Flight Center is a forward loop gain multiplicative adaptive algorithm that modifies the total attitude control system gain in response to sensed model errors or undesirable parasitic mode resonances. The AAC algorithm provides the capability to improve or decrease performance by balancing attitude tracking with the mitigation of parasitic dynamics, such as control-structure interaction or servo-actuator limit cycles. In the case of the latter, if unmodeled or mismodeled parasitic dynamics are present that would otherwise result in a closed-loop instability or near instability, the adaptive controller decreases the total loop gain to reduce the interaction between these dynamics and the controller. This is in contrast to traditional adaptive control logic, which focuses on improving performance by increasing gain. The computationally simple AAC attitude control algorithm has stability properties that are reconcilable in the context of classical frequency-domain criteria (i.e., gain and phase margin). The algorithm assumes that the baseline attitude control design is well-tuned for a nominal trajectory and is designed to adapt only when necessary. Furthermore, the adaptation is attracted to the nominal design and adapts only on an as-needed basis (see Figure 1). The MSFC algorithm design was formulated during the Constellation Program and reached a high maturity level during SLS through simulation-based development and internal and external analytical review. The AAC algorithm design has three summary-level objectives: (1) "Do no harm;" return to baseline control design when not needed, (2) Increase performance; respond to error in ability of vehicle to track command, and (3) Regain stability; respond to undesirable control-structure interaction or other parasitic dynamics. AAC has been successfully implemented as part of the Space Launch System baseline design, including extensive testing in high-fidelity 6-DOF simulations the details of which are described in [1]. The Dryden Flight Research Center's F/A-18 Full-Scale Advanced Systems Testbed (FAST) platform is used to conduct an algorithm flight characterization experiment intended to fully vet the aforementioned design objectives. FAST was specifically designed with this type of test program in mind. The onboard flight control system has full-authority experiment control of ten aerodynamic effectors and two throttles. It has production and research sensor inputs and pilot engage/disengage and real-time configuration of up to eight different experiments on a single flight. It has failure detection and automatic reversion to fail-safe mode. The F/A-18 aircraft has an experiment envelope cleared for full-authority control and maneuvering and exhibits characteristics for robust recovery from unusual attitudes and configurations aided by the presence of a qualified test pilot. The F/A-18 aircraft has relatively high mass and inertia with exceptional performance; the F/A-18 also has a large thrust-to-weight ratio, owing to its military heritage. This enables the simulation of a portion of the ascent trajectory with a high degree of dynamic similarity to a launch vehicle, and the research flight control system can simulate unstable longitudinal dynamics. Parasitic dynamics such as slosh and bending modes, as well as atmospheric disturbances, are being produced by the airframe via modification of bending filters and the use of secondary control surfaces, including leading and trailing edge flaps, symmetric ailerons, and symmetric rudders. The platform also has the ability to inject signals in flight to simulate structural mode resonances or other challenging dynamics. This platform also offers more test maneuvers and longer maneuver times than a single rocket or missile test, which provides ample opportunity to fully and repeatedly exercise all aspects of the algorithm. Prior to testing on an F/A-18, AAC was the only component of the SLS autopilot design that had not been flight tested. The testing described in this paper raises the Technology Readiness Level (TRL) early in the SLS Program and is able to demonstrate its capabilities and robustness in a flight environment.

VanZwieten, Tannen S.↗

Programmed administration of parathyroid hormone increases bone formation and reduces bone loss in hindlimb-unloaded ovariectomized rats

