Measure Guideline: High Efficiency Natural Gas Furnaces

This Measure Guideline covers installation of high-efficiency gas furnaces. Topics covered include when to install a high-efficiency gas furnace as a retrofit measure, how to identify and address risks, and the steps to be used in the selection and installation process. The guideline is written for Building America practitioners and HVAC contractors and installers. It includes a compilation ofinformation provided by manufacturers, researchers, and the Department of Energy as well as recent research results from the Partnership for Advanced Residential Retrofit (PARR) Building America team.

03 NATURAL GAS↗

Standard Measurement and Verification Plan for Lighting Retrofit Projects for Buildings and Building Sites

This document provides a framework for standard measurement and verification (M&V) of lighting retrofit and replacement projects. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for lighting projects. It includes details on all aspects of effectively measuring light levels of existing and post-retrofit projects, conducting power measurement, and developing cost-effectiveness analysis. This framework M&V plan also enables consistent comparison among similar lighting projects, and may be used to develop M&V plans for non--lighting-technology retrofits and new installations.

Richman, Eric E.↗

Evaluation of Recent Trailer Contamination and Supersack Integrity Issues

During the period from fiscal year (FY) 2009 to FY 2011, there were a total of 21 incidents involving radioactively contaminated shipment trailers and 9 contaminated waste packages received at the Nevada National Security Site (NNSS) Area 5 Radioactive Waste Management Site (RWMS). During this time period, the EnergySolutions (ES) Clive, Utah, disposal facility had a total of 18 similar incidents involving trailer and package contamination issues. As a result of the increased occurrence of such incidents, DOE Environmental Management Headquarters (EM/HQ) Waste Management organization (EM-30) requested that the Energy Facility Contractors’ Group (EFCOG) Waste Management Working Group (WMWG) conduct a detailed review of these incidents and report back to EM-30 regarding the results of this review, including providing any recommendations formulated as a result of the evaluation of current site practices involving handling and management of radioactive material and waste shipments.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Standard Work Specifications for Single-Family Home Energy Upgrades Summary (Fact Sheet)

The U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) and numerous industry stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a unique source for defining high-quality home energy upgrades,establishing clear expectations for homeowners, contractors, trainers, workers, program administrators, and organizations that provide financing for energy upgrades.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Report for Grant R021597

The program was under the supervision of the Nevada State Office of Energy (NSOE) with sub-contractors being the Nevada Division of Minerals (NDOM), the Great Basin Center for Geothermal Energy (GBCGE) and the Renewable Energy and Energy Conservation Taskforce (REECT). The NDOM grant was for $40,560 to develop a trade mission for Nevada Native American tribes. The trade mission was a two day workshop and field trip held on October 11 & 12, 2005 with 44 in attendance representing 12 tribes. Per-diem allowances were made so the tribal groups could attend the workshop. The format followed similar trade missions done for Alaska, Idaho and Colorado. In addition to the trade mission, funding was used to allow 3 members of the geothermal working group to attend the Geothermal Research Council annual meeting and the Geopowering the West states meeting that followed.

15 GEOTHERMAL ENERGY↗

DEVELOPMENT OF A SOFTWARE DESIGN TOOL FOR HYBRID SOLAR-GEOTHERMAL HEAT PUMP SYSTEMS IN HEATING- AND COOLING-DOMINATED BUILDINGS

