Search NASA⌕ Search

SEARCH · Search NASA

Results for “DETAILS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

On-Orbit Performance of the NOAA-21 Advanced Technology Microwave Sounder (ATMS)

The Advanced Technology Microwave Sounder (ATMS) instrument provides sounding measurements of Earth’s atmosphere to collect temperature and water vapor data for NOAA’s Joint Polar Satellite System (JPSS) program. ATMS is a total-power passive microwave radiometer with 22 channels spanning a frequency range from 22 to 183 GHz. A general description of the ATMS instrument is detailed in [1]. Three ATMS units are currently on-orbit. The Suomi National Polar-orbiting Partnership (SNPP) unit was launched in 2011 and the NOAA-20 (previously JPSS-1) unit was launch in 2017. Both SNPP and NOAA-20 ATMS units are currently operational and the data is used for numerical weather prediction (NWP) models. The NOAA-21 (formerly JPSS-2) ATMS unit was launched on November 10, 2022 from Vandenberg Space Force Base in California [2]. The ATMS instrument began generating radiance data on November 21, 2022. At the time of this abstract NOAA-21 ATMS is currently completing on-orbit commissioning and checkout activities; it is expected that the commissioning activities will be complete by the IGARSS 2023 conference. This paper will focus on the on-orbit performance of the NOAA-21 ATMS instrument based on measurements and activities from the commissioning period. Comparisons will be made to specifications and to expected performance based on pre-launch test activities. Pre-launch JPSS-2 (NOAA-21) ATMS performance is detailed in [4]. Additionally, the NOAA-21 performance will be compared to the on-orbit performance of the SNPP and NOAA-21 ATMS units. The post-launch performance of SNPP ATMS is detailed in [1][5][6][7]. The post-launch performance of NOAA-20 ATMS is detailed in [5][7][8]. On-orbit performance is evaluated through data collects from nominal mission operations as well as specific post-launch tests and spacecraft maneuvers. Nominal mission operations can be used to evaluate parameters such as instrument thermal stability, Noise Equivalent Delta Temperature (NEDT)/radiometric sensitivity, geolocation, inter-channel noise correlation, striping, and radiometric bias and stability. Shortly after instrument activation, the instrument thermal stability as measured from onboard temperature sensors is evaluated to demonstrate stable and steady-state behavior. Methods for computing NEDT are described in [9][10][11]. Passive geolocation measurements are performed using the coastline inflection point (CIP) method, described in [8][12]. The striping index, used as a metric to quantify striping, is the ratio of along-track variance to cross-track variance of the observed brightness temperature [4][8][14]. Inter-channel noise correlation has been previously reported for SNPP and NOAA-20 [1][8]. Dedicated post-launch tests and spacecraft maneuvers are utilized during the commissioning phase for further evaluation of on-orbit instrument performance. These activities provide information on the optimal space view selection, noise power spectral density (PSD), gain stability, scan bias, interference from onboard transmitters, reflector emissivity, active geolocation, and radiometric bias and stability detection methods. The optimal space view selection is used to determine which of ATMS space view sectors is preferred for minimizing contamination of the space view [1]. Point and stare testing is used to generate noise PSD and gain stability information, as described in [1][8]. Spacecraft roll and pitch maneuvers allow the ATMS to view different zones, including deep space, and the data can be used to provide information on scan biases and antenna sidelobe contamination [1][8]. The pitch maneuver can also be used to assess interference from onboard Ka-band transmitters and reflector emissivity [8]. Active geolocation is evaluated as a method for geolocation, described in [15].

Edward Kim↗

ISRU Pilot Excavator (IPEx) Technology Readiness Level 5 Design Overview

This paper details the mechanical and mechatronic design of the Technology Readiness Level (TRL)-5 In-Situ Resource Utilization (ISRU) Pilot Excavator (IPEx). IPEx is a robotic excavator designed for a technology demonstration of regolith mining in the lunar south -pole region. The novel design uses pairs of counter-acting excavation tools called bucket drums, that dig at the same time in opposing directions to reduce the reaction force needed, thereby enabling mining with a small, low-mass, robotic system. IPEx builds on the prior work of the Regolith Advanced Surface Systems Operations Robot (RASSOR), which is the TRL-4 implementation of this concept. The TRL-5 IPEx subsystems that are discussed in this paper include: Regolith Delivery Subsystem (RDS), Mobility Subsystem (MS), Cameras and Dust Mitigation Subsystem (CDMS), and Thermal Control Subsystem (TCS). Each subsystem is described in detail with rationale for design selections. Dust tolerance is a key feature for IPEx and this paper details a thermal control system with an actuated radiator cover and phase change material as well as camera modules with removable electrodynamic dust shields (EDS). Additional components such as actuators, wheels, and bucket drums are discussed in detail. Due to their complexity, the avionics and software subsystems will be discussed in a separate publication.

