Search NASA⌕ Search

SEARCH · Search NASA

Results for “draft”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Precision Local Positioning System

The primary goal of the project is to lay the groundwork for a new system design, meaning that at the end of this project’s effort, a traditional LLNL project could begin. For this goal to be met, the overarching needs of potential sponsors and stakeholders must be analyzed and understood, and a clear statement of work should be able to be drafted from the finding in this report. More specifically, the results from this project should immediately feed into the drafting of requirements, an implementation plan, and a budget plan for a future project. In order to accomplish this goal, the team set a broad framework for work to be completed. First, conduct current market research and select reference technologies to decompose. From the decompositions, analyze shortcomings, possible pain-points and form metrics and architectural decisions. Next, analyze the potential market area by interviewing/researching stakeholders and understanding their needs. As an additional project goal, attempt to capture as large a market area and scope as reasonably possible by incorporating more than the traditional LLNL sponsors. From the information gathered, study stakeholder salience and understand the relationships between stakeholders, mission areas, mission critical functions, and system metrics. Further analyze the relationships to focus on critical system aspects and to group stakeholders and mission together in order to reduce system complexity while maintaining wide marketability. Finally, begin brainstorming concepts from the established architectural decision and use the found metrics to create tradespaces to down select the most viable architectures. This document presents the team’s findings as it progressed through the project’s strategy.

42 ENGINEERING↗

Wood-to-Fuel for California's Transportation Sector using Autothermal Pyrolysis (Progress Report)

We sent our updated draft Site License Agreement back to SPI on June 4 th , with redlines. Gary Blanc of SPI said he would circulate it internally to appropriate parties and get back to us. He did not return an accepted or redlined version to us before the end of the month of July, nor did he send us any questions/comments or updates, despite them being requested. He is currently traveling around visiting SPI’s various forestry locations and mills, so is difficult to reach. In working towards the commercialization strategy, during the month of July, further research was completed on understanding and evaluating the availability and potential availability of fire clearing forestry residue in California. In July, a meeting with Stephen Kaffka and Rob Williams who are both authors of the report “An Assessment of Biomass Resource in California, 2013” was attended. These individuals provided us with guidance and information about how to identify the availability and potential availability of forestry/wood resource biomass in California. Also, in the month of July, a meeting with Cal-Fire was attended in order to understand what Cal-Fire plans to do in terms of reducing the risk of wildfires and how much potential fire clearing forestry residue biomass this will produce for California. Additionally, the potential of a novel pathway of producing H2 from pyrolysis oil, maximizing the products’ value, as well as maximizing the carbon emission reduction potential by incorporating carbon capture onsite, was investigated. We continued with the process of subcontracting with Iowa State University and Frontline BioEnergy. We have our Contract Administrators working with their counterparts at each partner to get the details in place. Draft contracts with statements of work were provided to each partner, and updated schedules and budgets, broken down by task in the statements of work, have been requested from each.

09 BIOMASS FUELS↗

Potential Impacts of Accelerated Climate Change (4th Annual Report)

Pacific Northwest National Laboratory (PNNL) has completed the fourth year draft Annual Letter Report that summarizes i) NRC needs for climate and hydrologic information, ii) recent research into climate and hydrologic changes that may affect nuclear power plants; iii) recent reports by federal agencies, as well as national and international organizations tasked with climate change research and developing policy with respect to climate change and mitigation; and iv) trends and advances in accommodating required climate change estimates in site specific evaluations. The Northeast U.S., a region defined by the Forth National Climate Assessment is the focus of this report. The NRC COR will review and provide comments on this draft within four weeks.

