Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Method for Ground-to-Space Laser Calibration System

The present invention comprises an approach for calibrating the sensitivity to polarization, optics degradation, spectral and stray light response functions of instruments on orbit. The concept is based on using an accurate ground-based laser system, Ground-to-Space Laser Calibration (GSLC), transmitting laser light to instrument on orbit during nighttime substantially clear-sky conditions. To minimize atmospheric contribution to the calibration uncertainty the calibration cycles should be performed in short time intervals, and all required measurements are designed to be relative. The calibration cycles involve ground operations with laser beam polarization and wavelength changes.

Lukashin, Constantine↗

Method for Ground-to-Satellite Laser Calibration System

The present invention comprises an approach for calibrating the sensitivity to polarization, optics degradation, spectral and stray light response functions of instruments on orbit. The concept is based on using an accurate ground-based laser system, Ground-to-Space Laser Calibration (GSLC), transmitting laser light to instrument on orbit during nighttime substantially clear-sky conditions. To minimize atmospheric contribution to the calibration uncertainty the calibration cycles should be performed in short time intervals, and all required measurements are designed to be relative. The calibration cycles involve ground operations with laser beam polarization and wavelength changes.

Lukashin, Constantine↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture to where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publicatoin5, in 2006 development was started to baseline Extra- Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗

Speech Alarms Pilot Study

Currently on the International Space Station (ISS) and other space vehicles Caution & Warning (C&W) alerts are represented with various auditory tones that correspond to the type of event. This system relies on the crew's ability to remember what each tone represents in a high stress, high workload environment when responding to the alert. Furthermore, crew receive a year or more in advance of the mission that makes remembering the semantic meaning of the alerts more difficult. The current system works for missions conducted close to Earth where ground operators can assist as needed. On long duration missions, however, they will need to work off-nominal events autonomously. There is evidence that speech alarms may be easier and faster to recognize, especially during an off-nominal event. The Information Presentation Directed Research Project (FY07-FY09) funded by the Human Research Program included several studies investigating C&W alerts. The studies evaluated tone alerts currently in use with NASA flight deck displays along with candidate speech alerts. A follow-on study used four types of speech alerts to investigate how quickly various types of auditory alerts with and without a speech component - either at the beginning or at the end of the tone - can be identified. Even though crew were familiar with the tone alert from training or direct mission experience, alerts starting with a speech component were identified faster than alerts starting with a tone. The current study replicated the results from the previous study in a more rigorous experimental design to determine if the candidate speech alarms are ready for transition to operations or if more research is needed. Four types of alarms (caution, warning, fire, and depressurization) were presented to participants in both tone and speech formats in laboratory settings and later in the Human Exploration Research Analog (HERA). In the laboratory study, the alerts were presented by software and participants were asked to identify the alert as quickly and as accurately as possible. Reaction time and accuracy were measured. Participants identified speech alerts significantly faster than tone alerts. The HERA study investigated the performance of participants in a flight-like environment. Participants were instructed to complete items on a task list and respond to C&W alerts as they occurred. Reaction time and accuracy were measured to determine if the benefits of speech alarms are still present in an applied setting.

Sandor, A.↗

Simulation of Malfunctions for the ISS Double-Gimbal Control Moment Gyroscope

This paper presents a simplified approach to simulation of malfunctions of the Control Moment Gyroscope (CMG) on board the International Space Station (ISS). These malfunctions will be used as part of flight training of CMG failure scenarios in the guidance navigation control (GNC) subsystem of the Training Systems for 21st Century (TS21) simulator. The CMG malfunctions are grouped under mechanical, thermal and electrical categories. A malfunction can be as simple as one which only affects the telemetry or a complex one that changes the state and behavior of the CMG model. In both cases, the ISS GNC flight software will read the telemetry and respond accordingly. The user executes these malfunctions by supplying conditional data which modify internal model states and then elicit a response as seen on the user displays. Ground operators and crew on board the ISS use CMG malfunction procedures to better understand and respond to anomalies observed within the CMG subsystem.

