Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAPACITY PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Southern Bhutan Ecological Forecasting Project Summary - Modeling Asian Elephant (Elephas Maximus) Habitat Suitability along the Southern Bhutan Border with NASA Earth Observations

Asian elephants (Elephas maximus) are a flagship species essential for the functioning of forest ecosystems, and they also have cultural significance in Bhutan. Elephants receive the highest legal protection as listed under Schedule I of the Bhutan Forests and Nature Conservation Act, 1995. Yet, they face threats of extinction due to poaching for ivory as well as the loss and fragmentation of their habitat. Due to the recent clearing of forests and the growing populations in these areas, there has been an increase in incidents of human-elephant conflict. These conflicts have been detrimental to farmer’s annual harvests and livelihoods and have led to retaliatory killing and injury of elephants in southern Bhutan. The DEVELOP Southern Bhutan Ecological Forecasting team partnered with the Bhutan Foundation and Bhutan Tiger Center to help address this problem. The team integrated NASA Earth observations, including Landsat 5 Thematic Mapper (TM), Landsat 8 Operational Land Imager (OLI), Terra Moderate Resolution Imaging Spectroradiometer (MODIS), and the Shuttle Radar Topography Mission (SRTM) to acquire information on land cover change and elephant habitat suitability along the southern border of Bhutan. The team utilized Esri ArcGIS Pro and Software for Assisted Habitat Modeling (SAHM) for data analysis, modeling, and visualization. The team used elephant occurrence data and environmental variables to model current habitat suitability for migrating elephant populations. This analysis provided partners with maps to inform decisions about the placement and conservation of elephant corridors and helped build their capacity to use satellite data for future studies and project planning.

DEVELOP Project Summary↗

Accuracy and Validation of Measured and Modeled Data for Distributed PV Interconnection and Control

The distribution grid is changing to become an active resource with complex modeling needs. The new active distribution grid will, within the next ten years, contain a complex mix of load, generation, storage and automated resources all operating with different objectives on different time scales from each other and requiring detailed analysis. Electrical analysis tools that are used to perform capacity and stability studies have been used for transmission system planning for many years. In these tools, the distribution grid was considered a load and its details and physical components were not modeled. The increase in measured data sources can be utilized for better modeling, but also control of distributed energy resources (DER). The utilization of these sources and advanced modeling tools will require data management, and knowledgeable users. Each of these measurement and modeling devices have accuracy constraints, which will ultimately define their future ability to be planned and controlled. This paper discusses the importance of measured data accuracy for inverter control, interconnection and planning tools and proposes ranges of control accuracy needed to satisfy all concerns based on the present grid infrastructure.

Stewart, Emma↗

PR100 One-Year Progress Update: Preliminary Modeling Results and High-Resolution Solar and Wind Data Sets

The Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) is a 2-year study by the U.S. Department of Energy's (DOE's) Grid Deployment Office and six national laboratories to comprehensively analyze stakeholder-driven pathways to Puerto Rico's clean energy future. In Year 1 of the study, the PR100 team rigorously modeled and analyzed scenarios that meet Puerto Rico's renewable energy targets and achieve short-term recovery goals and long-term energy resilience. This presentation will be showcased in the form of a public webinar, which summarizes PR100 progress in Year 1, provides considerations that can inform potential funding and implementation decisions by key federal and local agencies and stakeholders. The presentation follows the publication in July 2022 of a PR100 Six-Month Progress Update (in English and Spanish), as well as public webinars in February 2022 to kick off the study and in July 2022 to present the 6-month update. A final written report and web-based visuals will be published in late 2023. All publications and public events associated with the study will be available in Spanish and English. This report is also available in Spanish: https://www.nrel.gov/docs/fy23osti/85201.pdf.

