Search NASA⌕ Search

SEARCH · Search NASA

Results for “Geostationary”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Search for extraterrestrial intelligence/high resolution microwave survey team member

This semiannual status report describes activities conducted by the Principal Investigator during the first half of this third year of the NASA High Resolution Microwave Survey (HRMS) Investigator Working Group (IWG). As a (HRMS) Team Member with primary interest in the Sky Survey activity, this investigator attended IWG meetings at NASA/Ames and U.C.-Santa Cruz in Apr. and Aug. 1992, and has traveled independently to NRAO/Kitt Peak, Arizona (April 1993) and Woodbury, Georgia (July 1993). During the July 1993 visit to the Georgia Tech Research Corporation/Woodbury Research Facility, an experiment was conducted to study the effects of interference from C-band (3.7 - 4.2 GHz) geostationary spacecraft on the Sky Survey operation in that band. At the first IWG meeting in April of this year, results of a SETI observation conducted at the 203 GHz positronium hyperfine resonance using the NRAO facility at Kitt Peak, AZ, were presented, as well as updates on the development of the spaceborne RFI data bases developed for the project. At the second meeting, results of the study of interference from C-band geostationary spacecraft were presented. Likewise, a presentation was made at the accompanying 1993 Bioastronomy Symposium describing the SETI observation at the positronium hyperfine resonance.

Steffes, Paul G.↗

User needs for propagation data

New and refined models of radio signal propagation phenomena are needed to support studies of evolving satellite services and systems. Taking an engineering perspective, applications for propagation measurements and models in the context of various types of analyses that are of ongoing interest are reviewed. Problems that were encountered in the signal propagation aspects of these analyses are reviewed, and potential solutions to these problems are discussed. The focus is on propagation measurements and models needed to support design and performance analyses of systems in the Mobile-Satellite Service (MSS) operating in the 1-3 GHz range. These systems may use geostationary or non-geostationary satellites and Frequency Division Multiple Access (FDMA), Time Division Multiple Access Digital (TDMA), or Code Division Multiple Access (CDMA) techniques. Many of the propagation issues raised in relation to MSS are also pertinent to other services such as broadcasting-satellite (sound) at 2310-2360 MHz. In particular, services involving mobile terminals or terminals with low gain antennas are of concern.

Sullivan, Thomas M.↗

US domestic and international regulatory issues

The U.S. domestic and international regulatory and policy milestones since 1982, when NASA filed its petition with the Federal Communications Commission (FCC) to establish the U.S. domestic Mobile Satellite Service (MSS), are described. In 1985, the FCC proposed to establish MSS services and allocate spectrum for such service. In 1986, the FCC allocated L-band spectrum for MSS. In 1987, at the Mobile World Administrative Radio Conference (MOB WARC-87), despite U.S., Canadian, and Mexican efforts, the WARC did not adopt a multi-service, generic MSS allocation. In 1989, the FCC licensed the first MSS system. After two decisions by the U.S. Court of Appeals, the FCC's licensing actions remain intact. The FCC also has permitted Comsat to provide international aeronautical and land MSS via the Inmarsat system. Inmarsat, however, may not serve the domestic U.S. market. In 1991, the FCC accepted applications for MSS systems, most of which were non-geostationary proposals, for operation in the Radiodetermination Satellite Service (RDSS) bands, and the VHF and UHF bands. In 1992, the FCC proposed rules for non-geostationary MSS systems and applied a negotiated rulemaking procedure to each. Also in 1992, the U.S. position for flexibility in existing MSS bands and for additional worldwide MSS allocations was adopted in large part at the 1992 World Administrative Radio Conference (WARC-92).

Levin, Lon C.↗

Development of a multilayer interference simulation program for MSS systems

This paper discusses the development of a multilayer interference analysis and simulation program which is used to evaluate interference between non-geostationary and geostationary satellites. In addition to evaluating interference, this program can be used in the development of sharing criteria and coordination among various Mobile Satellite Services (MSS) systems. A C++/Windows implementation of this program, called Globalstar Interference Simulation Program (GISP), has been developed.