Inampudi, Ravi↗

ASME Section VIII Recertification of a 33,000 Gallon Vacuum-jacketed LH2 Storage Vessel for Densified Hydrogen Testing at NASA Kennedy Space Center

The Ground Operations Demonstration Unit for Liquid Hydrogen (GODU-LH2) has been developed at NASA Kennedy Space Center in Florida. GODU-LH2 has three main objectives: zero-loss storage and transfer, liquefaction, and densification of liquid hydrogen. A cryogenic refrigerator has been integrated into an existing, previously certified, 33,000 gallon vacuum-jacketed storage vessel built by Minnesota Valley Engineering in 1991 for the Titan program. The dewar has an inner diameter of 9.5 and a length of 71.5; original design temperature and pressure ranges are -423 F to 100 F and 0 to 95 psig respectively. During densification operations the liquid temperature will be decreased below the normal boiling point by the refrigerator, and consequently the pressure inside the inner vessel will be sub-atmospheric. These new operational conditions rendered the original certification invalid, so an effort was undertaken to recertify the tank to the new pressure and temperature requirements (-12.7 to 95 psig and -433 F to 100 F respectively) per ASME Boiler and Pressure Vessel Code, Section VIII, Division 1. This paper will discuss the unique design, analysis and implementation issues encountered during the vessel recertification process.

Liquefaction↗

Orion Burn Management, Nominal and Response to Failures

An approach for managing Orion on-orbit burn execution is described for nominal and failure response scenarios. The burn management strategy for Orion takes into account per-burn variations in targeting, timing, and execution; crew and ground operator intervention and overrides; defined burn failure triggers and responses; and corresponding on-board software sequencing functionality. Burn-to- burn variations are managed through the identification of specific parameters that may be updated for each progressive burn. Failure triggers and automatic responses during the burn timeframe are defined to provide safety for the crew in the case of vehicle failures, along with override capabilities to ensure operational control of the vehicle. On-board sequencing software provides the timeline coordination for performing the required activities related to targeting, burn execution, and responding to burn failures.

Odegard, Ryan↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publication, in 2006 development was started to baseline Extra-Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗

After Math - Foamology and Flight Rationale

The Space Shuttle was developed by NASA to be a largely reusable launch system which could provide frequent access to low earth orbit. Like all previous launch systems, safe reentry for the crew and payload required the use of a thermal protection system (TPS). Unlike previous spacecraft though, the Shuttle's TPS was exposed from launch, making it sensitive to debris which could be generated by the vehicle on ascent. The most likely and potentially destructive source of debris was considered to be ice, which could build-up anywhere on the External Tank (ET) where there was exposed metal. Ice could form during ground operations after the cryogenic propellants had been loaded and then be knocked loose on ascent. In order to prevent both ice build-up and boil-off of the propellants, the entire ET and all protuberances (orbiter attach points, pressurization lines, propellant feed lines, etc.) were covered with a spray on foam insulation (SOFI) type TPS. Unfortunately the foam was also susceptible to liberation during ascent, and posed a debris risk of its own. During the early years of the Shuttle Program engineers spent a good deal of effort characterizing the amount of foam that was shed.

Steva, Thomas↗

NASA's Space Launch System: A New Opportunity for CubeSats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. Together with the Orion crew vehicle and ground operations at NASA's Kennedy Space Center in Florida, SLS is a foundational capability for NASA's Journey to Mars. From the beginning of the SLS flight program, utilization of the vehicle will also include launching secondary payloads, including CubeSats, to deep-space destinations. Currently, SLS is making rapid progress toward readiness for its first launch in 2018, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight, Exploration Mission-1, SLS will launch an uncrewed test flight of the Orion spacecraft into distant retrograde orbit around the moon. Accompanying Orion on SLS will be 13 CubeSats, which will deploy in cislunar space. These CubeSats will include not only NASA research, but also spacecraft from industry and international partners and potentially academia. Following its first flight and potentially as early as its second, which will launch a crewed Orion spacecraft into cislunar space, SLS will evolve into a more powerful configuration with a larger upper stage. This configuration will initially be able to deliver 105 t to LEO and will continue to be upgraded to a performance of greater than 130 t to LEO. While the addition of the more powerful upper stage will mean a change to the secondary payload accommodations from Block 1, the SLS Program is already evaluating options for future secondary payload opportunities. Early discussions are also already underway for the use of SLS to launch spacecraft on interplanetary trajectories, which could open additional opportunities for CubeSats. This presentation will include an overview of the SLS vehicle and its capabilities, including the current status of progress toward first launch. It will also explain the opportunities the vehicle offers for CubeSats and secondary payloads, including an overview of the CubeSat manifest for Exploration Mission-1 in 2018.

