At least 685 records · Page 38

Numerical Modeling & Size Optimization of Thermal Energy Storage for Iron & Steel Production

Iron and steel production are responsible for 90 million MtCO2 per year in the United States. Hydrogen direct reduction of iron (H2DRI) is a promising pathway for a more sustainable iron production than commercially deployed technologies which rely on natural gas. The H2DRI process requires hydrogen at a temperature of up to 950 degrees C fed into a reduction furnace to produce pellets or briquettes that are used in the downstream iron and steelmaking process. In this work, we propose to use an electrical thermal energy storage (ETES) system, that can use renewable electricity to store high-temperature heat and dispatch it upon demand. Such a system can buffer the H2DRI plant from the variability of electricity prices by charging during curtailment and running the plant from storage during times of peak electricity price. We have developed heat transfer models for two different ETES systems that can be used to heat up hydrogen to the required temperatures: a particle-based ETES and a firebrick ETES. These models are used to evaluate the performance of such a system and support the sizing and preliminary cost estimation. The preliminary results using both models show that designing ETES systems for an industrial-scale H2DRI furnace is feasible. The firebrick ETES system has limited operational duration, which might limit the price buffering effect unless significantly oversized. The particle ETES system heat exchanger has industry-feasible dimensions, but its storage capacity would be decided upon the number of particle storage silos.

25 ENERGY STORAGE↗

Very High Fuel Economy, Heavy Duty, Constant Speed, Truck Engine Optimized Via Unique Energy Recovery Turbines and Facilitated High Efficiency Continuously Variable Drivetrain

The project began under a corporative agreement between Mack Trucks, Inc and the Department of Energy starting from September 1, 2005. The major objective of the four year project is to demonstrate a 10% efficiency gain by operating a Volvo 13 Litre heavy-duty diesel engine at a constant or narrow speed and coupled to a continuously variable transmission. The simulation work on the Constant Speed Engine started on October 1st. The initial simulations are aimed to give a basic engine model for the VTEC vehicle simulations. Compressor and turbine maps are based upon existing maps and/or qualified, realistic estimations. The reference engine is a MD 13 US07 475 Hp. Phase I was completed in May 2006 which determined that an increase in fuel efficiency for the engine of 10.5% over the OICA cycle, and 8.2% over a road cycle was possible. The net increase in fuel efficiency would be 5% when coupled to a CVT and operated over simulated highway conditions. In Phase II an economic analysis was performed on the engine with turbocompound (TC) and a Continuously Variable Transmission (CVT). The system was analyzed to determine the payback time needed for the added cost of the TC and CVT system. The analysis was performed by considering two different production scenarios of 10,000 and 60,000 units annually. The cost estimate includes the turbocharger, the turbocompound unit, the interstage duct diffuser and installation details, the modifications necessary on the engine and the CVT. Even with the cheapest fuel and the lowest improvement, the pay back time is only slightly more than 12 months. A gear train is necessary between the engine crankshaft and turbocompound unit. This is considered to be relatively straight forward with no design problems.

33 ADVANCED PROPULSION SYSTEMS↗

Enhancing weak lensing redshift distribution characterization by optimizing the Dark Energy Survey Self-Organizing Map Photo-z method

Characterization of the redshift distribution of ensembles of galaxies is pivotal for large scale structure cosmological studies. In this work, we focus on improving the Self-Organizing Map (SOM) methodology for photometric redshift estimation (SOMPZ), specifically in anticipation of the Dark Energy Survey Year 6 (DES Y6) data. This data set, featuring deeper and fainter galaxies than DES Year 3 (DES Y3), demands adapted techniques to ensure accurate recovery of the underlying redshift distribution. We investigate three strategies for enhancing the existing SOM-based approach used in DES Y3: 1) Replacing the Y3 SOM algorithm with one tailored for redshift estimation challenges; 2) Incorporating $\textit{g}$-band flux information to refine redshift estimates (i.e. using $\textit{griz}$ fluxes as opposed to only $\textit{riz}$); 3) Augmenting redshift data for galaxies where available. These methods are applied to DES Y3 data, and results are compared to the Y3 fiducial ones. Our analysis indicates significant improvements with the first two strategies, notably reducing the overlap between redshift bins. By combining strategies 1 and 2, we have successfully managed to reduce redshift bin overlap in DES Y3 by up to 66$\%$. Conversely, the third strategy, involving the addition of redshift data for selected galaxies as an additional feature in the method, yields inferior results and is abandoned. Our findings contribute to the advancement of weak lensing redshift characterization and lay the groundwork for better redshift characterization in DES Year 6 and future stage IV surveys, like the Rubin Observatory.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Real time feedback-based optimization of distributed energy resources

An example device includes a processor configured to receive a plurality of voltage values corresponding to voltage nodes in a first portion of a power system and determine, for each voltage node, a respective value of first and second voltage-constraint coefficients. The processor is also configured to receive a power value corresponding to a connection point of the first portion of the power system with a second portion of the power system and determine for the connection point, a respective value of first and second power-constraint coefficients. The processor is also configured to cause at least one energy resource connected to the first portion of the power system to modify an output power of the at least one energy resource based on the value of the first and second voltage-constraint coefficients for each voltage node and the value of the first and second power-constraint coefficients.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimization of Dual Axis Asymmetric Cavity for Energy Recovery Linac

Optimization of the dual axis asymmetric cavity was performed to minimize the ratio of the peak magnetic and electric fields values to the accelerating voltage, to increase the distance between operating and neighbouring modes as well as to reduce the manufacturing cost of the cavity. To reach the goals several solutions have been suggested bringing the ratios to the acceptable values and leading to simplification of the manufacturing of the structure.

Shashkov, Ya. V.↗

Real time feedback-based optimization of distributed energy resources

An example device includes a processor configured to receive a plurality of voltage values representing respective voltage magnitudes at voltage nodes in a first portion of a power system and determine, for each voltage node, a respective value of first and second voltage-constraint coefficients. The processor is also configured to receive a power value corresponding to a connection point of the first portion of the power system with a second portion of the power system and determine for the connection point, a respective value of first and second power-constraint coefficients. The processor is also configured to cause at least one energy resource connected to the first portion of the power system to modify an output power of the at least one energy resource based on the value of the first and second voltage-constraint coefficients for each voltage node and the value of the first and second power-constraint coefficients.

Dall'Anese, Emiliano↗