Gonadal insufficiency and reduced mechanical usage are two important risk factors for osteoporosis. The beneficial effects of PTH therapy to reverse the estrogen deficiency-induced bone loss in the laboratory rat are well known, but the influence of mechanical usage in this response has not been established. In this study, the effects of programed administration of PTH on cancellous bone volume and turnover at the proximal tibial metaphysis were determined in hindlimb-unloaded, ovariectomized (OVX), 3-month-old Sprague-Dawley rats. PTH was administered to weight-bearing and hindlimb-unloaded OVX rats with osmotic pumps programed to deliver 20 microg human PTH (approximately 80 microg/kg x day) during a daily 1-h infusion for 7 days. Compared with sham-operated rats, OVX increased longitudinal and radial bone growth, increased indexes of cancellous bone turnover, and resulted in net resorption of cancellous bone. Hindlimb unloading of OVX rats decreased longitudinal and radial bone growth, decreased osteoblast number, increased osteoclast number, and resulted in a further decrease in cancellous bone volume compared with those in weight-bearing OVX rats. Programed administration of PTH had no effect on either radial or longitudinal bone growth in weight-bearing and hindlimb-unloaded OVX rats. PTH treatment had dramatic effects on selected cancellous bone measurements; PTH maintained cancellous bone volume in OVX weight-bearing rats and greatly reduced cancellous bone loss in OVX hindlimb-unloaded rats. In the latter animals, PTH treatment prevented the hindlimb unloading-induced reduction in trabecular thickness, but the hormone was ineffective in preventing either the increase in osteoclast number or the loss of trabecular plates. Importantly, PTH treatment increased the retention of a baseline flurochrome label, osteoblast number, and bone formation in the proximal tibial metaphysis regardless of the level of mechanical usage. These findings demonstrate that programed administration of PTH is effective in increasing osteoblast number and bone formation and has beneficial effects on bone volume in the absence of weight-bearing and gonadal hormones. We conclude that the actions of PTH on cancellous bone are independent of the level of mechanical usage.

NASA Discipline Musculoskeletal↗

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗

Advanced on-site power plant development technology program

A 30-cell, full area short stack containing advanced cell features was tested for 2900 hours. A stack acid addition approach was selected and will be evaluated on the stack at 5000 hours test time. A brassboard inverter was designed and fabrication was initiated. Evaluation of this brassboard inverter will take place in 1984. A Teflon coated commercial heat exchanger was selected as the preferred approach for the acid condenser. A reformer catalyst with significantly less pressure drop and equivalent performance relative to the 40-K baseline catalyst was selected for the development reformer. The early 40-kW field power plant history was reviewed and adjustments were made to the On-Site Technology Development Program to address critical component issues.

Source record↗

Constellation Program Life-cycle Cost Analysis Model (LCAM)

The Constellation Program (CxP) is NASA's effort to replace the Space Shuttle, return humans to the moon, and prepare for a human mission to Mars. The major elements of the Constellation Lunar sortie design reference mission architecture are shown. Unlike the Apollo Program of the 1960's, affordability is a major concern of United States policy makers and NASA management. To measure Constellation affordability, a total ownership cost life-cycle parametric cost estimating capability is required. This capability is being developed by the Constellation Systems Engineering and Integration (SE&I) Directorate, and is called the Lifecycle Cost Analysis Model (LCAM). The requirements for LCAM are based on the need to have a parametric estimating capability in order to do top-level program analysis, evaluate design alternatives, and explore options for future systems. By estimating the total cost of ownership within the context of the planned Constellation budget, LCAM can provide Program and NASA management with the cost data necessary to identify the most affordable alternatives. LCAM is also a key component of the Integrated Program Model (IPM), an SE&I developed capability that combines parametric sizing tools with cost, schedule, and risk models to perform program analysis. LCAM is used in the generation of cost estimates for system level trades and analyses. It draws upon the legacy of previous architecture level cost models, such as the Exploration Systems Mission Directorate (ESMD) Architecture Cost Model (ARCOM) developed for Simulation Based Acquisition (SBA), and ATLAS. LCAM is used to support requirements and design trade studies by calculating changes in cost relative to a baseline option cost. Estimated costs are generally low fidelity to accommodate available input data and available cost estimating relationships (CERs). LCAM is capable of interfacing with the Integrated Program Model to provide the cost estimating capability for that suite of tools.

Prince, Andy↗

Aerodynamic optimization, comparison, and trim design of canard and conventional high performance general aviation configurations

A design study has been conducted to optimize trim cruise flight of high performance general aviation canard aircraft which achieve minimum drag. In order to investigate the advantages and disadvantages of canard configured aircraft, corresponding conventional tail-aft 'baseline' aircraft were designed and used for comparison. Two-dimensional predictions were obtained by coupling inviscid results from a vortex panel multi-element program to a momentum integral boundary layer analysis. Using the results of the two-dimensional vortex panel analysis, a vortex lattice method was employed to predict the finite wing results. The analysis utilized a turbulent airfoil and a natural laminar airfoil which are two NASA state-of-the-art airfoil sections. The canard aircraft designs give quantitative results of wing and canard loadings, wing-to-canard moment arm ratios, and aspect ratio effects for trim cruise flight for a wide range of wing-to-canard area ratios. Both canard and baseline aircraft achieved a 25 to 30 percent improvement in performance over typical current technology aircraft, but high canard loading necessary for trim resulted in slightly poorer performance of the canard aircraft as compared to the baseline designs.

