Light Water Reactor Sustainability Program: Integrated Program Plan

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2013 to 2040 . At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the United States reached their 40th anniversary in 2009). Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity for 40- and 60-year license periods. If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements. The U.S. Department of Energy Office of Nuclear Energy's 2010 Research and Development Roadmap (2010 Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: 1. Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; 2. Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; 3. Develop sustainable nuclear fuel cycles; and 4. Understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Processing and Disposition of Special Actinide Target Materials - 17071

The DOE manages an inventory of materials that contain a range of long-lived radioisotopes that were produced from the 1960's through the 1980's by irradiating targets in high-flux reactors at the SRS to produce special heavy isotopes for DOE programmatic use, scientific research, and industrial and medical applications. Among the products were Cf-249, -250, -251, and -252; heavy curium (=50% Cm-246); and Pu-242 and -244. The irradiation of the Mark-18A (Mk-18A) targets at extremely high fluxes produced the world's supply of heavy curium and Pu-244. Approximately one fourth of the Mk-18A targets were processed in the 1970's to recover and enrich the material that has been used as the global source of Pu-244 and heavy curium by industry and researchers. These isotopes are still in demand, and the available supply of purified material is dwindling. A program has been initiated to recover heavy curium and Pu-244 from the remaining stored unprocessed Mk-18A targets. Improved flowsheets to process the materials to recover Pu-244 and heavy curium are being developed. Evaluations are also underway to determine whether additional materials present in the targets in much smaller quantities, such as long-lived fission product (LLFP) isotopes, can be recovered for research and development applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Future of Robotics/Remote Handling Solutions for the Nuclear Industry - 17347

The nuclear industry is seeing a resurgence of development and utilization of advanced integrated systems; fused sensor arrays; autonomous, remote and hybrid operations; and augmented reality display and control system interfaces. A new age of 'robotics' and remote handling technologies. For many years the use of robotics in nuclear applications has been done sparingly due to technical limitations, perceived and real reliability issues, perceived and real risk concerns, and cost. Although robotics have been used successfully on a variety of projects globally, the underuse of this technology, particularly within the nuclear industry both public and private, is overwhelming. As the number of complex, high hazard projects in the nuclear industry increases, the use of robotics for maintenance, inspection, repair, decommissioning, and remediation activities will become increasingly vital in the future. The risks associated with direct human exposure are high and thus eliminating the risk, or managing it to acceptable levels by using robotics/remote handling as well as other technologies is critical to success as more extreme environment operations and tasks are undertaken. Recent and ongoing advances in technology now allows us to safely and effectively remove the direct / in-situ human element from these type of activities. All the while delivering the same or better outcomes when considering the alternatives when limited or no direct / in-situ human intervention would be allowed. The biggest obstacles the nuclear industry faces center on the cost, reliability, maintainability, effectiveness and appropriate uses of robotics/remote handling solutions in a nuclear (radiation and/or contamination) environment. In order to mitigate these concerns, a sound approach to the use of robotics needs to be addressed. This approach must include: 1. A better understanding of what technology is available and how it can be utilized across multiple sectors, e.g. Commercial Off-the-Shelf (COTS) technology modified / adapted for the nuclear sector; 2. How to implement technology in an integrated pragmatic approach that is cost effective by combining technological know-how / subject matter expertise (SME) with the equivalent subject matter expertise in regulatory, operational and maintenance requirements and limitations, such that a more complete set of functional and operational requirements can be jointly developed in the process. 3. The integration of requirements (project, site, regulatory, etc.), risk management (human factors) and technology, i.e. a marriage between political, programmatic, and technological factors. As the development of robotic/remote handling technology progresses and the successful implementation on projects is demonstrated, the better off the industry will be. This paper provides an overview of the fundamental issues facing the nuclear industry with regard to effective and successful technology selection, maturation, deployment, and integrated risk management, and offers suggestions on how we may overcome these persistent issues now and in the future. Robotic systems and solution experts that are focused on the integration of proven technologies - and that are an integrated part of the project team from its onset - are a necessity for successful planning during nuclear operations. The approach to nuclear operations should always be, 'what is the simplest, most effective way we can approach a particular project need?'. Understanding and implementing the right technologies is where the true value will be recognized. The integration of systems, which includes more than just robotics, is key when developing schemes for these types of complex operations. Often times during planning, the remote handling needs of the job are set aside to be evaluated at a later time due to risk concerns and lack of knowledge. The issue is, experts in the area of robotics or remote handling are rarely involved in the upfront planning. As a result, unnecessary constraints, risks, and obstacles are imposed on project teams to deliver. If done intelligently, this should be introduced at the forefront of planning. Using this type of sound approach leads to effective task organization for the end user. By developing an overall philosophy that leverages proven technologies with implementation expertise; i.e. solutions versus products, is a recipe for success. This is the area that is under-appreciated in the industry and one that needs to be recognized on a much broader scale. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technetium Management Program Plan - 17376

