Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated Resource Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

WECC Variable Generation Planning Reference Book

This planning reference book is a document reflecting a Western Electricity Coordination Council (WECC) effort to put together multiple sources of information and provide a clear, systemic, comprehensive outline of the problems, both existing and anticipated; their impacts on the system; currently used and proposed solutions by the industry and research community; planning practices; new technologies, equipment, and standards; and expected future trends. This living (periodically updated) document could help WECC and other practicing engineers, especially the younger generation of engineers joining the workforce, to get familiar with a large variety of information related to the integration of variable resources into the WECC system, bypassing in part the need for time-consuming information gathering and learning processes from more experienced engineers or from the literature.

Electricity↗

Evolving the Land Information System into a Cloud Computing Service

The Land Information System (LIS) was developed to use advanced flexible land surface modeling and data assimilation frameworks to integrate extremely large satellite- and ground-based observations with advanced land surface models to produce continuous high-resolution fields of land surface states and fluxes. The resulting fields are extremely useful for drought and flood assessment, agricultural planning, disaster management, weather and climate forecasting, water resources assessment, and the like. We envisioned transforming the LIS modeling system into a scientific cloud computing-aware web and data service that would allow clients to easily setup and configure for use in addressing large water management issues. The focus of this Phase 1 project was to determine the scientific, technical, commercial merit and feasibility of the proposed LIS-cloud innovations that are currently barriers to broad LIS applicability. We (a) quantified the barriers to broad LIS utility and commercialization (high performance computing, big data, user interface, and licensing issues); (b) designed the proposed LIS-cloud web service, model-data interface, database services, and user interfaces; (c) constructed a prototype LIS user interface including abstractions for simulation control, visualization, and data interaction, (d) used the prototype to conduct a market analysis and survey to determine potential market size and competition, (e) identified LIS software licensing and copyright limitations and developed solutions, and (f) developed a business plan for development and marketing of the LIS-cloud innovation. While some significant feasibility issues were found in the LIS licensing, overall a high degree of LIS-cloud technical feasibility was found.

54 ENVIRONMENTAL SCIENCES↗

An intelligent planning and scheduling system for the HST servicing missions

A new, intelligent planning and scheduling system has been delivered to NASA-Goddard Space Flight Center (GSFC) to provide support for the up-coming Hubble Space Telescope (HST) Servicing Missions. This new system is the Servicing Mission Planning and Replanning Tool (SM/PART). SM/PART is written in C and runs on a UNlX-based workstation (IBM RS/6000) under Motif. SM/PART effectively automates the complex task of building or rebuilding integrated timelines and command plans which are required by HST Servicing Mission personnel at their consoles during the missions. SM/PART is able to quickly build or rebuild timelines based on information stored in a Knowledge Base (KB) by using an Artificial Intelligence (AI) tool called the Planning And Resource Reasoning (PARR) shell. After a timeline has been built in the batch mode, it can be displayed and edited in an interactive mode with help from the PARR shell. Finally a detailed command plan is generated. The capability to quickly build or rebuild timelines and command plans provides an additional safety factor for the HST, Shuttle and Crew.

Johnson, Jay↗

Integration and Test of Shuttle Small Payloads

Recommended approaches for space shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of shuttle small payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration and interface testing; (7) Postflight operations. This paper is of special interest to those payload projects that have small budgets and few resources: that is, the truly faster, cheaper, better projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

Wright, Michael R.↗

Automated Derivation of Complex System Constraints from User Requirements

The Payload Operations Integration Center (POIC) located at the Marshall Space Flight Center has the responsibility of integrating US payload science requirements for the International Space Station (ISS). All payload operations must request ISS system resources so that the resource usage will be included in the ISS on-board execution timelines. The scheduling of resources and building of the timeline is performed using the Consolidated Planning System (CPS). The ISS resources are quite complex due to the large number of components that must be accounted for. The planners at the POIC simplify the process for Payload Developers (PD) by providing the PDs with a application that has the basic functionality PDs need as well as list of simplified resources in the User Requirements Collection (URC) application. The planners maintained a mapping of the URC resources to the CPS resources. The process of manually converting PD's science requirements from a simplified representation to a more complex CPS representation is a time-consuming and tedious process. The goal is to provide a software solution to allow the planners to build a mapping of the complex CPS constraints to the basic URC constraints and automatically convert the PD's requirements into systems requirements during export to CPS.

