Search NASA⌕ Search

SEARCH · Search NASA

Results for “reporting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37

Submittal of Solid Waste Management Units and Areas of Concern Annual Long-Term Monitoring and Maintenance Report for Calendar Year 2017

This SWMU and AOC Annual Long-Term Monitoring and Maintenance (LTMM) Report for Calendar Year 2017 (Annual LTMM Report) details the measures performed for 21 Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) at Sandia National Laboratories/New Mexico (SNL/NM) in accordance with the requirements of the “Long-Term Monitoring and Maintenance [LTMM] Plan for SWMUs and AOCs Granted Corrective Action Complete with Controls” in Attachment M of the Resource Conservation and Recovery Act Facility Operating Permit (Permit), which took effect February 26, 2015. This Annual LTMM Report does not present the measures for SWMU 76, Mixed Waste Landfill (MWL), as the applicable MWL reporting adheres to the approved MWL LTMM Plan, Section 4.8.1 and requires a separate annual report which will be submitted to the New Mexico Environment Department by June 30, 2018. Measures at these SWMUs and AOCs include surveillance of site conditions and maintenance of institutional controls. Conditions requiring maintenance or repair activities were identified at three of the inspected SWMUs and AOCs (SWMUs 45, 46, and 87) during the Permit-required annual site inspections. One SWMU identification sign located at SWMU 46 and two identification signs located at SWMU 87 were replaced due to weathered lettering. Evidence of erosion was observed at SWMU 45 during the annual site inspection; erosion controls will be implemented as needed to prevent the inadvertent exposure of hazardous wastes or hazardous waste constituents. SWMU 45 is located on the sloped border of Tijeras Arroyo south of Technical Area-IV. The erosion controls planned for the Tijeras Arroyo Escarpment will address not only SWMU 45, but also SWMUs 46 and 229 as a best management practice. SNL/NM personnel plan to complete this work in calendar year 2018. The status and progress of this project will be reported in the 2018 Annual SWMUs and AOCs Annual LTMM Report for Calendar Year 2018 to be submitted to the New Mexico Environment Department on March 31, 2019, as required by the Permit. Based upon the inspections performed and site conditions observed, the administrative and physical institutional controls in place at the SWMUs and AOCs are effectively providing continued protection of human health and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2018 (Revision 0)

This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. The locations of the sites are shown in Figure ES-1. This report covers calender year 2018. The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110; and quarterly at CAU 111. Additional inspections are conducted at CAUs 92 and 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAUs 110 and 111, soil moisture monitoring and subsidence surveys are conducted in addition to the visual inspections. At CAU 110 the site fence, gate, lock and use restriction signs are evaluated. At CAU 111, an ecological survey, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are also conducted. This report will address all monitoring item notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of Permit NEV HW0101 was issued effective December 10, 2015, and remains in effect until December 10, 2020.

54 ENVIRONMENTAL SCIENCES↗

NCSP FY 2015 AMPX Annual Report

The objective of the Nuclear Criticality Safety Program (NCSP) Analytical Methods program element is to sustain state-of-the-art radiation transport modeling capabilities and the expertise necessary to develop, maintain, and disseminate the analytical tools and data libraries in a manner that is responsive to the needs of those responsible for developing, implementing, and maintaining criticality safety. To this end, the objective of the AMPX Development and Maintenance Subtask is to ensure that the AMPX cross-section processing system is available to prepare cross-section and covariance libraries that are needed by SCALE and other radiation transport packages to support criticality safety analyses of systems with fissionable material. Moreover, the task ensures that the cross-section processing software is current and up-to-date with the Evaluated Nuclear Data File (ENDF/B) formats and procedures for disseminating evaluated cross-section data provided through new measurement and evaluation work efforts. The AMPX subtask provides for the production of data libraries needed for criticality safety analyses. As such, the task provides the “bridge” between the nuclear data evaluations and the radiation transport software. In the absence of the AMPX cross-section processing task, the ability to maintain and update the SCALE nuclear data libraries (cross-section and covariance data) would be hindered. Therefore, the AMPX Development and Maintenance Subtask ensures that SCALE is up-to-date with the latest cross-section data for supporting criticality safety analyses. This letter report provides a summary of the FY 2015 AMPX development and maintenance activities that have been performed in support of the NCSP. Specifically, the report summarizes the AMPX code system updates and modernization accomplishments that have been made to the software package. Also, the report documents the cross-section library updates that have been made for the SCALE radiation transport package. In addition, the report documents testing activities that have been performed to process available cross-section and covariance data files to ensure the latest ENDF/B data files can be processed properly. This report satisfies the following reporting milestone in the NCSP FY16-20 Five Year Plan: Document AMPX modernization and technical support for SCALE continuous energy (CE), multigroup (MG), and covariance libraries and report status annually to the NCSP Manager (AM3: Q2)