Izadian, Jamal S.↗

Low earth orbit satellite/terrestrial mobile service compatibility

Digital cellular mobile 'second generation' systems are now gradually being introduced into service; one such example is GSM, which will provide a digital voice and data service throughout Europe. Total coverage is not expected to be achieved until the mid '90's, which has resulted in several proposals for the integration of GSM with a geostationary satellite service. Unfortunately, because terrestrial and space systems have been designed to optimize their performance for their particular environment, integration between a satellite and terrestrial system is unlikely to develop further than the satellite providing a back-up service. This lack of system compatibility is now being addressed by system designers of third generation systems. The next generation of mobile systems, referred to as FPLMTS (future public land mobile telecommunication systems) by CCIR and UMTS (universal mobile telecommunication system) in European research programs, are intended to provide inexpensive, hand-held terminals that can operate in either satellite, cellular, or cordless environments. This poses several challenges for system designers, not least in terms of the choice of multiple access technique and power requirements. Satellite mobile services have been dominated by the geostationary orbital type. Recently, however, a number of low earth orbit configurations have been proposed, for example Iridium. These systems are likely to be fully operational by the turn of the century, in time for the implementation of FPLMTS. The developments in LEO mobile satellite service technology were recognized at WARC-92 with the allocation of specific frequency bands for 'big' LEO's, as well as a frequency allocation for FPLMTS which included a specific satellite allocation. When considering integrating a space service into the terrestrial network, LEO's certainly appear to have their attractions: they can provide global coverage, the round trip delay is of the order of tens of milliseconds, and good visibility to the satellite is usually possible. This has resulted in their detailed investigation in the European COST 227 program and in the work program of the European Telecommunications Standards Institute (ETSI). This paper will consider the system implications of integrating a LEO mobile service with a terrestrial service. Results will be presented from simulation software to show how a particular orbital configuration affects the performance of the system in terms of area coverage and visibility to a terminal for various locations and minimum elevation angle. Possible network topologies are then proposed for an integrated satellite/terrestrial network.

Sheriff, R. E.↗

A processing centre for the CNES CE-GPS experimentation

CNES is involved in a GPS (Global Positioning System) geostationary overlay experimentation. The purpose of this experimentation is to test various new techniques in order to select the optimal station synchronization method, as well as the geostationary spacecraft orbitography method. These new techniques are needed to develop the Ranging GPS Integrity Channel services. The CNES experimentation includes three transmitting/receiving ground stations (manufactured by IN-SNEC), one INMARSAT 2 C/L band transponder and a processing center named STE (Station de Traitements de l'Experimentation). Not all the techniques to be tested are implemented, but the experimental system has to include several functions; part of the future system simulation functions, such as a servo-loop function, and in particular a data collection function providing for rapid monitoring of system operation, analysis of existing ground station processes, and several weeks of data coverage for other scientific studies. This paper discusses system architecture and some criteria used in its design, as well as the monitoring function, the approach used to develop a low-cost and short-life processing center in collaboration with a CNES sub-contractor (ATTDATAID), and some results.

Suard, Norbert↗

Mini All-purpose Satellite Control Center (MASCC)

A new generation of Mini All-purpose Satellite Control Centers (MASCC) has been developed by CNES (F). They turn out to be easily adaptable to different kinds of satellites, both Low Earth Orbital or Geostationary. The features of MASCC allow both standard satellite control activities, and checking of passengers experiments hosted on a space platform. In the different environments in which it may be used, MASCC provides standard broadcasting of telemetry parameters on animated synoptics (curves, bar graphs, alphanumeric displays, ...), which turns out to be a very useful and ergonomic medium for operational teams or satellite specialists. Special care has been taken during the MASCC development about two points: - automation of all routine tasks, allowing automated operation, and limiting human commitment to system supervision and decision making, - software adaptability. To reach these two main objectives, the MASCC design provides:(1) a simple, robust and flexible hardware architecture, based on powerful distributed workstations; and (2) a table-driven software architecture, easily adapted to various operational needs. Satellite characteristics are described in a central Data Base. Hence, the processing of telemetry and commands is largely independent from the satellite itself. In order to validate these capabilities, the MASCC has been customized to several types of satellites and orbital platforms: (1) SPOT4, the French new generation of remote sensing satellites; (2) TELECOM2, the French geostationary TV and telecommunication satellite; and (3) MIR, the Russian orbital platform. MASCC development has been completed by the third quarter of 1993. This paper will provide first a description of the MASCC basic functions, of its hardware and software design. It will then detail the increased automation capability, along with the easy adaptation of the MASCC to new satellites with minimal software modifications.

