Search NASA⌕ Search

SEARCH · Search NASA

Results for “Grid Connection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Five new Zn(II) and Cd(II) coordination polymers constructed by 3,5-bis-oxyacetate-benzoic acid: Syntheses, crystal structures, network topologies and luminescent properties

Five Zn(II) and Cd(II) coordination polymers, [Zn{sub 2}(BOABA)(bpp)(OH)]{center_dot}0.5H{sub 2}O (1), [Cd{sub 3}(BOABA){sub 2}(bpp){sub 2}(H{sub 2}O){sub 6}]{center_dot}2H{sub 2}O (2), [Cd{sub 3}(BOABA){sub 2}(2,2 Prime -bipy){sub 3}(H{sub 2}O){sub 4}]{center_dot}5.5H{sub 2}O (3), [CdNa(BOABA)(H{sub 2}O)]{sub 2}{center_dot}H{sub 2}O (4) and [Cd{sub 2}(BOABA)(bimb)Cl(H{sub 2}O){sub 2}]{center_dot}H{sub 2}O (5) (H{sub 3}BOABA=3,5-bis-oxyacetate-benzoic acid, bpp=1,3-bi(4-pyridyl)propane, 2,2 Prime -bipy=2,2 Prime -bipyridine, bimb=1,4-bis(imidazol-1 Prime -yl)butane), have been solvothermally synthesized and characterized by single-crystal X-ray diffraction, elemental analyses, IR spectra and TG analyses. 1 is an uninodal 4-connected 2D square grid network based on binuclear zinc clusters. 2 is 2D wavelike layer structure and further linked by hydrogen bonds into the final 3D (5,6,6)-connected topology network. 3 is 3-connected 2D topology network and the 2,2 Prime -bipy ligands decorate in two different types. 4 is a (4,8)-connected 2D topology network with heterocaryotic {l_brace}Cd{sub 2}Na{sub 2}{r_brace} clusters and BOABA{sup 3-} ligands. 5 can be rationalized as a (3,10)-connected 3D topology network with tetranuclear {l_brace}Cd{sub 4}Cl{sub 2}{r_brace} clusters and BOABA{sup 3-} ligands. Meanwhile, photoluminescence studies revealed that these five coordination polymers display strong fluorescent emission bands in the solid state at room temperature. - Graphical abstract: Five new d{sup 10} metal(II) coordination polymers based on H{sub 3}BOABA ligand were obtained and characterized. They display different topological structures and luminescent properties. Highlights: Black-Right-Pointing-Pointer Five d{sup 10} metal(II) polymers based on 3,5-bis-oxyacetate-benzoic acid were obtained. Black-Right-Pointing-Pointer The polymers were structurally characterized by single-crystal X-ray diffraction. Black-Right-Pointing-Pointer Polymers 1-5 display different topological structures. Black-Right-Pointing-Pointer They show strong fluorescent emission bands in the solid state.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Enabling a Decentralized Smart Grid Using Autonomous Edge Control Devices

As a large number of distributed devices are connected to the modern smart grid, the traditional centralized connectivity models fail to provide economic value. These models have relied on sending data to the cloud for processing and receiving commands to exert control actions, resulting in an ‘on-demand system’ with high bandwidth, low latency and an overload of data on the cloud. For realizing a decentralized system, there is a strong need to embed intelligence at the ‘edge of the network’. These intelligent devices, capable of sensing, local data processing and exerting control actions, report only actionable information to the cloud, acting as an edge control node. The system can then function autonomously, without constant cloud inputs, tolerating longer delays in communication, making the overall system ultra-low cost. The Global Asset Monitoring, Management and Analytics (GAMMA) Platform is a novel ultralow- cost, secure platform that operates through a Bluetooth based delay tolerant network. It relies on so-called ‘data mules’ to bridge the last mile connectivity gap in an inherently secure way. Due to this model, the platform requires no in-country certifications, does not rely on a dedicated backhaul technology and is immune to technology migration. This architecture also addresses some gaps identified in traditional IoT-based solutions in remote areas and sparse connectivity. A functional unit of the edge computing node has been built, taking into account various constraints like costs, customizations, data storage, cybersecurity and power management. Here, the platform has been built, deployed and has demonstrated distributed smart grid applications like power quality sensing, automated metering infrastructure and utility asset monitoring.