54 ENVIRONMENTAL SCIENCES↗

ORNL AGR PIE Upgrades - FY08 Summary Report

The first part of this activity, supporting the draft AGR-1 PIE, was completed by a series of draft report reviews, informal discussions, conference calls, and e-mails with INL staff and the AGR Technical Coordination Team (TCT). PIE planning efforts have included an evaluation of the PIE techniques to be used as a function of the AGR-1 in-reactor fuel performance. Because the fuel is performing well, the early emphasis has shifted toward showing that the performance goals for the fuel are being met rather than concentrating on individual particle examination. Since proof of performance is crucial for the NGNP design and schedule, this focus on overall performance allows the program to vet the fuel (design) variants and show a connection with the best performing historical fuel. If the good fuel behavior continues, the NGNP conceptual design can be approached with a creditable fuel, supported by early PIE data.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Work Plan for the Site-wide SSHAC Level 3 Probabilistic Seismic Hazard Analysis at INL

This work plan provides the overall framework, key activities, key tasks, and schedule for the execution of a probabilistic seismic hazard analysis at Idaho National Laboratory (INL). The probabilistic seismic hazard analysis will follow processes and procedures appropriate for the Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 study provided in U. S. Nuclear Regulatory Commission guidance, NUREG-2213. The SSHAC Level 3 probabilistic seismic hazard analysis (PSHA) is being conducted as an INL site-wide effort. The work plan was developed and revised by participants who will perform the SSHAC Level 3 PSHA. The work plan also includes the quality assurance requirements commensurate with American Society of Mechanical Engineers Nuclear Quality Assurance NQA 1 2008/2009 and 2011 Addendum for design nuclear facilities under the U.S. Department of Energy and U. S. Nuclear Regulatory Commission. The scope of the SSHAC Level 3 PSHA is designed to produce the mean-centered definition of the seismic hazard with the appropriate treatment of uncertainties supported by the associated technical justifications. The SSHAC Level 3 study will properly implement and completely document the activities of evaluation, integration, and documentation. The evaluation process will consider data, models, and methods proposed by the larger technical community that are relevant to the PSHA at INL. The integration process will build seismic-source and ground-motion characterization models that represent the center, body, and range of technically defensible interpretations, taking into consideration the outcomes of the evaluation process. Key tasks and activities—such as a project kickoff meeting, three workshops, four formal working meetings, and a briefing meeting with the Participatory Peer Review Panel—will occur for the seven-member technical integration teams to construct seismic-source and ground-motion-characterization models. Both preliminary and final hazard-input documents will be developed to perform sensitivity analyses and the final PSHA, respectively. The entire study will be thoroughly documented in draft and final reports. The Participatory Peer Review Panel will review the SSHAC Level 3 study from start to finish, including the draft and final INL Site-wide PSHA reports, so they can provide a closure letter documenting the study’s adherence to SSHAC processes and technical adequacy of the final products.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

DIC Challenge Sample Images Update

After the meetings at SEM and ICEM this year, which were both well attended by participants, it was decided by the participants that a first round of scoring the codes would be done using the Sample 14 and Sample 15 images. There was plenty of discussion on how we (the DIC Challenge Board) were going to score the results. What is going to be the balance between noise and filtering? And so forth. So it was decided to use a sub-group of the participants to help figure out if the submission guidelines were working, and how we would score the results. An additional benefit of this is that we can fix any submission guideline issues before getting results more broadly, and begin writing automated analysis codes. I expect that there will be a discussion on both subjects after I create a draft document of the scoring. This document is a draft of that report.

97 MATHEMATICS AND COMPUTING↗

Development of an Interactive Valuation Model for Distributed Energy Resource Value

The Oklahoma Secretary of Commerce & Tourism (OSCT) seeks to address perceived challenges and barriers to the deployment of distributed energy generation resources (DERs), including solar and other technologies, in the state of Oklahoma. The Scope of Work (SOW) outlines follow-on tasks related to the previous CRADA # CRD-18-762. The first task will finalize the Interactive Valuation Model Requirements Document, the final draft of which was provided in June 2018. The second task includes the building, validation, and finalization of the interactive valuation model for expressing distributed energy resource value based on user inputs to be completed by June 30, 2019. Training for how to prepare the data inputs and use the model will also be provided. To address perceived challenges and barriers to the deployment of distributed energy generation resources (DERs), including solar and other technologies, in the state of Oklahoma, the work under this CRADA will: 1) finalize the draft Interactive Valuation Model Requirements Document delivered in June 2018; 2) finish building and validating the interactive valuation model for expressing DER value based on user inputs, and 3) provide training for use of this model.