This project provides an easy-to-use, menu-driven, software tool for designing hybrid solar-geothermal heat pump systems (GHP) for both heating- and cooling-dominated buildings. No such design tool currently exists. In heating-dominated buildings, the design approach takes advantage of glazed solar collectors to effectively balance the annual thermal loads on the ground with renewable solar energy. In cooling-dominated climates, the design approach takes advantage of relatively low-cost, unglazed solar collectors as the heat rejecting component. The primary benefit of hybrid GHPs is the reduced initial cost of the ground heat exchanger (GHX). Furthermore, solar thermal collectors can be used to balance the ground loads over the annual cycle, thus making the GHX fully sustainable; in heating-dominated buildings, the hybrid energy source (i.e., solar) is renewable, in contrast to a typical fossil fuel boiler or electric resistance as the hybrid component; in cooling-dominated buildings, use of unglazed solar collectors as a heat rejecter allows for passive heat rejection, in contrast to a cooling tower that consumes a significant amount of energy to operate, and hybrid GHPs can expand the market by allowing reduced GHX footprint in both heating- and cooling-dominated climates. The design tool allows for the straight-forward design of innovative GHP systems that currently pose a significant design challenge. The project lays the foundations for proper and reliable design of hybrid GHP systems, overcoming a series of difficult and cumbersome steps without the use of a system simulation approach, and without an automated optimization scheme. As new technologies and design concepts emerge, sophisticated design tools and methodologies must accompany them and be made usable for practitioners. Lack of reliable design tools results in reluctance of practitioners to implement more complex systems. A menu-driven software tool for the design of hybrid solar GHP systems is provided that is based on mathematically robust, validated models. An automated optimization tool is used to balance ground loads and incorporated into the simulation engine. With knowledge of the building loads, thermal properties of the ground, the borehole heat exchanger configuration, the heat pump peak hourly and seasonal COP for heating and cooling, the critical heat pump design entering fluid temperature, and the thermal performance of a solar collector, the total GHX length can be calculated along with the area of a supplemental solar collector array and the corresponding reduced GHX length. An economic analysis module allows for the calculation of the lowest capital cost combination of solar collector area and GHX length. ACKNOWLEDGMENTS This project was funded by the United States Department of Energy DOE-DE-FOA-0000116, Recovery Act Geothermal Technologies Program: Ground Source Heat Pumps. The lead contractor, The University of Hartford, was supported by The University of Dayton, and the Oak Ridge National Laboratories. All funding and support for this project as well as contributions of graduate and undergraduate students from the contributing institutions are gratefully acknowledged.

14 SOLAR ENERGY↗

Supercritical CO 2 recompression Brayton cycle: completed assembly description

Through multi-year funding from DOE-NE, Sandia National Labs supercritical carbon dioxide (SCO 2 ) closed Brayton cycle (CBC) research and development team have recently overseen the completion of the SCO 2 CBC recompression test assembly (TA), and delivery from the development contractor’s facility to Sandia, Albuquerque. The primary components of the completed TA include two turbo alternator-compressors and associated motor/controllers, three printed circuit heat exchangers, and six shell-and-tube heaters and associated controllers. Principal supporting components include a cooling tower, electricity-dissipating load bank, and leakage flow management equipment. With this milestone completed, significant increase in CBC R&D is anticipated with the objective of advancing the technology readiness level of components seen by industry as immature. This report presents detailed descriptions of all components and operating software necessary to operate the recompression CBC.

Pasch, James Jay↗

Strategy Guideline: Mitigation of Retrofit Risk Factors

The Alliance for Residential Building Innovation (ARBI) is currently developing strategies designed to promote and achieve increased energy savings and promote upgrades in the residential retrofit sector. These strategies are targeted to retrofit program managers, retrofit contractors, policy makers, academic researchers, and non-governmental organizations. This report focuses on four key areas to promote home energy upgrades: fostering accurate energy savings projections; understanding consumer perceptions for energy savings; measuring energy savings, and ensuring quality control for retrofit installations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Independent Verification Survey Report for Zone 1 of the East Tennessee Technology Park in Oak Ridge, Tennessee

Oak Ridge Associated Universities (ORAU) conducted in-process inspections and independent verification (IV) surveys in support of DOE's remedial efforts in Zone 1 of East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Inspections concluded that the remediation contractor's soil removal and survey objectives were satisfied and the dynamic verification strategy (DVS) was implemented as designed. Independent verification (IV) activities included gamma walkover surveys and soil sample collection/analysis over multiple exposure units (EUs).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Peak Dose Assessment for Proposed DOE-PPPO Authorized Limits