Technetium management is a high-priority activity for the U.S. Department of Energy (DOE) Office of Environmental Management (EM) complex. Waste management and remediation issues involving technetium represent environmental risks and challenges that are unique to DOE. This plan lays out the technology development activities that are underway as well as future technology needs to address technetium issues across DOE EM sites and across programmatic areas of tank waste, groundwater and soils, and facility decommissioning and deactivation in order to be comprehensive and to allow integration of similar activities. The program was developed in close coordination with site representatives and program offices. Activities and needs that were identified share common themes and were grouped into areas of characterization, treatment, and disposition. Characterization includes understanding the inventory at particular locations, the chemical species, and chemical and physical behavior, whether in a treatment process flowsheet or a geological setting that displays periodic contaminant releases. The tools for characterization in these different environments might use the same sensors or protocols. Treatment options include methods to capture technetium such as ion-exchange or manipulation of oxidation states, which also may be applied across program areas. Disposition includes end-points of the processes and environmental risk, including waste form behavior, mobility of technetium once it is treated or remediated, and long-term monitoring. Disposition represents integration of all cleanup actions at a site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FUSRAP Maywood Site - Remediation of a Residential Property at 61 Trudy Drive, Lodi, NJ - 17533

The Formerly Utilized Sites Remedial Action Program (FUSRAP) is the U.S. government program started in 1974 to identify, investigate and clean up or control sites that became contaminated as a result of the nation's early atomic programs. The FUSRAP Maywood (New Jersey) Superfund Site (FMSS) consists of 92 designated property parcels known as vicinity properties. 61 Trudy Drive in Lodi, New Jersey is one such vicinity property. Construction planning for a recently-completed remedial excavation at 61 Trudy Drive was predicated on a fundamental question: to remediate the property with the existing home remaining in place or to demolish the exiting home. Answering this question involved detailed engineering and cost analyses, programmatic considerations, and stakeholder input. 61 Trudy Drive was originally addressed under FUSRAP in 1985 by the U.S. Department of Energy (DOE). However, subsequent remediation on an adjacent property by the U.S. Army Corps of Engineers (USACE) in 1998 suggested that residual contamination remained at depth at 61 Trudy. The property owner at that time declined to allow FUSRAP access to the property. However, a property transfer in 2012 presented USACE with an opportunity to address this property. Characterization of the property began in 2013; remedial activities were completed in 2015. The 61 Trudy Drive remediation required an intensive stakeholder communications program tailored for several audiences, including the affected property owner, local government officials and the neighboring community This paper will present the FUSRAP history at 61 Trudy Drive, to provide context for recent FUSRAP actions there. It will then focus on the challenges and complexities of performing environmental remediation in a suburban residential setting, focusing on both construction and communications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigations for improved tank characterization and cleaning - 15454

In the process of tank closure, significant waste characterization and chemical cleaning occur. Costly characterization is performed at numerous processing stages. A need exists for new strategies and technologies to understand, optimize, scale, and speed up tank waste characterization with the end goal of reducing costs through implementation of programmatic changes that accelerate tank waste processing and tank closure schedules. This paper will explore a possible alternative to waste characterization methodologies and cleaning technologies to reduce costs and improve processing efficiency. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress updates for the Hanford waste treatment and immobilization plant project - 15593