RASSOR↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Genesis Solar Wind – Capture, Return, Curate and Analyze: Looking Backward and Creating a Timeline

Introduction: In 1997 NASA’S Discovery Program selected the Genesis mission proposal to return solar wind samples to Earth for laboratory analyses. Principal Investigator Donald S. Burnett and the science team defined the purity of collector materials and ability to analyze solar wind composition to the precision required for planetary science. As a small mission, focused on a well-defined science goal, yet needing careful attention to engineering details, the communication among scientists and engineers, nurtured by Don Burnett, was exceptional. Genesis Mission and Curation Legacy: Genesis, as the first U. S. spacecraft to return astromaterial samples since Apollo, not only integrated the mission planning and flight teams, but also the science and sample curation teams during the mission development period. Since Genesis is a sample return mission, the Science Team was essential in certifying the collectors (sample containers for solar atoms). From inception, Genesis established mission funding for returned sample curation. JSC was lead in contamination control during mission preparation, including establishment of an ISO 4 cleanroom facility and use of ultrapure water (UPW) for cleaning flight hardware (and, as it turned out, for cleaning collectors after the mishap). Reliable, fast communication among scientists, engineers and curators at the hands-on level established deep respect among team members and efficient decision-making. JSC’s 50-years of astromaterial sample curation provided experienced sample processors onsite during recovery in Utah (a deep bench for emergency response). Post-recovery curation included iterative collaboration with science sample users to clean or verify cleanliness of samples. The science legacy from Genesis is addressed by Burnett and Jurewicz, this volume. In The Beginning: After Apollo sample return, Burnett and Marcia Neugebauer at JPL began discussing a solar wind sample return, with Neugebauer arguing that separate collection of solar wind regimes was essential science. By 1992 a solar wind sample return mission was presented at a workshop, and by 1994 a mission was proposed named Suess-Urey. The mission was re-proposed under a new name GENESIS and selected in 1997. Susan Niebur captured the Genesis mission history and stories, from high level management documents and from many interviews with participants [2]. Her account lets readers glimpse personality of participants in quotations from interviews. Need and Scope for Detailed Technical Timeline: A timeline constructed from lower level task documents has been initiated to document the resources and skills actually used, as well as task sequence or concurrency. Timelines for high level mission events are captured in two documents [1] [2] and for detailed re-entry events in [3]. A detailed technical timeline for Genesis mission and curation activities will provide data points for lower level tasks, such as ISO 4 curation facility construction time, preparation for nominal sample field recovery, mishap recovery, and UPW expansion. Changes in technology context 1990-2024: Semiconductor technologies were easily accessible in the U.S.A. (1990-1999), and the Genesis team used those resources for cleanroom design and UPW system expansion. Image documentation was changing from film to digital during cleanroom construction and payload cleaning (1997-2001). Engineering design was done using computer aided design proprietary software, making more difficult the archiving of payload configuration and materials. Email of documents, tracked delivery service and virtual meeting capability greatly improved communication efficiency. Information sources – Pre-launch mission preparation: Examples of mission science, engineering and contamination control are collector purity testing, payload design/fabrication and ISO 4 cleanroom construction. Information on timing of these activities comes from facility readiness reviews, management reviews, shipping documents, procurement documents, test reports, travel documents, laboratory logs, Quality Assurance documents, dates on images, participant notebooks and emails. Information sources – Sample return re-entry and field recovery activities: Information comes from event timelines produced by Mid-Air Recovery team, Lockheed team lead notes and from chase video, JPL Quality Assurance. Information also comes from images and logbooks from UTTR cleanroom operations and from curatorial documents. Information sources – Resulting science and sample cleaning processes: Agendas from the annual gatherings of the science team initially trace testing for collector purity/cleanliness, and after sample recovery, include collector cleaning and cleanliness assessment. Post-recovery documents include curatorial orders and procedures, sample allocation documents and LPSC abstracts. Timeline Objectives: A simple spreadsheet timeline with headers DATE, EVENT, PEOPLE, COMMENT, INFORMATION SOURCE has been initiated and currently has over 90 entries. While this is not definitive historical research, it is a quick look at the evolution of Genesis curation with pointers to documents or people with information. Engineers for future missions may find useful points of comparison for development of facilities. References:[1] Genesis Mission Reference Document, (2011) JPL D-62382.[2] Niebur S. M., edited by Brown D. W. (2023) NASA’s Discovery Program: The First 20 Years of Competitive Planetary Exploration, NASA-SP-2023-4238.[3] Genesis Mishap Investigation Board Report, Vol. 1 (July 2005).