14 SOLAR ENERGY↗

Distributed Energy Resource Cybersecurity Standards Development [Final Report]

Currently, the solar industry is operating with little application-specific guidance on how to protect and defend their systems from cyberattacks. This 3-year Department of Energy (DOE) Solar Energy Technologies Office-funded project helped advance the distributed energy resource (DER) cybersecurity state-of-the-art by (a) bolstering industry awareness of cybersecurity concepts, risks, and solutions through a webinar series and (b) developing recommendations for DER cybersecurity standards to improve the security performance of DER products and networks. Drafting DER standards is a lengthy, consensus-based process requiring effective leadership and stakeholder participation. This project was designed to reduce standard and guide writing times by creating well-researched recommendations that could act as a starting place for national and international standards development organizations. Working within the SunSpec/Sandia DER Cybersecurity Workgroup, the team produced guidance for DER cybersecurity certification, communication protocol standards, network architecture s, access control, and patching. The team also led subgroups within the IEEE P 1547.3 Guide for Cybersecurity of Distributed Energy Resources Interconnected with Electric Power Systems committee and pushed a draft to ballot in October 2021.

14 SOLAR ENERGY↗

Thermochemical characterization of intumescent materials and their application in FEM models using Aria

Intumescent materials are in wide use as protective coatings in fire protection or thermal management applications. These materials undergo chemical reactions occurring from approximately 300°C to 900°C, which outgas and expand the material, providing an appreciable increase in insulative performance. However, the complicated chemical mechanisms and large changes in materials properties complicate the incorporation of these materials into predictive thermal models. This document serves to outline the thermochemical characterization of select intumescent materials, the extraction of relevant parameters, and the incorporation of these parameters into the ChemEQ reaction model implemented in Aria. This work was performed in 2016 and documented in a draft SAND report in March 2017. In 2022, the draft SAND report was discovered and put through R&A.

36 MATERIALS SCIENCE↗

United States Nuclear Data Program: Work Plan for Fiscal Year 2023

The work plan described in this document has been developed to cover work to be performed by the U. S. Nuclear Data Program (USNDP) during Fiscal Year (FY) 2023 that begins on October 1, 2022. Previously, 23 work plans have been prepared for the nuclear data program covering FYs 2021-2022. This plan has been prepared in consultation with the members of the Coordinating Committee who represent the organizations participating in the program. Each Coordinating Committee member prepared a draft plan for his/her organization. Each contribution was integrated into a unified work plan. The draft plan was then circulated to the Coordinating Committee for comments and corrections before the final document was submitted to the U.S. Department of Energy (DOE). As was done in previous years, the tasks proposed by the various organizations were reviewed internally according to the following criteria, which were developed considering the mission and goals outlined in past review panel reports and oversight committee discussions, and in consultation with the DOE program manager.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

United States Nuclear Data Program Work Plan for FY 24

The work plan described in this document has been developed to cover work to be performed by the U. S. Nuclear Data Program (USNDP) during Fiscal Year (FY) 2024 that begins on October 1, 2022. Previously, 23 work plans have been prepared for the nuclear data program covering FYs 2021-2022. This plan has been prepared in consultation with the members of the Coordinating Committee who represent the organizations participating in the program. Each Coordinating Committee member prepared a draft plan for his/her organization. Each contribution was integrated into a unified work plan. The draft plan was then circulated to the Coordinating Committee for comments and corrections before the final document was submitted to the U.S. Department of Energy (DOE).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Joint Comments from the Department of Energy, National Nuclear Security Administration (DOE NNSA) Los Alamos Field Office and Triad National Security, LLC on the U.S. Environmental Protection Agency’s New Mexico State-Wide Municipal Separate Storm Sewer System Strawman General Permit