The Oak Ridge Institute for Science and Education (ORISE), a U.S. Department of Energy (DOE) prime contractor, was contracted by the DOE Portsmouth/Paducah Project Office (DOE-PPPO) to conduct a peak dose assessment in support of the Authorized Limits Request for Solid Waste Disposal at Landfill C-746-U at the Paducah Gaseous Diffusion Plant (DOE-PPPO 2011a). The peak doses were calculated based on the DOE-PPPO Proposed Single Radionuclides Soil Guidelines and the DOE-PPPO Proposed Authorized Limits (AL) Volumetric Concentrations available in DOE-PPPO 2011a. This work is provided as an appendix to the Dose Modeling Evaluations and Technical Support Document for the Authorized Limits Request for the C-746-U Landfill at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky (ORISE 2012). The receptors evaluated in ORISE 2012 were selected by the DOE-PPPO for the additional peak dose evaluations. These receptors included a Landfill Worker, Trespasser, Resident Farmer (onsite), Resident Gardener, Recreational User, Outdoor Worker and an Offsite Resident Farmer. The RESRAD (Version 6.5) and RESRAD-OFFSITE (Version 2.5) computer codes were used for the peak dose assessments. Deterministic peak dose assessments were performed for all the receptors and a probabilistic dose assessment was performed only for the Offsite Resident Farmer at the request of the DOE-PPPO. In a deterministic analysis, a single input value results in a single output value. In other words, a deterministic analysis uses single parameter values for every variable in the code. By contrast, a probabilistic approach assigns parameter ranges to certain variables, and the code randomly selects the values for each variable from the parameter range each time it calculates the dose (NRC 2006). The receptor scenarios, computer codes and parameter input files were previously used in ORISE 2012. A few modifications were made to the parameter input files as appropriate for this effort. Some of these changes included increasing the time horizon beyond 1,050 years (yr), and using the radionuclide concentrations provided by the DOE-PPPO as inputs into the codes. The deterministic peak doses were evaluated within time horizons of 70 yr (for the Landfill Worker and Trespasser), 1,050 yr, 10,000 yr and 100,000 yr (for the Resident Farmer [onsite], Resident Gardener, Recreational User, Outdoor Worker and Offsite Resident Farmer) at the request of the DOE-PPPO. The time horizons of 10,000 yr and 100,000 yr were used at the request of the DOE-PPPO for informational purposes only. The probabilistic peak of the mean dose assessment was performed for the Offsite Resident Farmer using Technetium-99 (Tc-99) and a time horizon of 1,050 yr. The results of the deterministic analyses indicate that among all receptors and time horizons evaluated, the highest projected dose, 2,700 mrem/yr, occurred for the Resident Farmer (onsite) at 12,773 yr. The exposure pathways contributing to the peak dose are ingestion of plants, external gamma, and ingestion of milk, meat and soil. However, this receptor is considered an implausible receptor. The only receptors considered plausible are the Landfill Worker, Recreational User, Outdoor Worker and the Offsite Resident Farmer. The maximum projected dose among the plausible receptors is 220 mrem/yr for the Outdoor Worker and it occurs at 19,045 yr. The exposure pathways contributing to the dose for this receptor are external gamma and soil ingestion. The results of the probabilistic peak of the mean dose analysis for the Offsite Resident Farmer indicate that the average (arithmetic mean) of the peak of the mean doses for this receptor is 0.98 mrem/yr and it occurs at 1,050 yr. This dose corresponds to Tc-99 within the time horizon of 1,050 yr.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dose Modeling Evaluations and Technical Support Document For the Authorized Limits Request for the DOE-Owned Property Outside the Limited Area, Paducah Gaseous Diffusion Plant Paducah, Kentucky

Environmental assessments and remediation activities are being conducted by the U.S. Department of Energy (DOE) at the Paducah Gaseous Diffusion Plant (PGDP), Paducah, Kentucky. The Oak Ridge Institute for Science and Education (ORISE), a DOE prime contractor, was contracted by the DOE Portsmouth/Paducah Project Office (DOE-PPPO) to conduct radiation dose modeling analyses and derive single radionuclide soil guidelines (soil guidelines) in support of the derivation of Authorized Limits (ALs) for "DOE-Owned Property Outside the Limited Area"; ("Property") at the PGDP. The ORISE evaluation specifically included the area identified by DOE restricted area postings (public use access restrictions) and areas licensed by DOE to the West Kentucky Wildlife Management Area (WKWMA). The licensed areas are available without restriction to the general public for a variety of (primarily) recreational uses. Relevant receptors impacting current and reasonably anticipated future use activities were evaluated. In support of soil guideline derivation, a Conceptual Site Model (CSM) was developed. The CSM listed radiation and contamination sources, release mechanisms, transport media, representative exposure pathways from residual radioactivity, and a total of three receptors (under present and future use scenarios). Plausible receptors included a Resident Farmer, Recreational User, and Wildlife Worker. single radionuclide soil guidelines (outputs specified by the software modeling code) were generated for three receptors and thirteen targeted radionuclides. These soil guidelines were based on satisfying the project dose constraints. For comparison, soil guidelines applicable to the basic radiation public dose limit of 100 mrem/yr were generated. Single radionuclide soil guidelines from the most limiting (restrictive) receptor based on a target dose constraint of 25 mrem/yr were then rounded and identified as the derived soil guidelines. An additional evaluation using the derived soil guidelines as inputs into the code was also performed to determine the maximum (peak) dose for all receptors. This report contains the technical basis in support of the DOE's derivation of ALs for the "Property"; A complete description of the methodology, including an assessment of the input parameters, model inputs, and results is provided in this report. This report also provides initial recommendations on applying the derived soil guidelines.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Independent Verification Survey Summary and Results for the Argonne National Laboratory Building 330 Project Footprint, Argonne, Illinois (Final Report)

