Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerators, Instrumentation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Stainless Steel to Titanium Bimetallic Transitions

In order to use stainless steel piping in an LCLS-II (Linac Coherent Light Source Upgrade) cryomodule, stainless steel to titanium bimetallic transitions are needed to connect the stainless steel piping to the titanium cavity helium vessel. Explosion bonded stainless steel to titanium transition pieces and bimetallic transition material samples have been tested. A sample transition tube was subjected to tests and x-ray examinations between tests. Samples of the bonded joint material were impact and tensile tested at room temperature as well as liquid helium temperature. The joint has been used successfully in horizontal tests of LCLS-II cavity helium vessels and is planned to be used in LCLS-II cryomodules. Results of material sample and transition tube tests will be presented.

43 PARTICLE ACCELERATORS↗

Beam imaging sensor

The present invention relates generally to the field of sensors for beam imaging and, in particular, to a new and useful beam imaging sensor for use in determining, for example, the power density distribution of a beam including, but not limited to, an electron beam or an ion beam. In one embodiment, the beam imaging sensor of the present invention comprises, among other items, a circumferential slit that is either circular, elliptical or polygonal in nature.

43 PARTICLE ACCELERATORS↗

Short pulse neutron generator

Short pulse neutron generators are described herein. In a general embodiment, the short pulse neutron generator includes a Blumlein structure. The Blumlein structure includes a first conductive plate, a second conductive plate, a third conductive plate, at least one of an inductor or a resistor, a switch, and a dielectric material. The first conductive plate is positioned relative to the second conductive plate such that a gap separates these plates. A vacuum chamber is positioned in the gap, and an ion source is positioned to emit ions in the vacuum chamber. The third conductive plate is electrically grounded, and the switch is operable to electrically connect and disconnect the second conductive plate and the third conductive plate. The at least one of the resistor or the inductor is coupled to the first conductive plate and the second conductive plate.

43 PARTICLE ACCELERATORS↗

The Status of the Construction of MICE Step IV

The International Muon Ionization Cooling Experiment will provide the demononstration ionization cooling. The experiment is being built in a series of Steps. Step IV, which consists of a tracking spectrometer upstream and downstream of an absorber/focus-coil module will be completed in early in 2015. In this configuration, the emittance of the muon beam upstream and downstream of the absorbed will be measured precisely allowing the emittance reduction and the factors that determine the ionization-cooling effect to be studied in detail. Each tracking spectrometer consists of a scintillating-fibre tracker placed within a 4 T field provided by the superconducting spectrometer solenoid. The muon beam is transported to the absorber/focus-coil module: a 22 liter volume of liquid hydrogen placed inside a superconducting focusing coil. The properties of lithium hydride, and possibly other absorber materials, will also be studied. All the components of Step IV have been manufactured and integration of the experiment in the MICE Hall at the Rutherford Appleton Laboratory is underway. The construction and performance of Step IV will be described. A full study of ionization cooling will be carried out with Step V of the experiment which will include a short 201 MHz linac module in which beam transport is achieved with a superconducting “coupling-coil”. The status of the preparation of the components of Step V of the experiment will be described briefly.

43 PARTICLE ACCELERATORS↗

Energy Production Demonstrator for Megawatt Proton Beams

A preliminary study of the Energy Production Demonstrator (EPD) concept - a solid heavy metal target irradiated by GeV-range intense proton beams and producing more energy than consuming - is carried out. Neutron production, fission, energy deposition, energy gain, testing volume and helium production are simulated with the MARS15 code for tungsten, thorium, and natural uranium targets in the proton energy range 0.5 to 120 GeV. This study shows that the proton energy range of 2 to 4 GeV is optimal for both a natU EPD and the tungsten-based testing station that would be the most suitable for proton accelerator facilities. Conservative estimates, not including breeding and fission of plutonium, based on the simulations suggest that the proton beam current of 1 mA will be sufficient to produce 1 GW of thermal output power with the natU EPD while supplying < 8% of that power to operate the accelerator. The thermal analysis shows that the concept considered has a problem due to a possible core meltdown; however, a number of approaches (a beam rastering, in first place) are suggested to mitigate the issue. The efficiency of the considered EPD as a Materials Test Station (MTS) is also evaluated in this study.

43 PARTICLE ACCELERATORS↗

Advanced penning ion source

This disclosure provides systems, methods, and apparatus for ion generation. In one aspect, an apparatus includes an anode, a first cathode, a second cathode, and a plurality of cusp magnets. The anode has a first open end and a second open end. The first cathode is associated with the first open end of the anode. The second cathode is associated with the second open end of the anode. The anode, the first cathode, and the second cathode define a chamber. The second cathode has an open region configured for the passage of ions from the chamber. Each cusp magnet of the plurality of cusp magnets is disposed along a length of the anode.