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Environmental Restorations Operations (Consolidated Quarterly Report Jul - Sep 2019)

This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the July - September 2019 reporting period. Table I-1 lists the Solid Waste Management Units (SWMUs) and Areas of Concern (A0Cs) currently identified for corrective action at SNL/NM. This section of the ER Quarterly Report summarizes the work completed during this quarterly reporting period at sites undergoing corrective action. Corrective action activities were conducted during this reporting period at the three groundwater AOCs (Burn Site Groundwater [BSG] AOC, Technical Area-V [TA-V] Groundwater [TAVG] AOC, and Tijeras Arroyo Groundwater [TAG] AOC). Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active mission sites are located in Technical Area-III. There were no SWMUs or AOCs in the corrective action complete regulatory process during this quarterly reporting period.

54 ENVIRONMENTAL SCIENCES↗

Herbaceous Feedstock 2018 State of Technology Report

The U.S. Department of Energy (DOE) promotes the production of advanced liquid transportation fuels from lignocellulosic biomass by funding fundamental and applied research that advances the state of technology (SOT). As part of its involvement with this mission, Idaho National Laboratory (INL) completes an annual SOT report for biomass feedstock logistics. This report summarizes supply system impacts of Bioenergy Technologies Office (BETO)-funded research and development efforts at INL and elsewhere (such as the High-Tonnage Feedstock Logistics projects (Webb et al. 2013a, Webb et al. 2013b, Webb et al. 2013c, Webb and Sokhansanj 2014, Sokhansanj et al. 2014) that lead to improvements in feedstock supply systems. These include improvements to and observed performance of innovative harvest and collection methods, storage technologies, transportation and handling approaches, and advanced preprocessing technologies. Biomass quality and variability, and the interface between feedstock quality and conversion performance are key drivers in addition to delivered feedstock cost. In this report, we estimate the benefits of R&D improvements to individual supply system unit operations, and present the status of feedstock logistics technology development for converting biomass into biofuels. These analyses are supported by experimental data where possible, and help to align the SOT relative to the cost goals defined in the Multi-Year Program Plan. The 2018 Herbaceous SOT aligned feedstock logistic design with current biorefinery’s design capacity utilized by biochemical conversion platform. Currently biochemical conversion platform utilizes a 725,000 dry ton/year biorefiney design for the techno economic analysis. Hence, feedstock delivered cost in the 2018 Herbaceous SOT is calculated based on biorefinery’s 725,000 dry ton design capacity instead of 800, 000 dry ton capacity utilized in the 2017 Herbaceous SOT. Biomass availabilities in this SOT were updated to year 2018 data from the 2016 Billion-Ton Report (BT16) (DOE 2016a), with the exception of switchgrass, for which the 2018 Herbaceous SOT utilized the 2019 switchgrass availability data from BT16. The BT16 report (DOE 2016a) does not project switchgrass availability in 2018; the soonest switchgrass is available in the BT16 report is 2019. Therefore, availability of switchgrass for this analysis was that projected for 2019. The 2018 Herbaceous SOT incorporates same technologies utilized in the 2017 Herbaceous SOT. However, a sensitivity analysis is performed to understand the impact of variation of process parameters on those technologies on feedstock logistic cost. New R&D data that shows the variations of process parameters affecting process performance is incorporated in the 2018 SOT to measure the variations in delivered feedstock cost. The 2018 Herbaceous SOT has also provided projected delivered feedstock of 2022 design case based on near term technical target under BETO funded R&D project. Finally, updated biorefinery size of 725,000 dry ton/year was incorporated within least-cost formulation model to select optimal siting and depot scales during optimization of the least cost blend. This modification to the optimization algorithm allows the trade-off between the cost of increased supply radius and the savings from selecting biomass from higher producing counties to be assessed. Such optimization has also showed the economic benefit of decentralized depots in comparison to centralized preprocessing co-located with the biorefinery by decoupling the biorefinery and feedstock locations. The 2018 Herbaceous SOT report documents the current modeled cost of a herbaceous feedstock supply system (from harvest to the pretreatment reactor throat, including grower payment) for hydrocarbon fuel production via biochemical conversion, based on equipment and processes now available or potentially available in the near term. The modeled cost also considers both the required quality and the availability of the biomass resources. The 2018 Herbaceous SOT predicts a modeled delivered feedstock cost of $83.67/dry ton (2016$); this is a $0.23/dry ton (2016$) decrease from the 2017 Herbaceous SOT. The modification of biorefinery’s designed capacity and increased projected biomass availability in the same supply shed contributed to this modeled cost reduction. The least-cost formulation model to optimally site and scale local distributed preprocessing depots also contributed to the cost reduction by considering county-level grower payment and distance from the biorefinery as variables in the optimization algorithm. Sensitivity analysis on various process parameters that affect delivered feedstock cost in the 2018 Herbaceous SOT shows that the delivered cost could varies from $80.45-$88.83/dry ton. The top factors that causes such variations are: effective baling rate, bale density, hammer mill throughput, interest rate and storage dry matter loss.