In December 2020 and March 2021, EPA issued two MS4 strawman permit drafts specific to the Los Alamos area. EPA made text changes in the 2 nd strawman permit based on stakeholder comments related to the initial draft. During the public meeting on the Los Alamos area designation decision held on February 13, 2024, EPA staff stated that comments from the past strawman permits would be incorporated into the new MS4 permit to be issued state-wide. However, it does not appear that any of the text changes from the 2 nd Los Alamos area strawman permit were included in this state-wide general MS4 strawman permit. For reference, the 2 nd Los Alamos area revised strawman permit is included with these comments as Attachment 2. Many of the following comments refer to or state EPA’s updated text included in the 2 nd Los Alamos area strawman permit. The updated text from this 2 nd strawman permit that are referenced in the following comments should be applicable state-wide and it is suggested that this past work be reconsidered and incorporated.

54 ENVIRONMENTAL SCIENCES↗

Community Planning for Solar: Compiling a Community Solar Action Plan

This document provides an annotated outline for a Community Solar Action Plan. This document is designed to assist community officials, volunteers, and regional planning agency staff in preparing a draft Community Solar Action Plan for a municipality, community, or other jurisdiction. Preparing a Community Solar Action Plan is the fifth step in the Community Planning for Solar process (ag.umass.edu/solarplanning). The plan is intended to be the culmination of the planning process. The contents of the plan will include summaries of information gathered as part of foregoing steps in the process, including completion of a Solar Resource and Infrastructure Assessment, administering of a Community Solar Survey, interpretation of survey results, and review of Solar Financing and Ownership Options and tools. Once the Community Solar Action Plan has been drafted, it should be reviewed by municipal board and commission members and presented at an open community forum. Any important comments or revisions can be incorporated before the final Community Solar Action Plan is approved and implemented. The approved Community Solar Action Plan is a living document that guides community solar planning action over time. As conditions change, new information becomes available, or actions progress over the life of the plan, adjustments may be necessary to maintain the plan's relevance. The Monitoring, Evaluating, and Updating Your Community Solar Action Plan fact sheet (Step 6, Item a) describes some things to consider when updating the Community Solar Action Plan over time.

14 SOLAR ENERGY↗

Pathways Analysis Summary: Decarbonization Potential for Industrial Subsectors - Preliminary Modeling Results

This provides a summary of draft modeling efforts undertaken by the U.S. Department of Energy (DOE) Industrial Efficiency and Decarbonization Office (IEDO) as an extension and expansion of the 2022 Industrial Decarbonization Roadmap. IEDO is providing these draft modeling results to support stakeholder engagement and inform office- and department wide strategy and decision making. Section 1 provides an overview of the context for this analysis and modeling as well as information on the decarbonization pillars characterized and the models themselves. Section 2 presents modeling results of one net-zero emissions pathway each for six industrial subsectors: cement, chemicals, food and beverage, iron and steel, petroleum refining, and pulp and paper. It is important to note that these pathways are just one example and there is no single pathway for any single industrial subsector. Competition across different possible pathways will be essential to industrial decarbonization success. Section 3 provides an overview of the “rest of industry” subsectors and a high-level overview of net-zero barriers, challenges, pathways, and technologies. IEDO will continue to consider net-zero pathways and modeling for these rest of industry subsectors. Additional details will be made available in the future on the IEDO website.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Evaluation of flame propagation of retrofit energy efficient wall assemblies

Leveraging safety science experience and industry relationships, UL Solutions and the International Association of Fire Fighters (IAFF) initiated a joint project in 2022 under an agreement with the US Department of Energy to evaluate the flame propagation of retrofit energy efficient wall assemblies. A draft of the protocol from the ASTM work was used to test and comparatively study various retrofit energy efficient designs to gain a better understanding of their fire behavior. The goals of this study were as follows: Develop an understanding of fire propagation across new, cost effective, and energy efficient exterior retrofit wall assemblies. Refine the flame propagation draft test method for exterior wall assemblies based on ASTM E2707. Identify conditions that create fire propagation hazards in exterior wall assemblies and educate the fire service on the findings.