100%↗

ORCA Software Quality Assurance Plan

This document summarizes the software quality assurance (SQA) planning activities conducted for the Optimization of Real-time Capacity Allocation (ORCA) plug-in. It outlines the approaches and document structures adopted to maintain high standards of software quality. It also gives examples of certain SQA documents.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Demand Capacity Balancing at Vertiports for Initial Strategic Conflict Management of Urban Air Mobility Operations

Demand Capacity Balancing (DCB) can be applied in strategic conflict management for safe Urban Air Mobility (UAM) operations. Even when the operational tempo is low, traffic demand can locally exceed the capacity at airspace resources like vertiports. This paper proposes a DCB algorithm to manage the UAM traffic demand strategically, given the capacity at vertiports. The DCB algorithm is evaluated with traffic scenarios at Dallas/Fort Worth urban area in terms of various metrics such as demand distribution changes, pre-departure delay, and the number of simultaneous operations in the air. With the same experiment setup, more extended studies are also conducted to investigate how the UAM flight scheduling based on the DCB algorithm is affected by various conditions that can occur in a practical UAM environment, including vertiport capacity changes, a slot size parameter in capacity constraint, differences in operational policy between operators like lead time for flight plan submission and cruise flight speed, and uncertainties in actual departure and arrival times.

Urban Air Mobility↗

FY 2013 Site Sustainability Plan

LANL prepared the fiscal year (FY) 2013 Site Sustainability Plan to describe progress towards the goals established in the DOE Strategic Sustainability Performance Plan. Per the requirements of DOE Order 436.1 Departmental Sustainability , Los Alamos National Laboratory (LANL) uses its ISO 14001:2004 certified Environmental Management System (EMS) to establish objectives to improve compliance, reduce environmental impacts, increase operational capacity, and meet long term sustainability goals. The goals of the 2012 Site Sustainability Plan are fully integrated into LANL’s institutional environmental objectives under the EMS and its Long Term Strategy for Environmental Stewardship & Sustainability.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

AztechSat-1, a First Collaborative CubeSat Between NASA and Mexico

An international collaboration program for capacity building in space technology is being established between NASA and the Mexican Space Agency (AEM). Its objective is to develop a series of CubeSats collaboratively in a way that benefits both agencies. For AEM, this experience will support the development of human capital required for its space program. This project provides an opportunity for NASA future missions to benefit from commercially available technologies demonstrated in space. AEM was recently created by the Mexican Government to use and develop space technology in Mexico. Current AEM plans call for having the capability of developing its own communication satellites by 2030, so the need for having a Mexican cadre of space experts is mandatory. The program will start with the development and launching of AztechSat-1, the first AEM CubeSat project to be deployed from the International Space Station (ISS). Several public Mexican universities will participate in this project to demonstrate GlobalStar, a satellite communications provider using a constellation of LEO satellites, as an option for small satellite missions. AztechSat-1 mission objectives are:(1) Develop a flight ready CubeSat for deployment from the ISS; (2) Demonstrate GlobalStar´s Network as a method to advance communications in CubeSat missions. AztechSat-1 is envisioned as a 1U CubeSat and will be designed and constructed by Mexican graduate students from two major universities in Mexico: UNAM and IPN. The students will be mentored and supervised by researchers from NASA Ames Research Center (NARC). Flight acceptance tests are going to be done both at Mexican university labs as well as at NARC. Funding for the project will be provided concurrently by AEM, the Mexican participating universities, and other Mexican entities. The development of AztechSat-1 will emphasize the transfer of knowledge in space mission analysis and design, flight acceptance testing and other areas of space technology which are not well developed in Mexico yet. Mexican students will benefit from their mentoring from NASA researchers and will provide a multiplier effect in the development of the next generation of Mexican aerospace engineers. AztechSat-1 will be developed in a period of twelve months and will be launched by late 2015. AztechSat´s success will define the future of collaboration between NASA and AEM in capacity building. A plan for developing a series of AztechSat’s in a one per year basis, with increasing capabilities and complexity is currently being negotiated between NASA an AEM.