09 BIOMASS FUELS↗

LLNL Semiannual Wastewater Point Source Monitoring Report (July 2020)

In accordance with the Code of Federal Regulations, Title 40, Part 403.12(e), Lawrence Livermore National Laboratory (LLNL) submits a semiannual monitoring report regarding federally regulated wastewater generating processes (categorical processes) that discharge wastewater to the sanitary sewer system. Attachments A-2 and A-3 of the 2019-2020 Wastewater Discharge Permit #1250 granted to LLNL by the City of Livermore Water Resources Division (WRD) also mandate submission of this report. The LLNL Livermore Site is required to monitor identified electrical and electronic components processes (40 CFR Part 469) and metal finishing processes (40 CFR Part 433) semiannually and to submit monitoring reports in January and July of each year. Under authority delegated to enforce compliance with these regulations, the WRD reviews this report. This report provides information on the significant metal-finishing operations and electrical and electronic component operations located at the Livermore Site during the period from December 1, 2019 through May 31, 2020 and includes descriptions of the LLNL regulated (categorical) processes that discharge to the sanitary sewer. Attachments A-2 and A-3 of the 2019-2020 Wastewater Discharge Permit #1250 provide the list of categorical processes and the required self-monitoring program for point-source discharges at LLNL. The monitoring data collected for this report documents compliance with all federal and local pretreatment limits. Compliance certification accompanies this report, as required by federal regulations.