42 ENGINEERING↗

United States Nuclear Data Program Work Plan for Fiscal Year 2025

The work plan described in this document has been developed to cover work to be performed by the U. S. Nuclear Data Program (USNDP) during Fiscal Year (FY) 2025 that begins on October 1, 2024. This plan has been prepared in consultation with the members of the Coordinating Committee who represent the organizations participating in the program. Each Coordinating Committee member prepared a draft plan for his/her organization. Each contribution was integrated into a unified work plan. The draft plan was then circulated to the Coordinating Committee for comments and corrections before the final document was submitted to the U.S. Department of Energy (DOE).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Modeling and Analysis for Spent Nuclear Fuel Seismic Testing

Note: This is the final public release version of PNNL-31671 Draft, which was previously released to the sponsor for review. The intent is the public release version will be PNNL-31671. There are no significant changes from the earlier draft version. This unlimited distribution report is the deliverable for M3SF-21PN010202014: Modeling and Analysis for Spent Nuclear Fuel Seismic Testing. This report summarizes the modeling, analysis, and test plan support completed by Pacific Northwest National Laboratory for the spent nuclear fuel dry storage system seismic test plan through May of 2021. Test plan preparation is planned to continue until the seismic test is completed in July of 2022. This report covers preliminary structural dynamic model development and computer-aided design of test hardware. Based on preliminary modeling, the strongest earthquakes under consideration in this test program provide mechanical loading on the spent nuclear fuel that is comparable to the 30 cm cask drop scenario, although the loads do not appear to be strong enough to cause significant permanent deformation of the fuel assembly spacer grids. The potential for grid deformation during the test will be assessed when the proposed shake table motion becomes available. The weakest earthquakes considered in this test are expected to be comparable to the mechanical loads witnessed in the multimodal transportation test of 2017. The horizontal canister system is predicted to provide nearly-uniform loading condition on the fuel assemblies it contains, while the vertical cask system is predicted to cause non-uniform dynamic loads on the fuel assemblies. In the horizontal case, gravity keeps the fuel assemblies in contact with one basket wall surface unless the loads are strong enough to cause a separation. In the vertical case, the fuel assemblies are relatively long and slender, and seismic motion in the anticipated test range is predicted to cause the assemblies to lean, tilt, and impact the basket walls throughout the seismic event. These gap closures are a nonlinear force transmission condition, so the vertical system is expected to have more variation and variability than the horizontal system. While the horizontal system is expected to have a relatively more linear response than the vertical system, there is still the potential for nonlinear behavior in the horizontal system because the fuel assemblies are free to slide, bounce, and impact the basket walls if the seismic loads are strong enough. One major conclusion of this study is that the use of mixed fuel assemblies in the canister will be acceptable. There are differences in overall system response when the mass, center of gravity, or gaps are changed, but the changes in response are within the bounds of a system that contains completely homogeneous fuel assemblies. One important observation is that the loading for each individual fuel assembly within the vertical canister is expected to be different from that of the others because of nonlinearities in the system. The horizontal canister system is expected to have a more uniform and more predictable response than the vertical canister, making variations in fuel assembly characteristics easier to account for. One important recommendation that comes from this modeling work is to repeat some of the strongest shake tests at different angles, particularly for the vertical cask system. Modeling predicts that strong seismic motion will cause the fuel assemblies to close initial gaps and impact the fuel basket walls when the canister is in the vertical cask configuration. Each shake test will impose a pre-defined three-dimensional time history on the cask system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