solar wind↗

Motor Configuration Selection for A New Technical Challenge to Develop A 5 MW Cryogenic Motor and Drive

Due to aviation’s appreciable and growing share of humanity’s impact on our environment and estimates that CO2emissions only account for 34% of aviation’s total effective radiative forcing [1], there is a need to reach beyond climate goals that focus only on CO2emissions, such as the US Aviation Climate Action Plan’s [3] goal to reach net-zero carbon emissions by 2050.There is motivation to develop technology that pushes toward future large transport aircraft with net zero climate impact that are highly electrified (i.e., have higher power electrical propulsion system components). This paper describes a new, 6-year technical challenge to address this need by developing a 5 MW superconducting motor and cryogenic drive. Section 1 will detail the motivation for this work. Section 2 will describe the technical challenge and the selected specifications for the motor. Section 3 will present the results of a motor configuration trade study and the down selection of one configuration to develop a detailed design for. The technical challenge focuses on the design of a5 MW superconducting motor and cryogenic drive and demonstration of it at a 2+ MW scale to achieve TRL 3. Both fully superconducting (superconducting stator and rotor) and fully cryogenic (superconducting rotor and cryogenic stator) machine configurations will be explored. An emphasis will be placed on addressing the key tall poles for high power superconducting machines. Further details will be included in the full paper. The requirements and goals of the motor will be detailed. The rated speed (2,000 to 3,000 rpm) is defined to be appropriate for directly driving multi-MW fans or propellers. A range of rated speed is permitted because the motor is not designed for a specific aircraft and to provide design flexibility if AC losses in the stator winding are found to be a significant constraint (i.e., a lower speed can be selected to reduce electrical frequency). Relatively conservative requirements for efficiency (99%) and specific power (20 kW/kg) are defined, because TRL advancement and pushing toward flight readiness is emphasized over performance optimization. However, more aggressive efficiency and specific power goals are specified (99.9% and 40 kW/kg). The 3rd section will present the results of a motor configuration trade study. The study started with a qualitative assessment of sixteen motor configurations based on geometric, mechanical, thermal, and electromagnetic criteria. This assessment has been completed with three evaluators scoring all nine criteria. A configuration down select was made by prioritizing the sixteen configurations into four tiers based on each configuration’s total score and consideration of manufacturability, complexity, and support hardware (e.g., rotary vacuum seals, bearings). Configurations in priority A and B will be further evaluated through quantitative assessments, whereas those in priority C will only be further evaluated if time permits and priority D will not be further evaluated. Eight of the sixteen configurations were down selected for quantitative assessment, which will include analytical calculations and low-to moderate-fidelity finite element analysis to produce a preliminary Pareto front of efficiency versus specific power for each configuration. This assessment emphasizes the calculation of AC losses in the stator winding and an exploration of thermal management approaches to remove that heat and maintain cryogenic temperature. The final paper will include a description of each motor configuration that was considered. The quantitative assessments are underway, and an assessment of one configuration is complete for multiple stator conductor options. The remaining assessments are scheduled to be completed by late March so that the final down select to one configuration can be included in this paper.

Net Zero↗

Feasibility Study 30 Watts per Pound Rollup Solar Array

Principal efforts in this reporting period were applied to preparation of the detail design of the array structure and mechanisms and to manufacturing drawings for a demonstration model of the selected design concept. Analytical support focused on substantiation of the detail design. Additional studies were performed of dynamic criteron effects on components of the wrap drum. Thermal studies were extended to evaluate another thin film (preferred) material for the substrate and its influence on solar cell temperatures. Electrical design considerations included feasibility studies and ramifications of using a new, larger size, solar cell and a new coverglass application concept. Preliminary evaluations suggest improvement in the array power to weight characteristic and net savings in the estimated cost of cell installation. Weight estimates have been up-dated in keeping with refinements in detail design. Performance of this contractor's rollout solar array design is now projected as capable of producing 31.6 watts per pound of weight; excludes estimated improvements from use of new solar cell design.