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to clean up radioactive waste at the Hanford Site in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 211 983 m{sup 3} (56 million gallons) of radioactive waste stored in 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. In recent years, the project has encountered issues that affected project design completion, especially in the Pretreatment and High-Level Waste Facilities. These included technical issues, changes in requirements, changes in funding, weaknesses in the nuclear supply chain, identification of new hazards, and new information about the tank waste. The combination of these issues led to a suspension of construction of the Pretreatment Facility and a partial suspension of construction of the High-Level Waste Facility in mid-2012. Since then, the WTP Project has made significant progress in establishing and implementing a strategy for resolving these issues. This strategy focuses on resuming full production work in a sequence that fully supports the DOE plan for a phased approach for starting treatment of the Hanford tank waste, beginning with the low-activity waste streams. Concurrent with the technical and programmatic issues, the DOE Office of River Protection has made numerous changes in the processes it uses to manage and oversee the WTP Project. These changes have had a beneficial impact on the progress the project has made in establishing a path forward for resuming production activities, and on planning for the necessary contract and baseline changes needed to complete the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

D and D decision model and mobile application for selection of fixative, strippable coating, and decontamination gel products - 15696

Deactivation and decommissioning (D and D) is the process of taking an active/excess/abandoned facility to a final disposition end state. D and D presents unique hazards that must be addressed from a safety, programmatic, environmental, and technological standpoint. This definition is especially applicable to Savannah River Site's 235-F facility. The facility was constructed in the 1950's as part of the weapons complex materials production and fabrication. The most significant quantities of residual contamination remaining in 235-F building is in the form of Plutonium-238. A Decision Model was created using MatLab to work hand-in-hand with a product list containing commercially available D and D products. This model was created to further enhance and accelerate the decontamination process. It is envisioned that D and D engineers will be able to use this Decision Model in the field via a mobile device. It allows the user to select four inputs to match their situation. The model searches the database and returns the products that fit the criteria selected by the user. This Decision Model will be made available in a web-based application and as a mobile application to ensure end users can access it when needed. The MatLab code recognizes what position in the text box is selected and then this input is converted to the corresponding string. The string is then compared with the information in the product list in the specified column in order to reduce processing time. Then the products that contain the string inputted are displayed on the table and are separated by category. The web-based version of the model will receive three specified criteria and sub-criteria from the user and update the table with products that fit each criteria. A web-based version of this Decision Model is under way and will be set up on the D and D KM-IT platform. There will be two versions of this mobile application: for devices with internet connection and for those that do not have internet connection. This will ensure end users have access to the Decision application at any time or place during the D and D process. A mobile version of the model will also be developed in the near future.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pursuing Cost Effective Tank Waste Characterization at the Savannah River Site - 16172

The U. S. Department of Energy Office of Environmental Management has tasked the Savannah River National Laboratory (SRNL) with developing strategies and technologies to understand, optimize, scale, and speed up tank waste characterization. This scope is part of a multi-year project with the end goal of implementing programmatic changes that accelerate tank waste processing and tank closure schedules, and at the same time reduce characterization costs, while maintaining data integrity. The project is currently in its second year. During the first year of the project, SRNL completed a series of activities focused on understanding the range of current characterization practices, needs, gaps, risks, and potential alternative approaches. Based on the results, conclusions were drawn regarding aspects of the programs that are most costly and time consuming; particular waste constituents that drive costs, schedule, and program risks; alternative characterization approaches (other than sampling and analysis) that are less expensive and more rapid; new laboratory methods holding the greatest promise for reducing characterization costs and schedule; and in whole, the primary areas where current characterization practices can be improved. SRNL's current scope is focusing on three primary activities: 1) development of a technical basis/strategy for improving the cost effectiveness and schedule of SRNL's tank closure characterization program; 2) design/assembly of hardware, plumbing, and software for automating select radiochemical separation and waste removal processes; and 3) development and testing of alternative radiochemical separation protocols most likely to improve high resource demand/time consuming analysis methods (such as Ra-226, Pa-231, Tc-99/I-129, and/or Y/trivalent actinide separations). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transition and Transfer of Remediated FUSRAP Sites from USACE to US DOE for Long-Term Surveillance and Maintenance - 16209