Martinez, Andres↗

Supporting Resource Adequacy via the ReEDS-India Model [Slides]

ReEDS-India is an open-access tool for mid- and long-term capacity expansion modeling that finds the mix of generation, transmission, and storage technologies that meet the anticipated requirements of the electric sector at least cost.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

State Requirements for Electric Distribution System Planning

Utilities have conducted distribution planning since they first began building and operating electricity systems. But filing these plans for regulatory and stakeholder review is a relatively recent phenomenon. This report summarizes legislative and regulatory requirements for regulated electric utilities to file some type of distribution system plan in 20 U.S. jurisdictions. Some plans focus on expedited cost recovery for certain types of distribution system improvements; other plans focus on investments for grid modernization or distributed energy resources. Increasingly, states are adopting requirements for Integrated Distribution Plans. Such plans provide holistic grid investment strategies that address state and local policies and increasing complexity at the grid edge. The report covers the following topics for distribution system plans, highlighting advanced practices: -State goals and objectives -Procedural requirements -Forecasting loads and distributed energy resources -Hosting capacity analysis -Baseline information requirements -Grid modernization strategy -Grid needs assessment -Non-wires solutions -Reliability and resilience analyses -Stakeholder engagement -Equity -Pilots -Coordination with other planning processes The report includes links to legislation; regulatory requirements, proceedings, and orders; and filed utility plans. The U.S. Department of Energy’s Office of Electricity provided funding support.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impacts of Spatial Resolution in a High-Fidelity Capacity Expansion Model: An ERCOT Case Study

Capacity expansion models are important tools in examining the evolution of the electric power sector. Embedded in these tools are many modeling choices with consequential impacts on computational burden and associated analysis. In this study, we adjust the spatial resolution of the Regional Energy Deployment System (ReEDS) to understand the implications of higher-fidelity modeling on energy system projections and model solve times. The native ReEDS regions capture the contiguous United States in 134 balancing areas whereas the regions in the higher-resolution version are defined by over 3,000 U.S. counties. Using both resolutions, we conduct a case study of the Texas Interconnection (The Electric Reliability Council of Texas [ERCOT]) to explore differences in model projections and to inform appropriate applications of high spatial resolution in a large-scale, applied capacity expansion model.

county↗

Accounting for Depletion of Oil and Gas Resources in Malaysia

Since oil and gas are non-renewable resources, it is important to identify the extent to which they have been depleted. Such information will contribute to the formulation and evaluation of appropriate sustainable development policies. This paper provides an assessment of the changes in the availability of oil and gas resources in Malaysia by first compiling the physical balance sheet for the period 2000-2007, and then assessing the monetary balance sheets for the said resource by using the Net Present Value method. Our findings show serious reduction in the value of oil reserves from 2001 to 2005, due to changes in crude oil prices, and thereafter the depletion rates decreased. In the context of sustainable development planning, albeit in the weak sustainability sense, it will be important to ascertain if sufficient reinvestments of the estimated resource rents in related or alternative capitals are being attempted by Malaysia. For the study period, the cumulative resource rents were to the tune of RM61 billion. Through a depletion or resource rents policy, the estimated quantum may guide the identification of a reinvestment threshold (after considering needed capital investment for future development of the industry) in light of ensuring the future productive capacity of the economy at the time when the resource is exhausted.

02 PETROLEUM↗

Summary Report of Comprehensive Laboratory Testing to Establish the Effectiveness of Proposed Treatment Methods for Unremediated and Remediated Nitrate Salt Waste Streams