Source record↗

Skin-stringer panel normal mode response experimental data and finite element computer program documentation

Detailed information is presented for the analytical and the experimental programs described in the report on Effects of Design Details on Structural Response to Acoustic Excitation, NASA CR-1959. This is a supplement to the basic report and detailed experimental data from all the specimens described in that report are discussed and presented in tabular form.

Rudder, F. F., Jr.↗

Methods of space radiation dose analysis with applications to manned space systems

The full potential of state-of-the-art space radiation dose analysis for manned missions has not been exploited. Point doses have been overemphasized, and the critical dose to the bone marrow has been only crudely approximated, despite the existence of detailed man models and computer codes for dose integration in complex geometries. The method presented makes it practical to account for the geometrical detail of the astronaut as well as the vehicle. Discussed are the major assumptions involved and the concept of applying the results of detailed proton dose analysis to the real-time interpretation of on-board dosimetric measurements.

Langley, R. W.↗

Urological considerations in space medicine.

Urological problems encountered during the preparation phases of Biosatellite III, flight of Bonny the Space Monkey, are detailed. The solution to each problem is detailed. The catheter system employed, antibiotic coverage used, and bacteria encountered in the urine of the five animals are detailed. Urinary calcium levels in three ground based animals are illustrated. Testicular alterations encountered in all animals are mentioned. It is concluded that space flights of duration beyond nine days may present serious problems of a urological nature.

Cockett, A. T. K.↗

Mariner 9 and the exploration of Mars.

Review of the progress of Mariner series spacecraft with details on the Mariner 4, 6, 7, 8, and 9 missions and equipment. The systems of Mariner 9 are discussed in great detail. Mariner 9 photographs of Mars, Phobos, Diemos, Martian peaks, Nix Olympica, Martian equatorial region, and some other Martian surface details are included. Diagrams of Mariner 9 daily operating profile, of Mariner 9 TV coverage vs time in orbit, and of Mariner 9 in superior conjunction on Sept. 7, 1972 are also given. It is hoped that Martian landing missions as planned in 1975 by the Viking project will be more productive than Mariner 9 in answering the question of whether life did, or does, exist on that planet.

Parks, R. J.↗

Exploitation of ERTS-1 imagery utilizing snow enhancement techniques

Photogeological analysis of ERTS-simulation and ERTS-1 imagery of snowcovered terrain within the ERAP Feather River site and within the New England (ERTS) test area provided new fracture detail which does not appear on available geological maps. Comparative analysis of snowfree ERTS-1 images has demonstrated that MSS Bands 5 and 7 supply the greatest amount of geological fracture detail. Interpretation of the first snow-covered ERTS-1 images in correlation with ground snow depth data indicates that a heavy blanket of snow (more than 9 inches) accentuates major structural features while a light "dusting", (less than 1 inch) accentuates more subtle topographic expressions. An effective mail-based method for acquiring timely ground-truth (snowdepth) information was established and provides a ready correlation of fracture detail with snow depth so as to establish the working limits of the technique. The method is both efficient and inexpensive compared with the cost of similarly scaled direct field observations.

Wobber, F. J.↗

Assessment of Southern California environment from ERTS-1

ERTS-1 imagery is a useful source of data for evaluation of earth resources in Southern California. The improving quality of ERTS-1 imagery, and our increasing ability to enhance the imagery has resulted in studies of a variety of phenomena in several Southern California environments. These investigations have produced several significant results of varying detail. They include the detection and identification of macro-scale tectonic and vegetational patterns, as well as detailed analysis of urban and agricultural processes. The sequential nature of ERTS-1 imagery has allowed these studies to monitor significant changes in the environment. In addiation, some preliminary work has begun directed toward assessing the impact of expanding recreation, agriculture and urbanization into the fragile desert environment. Refinement of enhancement and mapping techniques and more intensive analysis of ERTS-1 imagery should lead to a greater capability to extract detailed information for more precise evaluations and more accurate monitoring of earth resources in Southern California.

Bowden, L. W.↗

Use of ERTS-1 data for regional planning in the Metropolitan Washington Council of Governments: A short brief

Land use and land use activity changes over discrete intervals of time represent basic data requirements in regional planning studies. Two examples of land use analysis required by the Council of Governments' transportation planning staff are described. Both were undertaken utilizing remote sensing imagery analysis. One study using large scale aircraft imagery developed a high degree of analytical detail and functional identification. The other, to support further detailed data base evaluation, utilizing ERTS-1 and small scale aircraft imagery, developed data identifying in more general detail major activity changes within the metropolitan region.