43 PARTICLE ACCELERATORS↗

Intensity Frontier Computing at Fermilab

The Intensity Frontier (IF) experiments at Fermilab require computing, software, data handling, and infrastructure development for detector and beamline design and to extract maximum scientific output from the data. The emphasis of computing at Fermilab for many years has been on the Tevatron collider Run 2 experiments and CMS. Using the knowledge and experience gained from those experiments as well as new computing developments, preparations for computing for IF experiments are ramping up. There are many challenges in IF computing. These include event generators and detector simulation, beamline simulation, detector design and optimization, data acquisition, data handling, data analysis, and all of the associated services required. In this presentation the computing challenges and requirements will be described and the approaches being taken to address them will be shown.

43 PARTICLE ACCELERATORS↗

Enabling Intensity and Energy Frontier Science with a Muon Accelerator Facility in the U.S.: A White Paper Submitted to the 2013 U.S. Community Summer Study of the Division of Particles and Fields of the American Physical Society

A staged approach towards muon based facilities for Intensity and Energy Frontier science, building upon existing and proposed facilities at Fermilab, is presented. At each stage, a facility exploring new physics also provides an R&D platform to validate the technology needed for subsequent stages. The envisioned program begins with nuSTORM, a sensitive sterile neutrino search which also provides precision neutrino cross-section measurements while developing the technology of using and cooling muons. A staged Neutrino Factory based upon Project X, sending beams towards the Sanford Underground Research Facility (SURF), which will house the LBNE detector, could follow for detailed exploration of neutrino properties at the Intensity Frontier, while also establishing the technology of using intense bunched muon beams. The complex could then evolve towards Muon Colliders, starting at 126 GeV with measurements of the Higgs resonance to sub-MeV precision, and continuing to multi-TeV colliders for the exploration of physics beyond the Standard Model at the Energy Frontier. An Appendix addresses specific questions raised by the Lepton Colliders subgroup of the CSS2013 Frontier Capabilities Study Group.

43 PARTICLE ACCELERATORS↗

Ultralow-dose, feedback imaging with laser-Compton X-ray and laser-Compton gamma ray sources

Ultralow-dose, x-ray or gamma-ray imaging is based on fast, electronic control of the output of a laser-Compton x-ray or gamma-ray source (LCXS or LCGS). X-ray or gamma-ray shadowgraphs are constructed one (or a few) pixel(s) at a time by monitoring the LCXS or LCGS beam energy required at each pixel of the object to achieve a threshold level of detectability at the detector. An example provides that once the threshold for detection is reached, an electronic or optical signal is sent to the LCXS/LCGS that enables a fast optical switch that diverts, either in space or time the laser pulses used to create Compton photons. In this way, one prevents the object from being exposed to any further Compton x-rays or gamma-rays until either the laser-Compton beam or the object are moved so that a new pixel location may be illumination.

43 PARTICLE ACCELERATORS↗

The International Linear Collider. A Global Project

A large, world-wide community of physicists is working to realise an exceptional physics program of energy-frontier, electron-positron collisions with the International Linear Collider (ILC). This program will begin with a central focus on high-precision and model-independent measurements of the Higgs boson couplings. This method of searching for new physics beyond the Standard Model is orthogonal to and complements the LHC physics program. The ILC at 250 GeV will also search for direct new physics in exotic Higgs decays and in pair-production of weakly interacting particles. Polarised electron and positron beams add unique opportunities to the physics reach. The ILC can be upgraded to higher energy, enabling precision studies of the top quark and measurement of the top Yukawa coupling and the Higgs self-coupling. The key accelerator technology, superconducting radio-frequency cavities, has matured. Optimised collider and detector designs, and associated physics analyses, were presented in the ILC Technical Design Report, signed by 2400 scientists. There is a strong interest in Japan to host this international effort. A detailed review of the many aspects of the project is nearing a conclusion in Japan. Now the Japanese government is preparing for a decision on the next phase of international negotiations, that could lead to a project start within a few years. The potential timeline of the ILC project includes an initial phase of about 4 years to obtain international agreements, complete engineering design and prepare construction, and form the requisite international collaboration, followed by a construction phase of 9 years.

43 PARTICLE ACCELERATORS↗

A Method to Reduce the Coherent Betatron Oscillations in a Muon g-2 Storage Ring Experiment using RF Fields

The muon $g-2$ storage-ring experiments store a beam of polarized muons in a weak focusing storage ring. As the ensemble of muons goes around the ring, their spin precesses, and when they decay through the weak interaction: $\mu^+ \rightarrow e^+ \nu_e \bar{\nu_\mu}$ the decay positrons are detected by electromagnetic calorimeters. In addition to the expected exponential decay in the positron time spectrum, the weak decay asymmetry causes a modulation in the number of positrons at the difference frequency between the spin and cyclotron frequencies, $\omega_a$. This frequency is directly proportional to the magnetic anomaly $a =(g-2)/2$, where $g$ is the gyromagnetic ratio of the muon, which is slightly greater than 2. The detector acceptance depends on the radial position of the muon decay, so the coherent betatron oscillations (CBO) of the muon bunch following injection into the storage ring amplitude modulates the measured muon signal with the frequency $\omega_{CBO}$. A new method using radio frequency (RF) electric fields has the potential to significantly decrease the beam CBO, and additionally to scrape the beam to reduce muon losses from the storage ring during the measurement period.

43 PARTICLE ACCELERATORS↗