42 ENGINEERING↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effects of V2G Reactive Power Compensation on the Component Selection in an EV or PHEV Bidirectional Charger

Electric vehicles (EVs) and plug-in hybrid electric vehicles (PHEVs) are becoming a part of the electric grid day by day. Chargers for these vehicles have the ability to make this interaction better for the consumer and for the grid. Vehicle to grid (V2G) power transfer has been under research for more than a decade because of the large energy reserve of an electric vehicle battery and the potential of thousands of these connected to the grid. Rather than discharging the vehicle batteries, reactive power compensation in particular is beneficial for both consumers and for the utility. However, certain adverse effects or requirements of reactive power transfer should be defined before a design stage. To understand the dynamics of this operation, this study investigates the effect of reactive power transfer on the charger system components, especially on the dc-link capacitor and the battery.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hiding Critical Targets in Smart Grid Networks

With the integration of advanced communication technologies, the power grid is expected to greatly enhance efficiency and reliability of future power systems. However, since most electrical devices in power grid substations are connected via communication networks, cyber security of these communication networks becomes a critical issue. Real-World incidents such as Stuxnet have shown the feasibility of compromising a device in the power grid network to further launch more sophisticated attacks. To deal with security attacks of this spirit, this paper aims to hide critical targets from compromised internal nodes and hence protect them from further attacks launched by those compromised nodes. In particular, we consider substation networks and propose to add carefully-controlled dummy traffic to a substation network to make critical target nodes indistinguishable from other nodes in network traffic patterns. This paper describes the design and evaluation of such a scheme. Evaluations show that the scheme can effectively protect critical nodes with acceptable communication cost.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Formulation of Three-Phase State Estimation Problem Using a Virtual Reference

State Estimation (SE) is the backbone of modern Energy Management System (EMS) due its capability of processing real time measurements and provide reliable information to system operators. Since its introduction to power systems in the 70’s, SE has been widely used in transmission networks. Distribution grids on the other hand lack sufficient number of real time measurements, and for that reason SE has not been widely implemented on these systems. The recent increase in the number of renewable energy sources connected to the grid at lower voltage levels, the advent of Distribution Automation (DA) and Smart Grids necessitate closer monitoring of distribution networks and thus forcing utilities to upgrade their operations and deploy Advanced Distribution Management Sytems (ADMS). Therefore, Distribution System State Estimation (DSE) is paramount to provide real time monitoring of active distribution grids. This papers investigates the formulation of the three-phase distribution state estimation where in the most general case, none of the system buses may have balanced three phase voltages. In such a case, the choice and definition of the slack bus need to be revisited. Most of the existing work arbitrarily assign the root bus of the distribution feeder as the balanced three-phase reference which may not be realistic for today’s active distribution systems. This paper addresses this shortcoming of the existing SE formulations by introducing a virtual reference bus. Here, the proposed approach is effectively validated by simulations carried out on distribution test systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cybersecurity Certification Recommendations for Interconnected Grid Edge Devices and Inverter Based Resources

Escalating deployment of PV and grid-edge devices on the distribution grid has increased the sustainability and efficiency of the electric grid. However, the increasing number of distributed energy resources (DERs) deployed creates a heightened cyber-physical interdependency on the distribution grid and thus creates more vectors for cyber-attacks to exploit through information and communication technology (ICT) systems and networks. For example, control signal packets can be modified, intercepted, or corrupted due to vulnerabilities in communication protocols used by microgrid controllers and grid edge devices for power control. Therefore, to mitigate and prevent cyber-attacks on grid edge devices and the inverter-based resources connected to the distribution grid, the U.S. Department of Solar Energy Technologies Office (SETO) awarded funding to the National Renewable Energy Laboratory and Sandia National Laboratory (SNL) to research, develop, and harmonize cybersecurity standards for Photovoltaic (PV) systems and for other kinds of DERs. To help develop a standard for DER cybersecurity, NREL established certification recommendations and test cases, in consensus with the solar industry and UL, for ensuring intrinsic design security for DERs. These recommendations were developed to bolster the cybersecure functionalities such as TLS, MAC, CRL, session resumption/renegotiation, and password, system, and service security management within the DER devices. The proposed test cases verify authentication, authorization, confidentiality, and data integrity for data and communications of DERs that use Transmission Control Protocol/Internet Protocol (TCP/IP). They were also developed to protect DER communications from eavesdropping, replay, man-in-the-middle, denial of service (DoS), spoofing through security certificates, least-privilege violation, and brute-force credentials. This report, which has been validated and reviewed by UL, expands upon those test cases to provide DER cybersecurity certification recommendations which increase DER resiliency and help to mitigate cyber-attacks. UL's collaboration with NREL and approval of this document will accelerate the adoption of a UL standard for DER cybersecurity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Roadmap and Benchmarking: Privacy in Federated Load Forecasting