Foshee, Mark↗

A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki

The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.

Delaney, Michael M.↗

ARIES and ADMS Test Bed Overview and Updates

This presentation provides an overview and updates on the National Renewable Energy Laboratory's Advanced Research on Integrated Energy Systems (ARIES) platform and Advanced Distribution Management System (ADMS Test Bed).

ADMS↗

The Value of Resilience for Distributed Energy Resources: An Overview of Current Analytical Practices

Recent extreme weather events, natural disasters, and cyber incursions have brought the vulnerability of the electric system into sharp focus. These events have demonstrated that planning for long-duration power interruptions caused by high-impact, low-probability events will require new approaches to power system resilience above and beyond previous hardening efforts. At the same time, the rapid growth and declining costs of distributed energy resources (DERs) such as microgrids, solar photovoltaics, and batteries have introduced new technology options for energy resilience. Consequently, state policymakers across the country have established electricity resilience policies and programs, with several states focusing specifically on resilient DERs as part of clean energy programs and grid modernization efforts. Although it is clear that DERs offer resilience benefits, it is unclear how to determine the value of those benefits. Identifying appropriate methodologies to calculate the value of resilience will be an important step toward ensuring that resilient DERs are considered alongside alternatives and integrated into future energy infrastructure and investment planning efforts. This paper reviews current practices for calculating the value of resilience with a focus on valuing resilient DERs installed within the distribution system. It examines both regulatory decision-making and non-regulatory cost-benefit analyses in order to determine if, and how, a value of resilience was calculated and applied. The paper is designed to address questions that utility regulators have identified as being of interest: (1) Have regulators identified and utilized a value of resilience in regulatory decisions related to resilient DERs? (2) Is the value of resilience being used to analyze resilient DERs in venues other than regulatory proceedings? (3) What are the different methods to value energy resilience? (4) What are the pros and cons of different methods used to value resilience? (5) Can regulators adopt or improve value of resilience methods to support their decisions?

14 SOLAR ENERGY↗

Hardware-in-the-Loop Evaluation of Grid-Edge DER Chip Integration Into Next-Generation Smart Meters

To facilitate the implementation of distributed energy resource management systems (DERMS), we propose to insert a grid-edge distributed energy resource (DER) chip hosting a DERMS algorithm into the next generation of smart meters. This will create a pathway for the wide adoption of DERMS technology because many utilities plan to invest in advanced metering infrastructure in the near future. This will also bridge the gap between an electrical power utility and DERs behind the meter. The DER chip is designed to follow power direction signals from the DERMS coordinator while balancing its local objectives. We tested the chip using a controller- and power-hardware-in-the-loop evaluation under three scenarios that a DERMS could face in the real world. The DER chip was capable of and effective at directing four heterogeneous DERs to respond to a DERMS coordinator for grid services (e.g., voltage regulation and a virtual power plant).

distributed energy resource management system↗

Power System Modeling for the Study of High Penetration of Distributed Photovoltaic Energy

Many conventional power systems are evolving due to the growth of renewable energy and distributed energy resources (DERs). Modeling the interplay of transmission and distribution systems is critical to analyze how DERs impact a system’s conventional operation and which electric infrastructure improvements are needed to achieve a balance between centralized generation and DERs. This article describes the process, tools, and resources used to model electric power systems with a centralized infrastructure in an isolated context and limited access to actual utility data. Photovoltaic systems installed on residential rooftops were the main design option. This work broadened the typical power system modeling to include planning and social considerations. This integrative engineering-social method allows for interdisciplinary teams to work in the development of a model as part of broader design goals for a renewable-dominant energy system. The Puerto Rico electric power system was used as a case study to demonstrate the process. The integrative engineering-social perspective in developing the model and the actions to manage data limitations are aspects that could be followed in other locations with aggressive renewable energy goals and where utility data are not readily available.