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS and M). US DOE's Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS and M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM's perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS and M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canada's Underground Research Laboratory (1980-2014) - 16274

In 1980, Canada initiated a long-term, comprehensive research and development program of geologic characterization and large-scale in situ geotechnical experiments in a subsurface facility, the Underground Research Laboratory (URL). The URL was excavated specifically to evaluate the concept of permanent disposal of used CANDU{sup R} nuclear reactor fuel in a deep geological repository (DGR) constructed in Canadian Shield granite. Key phases of the URL included siting, detailed site characterization and monitoring, construction, operation, decommissioning, and closure. Much collaborative research with international organizations was undertaken at the URL and continues, even after the closure of the facility, through the ongoing Enhanced Sealing Project (ESP). The ESP monitors the engineered performance of a full-scale composite shaft seal that was emplaced during URL closure to permanently seal the main URL access shaft across a sub-horizontal hydraulically active fracture zone. Currently the ESP is jointly funded by Canadian Nuclear Laboratories (CNL) (Canada), Posiva (Finland), and Andra (France), and monitoring is planned to continue until the end of 2016. Decades of programmatic experience at the URL have shown that knowledge continuity is integral to supporting the development of a safe geological disposal facility for high level nuclear waste. This paper outlines the history of the URL and describes some technical lessons learned from its 30-plus years of construction, operation, and closure activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Examining Supply Chain Resilience for the Inter-modal Shipment of Spent Nuclear Fuel and High Level Radioactive Materials - 16309

The U.S. Department of Energy (DOE) has a significant programmatic interest in the safe and secure routing and transportation of Spent Nuclear Fuel (SNF) and High Level Waste (HLW) in the United States, including shipments entering the country from locations outside U.S borders. In any shipment of SNF/HLW, there are multiple 'chains'; a jurisdictional chain as the material moves between jurisdictions (state, federal, tribal, administrative), a physical supply chain (which mode), as well as a custody chain (which stakeholder is in charge/possession) of the materials being transported. Given these interconnected networks, there lies vulnerabilities, whether in lack of communication between interested stakeholders or physical vulnerabilities such as interdiction. By identifying key links and nodes as well as administrative weaknesses, decisions can be made to 'harden' the physical network and improve communication between stakeholders. This paper examines the parallel chains of oversight and custody as well as the chain of stakeholder interests for the shipments of SNF/HLW and the potential impacts on systemic resiliency. Using the Crystal River shutdown location as well as a hypothetical international shipment brought into the United States, this paper illustrates the parallel chains and maps them out visually. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Maturation in Support of DOE 413.3B Project Execution - 16436

The DOE Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' provides program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements. Execution of complex DOE 413.3B projects depends, in part, upon the successful integration of a technology maturation program. The Low Activity Waste Pre-Treatment System (LAWPS) is executing a detailed technology maturation program under the Technology Readiness Level/Technology Maturation Plan (TRL/TMP) guidance of DOE Order 413.3B. The interaction of the technology maturation process and the project execution including technical, programmatic, and contractual execution, has been a critical component for project success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SURF: Advances in the Incorporation of Sustainability Into Remedial Approaches - 16451

