Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Analysis of Unit-Level Changes in Operations with Increased SPP Wind from EPRI/LCG Balancing Study

Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The Department of Energy funded the project 'Integrating Midwest Wind Energy into Southeast Electricity Markets' to be led by EPRI in coordination with the main authorities for the regions: SPP, Entergy, TVA, Southern Company and OPC. EPRI utilized several subcontractors for the project including LCG, the developers of the model UPLAN. The study aims to evaluate the operating cost benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of regional cooperation for integrating mid-western wind energy into southeast electricity markets. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. DOE funded Oak Ridge National Laboratory to provide additional support to the project, including a review of results and any side analysis that may provide additional insight. This report is a unit-by-unit analysis of changes in operations due to the different scenarios used in the overall study. It focuses on the change in capacity factors and the number of start-ups required for each unit since those criteria summarize key aspects of plant operations, how often are they called upon and how much do they operate. The primary analysis of the overall project is based on security-constrained unit commitment (SCUC) and economic dispatch (SCED) simulations of the SPP-SERC regions as modeled for the year 2022. The SCUC/SCED models utilized for the project were developed through extensive consultation with the project utility partners, to ensure the various regions and operational practices are represented as best as possible in the model. SPP, Entergy, Oglethorpe Power Company (OPC), Southern Company, and the Tennessee Valley Authority (TVA) actively participated in the project providing input data for the models and review of simulation results and conclusions. While other SERC utility systems are modeled, the listed SERC utilities were explicitly included as active participants in the project due to the size of their load and relative proximity to SPP for importing wind energy.

17 WIND ENERGY↗

Report on the Use and Function of the Integrated Operations Capability Analysis Platform (ICAP) and the LWRS Innovation Portal (IP)

The commercial nuclear power industry has achieved excellent safety and reliability performance but is struggling to survive in an electricity market that is increasingly dominated by subsidized renewables and cheap natural gas. These challenges have forced utilities to explore previously uncharted avenues to drastically reduce the operations and maintenance costs of their plants which are the primary drivers of the total cost to produce electricity. The petrochemical industry faced similar challenges some years ago as the costs of extraction and processing were rising while their reservoirs were being depleted along with a drop-in commodity prices that resulted in unsustainable operations. In this challenging climate, they developed a business model called Integrated Operations (IO) that sought to utilize technology to enable news ways of working through the integration of people, technology, process and governance changes. The Light Water Reactor Sustainability (LWRS) program, working with IFE have developed an operating model via transferable learnings from the North Sea O&G industry. This framework is termed “Integrated Operations for Nuclear” (ION). ION is a transformation model that integrates the benefits and features of four principal factors: People, Technology, Process and Governance. The purpose of this report is to describe how to generate an ION business process analysis and utilize this information to reduce O&M costs. In order to make this job easier, DOE LWRS has created a suite of tools that will allow a person who is involved in a transformation effort at their company to build a solid documented business case for embarking on a major transformation effort. These tools, the Integrated Operations Capability Analysis Model (ICAP) and the LWRS Innovation Portal (IP) are described herein with instructions on their use. Instructions on how the interface with the EPRI Business Case Analysis Method (BCAM) are also provided.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Solar and Storage Integration in the Southeastern United States: Economics, Reliability, and Operations

Solar energy has the potential to be a core energy resource for the southeastern United States. To better understand the implications of higher levels of solar PV (27%-43% of total generation capacity) and electricity storage (13%-49% of peak load) would affect electricity system reliability, costs, and operations in the U.S. Southeast, this study sought to address two main questions. First, how would higher levels of solar PV and electricity storage impact the costs, reliability, and operations of electricity systems in the Southeast in 2035? Second, at different levels of solar PV and electricity storage, what are the benefits of operational coordination among utilities in the Southeast, through more efficient regional dispatch and sharing operating reserves? To answer these questions, the study used detailed capacity expansion and dispatch modeling to develop and examine 15 scenarios with different levels of solar PV, electricity storage, and operational coordination, focusing on the year 2035. The study also evaluates the benefits of operational coordination among utilities through more efficient regional dispatch and reserve sharing, at different levels of solar and storage. The study focuses on five balancing regions that cover Alabama, Georgia, Kentucky, North Carolina, South Carolina, Tennessee, and parts of Mississippi and Missouri.