The inadvertent creation of transuranic waste carrying hazardous waste codes D001 and D002 requires the treatment of the material to eliminate the hazardous characteristics and allow its eventual shipment and disposal at the Waste Isolation Pilot Plant (WIPP). This report documents the effectiveness of two treatment methods proposed to stabilize both the unremediated and remediated nitrate salt waste streams (UNS and RNS, respectively) at Los Alamos National Laboratory (LANL). The two technologies include the addition of zeolite (with and without the addition of water as a processing aid) and cementation. Surrogates were developed to evaluate both the solid and liquid fractions expected from parent waste containers, and both the solid and liquid fractions were tested. Both technologies are shown to be effective at eliminating the characteristic of ignitability (D001), and the addition of zeolite was determined to be effective at eliminating corrosivity (D002), with the preferred option1 of adding zeolite currently planned for implementation at LANL’s Waste Characterization, Reduction, and Repackaging Facility (WCRRF). The course of this work verified the need to evaluate and demonstrate the effectiveness of the proposed remedy for debris material, if required. The evaluation determined that WypAlls, cheesecloth, and Celotex absorbed with saturated nitrate salt solutions exhibit the ignitability characteristic (all other expected debris is not classified as ignitable). Finally, liquid surrogates containing saturated nitrate salts did not exhibit the characteristic of ignitability in their pure form (those neutralized with Kolorsafe and mixed with sWheat did exhibit D001). Sensitivity testing and an analysis were conducted to evaluate the waste form for reactivity. Tests included subjecting surrogate material to mechanical impact, friction, electrostatic discharge and thermal insults. The testing confirmed that the waste does not exhibit the characteristic of reactivity (D003). Follow-on testing was conducted to demonstrate the effectiveness of zeolite stabilization for ignitable WypAll and cheesecloth debris and additional nitrate salt solutions (those exhibiting the oxidizer characteristic) to demonstrate the effectiveness of the remedy. Follow-on testing also included testing of surrogate materials containing Waste Lock 770, which is present in four of the RNS containers, and potential items of debris such as plywood and Celotex material. Testing to evaluate the effectiveness of the remedy was performed using the specific remediation processes that are planned for use at the WCRRF. Finally, testing was also performed to evaluate the holding capacity of zeolite using a highly acidic surrogate solution and to characterize the composition of gases generated during mixing of zeolite with surrogate solutions. All these tests demonstrated the effectiveness of adding zeolite as the planned remedy.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-Objective Multi-User Scheduling for Space Science Missions

We have developed an architecture called MUSE (Multi-User Scheduling Environment) to enable the integration of multi-objective evolutionary algorithms with existing domain planning and scheduling tools. Our approach is intended to make it possible to re-use existing software, while obtaining the advantages of multi-objective optimization algorithms. This approach enables multiple participants to actively engage in the optimization process, each representing one or more objectives in the optimization problem. As initial applications, we apply our approach to scheduling the James Webb Space Telescope, where three objectives are modeled: minimizing wasted time, minimizing the number of observations that miss their last planning opportunity in a year, and minimizing the (vector) build up of angular momentum that would necessitate the use of mission critical propellant to dump the momentum. As a second application area, we model aspects of the Cassini science planning process, including the trade-off between collecting data (subject to onboard recorder capacity) and transmitting saved data to Earth. A third mission application is that of scheduling the Cluster 4-spacecraft constellation plasma experiment. In this paper we describe our overall architecture and our adaptations for these different application domains. We also describe our plans for applying this approach to other science mission planning and scheduling problems in the future.

science planning↗

Identifying Robust Decarbonization Pathways for the Western U.S. Electric Power System Under Deep Climate Uncertainty

Climate change threatens the resource adequacy of future power systems. Existing research and practice lack frameworks for identifying decarbonization pathways that are robust to climate-related uncertainty. We create such an analytical framework, then use it to assess the robustness of alternative pathways to achieving 60% emissions reductions from 2022 levels by 2040 for the Western U.S. power system. Our framework integrates power system planning and resource adequacy models with 100 climate realizations from a large climate ensemble. Climate realizations drive electricity demand; thermal plant availability; and wind, solar, and hydropower generation. Among five initial decarbonization pathways, all exhibit modest to significant resource adequacy failures under climate realizations in 2040, but certain pathways experience significantly less resource adequacy failures at little additional cost relative to other pathways. By identifying and planning for an extreme climate realization that drives the largest resource adequacy failures across our pathways, we produce a new decarbonization pathway that has no resource adequacy failures under any climate realizations. This new pathway is roughly 5% more expensive than other pathways due to greater capacity investment, and shifts investment from wind to solar and natural gas generators. Our analysis suggests modest increases in investment costs can add significant robustness against climate change in decarbonizing power systems. Our framework can help power system planners adapt to climate change by stress testing future plans to potential climate realizations, and offers a unique bridge between energy system and climate modeling.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Planning Amidst Uncertainty: Identifying Core CCS Infrastructure Robust to Storage Uncertainty