The inclusion of sustainability considerations in remediation cleanup process (investigation through site closure) benefits site owners, including Federal agencies such as the Department of Defense (DOD) and Department of Energy (DOE), through development of more efficient and cost-effective remedies as well as communities by considering socio-economic impacts and redevelopment into remedial decisions. The incorporation of social, environmental, and economic considerations early in the remedial process often enables achievement of regulatory site closure sooner and with broader community acceptance. In order to achieve these objectives, stakeholders, including federal facilities, regulators, contractors, and consultants, have expressed the need for case studies demonstrating successful implementation of sustainable practices. The Sustainable Remediation Forum emerged in 2006 and was established as a non-profit organization in 2010. Through exploration of technical issues such as groundwater conservation and reuse at remediation sites to life cycle assessment approaches, subject matter experts have led discussions across the industry of how the incorporation of sustainability into the remediation process can provide benefits through: - Consideration of socioeconomic impacts and drivers for remediation and redevelopment; - Reduced environmental impacts of remedial actions; and - Enhanced economic value through partnerships and informed decision making. Incorporation of sustainable remediation concepts provides distinct and recognizable value, as demonstrated through the technical initiatives of the Sustainable Remediation Forum, remediation industry conferences and events, and the prevalence of government agency and corporate sustainable remediation programs, such as the DOE's Cross-Programmatic Work Group. Sustainable remediation has evolved from discussions of environmental impacts of cleanups (with considerable green-washing), to quantifying and minimizing the environmental footprint and subsequent long term global impacts of a remedy, and currently, incorporating strategies to address all three components of sustainability - environmental, social, and economic. However, the practice of sustainability must continue to advance and new approaches should be adopted to holistically evaluate beneficial and detrimental impacts from the remedial process and incorporate sustainability concepts throughout the project life cycle. A more holistic and comprehensive approach, beyond the traditional paradigm of sustainable remediation, will lead a project team to achieve social and economic sustainability objectives of the community while protecting human health and the environment. This 'advanced' approach is where the most significant benefits will be achieved. Practitioners need documented, peer-reviewed, technically sound concepts and examples of sustainable remediation as supporting material to gain acceptance and approval of incorporation of best management practices and evaluation techniques. Reviewing the advancements of sustainable remediation over the last 5-10 years and the identification of lessons learned has great merit. This discussion of case studies will highlight successful incorporation of social impacts, economic analysis, and site redevelopment into the remedial process to provide a roadmap for site owners in developing sustainable approaches for their sites. Specifically, benefits were achieved in these case studies through promotion of economic development, innovative financing, incorporation of risk-based approaches, and consideration of social value of a site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct Feed Low Activity Waste (DFLAW) Program: Development, Progression and Risk Management - 16476

This Direct Feed Low-Activity Waste (DFLAW) Program paper describes the key programmatic elements to enable the startup of treatment and disposal of Hanford tank waste through a phased startup of the Hanford Tank Waste Treatment and Immobilization Plant (WTP). Specifically the DFLAW Program consists of the Low- Activity Waste (LAW) vitrification facility, and the direct feed to LAW of treated tank farm supernatant from the Low-Activity Waste Pretreatment System (LAWPS). This document identifies the overall strategy, objectives, and processes of the U.S. Department of Energy (DOE), Office of River Protection (ORP) and all supporting DOE subcontractors, and describes the scope of the program elements. In addition gaps, risks, and opportunities to successful integration for commissioning of all needed systems and facilities to produce immobilized LAW product (ILAW) are described. The scope of the DFLAW Program extends up to the point that LAW Facility hot commissioning is complete and all DFLAW systems are fully operational. The DFLAW Program coordinates, integrates, and monitors all the activities necessary to successfully commission and start up the WTP LAW facility. This involves integrating the readiness of all the plant, personnel and program/procedures that support startup of hot commissioning of tank farms systems, WTP systems, waste treatment and disposal systems, and site utility, infrastructure and services. Multiple Hanford contractors have responsibilities to execute and perform scope under the umbrella of the DFLAW Program. The primary focus of the One System organization, comprised of WTP Project and Tank Operations Contract (TOC) personnel, is to manage the coordination and integration across the interfaces of the work scope described above. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Options for Disposition of Mk-42 Materials - 18034

In the late 1980's, the DOE defense programs identified a need to recover special isotopes of americium, curium, and plutonium from Mark-42 (Mk-42) targets that had been irradiated at the SRS. Eighty Mk-42 target segments were transferred from SRS to ORNL for recovery of these special isotopes. Approximately 65% of the target material has been processed, and the recovered material converted to solids. The remaining Mk-42 materials are stored either as targets in their irradiated forms or as target material from various stages of processing. The Pu, Am-243 and Cm-244 in these targets are valuable materials; for example, the Am/Cm materials are potential feedstocks for production of heavy actinides (Cf-252, Bk-249, etc.). In addition, rare long-lived fission product (LLFP) isotopes present in the targets in much smaller quantities, such as Zr-93, also have value to the research community. Although the isotopes in the Mk-42 materials have value, there is continual pressure to de-inventory the material in storage and only retain the most valuable materials needed to meet mission needs and provide inventory space for other materials to be added as they become available. Evaluations are underway for potential disposition options for the Mk-42 materials. Previous studies have included identification and evaluation of disposition options for the various Mk-42 materials in storage at ORNL [1]. Evaluations have included options for recovering the major isotopes and evaluating the waste that would be sent to disposal facilities. This paper summarizes the next steps in the evaluation process to develop an optimum path forward for the disposition of the Mk-42 materials. It includes an evaluation of the future programmatic need for the materials, the impact of storage on facility operations, and additional evaluations of options for dispositioning the materials. In addition to recovery of the major isotopes previously evaluated, it also looks at the potential to recover rare LLFP isotopes present in the targets in small quantities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Technical Standard for Radiological Characterization of DAW - 18062

