Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Developing and Implementing a Process to Verify and Validate the NASA InSight Mission’s Instrument Command Products

The NASA InSight Mars lander is a roboticspacecraft which is investigating the interior structure of Marsthrough a series of seismological measurements andexperiments. Much of the commanding of activities performedby the instruments was done using ‘blocks’ – reusable functionswritten in Virtual Machine Language stored onboard thespacecraft– and sequences (series of commands) that werecreated by teams to operate their instruments. It was vital thatthese blocks and sequences (collectively called commandproducts) be thoroughly examined prior to onboard executionusing a comprehensive test program to reduce risk to thespacecraft and instruments and ensure smooth operations onthe surface of Mars. The Verification and Validation (V&V)process that was designed and implemented during the monthsleading up to InSight’s launch and landing successfullyuncovered a number of issues that could have causedoperational delays or impacted hardware. The process alsohelped adapt ground tools to better model onboard activities,create operational principles to avoid unintended consequencesduring flight, and generate a reference database for commandproduct use during operations. This allowed InSight to meet itssurface operations goals in the desired timeframe. This paperdescribes the development, implementation and results ofInSight’s command product V&V process, its contribution tomission success, and challenges faced.

Cloutier, Kyle↗

Ground Winds Experienced by the Space Launch System Rocket on the Pad before the Artemis I Launch

Over the course of the development of the Space Launch System (SLS) human-rated heavy-lift launch vehicle, the magnitude and nature of the ground winds experienced by the rocket and its Mobile Launcher (ML) on Pad 39B at the NASA Kennedy Space Center (KSC) became a more critical environment that required characterization as well as a more accurate prediction of the vehicle and ML response in the form of detailed wind loads. The numerous reasons for the sensitivity of the launch system to these ground winds and the growing importance of high fidelity rollout and launch pad wind loading estimates are discussed in this article. A description of the wind measurement instrumentation at and around the Launch Complex is provided. A methodology is developed to estimate from these raw anemometer measurements the winds experienced by the rocket and mobile launcher on the launch pad, either in real time or during post-processing. An analysis is then performed and documented on the 121 days worth of wind measurements recorded while the SLS vehicle was secured on the pad during various launch attempts and wet dress rehearsals. This included the occurrence of a tropical storm that evolved into a named hurricane by the time it arrived on Cape Canaveral and hit the vehicle while sitting on the launch pad. Plans for further developments to improve on this predictive capability in preparation for Artemis II are also presented.

Jeremy T Pinier↗

Ground Winds Experienced by the Space Launch System Rocket on the Pad before the Artemis I Launch

Over the course of the development of the Space Launch System (SLS) human-rated heavy-lift launch vehicle, the magnitude and nature of the ground winds experienced by the rocket and its Mobile Launcher (ML) on Pad 39B at the NASA Kennedy Space Center (KSC) became a more critical environment that required characterization as well as a more accurate prediction of the vehicle and ML response in the form of detailed wind loads. The numerous reasons for the sensitivity of the launch system to these ground winds and the growing importance of high fidelity rollout and launch pad wind loading estimates are discussed in this article. A description of the wind measurement instrumentation at and around the Launch Complex is provided. A methodology is developed to estimate from these raw anemometer measurements the winds experienced by the rocket and mobile launcher on the launch pad, either in real time or during post-processing. An analysis is then performed and documented on the 121 days worth of wind measurements recorded while the SLS vehicle was secured on the pad during various launch attempts and wet dress rehearsals. This included the occurrence of a tropical storm that evolved into a named hurricane by the time it arrived on Cape Canaveral and hit the vehicle while sitting on the launch pad. Plans for further developments to improve on this predictive capability in preparation for Artemis II are also presented.

Jeremy T. Pinier↗

Develop and demonstrate manufacturing processes for fabricating graphite filament reinforced polymide (Gr/PI) composite structural elements

A study was conducted to assess the merits of using graphite/polyimide, NR-150B2 resin, for structural applications on advanced space launch vehicles. The program was divided into two phases: (1) Fabrication Process Development; and (2) Demonstration Components. The first phase of the program involved the selection of a graphite fiber, quality assurance of the NR-150B2 polyimide resin, and the quality assurance of the graphite/polyimide prepreg. In the second phase of the program, a limited number of components were fabricated before the NR-150B2 resin system was removed from the market by the supplier, Du Pont. The advancement of the NR-150B2 polyimide resin binder was found to vary significantly based on previous time and temperature history during the prepregging operation. Strength retention at 316C (600F) was found to be 50% that of room temperature strength. However, the composite would retain its initial strength after 200 hours exposure at 316C (600F). Basic chemistry studies are required for determining NR-150B2 resin binder quality assurance parameters. Graphite fibers are available that can withstand high temperature cure and postcure cycles.