54 ENVIRONMENTAL SCIENCES↗

U.S. Industrial and Commercial Motor System Market Assessment Report. Volume 3: Energy Saving Opportunity

This report seeks to inform the potential for motor systems to support decarbonization by estimating their potential energy, electricity cost, and CO 2 emissions reduction potential from adoption of proven energy efficiency actions and advanced technologies. This is the third and final report in a series of reports disseminating the findings of the U.S. Department of Energy’s (DOE’s) Motor System Market Assessment (MSMA). The MSMA and this report focus on polyphase motor systems greater than or equal to 1 horsepower (hp) in the industrial and commercial sectors. In the U.S. Industrial and Commercial Motor System Market Assessment Report Volume 1: Characteristics of the Installed Base (Volume 1 report), it was determined that these motor systems consume more than 1,000 terawatt-hours (TWh) annually. This equates to 29% of the U.S. electric grid load and results in 765 million metric tons (MMT) of CO 2 emissions and $166 billion in electricity costs. This report finds that substantial reductions to these energy, cost, and emissions impacts are possible, with three areas of significant opportunity being (1) improved load matching, (2) replacing older inefficient motors with more efficient motors, and (3) improving the condition of fluid (e.g., air, water, compressed air) distribution systems. A summary of the savings potential from these three opportunities placed within the context of the overall consumption for motor systems is illustrated in Figure ES 1 (industrial) and Figure ES 2 (commercial).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reducing Uncertainty of Fielded Photovoltaic Performance (Final Technical Report)

Improved analysis and reporting of photovoltaic (PV) field performance increases the certainty of owners and financiers that systems will perform as expected. Advanced module technologies (e.g., PERC, HJT, and bifacial) introduce new degradation mechanisms and performance characteristics. The FY19-21 Reducing Uncertainty project leveraged data from the ever-increasing PV fleet to develop models and understanding of the field performance of existing and new technologies. Specifically, we accomplished: report on field performance and degradation rates for high-efficiency silicon (HJT, PERC, IBC) and more conventional technologies; developed automated analysis techniques to quantify system performance (performance ratio, energy yield) and production shortfalls (soiling, degradation, availability); refined the RdTools software toolkit to bring standard, validated analysis techniques to bear on third-party data; analyzed and reported on large datasets including Treasury data and Lawrence Berkeley National Laboratory's Utility-Scale dataset to expand the high-quality degradation-rate histogram published previously; worked with industry partners and the DuraMAT data hub to enable private parties to share and aggregate PV production data anonymously, leveraging cloud-based data analysis infrastructure and publishing on US fleet-scale performance comprising over 7GW of operating systems. (https://www.nrel.gov/pv/fleet-performance-data-initiative.html). Through our industry collaborations we have engaged in NDA-covered data transfer with twelve PV fleet owners as of January 2022, with more agreements in negotiation. Our scalable cloud-based time series database contains over 30 billion rows (20TB) of PV time series data, representing over 1700 commercial and utility-scale systems, and over 7.2 GW of DC capacity (Fig 1). Initial field performance results have been distributed in several public reports. Because our fleet composition and data quality methods are continually improving, annual updates to these results are published to our PV Fleet webpage [ https://www.nrel.gov/pv/fleet-performance-data-initiative.html ] and DuraMAT data hub [DOI: 10.21948/1842958]. Another existing dissemination channel used for observed soiling losses is a map we maintain for soiling losses. Additional products developed include a report detailing fleet-wide performance index, availability, startup loss and snow loss factors, a detailed report on the 1603 grant dataset comprising over 100,000 PV systems with failure and performance details and a utility-scale report coauthored with LBNL on 31 GW of system performance.

14 SOLAR ENERGY↗

2021 Idaho National Laboratory Site Environmental Report

The INL Site’s operations, as well as the ongoing cleanup, necessarily involve a commitment to environmental stewardship and full compliance with environmental protection laws. As part of this commitment, the INL Site Environmental Report is prepared annually to inform the public, regulators, stakeholders, and other interested parties of the INL Site’s environmental performance during the year. This report is published for the DOE-ID in compliance with DOE O 231.1B, “Environment, Safety and Health Reporting.” Its purpose is to: • Present the INL Site, mission, and programs • Report compliance status with applicable federal, state, and local regulations • Describe the INL Site environmental programs and activities • Summarize results of environmental monitoring • Discuss potential radiation doses to the public residing in the vicinity of the INL Site • Report on ecological monitoring and research conducted by contractors and affiliated agencies and by independent researchers through the Idaho National Environmental Research Park • Describe quality assurance methods used to ensure confidence in monitoring data • Provide supplemental technical data and reports that support the INL Site Environmental Report (https://idahoeser.inl.gov/publications.html).