Cuello-Polo, Gustavo↗

Integration and Test for Small Shuttle Payloads

Recommended approaches for shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of small shuttle payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of the NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration, and interface testing; and (7) Postflight operations. This paper is of special interest to those payload projects which have small budgets and few resources: That is, the truly 'faster, cheaper, better' projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

Wright, Michael R.↗

Sensorimotor Application of Proposed Methods to Combine the Effects of Multiple Countermeasures for PRisM

Risk associated with human systems is challenging to quantify but is critical for the mission planning and decision making required to enable future Lunar and Martian missions. To address this gap, the Crew Health and Performance-Probabilistic Risk Assessment (CHP-PRA) project is developing an integrated computational model for CHP mission risk. Much like how MEDPRAT is designed to allow medical resource trades informed by medical risk, CHP-PRA will enable analogous trades in human system risks across multiple CHP functions and capabilities. Human performance is one component of the risk intended to be captured by CHP-PRA through the Performance Risk Model (PRisM). The sensorimotor risk area provides a good frame of reference for investigating the structure of a performance model because most tasks that astronauts are expected to perform require input from the sensory system and/or movement/motor control. Additionally, sensorimotor countermeasures are an area of particular concern for NASA’s Human Research Program because of the increased sensorimotor risk associated with surface operations in Lunar and Martian missions. Thus, a tool that can quickly compare risk reductions of potential countermeasures would be beneficial in guiding research and development of effective countermeasures. In this proof of concept, we present a systematic way to combine multiple performance data sets for humans subjected to different countermeasures such that we can predict the countermeasure(s) that optimize astronaut performance on relevant tasks. PRisM assumes that both the tests that are used to measure countermeasure effectiveness (input data) and the tasks we use to represent astronaut performance, can be broken down and represented as a function/vector of the human systems required to perform that test/task. Through mathematical combination, test data are used to predict performance on astronaut tasks that use similar systems. We propose that when combining countermeasures evaluated using the same test, that only one value should be used to represent their combined effectiveness. We start our analysis with the assumption that two countermeasures together will perform better than each countermeasure individually. Our initial implementation of this framework compares various space motion sickness countermeasures and the most up to date analysis will be demonstrated at the IWS.

Caroline R Austin↗

Grid Service for User-Centric Job

The User Centric Monitoring (UCM) project was aimed at developing a toolkit that provides the Virtual Organization (VO) with tools to build systems that serve a rich set of intuitive job and application monitoring information to the VO’s scientists so that they can be more productive. The tools help collect and serve the status and error information through a Web interface. The proposed UCM toolkit is composed of a set of library functions, a database schema, and a Web portal that will collect and filter available job monitoring information from various resources and present it to users in a user-centric view rather than and administrative-centric point of view. The goal is to create a set of tools that can be used to augment grid job scheduling systems, meta-schedulers, applications, and script sets in order to provide the UCM information. The system provides various levels of an application programming interface that is useful through out the Grid environment and at the application level for logging messages, which are combined with the other user-centric monitoring information in a abstracted “data store”. A planned monitoring portal will also dynamically present the information to users in their web browser in a secure manor, which is also easily integrated into any JSR-compliant portal deployment that a VO might employ. The UCM is meant to be flexible and modular in the ways that it can be adopted to give the VO many choices to build a solution that works for them with special attention to the smaller VOs that do not have the resources to implement home-grown solutions.