Keith, M. W.↗

Microgravity Compatible Reagentless Instrumentation for Detection of Dissolved Organic Acids and Alcohols in Potable Water

The Organic Acid and Alcohol Monitor (OAAM) program has resulted in the successful development of a computer controlled prototype analyzer capable of accurately determining aqueous organic acids and primary alcohol concentrations over a large dynamic range with high sensitivity. Formic, acetic, and propionic acid were accurately determined at concentrations as low as 5 to 10 micrograms/L in under 20 minutes, or as high as 10 to 20 mg/L in under 30 minutes. Methanol, ethanol, and propanol were determined at concentrations as low as 20 to 100 micrograms/L, or as high as 10 mg/L in under 30 minutes. Importantly for space based application, the OAAM requires no reagents or hazardous chemicals to perform these analyses needing only power, water, and CO2 free purge gas. The OAAM utilized two membrane processes to segregate organic acids from interfering ions. The organic acid concentration was then determined based upon the conductiometric signal. Separation of individual organic acids was accomplished using a chromatographic column. Alcohols are determined in a similar manner after conversion to organic acids by sequential biocatalytic and catalytic oxidation steps. The OAAM was designed to allow the early diagnosis of under performing or failing sub-systems within the Water Recovery System (WRS) baselined for the International Space Station (ISS). To achieve this goal, several new technologies were developed over the course of the OAAM program.

Akse, James R.↗

NASA Human System Risk Assessment Process

NASA utilizes an evidence based system to perform risk assessments for the human system for spaceflight missions. The center of this process is the multi-disciplinary Human System Risk Board (HSRB). The HSRB is chartered from the Chief Health and Medical Officer (OCHMO) at NASA Headquarters. The HSRB reviews all human system risks via an established comprehensive risk and configuration management plan based on a project management approach. The HSRB facilitates the integration of human research (terrestrial and spaceflight), medical operations, occupational surveillance, systems engineering and many other disciplines in a comprehensive review of human system risks. The HSRB considers all factors that influence human risk. These factors include pre-mission considerations such as screening criteria, training, age, sex, and physiological condition. In mission factors such as available countermeasures, mission duration and location and post mission factors such as time to return to baseline (reconditioning), post mission health screening, and available treatments. All of the factors influence the total risk assessment for each human risk. The HSRB performed a comprehensive review of all potential inflight medical conditions and events and over the course of several reviews consolidated the number of human system risks to 30, where the greatest emphasis is placed for investing program dollars for risk mitigation. The HSRB considers all available evidence from human research and, medical operations and occupational surveillance in assessing the risks for appropriate mitigation and future work. All applicable DRMs (low earth orbit for 6 and 12 months, deep space for 30 days and 1 year, a lunar mission for 1 year, and a planetary mission for 3 years) are considered as human system risks are modified by the hazards associated with space flight such as microgravity, exposure to radiation, distance from the earth, isolation and a closed environment. Each risk has a summary two-page assessment representing the state of knowledge/evidence of that risk, available risk mitigations, traceability to the Space Flight Human System Standards (SFHSS) and program requirements, and future work required. These data then can drive coordinated budgets across the Human Research Program, the International Space Station, Crew Health and Safety and Advanced Exploration System budgets to provide the most economical and timely mitigations. The risk assessments were completed for the 6 DRMs and serve as the baseline for which subsequent research and technology development and crew health care portfolios can be assessed. The HSRB reviews each risk at least annually or when new evidence/information is available that adds to the body of evidence. The current status of each risk can be reported to program management for operations, budget reviews and general oversight of the human system risk management program.

Francisco, D.↗

Technical Consultation of the Hubble Space Telescope (HST) System Health Assessment: Analysis of HST Health

The NESC conducted an abridged independent examination of available information and personnel interviews to evaluate the current and anticipated state of the spacecraft subsystems and the parameters that describe the HST's health. These examinations included the projected timeliness of a robotic SM and whether the GSFC baseline concept is likely to provide the capability to extend the useful scientific life of the HST by an additional 5 years. The NESC team collected a broad spectrum of pertinent HST Program analyses, reports, briefings, and the results of the IPAO and the Aerospace Corporation AOA assessments as they relate to the degradation of the HST s health. This review included the state of the HST subsystems having the potential to impact the viability of the HST, but will not be serviced under the baseline robotic SM.