Zaouche, Gerard↗

ORION: A Supersynchronous Transfer Orbit mission

ORION F1 was launched on 29th November 1994 on an Atlas IIA launch vehicle. It was designed, built and delivered in-orbit by Matra Marconi Space Systems Plc and was handed over to ORION Satellite Corporation on 20th January 1995 at its on-station longitude of 37.5 deg W. The mission differed significantly from that of any other geostationary communications satellite in that the Transfer Orbit apogee altitude of 123,507 km was over three times geosynchronous (GEO) altitude and one third of the way to the moon. The SuperSynchronous Transfer Orbit (SSTO) mission is significantly different from the standard Geostationary Transfer Orbit (GTO)mission in a number of ways. This paper discusses the essential features of the mission design through its evolution since 1987 and the details of the highly successful mission itself including a detailed account of the attitude determination achieved using the Galileo Earth and Sun Sensor (ESS).

Walters, I. M.↗

High-resolution satellite imagery for mesoscale meteorological studies

In this article high-resolution satellite imagery from a variety of meteorological and environmental satellites is compared. Digital datasets from Geostationary Operational Environmental Satellite (GOES), National Oceanic and Atmospheric Administration (NOAA), Defense Meteorological Satellite Program (DMSP), Landsat, and Satellite Pour l'Observation de la Terre (SPOT) satellites were archived as part of the 1990 Hawaiian Rainband Project (HaRP) and form the basis of the comparisons. During HaRP, GOES geostationary satellite coverage was marginal, so the main emphasis is on the polar-orbiting satellites.

Johnson, David B.↗

Observation and modeling of compressional Pi 3 magnetic pulsations

Compressional magnetic pulsations with irregular waveforms and periods longer than 150 s (here termed Pi 3) have been studied by using data from Active Magnetospheric Particle Tracer Explorers Charge Composition Explorer (AMPTE/CCE) and GOES 5 and 6 in the dayside magnetosphere and compared with signatures on the ground at low latitudes by using data from Kakioka station (L = 1.25). On the ground, the pulsations appear in the horizontal component. A study of 17 such concurrent events during a 2-month period in 1986 reveals the following pulsation characteristics. (1) The peak-to-peak amplitudes in space (delta B(sub T)) and on the ground (delta H) are comparable and are in the range of 0.5-7 nT. (2) On the ground the pulsations can be seen at all local times, even at midnight, while at geostationary orbit they are observed only on the dayside with a clear amplitude maximum at noon. (3) The pulsations on the ground lag those observed by CCE near local noon, and the lag increases as the local time separation between CCE and the ground station increases. The time lag is 1-2 min longer when the ground station is on the nightside than when it is on the dayside. (4) The time lag between pulsations observed at geostationary orbit and near noon by CCE varies systematically with local time and is about 2 min per 6 hours of local time separation. These observations indicate that some nightside pulsations in the Pi 3 band have dayside origins. The position dependence of the pulsation amplitude can be explained well by changes in the magnetopause current, which are in turn presumably caused by changes in the solar wind dynamic pressure. The time lags observed in space are consistent with signal propagation in the MHD fast mode, but the variation in space-ground time lags with ground station local time must be attributed to another mechanism.

Matsuoka, Hitoshi↗

Applications of GOES-8/9 data to hurricane analysis

GOES-8 was successfully launched in 1994, and has performed up to expeditions and in some cases has actually exceeded pre-launch specifications. A similar geostationary satellite, GOES-9, was launched in May of 1995. This new generation of NOAA's geostationary satellites carry a superior design and instrumentation package that allow for greater detection of meteorological features and parameters. The new GOES imager has a 5 band multispectral capability with high spatial resolution, while the sounder contains 18 thermal infrared (IR) bands plus a low resolution visible band. The imager carries a visible channel with 1 10-bit quantization and increased sampling frequency, a short-wave and long-wave window channel, and a water vapor band with a twofold increase in spatial resolution and a factor of 3 improvement in signal-to-noise over that obtained from previous GOES sensors. The advances in observing the earth's atmospheric system anticipated from these improvements are outlined in Menzel and Purdom (1994). The specific impact of this improved remote sensing capability on the analysis of tropical cyclones is discussed here.