99 GENERAL AND MISCELLANEOUS↗

Energy Storage Grand Challenge: Energy Storage Market Report

As part of the Department of Energy's (DOE) Energy Storage Grand Challenge (ESGC), DOE intends to synthesize and disseminate best available energy storage data, information, and analysis to inform decision-making and accelerate technology adoption. The ESGC Roadmap provides options for addressing technology development, commercialization, manufacturing, valuation, and workforce challenges to position the United States for global leadership in the energy storage technologies of the future. This report provides a baseline understanding of the numerous, dynamic energy storage markets that fall within the scope of the ESGC via an integrated presentation of deployment, investment, and manufacturing data from the best, publicly-available sources. This report covers the following energy storage technologies: lithium ion batteries, lead acid batteries, pumped storage hydropower, comrpessed air energy storage, redox flow batteries, hydrogen, building thermal energy storage, and select long duration energy storage technologies. Not all energy storage technologies and markets could be addressed in this report. Due to the wide array of energy technologies, market niches, and data availability issues, this market report only included a select group of technologies. For example, thermal energy storage technologies are very broadly defined and cover a wide range of potential markets, technology readiness levels, and primary energy sources. In other areas, data scarcity necessitates a greater understanding of future applications and emerging science. Future efforts will update data presented in this report and be expanded to include other energy storage technologies. This data-driven assessment of the current status of energy storage markets is essential to track progress toward the goals described in the Energy Storage Grand Challenge and inform the decision-making of a broad range of stakeholders. At the same time, gaps identified through the development of this report can point to areas where further data collection and analysis could provide an even greater level of understanding of the full range of markets and technologies. Finally, numerous complementary analyses are planned, underway, or completed that will provide a deeper understanding of the specific technologies and markets covered at a high-level in this report.

25 ENERGY STORAGE↗

Renewable Thermal Energy Systems: Characterization of the Most Important Thermal Energy Applications in Buildings and Industry (Report 1)

This report is the first in a three-report series that evaluates the provision of renewable heat for industry and buildings via current and prospective renewable thermal energy system (RTES) technologies. The RTES project has undertaken initial research focused on technologies that could be suited for industrial process heat applications at different temperature levels, and, where possible, gathered performance and cost data for these technologies. This project does not directly evaluate RTES for distributed residential or commercial applications, nor does it yet include documented cases or modeling of RTES using geothermal, biomass, waste heat, renewable fuels like renewable natural gas, or hydrogen production. The three technical reports are summarized as follows: Renewable Thermal Energy Systems: Characterization of the Most Important Thermal Energy Applications in Buildings and Industry (Report 1), this report: summary of thermal demands of U.S. industry and buildings, and relevant hybrid RTES configurations; Renewable Thermal Energy Systems: Systemic Challenges and Transformational Policies (Report 2): discussion of socio-technical characteristics of RTES, innovation challenges, and supporting policies. Available at: https://www.nrel.gov/docs/fy23osti/83020.pdf; Renewable Thermal Energy Systems: Modeling Developments and Future Directions (Report 3): Energy yield and performance modeling of RTES, techno-economic analysis via case studies, and proposed development of a user decision support tool. Available at: https://www.nrel.gov/docs/fy23osti/83021.pdf.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