Hitt, David↗

Rocket Propulsion (RP) 21 Steering Committee Meeting - NASA Spacecraft Propulsion Update

Lander Tech is three separate but synergistic efforts: Lunar CATALYST (Lunar Cargo Transportation and Landing by Soft Touchdown) Support U.S. industry led robotic lunar lander development via three public-private efforts. Support U.S. industry led robotic lunar lander development via three public-private partnerships. Infuse or transfer landing technologies into these public private partnerships. Advanced Exploration Systems-Automated Propellant Loading (APL) -Integrated Ground Operations. Demonstrate LH2 zero loss storage, loading and transfer operations via testing on a large scale in a relevant launch vehicle servicing environment. (KSC, GRC). Game Changing Technology-20 Kelvin -20 Watt Cryocooler Development of a Reverse Turbo-Brayton Cryocooler operating at 20 Kelvin with 20 Watts of refrigeration lift.

Propellant↗

Crewed Space Vehicle Battery Safety Requirements Revision D

The Crewed Space Vehicle Battery Safety Requirements document has been prepared for use by designers of battery-powered vehicles, portable equipment, and experiments intended for crewed spaceflight. The purpose of the requirements document is to provide battery designers with information on design provisions to be incorporated in and around the battery and on the verification to be undertaken to demonstrate a safe battery is provided. The term "safe battery" means that the battery is safe for ground personnel and crew members to handle and use; safe to be used in the enclosed environment of a crewed space vehicle; and safe to be mounted or used in unpressurized spaces adjacent to habitable areas. Battery design review, approval, and certification is required before the batteries can be used for ground operations and be certified for flight.

Russell, Samuel↗

Mission Planning for Robotic and Human Exploration

Mission planning for spaceflight is a complex challenge for ground operators managing robotic or human missions. It requires integrating the needs of various disciplines and creating an effective, efficient, and safe plan to execute. NASA uses specialized tools to meet planning requirements and constraints. This talk will provide an overview of spaceflight mission planning as well as the software tools the Human-Computer Interaction Group has built to support scheduling and planning. Also, it identifies the future scheduling and planning challenges for human Mars missions and how we leverage Earth Analogs to learn about Mars operations.

Scheduling and planning↗

Verification Testing and Veg-05 Tomato Crop Production on the International Space Station