Gentz, Steven J.↗

Bone Loss in Space: Shuttle/MIR Experience and Bed Rest Countermeasure Program

Loss of bone mineral during space flight was documented in the 1970's Skylab missions. The USSR space program made similar observations in the 1980's. The Institute of Biomedical Problems in Moscow and NASA JSC in 1989 began to collect pre- and post-flight bone mineral density (BMD) using Hologic QDR 1000 DEXA scanners transferred from JSC to Moscow and Star City. DEXA whole body, hip, and lumbar spine scans were performed prior to and during the first week after return from 4- to 6-month missions (plus one 8-month mission and one 14- month mission) on the Mir space station. These data documented the extent and regional nature of bone loss during long duration space flight. Of the 18 cosmonauts participating in this study between 1990 and 1995, seven flew two missions. BMD scans prior to the second flight compared to the first mission preflight scans indicated that recovery was possibly delayed or incomplete. Because of these findings, NASA and IBMP initiated the study "Bone Mineral Loss and Recovery After Shuttle/Mir Flights" in 1995 to evaluate bone recovery during a 3-year post-flight period. All of the 14 participants thus far evaluated lost bone in at least one region of the spine and lower extremities during flight. Of the 14, only one to date has exhibited full return to baseline BNM values in all regions. The current study will continue until the last participant has reached full bone recovery in all regions, has reached a plateau, or until three years after the flight (2001 for the last mission of the program). Bone mineral density losses in space and difficulty in returning to baseline indicate a need for countermeasure development. In late 1996 NASA JSC and Baylor College of Medicine were approved to conduct two countermeasure studies during 17 weeks of bed rest. In 1997 the studies were begun in the bed rest facility established by NASA, Baylor College of Medicine, and The Methodist Hospital in Houston. To date, three bed rest controls, five resistive exercisers, and four subjects taking alendronate (a bisphoshonate that inhibits osteoclastic resorption of bone) have completed 17 weeks bed rest. In contrast to information currently available from space flight (n=28) and bed rest (n= 12) in which all individuals experienced bone loss in at least one region, one of four subjects taking alendronate and one of five subjects performing heavy resistive exercise at bed rest fully maintained bone density in all regions of the spine and lower extremities. Overall results of both countermeasures which will be presented are encouraging. The study will be completed by mid to late 2000 with 10 subjects in each of three groups.

Shackelford, L. C.↗

Capillary acquisition devices for high-performance vehicles: Executive summary

Technology areas critical to the development of cryogenic capillary devices were studied. Passive cooling of capillary devices was investigated with an analytical and experimental study of wicking flow. Capillary device refilling with settled fluid was studied using an analytical and experimental program that resulted in successful correlation of a versatile computer program with test data. The program was used to predict Centaur D-1S LO2 and LH2 start basket refilling. Comparisons were made between the baseline Centaur D-1S propellant feed system and feed system alternatives including systems using capillary devices. The preferred concepts from the Centaur D-1S study were examined for APOTV and POTV vehicles for delivery and round trip transfer of payloads between LEO and GEO. Mission profiles were determined to provide propellant usage timelines and the payload partials were defined.

Blatt, M. H.↗

Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Wing planform study and final configuration selection

This report summarizes the Wing Planform Study Task and Final Configuration Selection of the Integrated Application of Active Controls (IAAC) Technology Project within the Energy Efficient Transport Program. Application of Active Controls Technology (ACT) in combination with increased wing span resulted in significant improvements over the Conventional Baseline Configuration (Baseline) and the Initial ACT Configuration previously established. The configurations use the same levels of technology (except for ACT), takeoff gross weight, and payload as the Baseline. The Final ACT Configuration (Model 768-107) incorporates pitch-augmented stability (which enabled an approximately 10% aft shift in cruise center of gravity and a 45% reduction in horizontal tail sizes), lateral/directional-augmented stability, an angle-of-attack limiter, and wing-load alleviation. Flutter-mode control was not beneficial for this configuration. This resulted in an 890 kg (1960 lb) reduction in airplane takeoff gross weight and a 9.8% improvement in cruise lift/drag. At the Baseline mission range (3590 km) (1938 nmi), this amounts to 10% block fuel reduction. Good takeoff performance at high-altitude airports on a hot day was also achieved. Results of this task strongly indicate that the IAAC Project should proceed with the Final ACT evaluation and begin the required control system development and testing.

Source record↗