43-0434 Bridge Inspection Report 2021

The documentation includes the following: 1. 2021 NMDOT Bridge Inspection Report including Element Level Data Collection (in digital formats prepared by NMSU)--conforms to the National Bridge Inspection Standards and AASHTO Manual for Bridge Element Inspection; 2. 2021 Supplemental Report (in digital formats prepared by NMSU)--provides detailed information related to current condition of major bridge components; 3. 2021 Inspection Pictures (in digital format prepared by NMSU); 4. 2021 Delamination Map (in digital format prepared by LANL). During the 2021 inspection, three critical findings were reported to our LANL contact, Mr. Jonathan Stein, by text and/or email on June 26, 2021. 1. The south joint of the bridge had a modular section of the joint that could potentially come loose during the passing of vehicles. This was reported as a critical finding for safety. If the modular section becomes dislodged or deformed it could pose a serious hazard that could result in a punctured tire to vehicles, motorcyclists and/or bicyclist causing drivers/riders to lose control; 2. The bracket plate located at the north end of the bridge on the pedestrian walkway was corroded through and provides little protection to pedestrians and bicyclists. This was reported as a critical finding for safety to prevent injuries to people; 3. The north approach rail has three missing posts. These posts help ensure that traffic is redirected and the energy is absorbed by the rail. This was reported as a critical finding for safety. Additionally, the approach rail is on a curve with a nearby drop off. Immediate repair is recommended. Based on the 2021 inspection, the bridge deck is rated in "fair" condition. The chain drag performed on the deck identified several areas with delamination that are concentrated near the expansion joints, in the closure joint of the deck near the bridge centerline, and at the south end of the northbound lanes. The chain drag performed during the 2021 inspection revealed 215,333 sq. in. (1495 sq. ft) of delaminations and patched areas (not including the sidewalk). This is approximately a 600% increase from 2019. It is recommended that the delaminations and spalls with exposed rebar be repaired. The "delaminated area" map for the 2021 inspection is provided in the supplemental report.

42 ENGINEERING↗

Feedback on the Electric Emergency Incident and Disturbance Report, OE-417

The US Department of Energy (DOE) Office of Electricity (OE) mandates requirements for reporting electric emergencies and disruptions in the United States. Specific electric power industry organizations (such as balancing authorities, reliability coordinators, some generating entities, and electric utilities) report this information through the OE-417 Electric Emergency Incident and Disturbance Report via Form OE-417. Entities are required to submit Form OE-417 when at least one of the qualifying 26 criteria is met pursuant to Section 13(b) of the Federal Energy Administration Act of 1974 (Public Law 93-275). Entities are required to report, within 6 hours of the incident, loss of electric service to 50,000 customers or more for 1 hour or longer. The deadline for submitting Form OE-417 depends on the nature of the incident. An updated Form OE-417 Schedule 1 and all of Schedule 2 are both due within 72 hours of the incident to provide complete disruption information. Additionally, a Final Report must be filed within 72 hours of the incident, unless an interim update has been provided. If the incident meets specific criteria, the form must be filed within one hour, six hours, or by the later of 24 hours after the recognition of the incident or by the end of the next business day.1 The ability of DOE to respond quickly to energy emergencies that could affect the nation’s infrastructure and help alleviate or prevent further disruptions depends on the industry’s prompt and complete submission of information. This report summarizes current issues with Form OE-417 and the reporting process and presents recommendations for improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-temperature seals for supercritical carbon-dioxide (sCO 2 ) turbines (Final Report)