Production of fresh, nutritious, and tasty produce for astronauts during spaceflight may provide health-promoting, bioavailable nutrients and enhance the dietary experience as we move into longer-duration missions. Growing and caring for plants may also reduce the psychological stresses associated with spaceflight and enhance connections to Earth. Requirements to consistently grow a diversity of crops under spaceflight environmental conditions remain poorly defined. The VEG-05 experiment is part of a series of experiments with pick-and-eat salad crops to better define best practices for crop production and handling in space. VEG-05 and predecessor experiments VEG-04A and VEG-04B, use the Veggie vegetable production facilities on the International Space Station to grow salad crops under different spectral compositions. In VEG-04A and B, mizuna mustard was cultivated with two different red: blue light treatments, and in VEG-05 we are cultivating ‘Red Robin’ dwarf cherry tomatoes under the same light spectra. Light can impact the growth habit, yield, nutritional composition, microbial levels, and even flavor attributes within crops, and our team will assess these characteristics for this crop during VEG-05. Prior to launch and installation on ISS in late 2022, both a science verification test (SVT), and an experiment verification test (EVT) were conducted at Kennedy Space Center in ISS Environment Simulator Chambers. Science verification testing, and a previous fertilizer test, grew plants in both plant pillows and PONDS (Passive Orbital Nutrient Delivery System) units and tested two different fertilizer treatments in both sets of hardware, with each test under only one of the light conditions. Because of challenges validating the PONDS hardware on ISS, and with good crop production in plant pillows, the EVT moved forward using only plant pillows with the highest fertilizer composition tested during SVT, and two Veggie units were utilized. One Veggie had light settings consisting of equal levels of red: blue light (150 µmol/m2/s for each color) plus green light (30 µmol/m2/s) while the second Veggie had a 90:10 ratio of red: blue light (270 µmol/m2/s red and 30 µmol/m2/s blue) plus green, so each unit provided 330 µmol/m2/s of photosynthetically active radiation to the tomato crops on average. Our original plan, based on prior ground testing, was to grow the crop for 104 days and harvest at 80, 90 and 104 days after initiation. For SVT, under the equal red: blue light treatment, fruit ripening in plant pillows was delayed and fruit were not ripe by day 80, so actual harvest days were days 90, 97, and 104. For EVT we saw fruit ripening earlier, especially in the high red treatment, and so we harvested at days 83, 90, and 99 days after initiation. In SVT we had mostly daily watering, and this led to excess water in plant pillows, which leaked out. This excess water also caused fungus to grow on one leaf and a couple of plant stems. To reduce this excess moisture, we throttled back the watering for EVT, and used the root mat reservoir more frequently. This led to watering only every other day, reducing crew time needed for plant care, however, two wilting events occurred during this EVT, at days 51 and 75. Plants recovered from these wilting events, but these events may have influenced the rate of fruit ripening and flower formation. Regardless, more than 10 fruit were produced from each plant on average, with the high red treatment producing slightly heavier fruit. Microbial testing from fruit during SVT indicated that fruit were safe for consumption with microbial levels below detection limits. VEG-05 flight and ground operations are expected to run between December 2022 and March 2023. This research was co-funded by the Human Research Program and Space Biology (MTL#1075) in the ILSRA 2015 NRA call.

Gioia D. Massa↗

APRES Prototype Mission Planner System Demonstration

Activity Planning with Resources for the Exploration of Space (APRES) is a mixed-initiative mission planning system for ground operations. APRES has been designed to support multi-spacecraft missions. The APRES Interface is browser-based and includes a plan editor, a timeline plan display, a temporal constraint editor, display of the state and numeric chronicles, and a violation resolution manager. Automation support is supplied by the APRES Service, which includes components that provide the following capabilities:(1) plan simulation, which determines the state and numeric chronicles (values of the model variables over time) and determines when "processes" are triggered and terminated based on world states in the execution trace, (2) violation detection of constraints and flight rules encoded in the domain model, and of the temporal constraints created by the user, (3) violation resolution suggestions as to how to fix the plan's violations via rescheduling. The user controls when and how to utilize the automation support. Demo video included with paper, runtime 8:54 in color with sound.