99 GENERAL AND MISCELLANEOUS↗

NASA Crew Exploration Vehicle, Thermal Protection System, Lessons Learned

The Orion (CEV) thermal protection system (TPS) advanced development project (ADP) was initiated in late 2006 to reduce developmental risk by significant investment in multiple heat shield architectural solutions that can meet the needs both the Low Earth orbit (LEO) and Lunar return missions. At the same time, the CEV TPS ADP was also charged with developing a preliminary design for the heat shield to meet the PDR requirement and at the time of the PDR, transfer the design to Lockheed- Martin, the prime contractor. We reported on the developmental activities of the first 18 months at the IPPW5 in Bordeaux, France, last summer. In June 08, at the time of the IPPW6, the CEV TPS ADP would have nearly completed the preparation for the Orion PDR and would be close to the original three-year mark. We plan to report on the progress at the Atlanta workshop. In the past year, Orion TPS ADP investment in TPS Technology, especially in PICA ablative Heat-shield design, development, testing and engineering (DDTE) has paid off in enabling MSL mission to switch from SLA 561 V heat shield to PICA heat shield. CEV TPS ADP considered SLA 561 V as a candidate for LEO missions and our testing identified failure modes in SLA and as a result, we dropped SLA for further evaluation. This close synergy between two projects is a highly visible example of how investment in technology areas can and does benefit multiple missions. In addition, CEV TPS ADP has been able to revive the Apollo ablative system namely AVCOAT honeycomb architecture as an alternate to the baseline PICA architecture and we plan to report the progress we have made in AVCOAT. CEV TPS ADP has invested considerable resources in developing analytical models for PICA and AVCOAT, material property measurements that is essential to the design of the heat-shield, in arcjet testing, in understanding the differences between different arc jet facilities, namely NASA Ames, NASA JSC and Air Force's AEDC, and in Non-Destructive Evaluation (NDE), and in integration of and manufacturing heat shield as a system. The capabilities of the two heat shield systems including failure modes via testing and analysis, once established, can serve the Probe Community and future mission designers to inner and outer planetary exploration very well. For example, missions to Venus, Mars and Titan can use either one of the system by selecting the mission design parameters that utilizes the full characteristics of these system to make use of system efficiency that will result in reduced heat shield mass, system robustness that will enhance mission success and cost. We plan to present significant progresses of the past three years and highlight the significant contributions CEV TPS ADP Project has made to advance the state of the art in Thermal Protection System technology that has and will continue to benefit future entry probe missions.

NASA Crew Exploration Vehicle↗

The Value of Increased HVDC Capacity Between Eastern and Western U.S. Grids: The Interconnections Seam Study

The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the Eastern and Western Interconnections using high-voltage direct-current (HVDC) transmission and cost-optimizing both generation and transmission resources across the United States. The study conducted a multi-model analysis that used co-optimized generation and transmission expansion planning and production cost modeling. Four transmission designs under eight scenarios were developed and studied to estimate costs and potential benefits. The results show benefit-to-cost ratios that reach as high as 2.9, indicating significant value to increasing the transmission capacity between the interconnections under the cases considered, realized through sharing generation resources and flexibility across regions.

13 HYDRO ENERGY↗

Hardware-in-the-Loop Evaluation of Grid-Edge DER Chip Integration Into Next-Generation Smart Meters: Preprint

To facilitate the implementation of distributed energy resource management systems (DERMS), we propose to insert a grid-edge distributed energy resource (DER) chip hosting a DERMS algorithm into the next generation of smart meters. This will create a pathway for the wide adoption of DERMS technology because many utilities plan to invest in advanced metering infrastructure in the near future. This will also bridge the gap between an electrical power utility and DERs behind the meter. The DER chip is designed to follow power direction signals from the DERMS coordinator while balancing its local objectives. We tested the chip using a controller- and power-hardware-in-the-loop evaluation under three scenarios that a DERMS could face in the real world. The DER chip was capable of and effective at directing four heterogeneous DERs to respond to a DERMS coordinator for grid services (e.g., voltage regulation and a virtual power plant).

distributed energy resource management system↗

Design, implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Design implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