14 SOLAR ENERGY↗

Naturalistic Decision Making in Power Grid Operations: Implications for Dispatcher Training and Usability Testing

The focus of the present study is on improved training approaches to accelerate learning and improved methods for analyzing effectiveness of tools within a high-fidelity power grid simulated environment. A theory-based model has been developed to document and understand the mental processes that an expert power system operator uses when making critical decisions. The theoretical foundation for the method is based on the concepts of situation awareness, the methods of cognitive task analysis, and the naturalistic decision making (NDM) approach of Recognition Primed Decision Making. The method has been systematically explored and refined as part of a capability demonstration of a high-fidelity real-time power system simulator under normal and emergency conditions. To examine NDM processes, we analyzed transcripts of operator-to-operator conversations during the simulated scenario to reveal and assess NDM-based performance criteria. The results of the analysis indicate that the proposed framework can be used constructively to map or assess the Situation Awareness Level of the operators at each point in the scenario. We can also identify the mental models and mental simulations that the operators employ at different points in the scenario. This report documents the method, describes elements of the model, and provides appendices that document the simulation scenario and the associated mental models used by operators in the scenario.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Expansion of Michigan EOR Operations Using Advanced Amine Technology at a 600 MW Project Wolverine Carbon Capture and Storage Project

Wolverine Power Supply Cooperative Inc, a member owned cooperative utility based in Cadillac Michigan, proposes to demonstrate the capture, beneficial utilization and storage of CO{sub 2} in the expansion of existing Enhanced Oil Recovery operations. This project is being proposed in response to the US Department of Energy Solicitation DE-FOA-0000015 Section III D, 'Large Scale Industrial CCS projects from Industrial Sources' Technology Area 1. The project will remove 1,000 metric tons per day of CO{sub 2} from the Wolverine Clean Energy Venture 600 MW CFB power plant owned and operated by WPC. CO{sub 2} from the flue gas will be captured using Hitachi's CO{sub 2} capture system and advanced amine technology. The capture system with the advanced amine-based solvent supplied by Hitachi is expected to significantly reduce the cost and energy requirements of CO{sub 2} capture compared to current technologies. The captured CO{sub 2} will be compressed and transported for Enhanced Oil Recovery and CO{sub 2} storage purposes. Enhanced Oil Recovery is a proven concept, widely used to recover otherwise inaccessible petroleum reserves. While post-combustion CO{sub 2} capture technologies have been tested at the pilot scale on coal power plant flue gas, they have not yet been demonstrated at a commercial scale and integrated with EOR and storage operations. Amine-based CO{sub 2} capture is the leading technology expected to be available commercially within this decade to enable CCS for utility and industrial facilities firing coal and waste fuels such as petroleum coke. However, traditional CO{sub 2} capture process utilizing commercial amine solvents is very energy intensive for regeneration and is also susceptible to solvent degradation by oxygen as well as SOx and NO{sub 2} in the flue gas, resulting in large operating costs. The large volume of combustion flue gas with its low CO{sub 2} concentration requires large equipment sizes, which together with the highly corrosive nature of the typical amine-based separation process leads to high plant capital investment. According to recent DOE-NETL studies, MEA-based CCS will increase the cost of electricity of a new pulverized coal plant by 80-85% and reduce the net plant efficiency by about 30%. Non-power industrial facilities will incur similar production output and efficiency penalties when implementing conventional carbon capture systems. The proposed large scale demonstration project combining advanced amine CO{sub 2} capture integrated with commercial EOR operations significantly advances post-combustion technology development toward the DOE objectives of reducing the cost of energy production and improving the efficiency of CO{sub 2} Capture technologies. WPC has assembled a strong multidisciplinary team to meet the objectives of this project. WPC will provide the host site and Hitachi will provide the carbon capture technology and advanced solvent. Burns and Roe bring expertise in overall engineering integration and plant design to the team. Core Energy, an active EOR producer/operator in the State of Michigan, is committed to support the detailed design, construction and operation of the CO{sub 2} pipeline and storage component of the project. This team has developed a Front End Engineering Design and Cost Estimate as part of Phase 1 of DOE Award DE-FE0002477.

01 COAL, LIGNITE, AND PEAT↗

Complex relationship between seasonal streamflow forecast skill and value in reservoir operations

Considerable research effort has recently been directed at improving and operationalising ensemble seasonal streamflow forecasts. Whilst this creates new opportunities for improving the performance of water resources systems, there may also be associated risks. Here, we explore these potential risks by examining the sensitivity of forecast value (improvement in system performance brought about by adopting forecasts) to changes in the forecast skill for a range of hypothetical reservoir designs with contrasting operating objectives. Forecast-informed operations are simulated using rolling horizon, adaptive control and then benchmarked against optimised control rules to assess performance improvements. Results show that there exists a strong relationship between forecast skill and value for systems operated to maintain a target water level. But this relationship breaks down when the reservoir is operated to satisfy a target demand for water; good forecast accuracy does not necessarily translate into performance improvement. We show that the primary cause of this behaviour is the buffering role played by storage in water supply reservoirs, which renders the forecast superfluous for long periods of the operation. System performance depends primarily on forecast accuracy when critical decisions are made – namely during severe drought. As it is not possible to know in advance if a forecast will perform well at such moments, we advocate measuring the consistency of forecast performance, through bootstrap resampling, to indicate potential usefulness in storage operations. Our results highlight the need for sensitivity assessment in value-of-forecast studies involving reservoirs with supply objectives.