Chase, V. A.↗

TESS Science Processing Operations Center Pipeline and Data Products

TESS (Transiting Exoplanet Survey Satellite) launched on 18-4-2018 to conduct a two-year, near all-sky survey for at least 50 nearby exoplanets for which masses can be obtained. TESS just completed surveying the southern hemisphere, identifying hundreds of candidate exoplanet systems and unveiling a plethora of exciting non-exoplanet astrophysics results, such as asteroseismology, asteroids, and supernova. The TESS Science Processing Operations Center (SPOC) at NASA Ames Research Center processes the image data downlinked from TESS every two weeks to generate a variety of data products hosted at the Mikulski Archive for Space Telescopes (MAST). For each approximately 1-month sector, the SPOC calibrates the image data for both 30-minute Full Frame Images (FFIs) and up to 20,000 pre-selected 2-minute target star postage stamps. Simple aperture photometry and systematic error-corrected flux-time series are generated for the 2-minute data. The data products also include co-trending basis vectors (CBVs) and calibration files, such as the Pixel Response Functions (PRF). The archival files are modeled after Kepler's for ease of use, and include Target Pixel Files (TPFs) containing original and calibrated 2-minute image data, Light Curve files (LCs) containing the photometric time series for each 2-minute target, as well as the Data Validation products. New products derived from the FFIs include light curves for the 2-minute targets and CBVs. The TESS Mission is funded by NASA's Science Mission Directorate as an Astrophysics Explorer Mission.

Science Pipeline↗

Geostationary Lightning Mapper for GOES-R

The Geostationary Lightning Mapper (GLM) is a single channel, near-IR optical detector, used to detect, locate and measure total lightning activity over the full-disk as part of a 3-axis stabilized, geostationary weather satellite system. The next generation NOAA Geostationary Operational Environmental Satellite (GOES-R) series with a planned launch in 2014 will carry a GLM that will provide continuous day and night observations of lightning from the west coast of Africa (GOES-E) to New Zealand (GOES-W) when the constellation is fully operational. The mission objectives for the GLM are to 1) provide continuous, full-disk lightning measurements for storm warning and Nowcasting, 2) provide early warning of tornadic activity, and 3) accumulate a long-term database to track decadal changes of lightning. The GLM owes its heritage to the NASA Lightning Imaging Sensor (1997-Present) and the Optical Transient Detector (1995-2000), which were developed for the Earth Observing System and have produced a combined 11 year data record of global lightning activity. Instrument formulation studies begun in January 2006 will be completed in March 2007, with implementation expected to begin in September 2007. Proxy total lightning data from the NASA Lightning Imaging Sensor on the Tropical Rainfall Measuring Mission (TRMM) satellite, airborne science missions (e.g., African Monsoon Multi-disciplinary Analysis, AMMA), and regional test beds (e.g, Lightning Mapping Arrays) are being used to develop the pre-launch algorithms and applications, and also improve our knowledge of thunderstorm initiation and evolution. Real time lightning mapping data now being provided to selected forecast offices will lead to improved understanding of the application of these data in the severe storm warning process and accelerate the development of the pre-launch algorithms and Nowcasting applications. Proxy data combined with MODIS and Meteosat Second Generation SEVERI observations will also lead to new applications (e.g., multi-sensor precipitation algorithms blending the GLM with the Advanced Baseline Imager, convective cloud initiation and identification, early warnings of lightning threat, storm tracking, and data assimilation).

Goodman, Steven↗

Production and Distribution of NASA MODIS Remote Sensing Products

The two Moderate Resolution Imaging Spectroradiometer (MODIS) instruments on-board NASA's Earth Observing System (EOS) Terra and Aqua satellites make key measurements for understanding the Earth's terrestrial ecosystems. Global time-series of terrestrial geophysical parameters have been produced from MODIS/Terra for over 7 years and for MODIS/Aqua for more than 4 1/2 years. These well calibrated instruments, a team of scientists and a large data production, archive and distribution systems have allowed for the development of a new suite of high quality product variables at spatial resolutions as fine as 250m in support of global change research and natural resource applications. This talk describes the MODIS Science team's products, with a focus on the terrestrial (land) products, the data processing approach and the process for monitoring and improving the product quality. The original MODIS science team was formed in 1989. The team's primary role is the development and implementation of the geophysical algorithms. In addition, the team provided feedback on the design and pre-launch testing of the instrument and helped guide the development of the data processing system. The key challenges the science team dealt with before launch were the development of algorithms for a new instrument and provide guidance of the large and complex multi-discipline processing system. Land, Ocean and Atmosphere discipline teams drove the processing system requirements, particularly in the area of the processing loads and volumes needed to daily produce geophysical maps of the Earth at resolutions as fine as 250 m. The processing system had to handle a large number of data products, large data volumes and processing loads, and complex processing requirements. Prior to MODIS, daily global maps from heritage instruments, such as Advanced Very High Resolution Radiometer (AVHRR), were not produced at resolutions finer than 5 km. The processing solution evolved into a combination of processing the lower level (Level 1) products and the higher level discipline specific Land and Atmosphere products in the MODIS Science Investigator Lead Processing System (SIPS), the MODIS Adaptive Processing System (MODAPS), and archive and distribution of the Land products to the user community by two of NASA s EOS Distributed Active Archive Centers (DAACs). Recently, a part of MODAPS, the Level 1 and Atmosphere Archive and Distribution System (LAADS), took over the role of archiving and distributing the Level 1 and Atmosphere products to the user community.