Data-driven techniques for energy demand forecasting continue to emerge with promising impacts on distribution grid planning. However, the development of robust and generalizable machine learning models requires that representative high quality training data are available. Distributed energy resources have begun to embed intelligence, gathering large amounts of data on customer demand, behavior, and household devices that are connected to the grid. Though utilities aggregate meter-level demand data for load shaping, demand response, outage management, reliability planning, and billing applications, there lies an inherent privacy concern in sharing consumption data that may identify individual consumer behavioral patterns. Hence, while sharing the data is crucial, the private sensitive customer data must be safeguarded from being exposed or manipulated. In this study, we propose a roadmap for implementing a based privacy preserving framework to support the advancement of data-driven analytics in data-sensitive distributed energy resources environments. The roadmap incorporates federated learning–a distributed training framework, differential privacy–a statistical framework that provides guarantees to safeguard the leakage of sensitive data, secure multiparty computation and homomorphic encryption– techniques for encrypting model gradients and applying secure aggregation on the server. Moreover, we perform baseline experiments on the federated short-term load forecasting (STLF) task using open-source residential load profile datasets, offering insights into the challenges of integrating differential privacy into federated learning.

Abebe, Waqwoya [Oak Ridge National Laboratory (ORN↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating Time Varying Connectivities and System Throughput in Opportunistic Networks for Smart Grid Applications

With increasing proliferation of smart phones, there is an opportunity to employ mobile ad hoc networks to connect to distributed energy assets located in remote areas. With embedded intelligence and edge computing capabilities, autonomous ‘edge control nodes’ can enable a decentralized energy nexus, without the need for on-demand communications. Authors have developed an opportunistic networking framework using Bluetooth Low Energy and a specialized mobile phone application that enables delay tolerant networking for the above framework. Here, this paper presents the analysis of time varying graph connectivity for such an opportunistic mobile ad hoc network. Dependence of connectivity on different network parameters such as radio characteristics, the mobility of data mules and parameters governing how connections are established are explored. Simulation results showing the variation of above trends have been presented.

Bluetooth↗

Quantification of storage required for preserving frequency security in wind‐integrated systems

Abstract The penetration of wind power generation into the power grid has been accelerated in recent times due to the aggressive emission targets set by governments and other regulatory authorities. Although wind power has the advantage of being environment‐friendly, wind as a resource is intermittent in nature. In addition, wind power contributes little inertia to the system as most wind turbines are connected to the grid via power electronic converters. These negative aspects of wind power pose serious challenges to the frequency security of power systems as penetration increases. In this work, an approach is proposed where an energy storage system (ESS) is used to mitigate frequency security issues of wind‐integrated systems. ESSs are well equipped to supply virtual inertia to the grid due to their fast‐acting nature, thus replenishing some of the energy storage capability of displaced inertial generation. In this work, a probabilistic approach is proposed to estimate the amount of inertia required by a system to ensure frequency security. Reduction in total system inertia due to the displacement of conventional synchronous generation by wind power generation is considered in this approach, while also taking into account the loss of inertia due to forced outages of conventional units. Monte Carlo simulation is employed for implementing the probabilistic estimation of system inertia. An ESS is then sized appropriately, using the system swing equation, to compensate for the lost inertia. The uncertainty associated with wind energy is modeled into the framework using an autoregressive moving average technique. Effects of increasing the system peak load and changing the wind profile on the expected system inertia are studied to illustrate various factors that might affect system frequency security. The proposed method is validated using the IEEE 39‐bus test system.