Velden, Christopher S.↗

Cloud Properties Derived From GOES-7 for Spring 1994 ARM Intensive Observing Period Using Version 1.0.0 of ARM Satellite Data Analysis Program

This document describes the initial formulation (Version 1.0.0) of the Atmospheric Radiation Measurement (ARM) program satellite data analysis procedures. Techniques are presented for calibrating geostationary satellite data with Sun synchronous satellite radiances and for converting narrowband radiances to top-of-the-atmosphere fluxes and albedos. A methodology is documented for combining geostationary visible and infrared radiances with surface-based temperature observations to derive cloud amount, optical depth, height, thickness, temperature, and albedo. The analysis is limited to two grids centered over the ARM Southern Great Plains central facility in north-central Oklahoma. Daytime data taken during 5 Apr. - 1 May 1994, were analyzed on the 0.3 deg and 0.5 deg latitude-longitude grids that cover areas of 0.9 deg x 0.9 deg and 10 deg x 14 deg, respectively. Conditions ranging from scattered low cumulus to thin cirrus and thick cumulonimbus occurred during the study period. Detailed comparisons with hourly surface observations indicate that the mean cloudiness is within a few percent of the surface-derived sky cover. Formats of the results are also provided. The data can be accessed through the World Wide Web computer network.

Minnis, Patrick↗

Logistics of a Lunar Based Solar Power Satellite Scenario

A logistics system comprised of two orbital stations for the support of a 500 GW space power satellite scenario in a geostationary orbit was investigated in this study. A subsystem mass model, a mass flow model and a life cycle cost model were developed. The results regarding logistics cost and burden rates show that the transportation cost contributed the most (96%) to the overall cost of the scenario. The orbital stations at a geostationary and at a lunar orbit contributed 4 % to that cost.

Melissopoulos, Stefanos↗

Limits to the Stability of Phase Transfer from Ground to Space

An alternative to having a primary frequency standard on board a spacecraft is to phase lock a simple oscillator on the spacecraft to a microwave tone transmitted from the ground. The received tone is transponded and rebroadcast to the ground. The round trip phase is measured, and used to correct for effects on time scales longer than the round trip light travel time. This method is used with the TDRSS relay satellites, and will be used for the Japanese space VLBI mission VSOP. There are several sources of error introduced by this process. The most important error source is a loss of the on board standard for all times that the satellite is out of contact with a ground tracking station. The fractional loss will be greater than 10% for almost any orbit, even with a network of several ground tracking stations, and it will be considerably worse for a low earth orbit. Only a geostationary orbit can eliminate this problem. Another error source is connected to the previous one. Round trip phase tracking can remove, after the fact, link effects during a tracking pass on time scales greater than the round trip light travel time. However, there will be a jump in the spacecraft clock when multiple passes are connected (e.g. when the spacecraft is reacquired after passing out of sight). These jumps will be equal in magnitude (except for a geometrical factor) to the accuracy with which the spacecraft orbit is known. With a GPS receiver and GPS-like beacon on a spacecraft, the orbit can be known to a few cm, giving timing jumps on the order of 100 picoseconds. Even with a geostationary orbit, these jumps would occur any time the link was interrupted due to mechanical or electrical problems.

Linfield, Roger P.↗

Characterization of Infrared Diode Laser Beams and Atmospheric CO Imaging Instrument