Carbon Capture and Storage (CCS) is a critical technology for reducing anthropogenic CO2 emissions, but its large-scale deployment is complicated by uncertainties in geological storage performance. These uncertainties pose significant financial and operational risks, as underperforming storage sites can lead to costly infrastructure modifications, inefficient pipeline routing, and economic shortfalls. To address this challenge, we propose a novel optimization workflow that is based on mixed-integer linear programming and explicitly integrates probabilistic modeling of storage uncertainty into CCS infrastructure design. This workflow generates multiple infrastructure scenarios by sampling storage capacity distributions, optimally solving each scenario using a mixed-integer linear programming model, and aggregating results into a heatmap to identify core infrastructure components that have a low likelihood of underperforming. A risk index parameter is introduced to balance trade-offs between cost, CO2 processing capacity, and risk of underperformance, allowing stakeholders to quantify and mitigate uncertainty in CCS planning. Applying this workflow to a CCS dataset from the US Department of Energy’s Carbon Utilization and Storage Partnership project reveals key insights into infrastructure resilience. Reducing the risk index from 15% to 0% is observed to lead to an 83.7% reduction in CO2 processing capacity and a 77.1% decrease in project profit, quantifying the trade-off between risk tolerance and project performance. Furthermore, our results highlight critical breakpoints, where small adjustments in the risk index produce disproportionate shifts in infrastructure performance, providing actionable guidance for decision-makers. Unlike prior approaches that aimed to cheaply repair underperforming infrastructure, our workflow constructs robust CCS networks from the ground up, ensuring cost-effective infrastructure under storage uncertainty. These findings demonstrate the practical relevance of incorporating uncertainty-aware optimization into CCS planning, equipping decision-makers with a tool to make informed project planning decisions.

Olson, Daniel↗

High electrification futures: Impacts to the U.S. bulk power system

Electrification of end-use technologies could have important implications for bulk power sector planning, operations, and impacts. By combining previously-defined electrification scenarios with capacity expansion modeling, we evaluate the potential challenges and opportunities associated with electrification. Our scenario analysis reveals that electrification reduces energy consumption and air emissions from across the energy sector, and its impacts on energy system costs are modest due, in part, to the abundance of low-cost resources in the United States.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Representation of Solar Capacity Value in the ReEDS Capacity Expansion Model

An important issue for electricity system operators is the estimation of renewables' capacity contributions to reliably meeting system demand, or their capacity value. While the capacity value of thermal generation can be estimated easily, assessment of wind and solar requires a more nuanced approach due to the resource variability. Reliability-based methods, particularly assessment of the Effective Load-Carrying Capacity, are considered to be the most robust and widely-accepted techniques for addressing this resource variability. This report compares estimates of solar PV capacity value by the Regional Energy Deployment System (ReEDS) capacity expansion model against two sources. The first comparison is against values published by utilities or other entities for known electrical systems at existing solar penetration levels. The second comparison is against a time-series ELCC simulation tool for high renewable penetration scenarios in the Western Interconnection. Results from the ReEDS model are found to compare well with both comparisons, despite being resolved at a super-hourly temporal resolution. Two results are relevant for other capacity-based models that use a super-hourly resolution to model solar capacity value. First, solar capacity value should not be parameterized as a static value, but must decay with increasing penetration. This is because -- for an afternoon-peaking system -- as solar penetration increases, the system's peak net load shifts to later in the day -- when solar output is lower. Second, long-term planning models should determine system adequacy requirements in each time period in order to approximate LOLP calculations. Within the ReEDS model we resolve these issues by using a capacity value estimate that varies by time-slice. Within each time period the net load and shadow price on ReEDS's planning reserve constraint signals the relative importance of additional firm capacity.

14 SOLAR ENERGY↗