Wolfe, Robert↗

Technological Progress: A Function of User Necessity

Conducting the myriad of space launch preparations more effectively with specialized tools that improve existing processes or address new issues requires innovative technologies. Although the mission of the Applied Physics Lab at NASA's Kennedy Space Center is to deliver gadgets to support these launch missions and operations, it is the verdict of the end users of these technologies that dictates which ones succeed and are used. There have been over total 40 pieces of hardware developed at the APL to assist the safety, efficiency, and cost of shuttle program operations in the 19 years of the lab's operation.

Shkolyar, Svetlana↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

A generalized behavioral model for rotating short period comets with spectral orbital elements and axial orientation

A generalized model for short period comets is developed which integrates in a fairly rigorous manner the isolation history of regions on rotating comets with specified axial orientation and the complex feedback processes involving heat, gas and dust transport, dust mantle development and coma opacity. Attention is focused on development, reconfiguration and partial or complete launching of dust mantles and the reciprocal effects of these three processes on ice surface temperature and gas and dust production. The dust mantle controls the H2O flux not only by its effect on the temperature at the ice interface but (dominantly) by its dynamic stability which strongly influences vapor diffusivity. The model includes the effects of latitude, rotation and spin axis orientation are included and applied to an initially homogeneous sphere of H2O ice and silicate using the orbital parameters of comet Encke. Numerous variations of the model, using combinations of grain size distribution, dust-to-ice ratio, latitude and spin axis orientation, are presented and discussed. Resulted for a similar nonrotating, constant Sun orientation models are also included.

Fanale, F. P.↗

Eclipsing Binaries from the Kepler Mission

The Kepler Mission is a photometric space mission that will continuously observe a single 100 sq deg field of view (FOV) of greater than 100,000 stars in the Cygnus-Lyra region for 4 or more years with a precision of 14 ppm (R=12). The primary goal of the mission is to detect Earth-size planets in the habitable zone of solar-like stars. In the process, many eclipsing binaries (EB) will also be detected. Prior to launch, the stellar characteristics will have been detennined for all the stars in the FOV with R<16. As part of the verification process, stars with transits ~<5% will need to have follow-up radial velocity observations performed to determine the component masses and thereby separate transits caused by stellar companions from those caused by planets. The result will be a rich database on EBs. The community will have access to the archive for uses such as for EB modeling of the high-precision light curves. A guest observer program is also planned for objects not already on the target list.

Koch, David↗

The Swift Project Contamination Control Program: A Case study of Balancing Cost, Schedule and Risk

The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.

Hansen, Patricia A.↗

The Swift Project Contamination Control Program: A Case Study of Balancing Cost, Schedule and Risk

The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.

Hansen, Patricia A.↗

The Maneuver Planning Process for the Microwave Anisotropy Probe (MAP) Mission

The Microwave Anisotropy Probe (MAP) was successfully launched from Kennedy Space Center's Eastern Range on June 30, 2001. MAP will measure the cosmic microwave background as a follow up to NASA's Cosmic Background Explorer (COBE) mission from the early 1990's. MAP will take advantage of its mission orbit about the Sun-Earth/Moon L2 Lagrangian point to produce results with higher resolution, sensitivity, and accuracy than COBE. A strategy comprising highly eccentric phasing loops with a lunar gravity assist was utilized to provide a zero-cost insertion into a lissajous orbit about L2. Maneuvers were executed at the phasing loop perigees to correct for launch vehicle errors and to target the lunar gravity assist so that a suitable orbit at L2 was achieved. This paper will discuss the maneuver planning process for designing, verifying, and executing MAP's maneuvers. A discussion of the tools and how they interacted will also be included. The maneuver planning process was iterative and crossed several disciplines, including trajectory design, attitude control, propulsion, power, thermal, communications, and ground planning. Several commercial, off-the-shelf (COTS) packages were used to design the maneuvers. STK/Astrogator was used as the trajectory design tool. All maneuvers were designed in Astrogator to ensure that the Moon was met at the correct time and orientation to provide the energy needed to achieve an orbit about L2. The Mathworks Matlab product was used to develop a tool for generating command quaternions. The command quaternion table (CQT) was used to drive the attitude during the perigee maneuvers. The MatrixX toolset, originally written by Integrated Systems, Inc., now distributed by Mathworks, was used to create HiFi, a high fidelity simulator of the MAP attitude control system. HiFi was used to test the CQT and to make sure that all attitude requirements were met during the maneuver. In addition, all ACS data plotting and output were generated in MatrixX. A final test used FlatSat, a real-time hardware-in-the-loop simulator, which used identical MAP flight code to simulate operations on the spacecraft. Simulations in FlatSat allowed the MAP team to verify maneuver commands, timing, and spacecraft configuration before the commands were sent up to the spacecraft for execution. The MAP maneuver team successfully pieced together all of these COTS tools for designing MAP's maneuvers and MAP is now collecting data at L2.