ORISE conducted onsite verification activities of the Building 330 project footprint during the period of June 6 through June 7, 2011. The verification activities included technical reviews of project documents, visual inspections, radiation surface scans, and sampling and analysis. The draft verification report was issued in July 2011 with findings and recommendations. The contractor performed additional evaluations and remediation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Technical Assessment of Current Water Policy Boundaries at U.S. Department of Energy, Paducah Gaseous Diffusion Plant, Paducah, Kentucky

In 1988, groundwater contaminated with trichloroethene (TCE) and technetium-99 (Tc-99) was identified in samples collected from residential water wells withdrawing groundwater from the Regional Gravel Aquifer (RGA) north of the Paducah Gaseous Diffusion Plant (PGDP) facility. In response, the U.S. Department of Energy (DOE) provided temporary drinking water supplies to approximately 100 potentially affected residents by initially supplying bottled water, water tanks, and water-treatment systems, and then by extending municipal water lines, all at no cost, to those persons whose wells could be affected by contaminated groundwater. The Water Policy boundary was established in 1993. In the Policy, DOE agreed to pay the reasonable monthly cost of water for homes and businesses and, in exchange, many of the land owners signed license agreements committing to cease using the groundwater via rural water wells. In 2012, DOE requested that Oak Ridge Associated Universities (ORAU), managing contractor of Oak Ridge Institute for Science and Education (ORISE), provide an independent assessment of the quality and quantity of the existing groundwater monitoring data and determine if there is sufficient information to support a modification to the boundary of the current Water Policy. As a result of the assessment, ORAU concludes that sufficient groundwater monitoring data exists to determine that a shrinkage and/or shift of the plume(s) responsible for the initial development of this policy has occurred. Specifically, there is compelling evidence that the TCE plume is undergoing shrinkage due to natural attenuation and associated degradation. The plume shrinkage (and migration) has also been augmented in local areas where large volumes of groundwater were recovered by pump-and treat remedial systems along the eastern and western boundaries of the Northwest Plume, and in other areas where pump-and-treat systems have been deployed by DOE to remove source contaminants. The available evidence supports adjusting the western and northwestern Water Policy boundary. Based on the historical and modeled hydrogeological data reflecting past flow and plume attenuation, along with associated plume migration toward the northeast, the establishment of a new boundary along the westernmost margin of the earliest indication of the TCE plume is proposed and justified on hydrogeological grounds. Approximately 30% of the original area would remain within the adjusted Water Policy area west and northwest of the PGDP facility. This modification would release about 70% of the area, although individual properties would overlap the new boundary.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Los Alamos National Laboratory Impacts and Investments in Taos County

Taos County is home to 432 LANL employees and contractors. LANL's estimated economic impact in Taos County in FY09 was $34M (based on employee salaries and benefits, indirect and induced impacts, and retirement benefits as determined in a study conducted by the University of New Mexico's Bureau of Business and Economic Research). Taos is one of seven northern New Mexico counties identified in the Lab's maintenance and operations contract with NNSA that is targeted for education, economic development, and charitable giving programs through the LANS, LLC Community Commitment Plan.

99 GENERAL AND MISCELLANEOUS↗

Los Alamos National Laboratory Impacts and Investments in Santa Fe County

Santa Fe County is home to 2,357 LANL employees and contractors. LANL's estimated economic impact in Santa Fe County in FY09 was $\$$672M (based on employee salaries and benefits, indirect and induced impacts, and retirement benefits as determined in a study conducted by the University of New Mexico's Bureau of Business and Economic Research). In FY10, LANL purchased $\$$26,448,987 in products and services from Santa Fe County businesses. Santa Fe is one of seven northern New Mexico counties identified in the Lab's maintenance and operations contract with NNSA that is targeted for education, economic development, and charitable giving programs through the LANS, LLC Community Commitment Plan.