This is the final report for project DE-FE0031924 titled “High-temperature seals for supercritical carbon-dioxide (sCO 2 ) turbines.” The report provides a summary of the entire project efforts from October 2020 through December 2024 including the high-temperature commercial dry gas seal (DGS) tests and thermal modeling of Task 2, as well as the high-temperature, large-diameter seal design and high-temperature tests of large-diameter seals in Task 3. A key outcome of Task 2 was the testing completion of specially instrumented commercial DGS in the GE-SwRI Apollo sCO 2 compressor (27,000 rpm). Test data from the DGS showed elevated temperatures upwards of 350 o F, which are close to the higher operating temperature limit of the DGS. The temperature measurements provide insight into the expected thermal loads on DGS operating in high-speed sCO 2 compressor and provided test data for validation of an in-house thermal model of the compressor/seal. Under Task 2.0, this report also presents the development of a steady-state conjugate heat-transfer model of the DGS operating in the sCO 2 compressor – a first of its kind model for modeling heat transfer of sCO 2 in an actual operating compressor. The findings of the thermal model show a reasonable match between temperature predictions of the model and the measured temperature data, also pointing out the validity of the approach and assumptions made in modeling the flows, heat transfer coefficients and windage modeling in the rig. Under Task 3.0, this report presents the preliminary design of a large-diameter hybrid face seal (14 inch and 26-inch diameter) for field testing in a land-based GE turbine. The preliminary seal design effort presented in this report under project DE-FE0031924 builds on the development and successful laboratory testing for such large diameter hybrid face seal under the prior DE-FE0024007 project. Key aspects of seal fluid analyses with CFD, mechanical design considerations and assembly considerations in a land-based turbine are presented. Finally, under Task 3.0, this report also presents the continued high-temperature testing of the 14-inch diameter hybrid face seal developed previously under the DE-FE0024007 program. Specifically, test data demonstrating successful non-contact seal operation and seal effective leakage of 0.001-inch with seal inlet temperatures above 700 o F are presented in this report. Successful hybrid seal operation in a laboratory environment for a large diameter (14-inch) seal at temperatures above 700 o F is a major technological milestone for this technology.

01 COAL, LIGNITE, AND PEAT↗

2024 Bioenergy Industry Status Report

This report provides a snapshot of the bioenergy industry status at the end of 2024. The report compliments other annual market reports from the Department of Energy's (DOE's) Office of Energy Efficiency and Renewable Energy (EERE) offices and is supported by DOE'sOffice of Critical Minerals and Energy Innovation's Alternative Fuels and Feedstocks Office. The 2024 Bioenergy Industry Status Report focuses on past year data covering multiple dimensions of the bioenergy industry and does not attempt to make future market projections. There report covers production, consumption, plants, trade, and end-use for all biofuels, biopower, and biobased products where data is available. The report provides a balanced and unbiased assessment of the industry and associated markets. It is openly available to the public and is intended to complement other industry reports with a focus on DOE stakeholder needs.

09 BIOMASS FUELS↗

Radiometric Testing of Germicidal UV Products, Round 1: UV-C Towers and Whole-Room Luminaires (CALiPER Summary Report)