17 WIND ENERGY↗

Fault-tolerant grid frequency measurement algorithm during transients

A system determines the frequency of grid signals corresponding to an electrical grid in real time. The system includes a transient detector that monitors a grid signal from a voltage meter or a current meter connected to the electrical grid. The system produces, in real time and at a sampling rate, a deviation signal indicative of a periodicity of the monitored grid signal. The system determines, over one or more cycles of the monitored grid signal, a measurement signal corresponding to the deviation signal. The system determines a frequency signal that corresponds a frequency estimation of the monitored signal by applying a frequency estimation when values of the measurement signal are less than a deviation threshold and maintaining the frequency signal at a constant value when values of the measured signal equal or exceeds the deviation threshold.

Zhan, Lingwei↗

Methods for Microgrid Protection (Literature Review)

This work reviews existing conventional and non-conventional protection schemes for grid- and islanded-connected mode operations in North American microgrid projects. The protection schemes applied for the microgrid projects had different types of distributed energy resources (DERs), and integrated the hydropower/diesel generators, gas/steam/wind turbines and photovoltaic (PV) systems with energy storages. In this work, conventional protection schemes were those defined within the IEEE Standard C37.2-2008, while non-conventional schemes were those not defined within this Standard. The pros and cons of conventional and non-conventional protection schemes applied in microgrid projects were discussed in detail. The overvoltage, undervoltage and frequency elements were the most common conventional protection schemes applied in microgrid projects in North America. These protection elements were used to detect the islanded conditions and faults that could not be sensed by overcurrent relays because the small fault currents contributed by the low-inertia DERs and power-electronic sources. The directional overcurrent elements allowed to distinguish between external (grid) and internal (microgrid) faults. The adaptive protection was the most popular non-conventional protection scheme applied in microgrid projects. The adaptive protection detected if the microgrid was set in grid- or islanding-connected modes and selected the relay settings for the actual microgrid conditions to avoid relays’ misoperations. In conclusion, each microgrid project can confront different types of DERs and operation modes that require individual studies to solve their protection and control challenges, to obtain the best technical and economical solution. The protection scheme results and discussions for North American microgrid projects collected in this report provides an important information to guide protection and control engineers, designers and researchers in defining the protection methods for microgrids based on the types of DERs and grid- or islanded-connected operational modes

24 POWER TRANSMISSION AND DISTRIBUTION↗

Survey of existing and emerging power conversion technologies relevant to a self-powered furnace

Furnaces for residential space heating consume about 2.5% of all annual primary energy consumed in the US. Conventional furnaces utilize electricity from the electric grid to power blowers and other components. A self-powered furnace would utilize fuel energy to generate its own power, while rejecting the waste heat from the power cycle to provide additional useful building heating. Assuming the total energy use remains the same as for a conventional furnace, there are advantages in primary energy efficiency and operating cost. With no electrical connection to the grid, the self-powered furnace also improves resiliency to electric grid outages and reduces demand on the grid, which can be important during periods of peak heating. In addition, when unit size and venting type are maintained, a drop-in replacement with no incremental installation cost and increased potential for market adoption is achieved. In this work, the power generation requirements for such a drop-in-ready, self-powered furnace are analyzed, and available power generation technologies are surveyed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Today's Energy Challenges, Tomorrow's Solutions: Integrated Energy Pathways: Modernizing Our Energy Systems

Integrated Energy Pathways Today's electric grid was built for century-old needs, not the needs of tomorrow's emerging system. As the cost of generating electricity falls, products and systems that previously operated on other types of fuels are becoming increasingly "electrified." Instead of a one-way flow of electricity to systems that operate independently from one another, we are seeing more bi-directional connectivity between the grid and multiple end points. Integrated Energy Systems require a fundamental rethinking of grid infrastructure and the path electricity takes from the source of generation to the end point of use. Inevitably, the way the grid is managed today won't be the way it is managed 10-15 years from now. NREL is pioneering the fundamental research needed to guide this transition through renewable energy fuels and low-carbon electricity generation. Working with industry partners, we can collaboratively develop a fresh approach to energy generation, security, resilience, and advanced mobility.

energy security↗