99 GENERAL AND MISCELLANEOUS↗

LANL SAVY-4000 Field Surveillance Plan

The Packaging Surveillance Program section of the DOE M 441.1-1, Nuclear Material Packaging Manual (DOE, 2008) requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” This report defines the near-term field surveillance plan for SAVY-4000 containers as required by the Manual. The long-term surveillance plan will be based on the results of the first several years of surveillance and the results of the lifetime extension studies.

42 ENGINEERING↗

Expert Meeting Report: Energy Savings You Can Bank On

In October 2011, ARBI organized and conducted an Experts' Meeting on the topic of performance guarantees and financing vehicles for Energy Efficiency Upgrades. The meeting brought together technical, policy, and financial experts, including researchers, experienced installation contractors, and innovative energy business leaders, in order to discuss the opportunities and challenges for the energy efficiency upgrade industry to increase market uptake of Home Energy Upgrades (HEUs) through innovative offerings, such as performance guarantees. The meeting had several primary goals. First, it sought to understand how other industries have developed successful models for financing renewable energy installations while providing performance guarantees. This has been most recently demonstrated by the solar leasing industry. Second, the meeting explored the applicability of such business models to the energy efficiency upgrade industry. Third, the meeting sought to identify technical impediments to performance guarantees for energy efficiency retrofits. Fourth, the meeting sought to provide a common framework for these goals within the context of current financing mechanisms for energy efficiency upgrades.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Sulfur Polymer Stabilization/Solidification Treatability Study of Mercury Contaminated Soil from the Y-12 Site

As a result of past operations, the Department of Energy’s (DOE) Oak Ridge Y-12 National Security Complex (Y-12 Plant) has extensive mercury-contamination in building structures, soils, storm sewer sediments, and stream sediments, which are a source of pollution to the local ecosystem. Because of mercury’s toxicity and potential impacts on human health and the environment, DOE continues to investigate and implement projects to support the remediation of the Y-12 site. URS and #9122;CH2M Oak Ridge LLC (UCOR) under its prime contract with DOE has cleanup responsibilities on the DOE Oak Ridge Reservation and is investigating potential mercury-contaminated soil treatment technologies through an agreement with Babcock and Wilcox (B and W) Y-12, the Y-12 operating contractor to DOE. As part of its investigations, UCOR has subcontracted with Brookhaven National Laboratory (BNL) to conduct laboratory-scale studies evaluating the applicability of the Sulfur Polymer Stabilization/Solidification (SPSS) process using surrogate and actual mixed waste Y-12 soils containing mercury (Hg) at 135, 2,000, and 10,000 ppm. SPSS uses a thermoplastic sulfur binder to convert Hg to stable mercury sulfide (HgS) and solidifies the chemically stable product in a monolithic solid final waste form to reduce dispersion and permeability. Formulations containing 40 – 60 dry wt% Y-12 soil were fabricated and samples were prepared in triplicate for Environmental Protection Agency Toxicity Characteristic Leaching Procedure (TCLP) testing by an independent laboratory. Those containing 50 and 60 wt% soil easily met the study criteria for maximum allowable Hg concentrations (47 and 1 ppb, respectively compared with the TCLP limit of 200 ppb Hg). The lowest waste loading of 40 wt% yielded TCLP Hg concentrations slightly higher (240 ppb) than the allowable limit. Since the Y-12 soil tended to form clumps, the improved leaching at higher waste loadings was probably due to reduction in particle size from friction of the soil mixing, which creates more surface area for chemical conversion. This was corroborated by the fact that the same waste loading pre-treated by ball milling to reduce particle size prior to SPSS processing yielded TCLP concentrations almost 30 times lower, and at 8.5 ppb Hg was well below EPA limits. Pre-treatment by ball milling also allowed a reduction in the time required for stabilization, thus potentially reducing total process times by 30%.Additional performance testing was conducted including measurement of compressive strength to confirm mechanical integrity and immersion testing to determine the potential impacts of storage or disposal under saturated conditions. For both surrogate and actual Y-12 treated soils, waste form compressive strengths ranged between 2,300 and 6,500 psi, indicating very strong mechanical integrity (a minimum of greater than 40 times greater than the NRC guidance for low-level radioactive waste). In general, compressive strength increases with waste loading as the soil acts as an aggregate in the sulfur concrete waste forms. No statistically significant loss in strength was recorded for the 30 and 40 wt% surrogate waste samples and only a minor reduction in strength was measured for the 43 wt% waste forms. The 30 wt% Y-12 soil did not show a significant loss in strength but the 50 wt% samples were severely degraded in immersion due to swelling of the clay soil. The impact on Hg leaching, if any, was not determined.