During June-August 1997 Dr. Jonathan Miles participated in the ASEE-sponsored summer faculty research program at NASA Langley Research Center (LaRC). The Aerospace Electronic Systems Division (AESD), Sensor Systems Branch (SSB), at NASA LARC had proposed a new mission, GEOstationary TROpospheric Pollution SATellite (GEO TROPSAT), to address critical science questions of tropospheric chemistry. The troposphere is a complex system, comprising "point" and distributed sources of natural and anthropogenic origin; complicated transport processes, both lateral and vertical; and photochemistry driven by UV flux, temperature, atmospheric composition, and other variables. GEO TROPSAT would be implemented about a geostationary Earth orbital (GEO) position at the equator between 600 and 80" West longitude to observe the Americas and large portions of the oceans of either coast. This mission would advance our knowledge of the atmosphere by capturing the wide temporal and spatial variability of tropospheric phenomena which is undetectable from low Earth orbit. A pre-prototype imaging carbon monoxide (CO) imaging system operating within a narrow waveband about 4.7 [Lm was built, demonstrated, and evaluated. This system applies the gas-filter correlation radiometry (GFCR) technique and produces digitized images comprising 4096 pixels, each representing a single CO mixing ratio measurement inferred from radiometric data. Associated tasks accomplished included specification for the next-generation prototype system to operate in the 2.3-@tm waveband; characterization of a 64x64, InSb focal-plane-array (FPA) imager; design, fabrication, and assembly of a filter wheel; and software development. Laboratory evaluation of this system involved imaging of a test cell placed in the path of radiant flux emanating from a blackbody source used to simulate the radiant energy reflected by Earth in real application. The cell was evacuated for system balancing and then charged with measured quantities of CO to provide a means for system characterization. Two related research efforts were undertaken during the term of the study reported here - continued development of an atmospheric CO imaging instrument and characterization of diode-laser beams. Both efforts were successful and are described within the body of this report. A second objective was to provide a means for undergraduate ISAT majors to become involved with the research described, to be afforded the opportunity to learn the technologies associated with the work performed. Two ISAT students gained a comprehensive understanding and interest in missions supported by NASA through direct involvement in this project. Many more students were exposed to these technologies through demonstrations, laboratory tours, and explanations provided in lectures.

Miles, Jonathan J.↗

Geospace Magnetospheric Dynamics Mission

The Geospace Magnetospheric Dynamics (GMD) mission is designed to provide very closely spaced, multipoint measurements in the thin current sheets of the magnetosphere to determine the relation between small scale processes and the global dynamics of the magnetosphere. Its trajectory is specifically designed to optimize the time spent in the current layers and to minimize radiation damage to the spacecraft. Observations are concentrated in the region 8 to 40 R(sub E) The mission consists of three phases. After a launch into geostationary transfer orbit the orbits are circularized to probe the region between geostationary orbit and the magnetopause; next the orbit is elongated keeping perigee at the magnetopause while keeping the line of apsides down the tail. Finally, once apogee reaches 40 R(sub E) the inclination is changed so that the orbit will match the profile of the noon-midnight meridian of the magnetosphere. This mission consists of 4 solar electrically propelled vehicles, each with a single NSTAR thruster utilizing 100 kg of Xe to tour the magnetosphere in the course of a 4.4 year mission, the same thrusters that have been successfully tested on the Deep Space-1 mission.

Russell, C. T.↗

Advanced Electric Propulsion for RLV Launched Geosynchronous Spacecraft

Solar Electric Propulsion (SEP) when used for station keeping and final orbit insertion has been shown to increase a geostationary satellite's payload when launched by existing expendable launch vehicles. In the case of reusable launch vehicles or expendable launch vehicles where an upper stage is an expensive option, this methodology can be modified by using the existing on-board apogee chemical system to perform a perigee burn and then letting the electric propulsion system complete the transfer to geostationary orbit. The elimination of upper stages using on-board chemical and electric propulsion systems was thus examined for GEO spacecraft. Launch vehicle step-down from an Atlas IIAR to a Delta 7920 (no upper stage) was achieved using expanded on-board chemical tanks, 40 kW payload power for electric propulsion, and a 60 day elliptical to GEO SEP orbit insertion. Optimal combined chemical and electric trajectories were found using SEPSPOT. While Hall and ion thrusters provided launch vehicle step-down and even more payload for longer insertion times, NH3 arcjets had insufficient performance to allow launch vehicle step-down. Degradation levels were only 5% to 7% for launch step-down cases using advanced solar arrays. Results were parameterized to allow comparisons for future reusable launch vehicles. Results showed that for an 8 W/kg initial power/launch mass power density spacecraft, 50% to 100% more payload can be launched using this method.

Oleson, Steven↗

In-Space Transportation for GEO Space Solar Power Satellites

This report summarizes results of study tasks to evaluate design options for in-space transportation of geostationary Space Solar Power Satellites. Referring to the end-to-end architecture studies performed in 1988, this current activity focuses on transportation of Sun Tower satellite segments from an initial low Earth orbit altitude to a final position in geostationary orbit (GEO; i.e., 35,786 km altitude, circular, equatorial orbit). This report encompasses study activity for In-Space Transportation of GEO Space Solar Power (SSP) Satellites including: 1) assessment of requirements, 2) design of system concepts, 3) comparison of alternative system options, and 4) assessment of potential derivatives.

Martin, James A.↗