John L. Bresina↗

Mission Planning for Trident: Discovery proposal to Neptune’s moon, Triton

Trident was one of the four Discovery-class Step-1 mission proposals selected by NASA in 2020 for further development and study; however, in 2021, the Step-2 proposal was not down-selected to transition into the next phase of mission development, i.e., a mission for flight.Neptune’s largest moon, Triton, was the primary focus of study for Trident. Triton’s physical and orbital characteristics make it a unique planetary target for scientific exploration, providing opportunities for investigations in a wide variety of scientific fields, including geomorphological, atmospheric, geophysical, magnetospheric, and ionospheric studies. The science objectives of the Trident mission encompassed an in-depth interior-to-exterior set of objectives, focused on multiple outstanding questions resulting from the 1989 encounter of Voyager 2, and subsequent analysis.Ball Aerospace Corp. was tasked with building the Trident spacecraft, with JPL responsible for providing Engineering Support (Mission Design & Navigation, Mission Planning, Flight Operations, Ground Data Systems, Systems Engineering) and leading Project Management. The observatory would carry a wide-ranging suite of scientific instruments onboard, including an Infrared Spectrometer (IRS) and Narrow Angle Camera (NAC) to be provided by Ball Aerospace Corp., a Wide Angle Camera (WAC) from JPL, a Magnetometer from UCLA, a contributed Plasma Science Suite from IRF (Sweden), and a contributed Radio Science instrument from ASI (Italy). All of these instruments would be used to collect unique datasets during the Triton encounter. Trident would have taken advantage of an ~13-yr, nearly-ballistic trajectory to Triton, utilizing a timely Jupiter Gravity Assist, to execute a 10-day long encounter in the Neptunian system. Launch was planned for October 2025, with Triton arrival scheduled for December 2038. The timeline for this mission would have been sub-divided into seven major phases: Launch, Commissioning, Inner Planet Cruise, Outer Planet Cruise, Approach, Encounter, and Science Data Return. Multiple planetary flybys were planned to be performed during the cruise, including three Earth flybys and one Venus flyby in the Inner Planet Cruise phase, and one Jupiter flyby in the Outer Planet Cruise phase. Along with conventional (Range and Doppler) tracking data, Delta-DOR and Optical Navigation data were also to be acquired to assist with spacecraft navigation during the Approach and Encounter phases. A 3 meter X-Band High Gain Antenna would allow playback of all science data at 1 kbps within 1 year after the Triton Encounter. The Mission Planning element on Trident encompassed and informed multiple aspects of this proposal, ranging from science observation planning during the Triton Encounter phase, to generation of activity timelines for all mission phases; performing ground coverage analysis for science observations to be acquired by all instruments and tracing them to science requirements; evaluation of spacecraft resources including data volume stored onboard, power/energy consumption, telecom (commanding/telemetry) requirements, and overall, working at the interface of science and engineering teams on the mission. All of these functions that were performed by the Mission Planning team on this proposal are discussed in this paper.

Prockter, Louise↗

Energy of Fluid (EOF) Simulation of Large-Scale Densification and Solidification of Hydrogen

The current research develops a finite volume-based Computation Fluid Dynamic (CFD) model utilizing an Energy of Fluid (EOF) approach to generate a simulation of the densification of liquid hydrogen (LH2) in the Integrated Refrigeration and Storage (IRAS) experimental tank for the Ground Operations Demonstration Unit for Liquid Hydrogen Project (GODU-LH2) at the Kennedy Space Center (KSC). The computational code will integrate a commercial software pressure-based model with User Defined Functions (UDF) generated and added to the model. The modified model will solve the energy equation in terms of internal energy and provide temperature and pressure calculations for a given tank geometry. This method will decrease computational time when compared to the built-in commercially available Enthalpy solvers. Currently the research focused on utilizing User Defined Scalars (UDS) compared to the enthalpy model and a lumped node analysis to show the written UDS is as accurate as the built-in solvers, and the models will be verified using known solutions for solidification and validated with the experimental results from the Cryogenics Test Laboratory (CTL) at KSC for the IRAS densification process.

C. Mahony↗

Mapping the ISS with the Autonomous Free-Flying Astrobee Robots

Space intra-vehicular robots (IVR) can provide coverage survey and targeted close-up inspection imagery capabilities that improve ground operator situation awareness. We report on a series of activities using the autonomous Astrobee robotic free-flyers that mapped the interior of three ISS modules, generating a panoramic tour of the ISS interior without astronaut manual photography. For the ISS, these capabilities can complement or replace time-consuming crew inspection tasks, providing panoramic data products that are easier to navigate than the baseline crew safety videos. For future exploration vehicles with extended uncrewed mission phases, robotic inspection will play a more critical role of providing the primary “eyes in the sky” for vehicle operators.

robotics↗