Mesarch, Michael A.↗

Process Engineering Technology Center Initiative

NASA's Kennedy Space Center (KSC) is developing as a world-class Spaceport Technology Center (STC). From a process engineering (PE) perspective, the facilities used for flight hardware processing at KSC are NASA's premier factories. The products of these factories are safe, successful shuttle and expendable vehicle launches carrying state-of-the-art payloads. PE is devoted to process design, process management, and process improvement, rather than product design. PE also emphasizes the relationships of workers with systems and processes. Thus, it is difficult to speak of having a laboratory for PE at KSC because the entire facility is practically a laboratory when observed from a macro level perspective. However, it becomes necessary, at times, to show and display how KSC has benefited from PE and how KSC has contributed to the development of PE; hence, it has been proposed that a Process Engineering Technology Center (PETC) be developed to offer a place with a centralized focus on PE projects, and a place where KSC's PE capabilities can be showcased, and a venue where new Process Engineering technologies can be investigated and tested. Graphics for showcasing PE capabilities have been designed, and two initial test beds for PE technology research have been identified. Specifically, one test bed will look into the use of wearable computers with head mounted displays to deliver work instructions; the other test bed will look into developing simulation models that can be assembled into one to create a hierarchical model.

Centeno, Martha A.↗

Process Engineering Technology Center Initiative

NASA's Kennedy Space Center (KSC) is developing as a world-class Spaceport Technology Center (STC). From a process engineering (PE) perspective, the facilities used for flight hardware processing at KSC are NASA's premier factories. The products of these factories are safe, successful shuttle and expendable vehicle launches carrying state-of-the-art payloads. PE is devoted to process design, process management, and process improvement, rather than product design. PE also emphasizes the relationships of workers with systems and processes. Thus, it is difficult to speak of having a laboratory for PE at K.S.C. because the entire facility is practically a laboratory when observed from a macro level perspective. However, it becomes necessary, at times, to show and display how K.S.C. has benefited from PE and how K.S.C. has contributed to the development of PE; hence, it has been proposed that a Process Engineering Technology Center (PETC) be developed to offer a place with a centralized focus on PE projects, and a place where K.S.C.'s PE capabilities can be showcased, and a venue where new Process Engineering technologies can be investigated and tested. Graphics for showcasing PE capabilities have been designed, and two initial test beds for PE technology research have been identified. Specifically, one test bed will look into the use of wearable computers with head mounted displays to deliver work instructions; the other test bed will look into developing simulation models that can be assembled into one to create a hierarchical model.

Centeno, Martha A.↗

Thirsty Walls: A New Paradigm for Air Revitalization in Life Support

This Phase I project Summary will be formatted as a series of summary statements, with additional comments. The summary statements are intended to focus on the most significant findings and discoveries – things that the project team knows now, but we didn’t know at the beginning of the project: 1) Direct Contact Between Gases is an ECLS (Environmental Control and Life Support) System enabling capability; 2) CO2 capture using liquid sorbents in microgravity is feasible; 3) There are other ways to contact gases and liquids – but thin film capillary techniques are new, exciting, and have amazing potential; 4) ECLS system reliability is the key to exploration missions – the key to reliability is having system attributes that favor reliability; 5) The processes with favorable reliability attributes tend to be biological; 6) The single greatest impact on launch mass of an ECLS system is water. The best way to enable biological water processing is to develop a capillary based method of urine capture that doesn’t use pretreat chemicals; 7) There is good, promising, forward design and development work – but no fundamental “show stoppers” – to develop a thin film liquid sorbent CO2 capture system; 8) The most capable Ionic Liquids are not presently feasible, but other chemically active liquids can be used to make an effective thin film CO2 capture device; 9) The C9 reduced gravity flight showed feasibility – and taught us about flow instability issues; 10) Capillary fluid management has ECLS system wide implications.

CO2↗