This summary report analyzes the independently tested performance of 13 germicidal ultraviolet (GUV) products purchased between February and July 2022. A companion full report provides additional information and discussion of the tested products, test methods, and results. The products were of three different types: • Seven portable, consumer-oriented GUV towers designed to be placed on the floor or a desk of an unoccupied room to disinfect air and surfaces. Five of these products used LED sources and two products used low-pressure mercury (LPM) sources. • One non-portable GUV whole-room luminaire designed to be installed on a ceiling to disinfect air when a room is occupied. This product used an LED source. • Five non-portable GUV troffer or high-bay style whole-room luminaires designed to be installed in or suspended from a ceiling to disinfect air and surfaces when a room is unoccupied. All five used LPM sources. Radiometric and electrical performance was evaluated for all 13 products. Photobiological safety was also assessed for two of the products because their documentation included testable claims. The test results were compared across products and to manufacturer or vendor claims. The testing identified many issues related to the accuracy of reported GUV product performance. Claims were often untestable, contradictory, ambiguous, or used incorrect units and/or terminology. And when claims were testable, they often did not match test results. For example, three products that claimed to emit UV-C emitted only UV-A. These product claim issues were more numerous with consumer-oriented tower products, but problems with accurate performance claims were found across all products. The UV-C radiant efficiency of the products varied widely, even among similar products using the same source technologies. For example, the UV-C radiant efficiency of LPM products varied by greater than a factor of three for the same product type, indicating a large potential energy savings opportunity for products that are better designed for efficiency. LED products had orders-of-magnitude lower UV-C radiant efficiency than LPM products. Several testing challenges and limitations were identified. Most significant among these is the capability to accurately test and report the performance of larger GUV products. Integrating spheres require a specialized and costly coating to test UV, and the testing laboratory for this round of products had only a 20-inch diameter hemisphere with this capability. Only 2 of the 10 UV-C emitting products could be tested in this sphere. Goniometer testing had a different size limitation in that mirrors typically used to increase goniometer test distance to the far field are not reflective of UV and therefore could not be used to increase test distance. As a result, 7 of 13 products could not be tested far field. The implication is that electronic files of UV-C intensity data typically imported into design software for designing GUV applications may not be reliable for predicting irradiance at arbitrary far-field distances. It is currently unclear if these are industry-wide testing laboratory limitations, and what solutions may exist to address them. Specifiers and buyers of GUV products will need accurate performance claims and data to safely and effectively deploy GUV technology to reduce the transmission of diseases in buildings. This CALiPER GUV Round 1 report demonstrates the significant education and training that is needed for manufacturers and vendors to accurately test and report the performance of their GUV products. Further standards and guidelines are needed to improve test methods, address testing limitations, and improve reporting of product performance. Additionally, the wide range in UV-C radiant efficiency of GUV products means there is a large energy-savings opportunity for more energy efficient GUV products.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Atmospheric Radiation Measurement program climate research facility operations quarterly report January 1 - March 31, 2008.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period January 1 - March 31, 2008, for the fixed sites. The AMF is being deployed to China and is not in operation this quarter. The second quarter comprises a total of 2,184 hours. The average as well as the individual site values exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. FKB represents the AMF statistics for the Haselbach, Germany, past deployment in 2007. NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request a research account on the local site data system. The seven computers for the research accounts are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; and the DMF at PNNL. In addition, the ACRF serves as a data repository for a long-term Arctic atmospheric observatory in Eureka, Canada (80 degrees 05 minutes N, 86 degrees 43 minutes W) as part of the multiagency Study of Environmental Arctic Change (SEARCH) Program. NOAA began providing instruments for the site in 2005, and currently cloud radar data are available. The intent of the site is to monitor the important components of the Arctic atmosphere, including clouds, aerosols, atmospheric radiation, and local-scale atmospheric dynamics. Because of the similarity of ACRF NSA data streams and the important synergy that can be formed between a network of Arctic atmospheric observations, much of the SEARCH observatory data are archived in the ARM archive. Instruments will be added to the site over time. For more information, please visit http://www.db.arm.gov/data. The designation for the archived Eureka data is YEU and is now included in the ACRF user metrics. This quarterly report provides the cumulative numbers of visitors and user accounts by site for the period April 1, 2007 - March 31, 2008. Table 2 shows the summary of cumulative users for the period April 1, 2007 - March 31, 2007. For the second quarter of FY 2008, the overall number of users was nearly as high as the last reporting period, in which a new record high for number of users was established. This quarter, a new record high was established for the number of user days, particularly due to the large number of field campaign activities in conjunction with the AMF deployment in Germany, as well as major field campaigns at the NSA and SGP sites. This quarter, 37% of the Archive users are ARM science-funded principal investigators and 23% of all other facility users are either ARM science-funded principal investigators or ACRF infrastructure personnel. For reporting purposes, the three ACRF sites and the AMF operate 24 hours per day, 7 days per week, and 52 weeks per year. Time is reported in days instead of hours. If any lost work time is incurred by any employee, it is counted as a workday loss. Table 3 reports the consecutive days since the last recordable or reportable injury or incident causing damage to property, equipment, or vehicle for the period January 1 - March 31, 2008. There were no incidents this reporting period.

54 ENVIRONMENTAL SCIENCES↗

Annual Transuranic Waste Inventory Report - 2009 (Rev. 0)

This inventory report serves to update TRU waste inventory information last reported in the ATWIR-2008 (DOE 2008a). The information contained in the CID that supports this report is the best estimate of TRU waste inventory information as of December 31, 2008, and includes waste that is emplaced in the WIPP as reported from the WWIS. The information presented in this report includes qualified rollup reports generated from the CID, as well as TRU waste characterization data obtained from the sites and reported in the WWIS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