Mallon, H. J.↗

Evaluation of a metal shear web selectively reinforced with filamentary composites for space shuttle application. Phase 1 summary report: Shear web design development

An advanced composite shear web design concept was developed for the Space Shuttle orbiter main engine thrust beam structure. Various web concepts were synthesized by a computer-aided adaptive random search procedure. A practical concept is identified having a titanium-clad + or - 45 deg boron/epoxy web plate with vertical boron/epoxy reinforced aluminum stiffeners. The boron-epoxy laminate contributes to the strength and stiffness efficiency of the basic web section. The titanium-cladding functions to protect the polymeric laminate parts from damaging environments and is chem-milled to provide reinforcement in selected areas. Detailed design drawings are presented for both boron/epoxy reinforced and all-metal shear webs. The weight saving offered is 24% relative to all-metal construction at an attractive cost per pound of weight saved, based on the detailed designs. Small scale element tests substantiate the boron/epoxy reinforced design details in critical areas. The results show that the titanium-cladding reliably reinforces the web laminate in critical edge load transfer and stiffener fastener hole areas.

Laakso, J. H.↗

Theory for radiatively driven harmonic acoustic waves in a confined gas.

A detailed theoretical study is made of radiatively driven acoustic waves inside a closed cylindrical tube. The formulation accounts for all the essential phenomena for a gas in vibrational equilibrium - namely, gas motion, longitudinal and radial viscous dissipation, longitudinal and radial heat conduction, and radiative transfer with spectral detail included. An approximate expression is derived for the pressure response. This solution is applicable to arbitrary spectral distribution of the radiative absorption coefficient, under conditions attainable in the laboratory. The solution includes both tuned and untuned acoustic conditions as well as the spectrophone limit - that is, the condition where the length of the tube is much smaller than the length of the acoustic wave. The influence of spectral detail on the pressure response is illustrated.

Chapman, G. T.↗

The applicability of frame imaging from a spinning spacecraft. Volume 1: Summary report

A detailed study was made of frame-type imaging systems for use on board a spin stabilized spacecraft for outer planets applications. All types of frame imagers capable of performing this mission were considered, regardless of the current state of the art. Detailed sensor models of these systems were developed at the component level and used in the subsequent analyses. An overall assessment was then made of the various systems based upon results of a worst-case performance analysis, foreseeable technology problems, and the relative reliability and radiation tolerance of the systems. Special attention was directed at restraints imposed by image motion and the limited data transmission and storage capability of the spacecraft. Based upon this overall assessment, the most promising systems were selected and then examined in detail for a specified Jupiter orbiter mission. The relative merits of each selected system were then analyzed, and the system design characteristics were demonstrated using preliminary configurations, block diagrams, and tables of estimated weights, volumes and power consumption.

Botticelli, R. A.↗

RI 1170 advanced strapdown gyro

The major components of the RI 1170 gyroscope are described. A detailed functional description of the electronics including block diagrams and photographs of output waveshapes within the loop electronics are presented. An electronic data flow diagram is included. Those gyro subassemblies that were originally planned and subsequently changed or modified for one reason or another are discussed in detail. Variations to the original design included the capacitive pickoffs, torquer flexleads, magnetic suspension, gas bearings, electronic design, and packaging. The selection of components and changes from the original design and components selected are discussed. Device failures experienced throughout the program are reported and design corrections to eliminate the failure modes are noted. Major design deficiencies such as those of the MSE electronics are described in detail. Modifications made to the gas bearing parts and design improvements to the wheel are noted. Changes to the gas bearing prints are included as well as a mathematical analysis of the 1170 gas bearing wheel by computer analysis. The mean free-path effects on gas bearing performance is summarized.

Source record↗

A study of Space Shuttle approach and landing navigation with conventional navaids

Four candidate navigation systems for the Space Shuttle Orbiter approach and landing phase are evaluated in detail. These include three conventional navaid systems and a single-station one-way Doppler system. In each case a Kalman filter is assumed to be mechanized in the onboard computer, blending the navaid data with IMU and altimeter data. Filter state dimensions ranging from 6 to 24 are involved in the candidate systems. Comprehensive truth models with state dimensions ranging from 63 to 82 are formulated and used to generate detailed performance projections. The detailed results are summarized, compared, and interpreted, the filter designs are reviewed, and suggestions are made concerning possible software improvements.

Crawford, B. S.↗