Throughout its 70+-year history, the U.S. Department of Energy (DOE) and its predecessor agencies have performed a wide mission involving nuclear materials and weapons development, production, testing, and modernization. While the initial mission components relied heavily upon reactor physics and chemistry, the environmental programs have increasingly relied upon development of more accurate and effective measurement methodologies to determine the radiological and chemical properties of the unique waste streams that were generated during the weapons production and testing mission. Over time, the DOE laboratories and former production sites have developed a wide range of site-specific processes and procedures for conducting radiological characterization of dry active waste (DAW) that is managed as low-level radioactive waste. This has resulted in a Complex-wide variability among sites with respect to the methodologies and instrumentation used to characterize individual waste streams. The DAW-type waste was selected for development of a characterization standard since it is a simple, voluminous, and repetitive waste stream with a substantial knowledge base, established experience history at multiple site locations, and the potential for realization of programmatic benefits though standardization. The Energy Facility Contractors Group (EFCOG) Waste Management Working Group (WMWG) has proposed the development of a new DOE Technical Standard for radiological characterization of DAW. The purpose of the proposed new standard is to provide a technical resource that integrates and enhances the utilization of current site-specific methodologies and processes. A Technical Basis Document (TBD) has been prepared to support the development and utilization of the new standard by providing detailed information for use by site personnel when implementing the guidance provided in the standard. It also provides the rationale for and details concerning the recommended technical approaches for radiological characterization of representative DAW-type waste streams. The TBD will be included as an appendix to the proposed standard. Adoption of a standardized approach to DAW characterization will take advantage of multiple applications for a technology that is both mature and stable. The DAW characterization process is repetitive and lends itself to implementation at a wide range of operating locations - resulting in economies of scale, compliance with regulatory requirements, and consistent implementation of procedures which support design, operations, maintenance, and management of facilities, activities and programs. The purpose of the proposed new Technical Standard for DAW Radiological Characterization is to integrate and improve the utilization of current site-specific methodologies and processes and will include a comprehensive evaluation and comparison of current radiological characterization methodologies to determine which ones are most reliable and effective in producing relevant and valid data. In view of the long history and participation by several agencies in the regulation of nuclear programs, existing Voluntary Consensus Standards have also been reviewed for relevancy and applicability to the new proposed standard. The proposed new Standard will be developed in concert with existing scientific and regulatory guidance to produce a document that incorporates the state of current knowledge and site practices with a graded approach to applying those methodologies that are applicable and effective for characterizing a wide range of DAW-type wastes - including, but not limited to, debris, low specific activity (LSA) material, and surface contaminated objects (SCO). Under the leadership of the National Laboratory Subgroup of the EFCOG/WMWG), an EFCOG team will develop the proposed technical standard. This process will incorporate the information gathered during preparation of the TBD, which will serve as a technical resource to support the technical approach for selection of DAW characterization methodologies. Preparation of the TBD included a detailed survey of historical site practices and examination of the characterization approaches and measurement methodologies currently being applied to DAW-type wastes. Future activities include the development and submittal of a Project Justification Statement that will be submitted to the DOE Technical Standards Program for review and comment. The EFCOG/WMWG Team will respond to reviewer comments, as required. Following final concurrence by affected organizations through the DOE Technical Standards Coordination process, the EFCOG/WMWG Team will prepare the draft technical standard and respond to comments generated during RevCom review and final format review by the DOE Technical Standards Management Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