42 ENGINEERING↗

Operational-Condition-Independent Criteria Dedicated to Monitoring Wind Turbine Generators: Preprint

To date the existing wind turbine condition monitoring technologies and commercially available systems have not been fully accepted for improving wind turbine availability and reducing their operation and maintenance costs. One of the main reasons is that wind turbines are subject to constantly varying loads and operate at variable rotational speeds. As a consequence, the influences of turbinefaults and the effects of varying load and speed are coupled together in wind turbine condition monitoring signals. So, there is an urgent need to either introduce some operational condition de-coupling procedures into the current wind turbine condition monitoring techniques or develop a new operational condition independent wind turbine condition monitoring technique to maintain high turbineavailability and achieve the expected economic benefits from wind. The purpose of this paper is to develop such a technique. In the paper, three operational condition independent criteria are developed dedicated for monitoring the operation and health condition of wind turbine generators. All proposed criteria have been tested through both simulated and practical experiments. The experimentshave shown that these criteria provide a solution for detecting both mechanical and electrical faults occurring in wind turbine generators.

17 WIND ENERGY↗

Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations: Preprint

The recent increased interest in utilizing variable generation (VG) resources such as wind and solar in power systems has motivated investigations into new operating procedures. Although these resources provide desirable value to a system (e.g., no fuel costs or emissions), interconnecting them provides unique challenges. Their variable, non-controllable nature in particular requires significant attention, because it directly results in increased power system variability and uncertainty. One way to handle this is via new operating reserve schemes. Operating reserves provide upward and downward generation and ramping capacity to counteract uncertainty and variability prior to their realization. For instance, uncertainty and variability in real-time dispatch can be accounted for in the hour-ahead unit commitment. New operating reserve methodologies that specifically account for the increased variability and uncertainty caused by VG are currently being investigated and developed by academia and industry. This paper examines one method inspired by the new operating reserve product being proposed by the California Independent System Operator. The method is based on examining the potential ramping requirements at any given time and enforcing those requirements via a reserve demand curve in the market-clearing optimization as an additional ancillary service product.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic Risk Assessment of Flexible Power Operation of a Nuclear Power Plant

Nuclear power plants (NPPs) are becoming cost prohibitive to operate. This is due to historically low natural gas prices and wind and solar prices often being less than the marginal cost of operating baseload coal and NPPs, which sometimes forces NPPs to pay for the electricity they create. Thus, the feasibility of using part of the heat from an NPP to create other commodities such as hydrogen is being evaluated; operating in this way is called flexible power operation (FPO). To change the NPP design and operation, a license review must happen. Part of the review is the Probabilistic Risk Assessment (PRA) which proves the safety of the design and operation by identifying sequences of events that result in plant failure and estimating their likelihood of occurrence. A Level 1 PRA model that evaluates the risk of removing heat from the secondary side of NPP was created. The model was developed using Systems Analysis Program for Hands-On Integrated Reliability Evaluations (SAPHIRE 8) software to calculate core damage frequency (CDF). It is a fault tree that represents the possible pathways that could lead to a loss of steam inventory in the secondary loop. A loss of steam inventory can induce steam generator tube rupture or other events that activates response systems to avoid core damage. This is the main concern for the Nuclear Regulatory Commission (NRC), the group in the United States that licenses NPPs. This model will calculate a total CDF of any of these pathways occurring which will be compared to the baseline CDF in a generic NPP PRA for licensing support.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Electrification Futures Study: Power Systems Operation with Newly Electrified and Flexible Loads

The Electrification Futures Study (EFS) is a multi-year study designed to analyze the impacts of widespread electrification in the U.S. energy system. In this webinar we present the detailed power systems operational analysis from the final report in the EFS series. For this analysis, we simulate multiple 2050 power systems for the conterminous United States to assess how variations in the magnitude and shape of electricity demand driven by electrification, and the extent of load participation to more-actively provide grid services, might impact the hourly operation, operational costs, and emissions of various power systems in 2050. The impacts of electrification and demand flexibility are overlayed across systems with significantly greater penetrations of variable renewable energy than today. Overall, we find that the high electrification scenarios envisioned in the EFS with significant VRE penetration (66% of annual national generation) can be operated to meet future increased levels of electrified demand. We also find that demand-side flexibility can enhance operational efficiency and reduce overall annual production costs by $5-$10 billion. The complementary relationship between flexible electric vehicle charging loads and solar generation is particularly pronounced, but in the absence of demand-side flexibility electrification can lead to increased wind and solar curtailment. By helping to reduce renewable curtailment, flexibility can also reduce power sector CO2 emissions. The analysis highlights the value of increased integration and coordination of demand- and supply-side resources in future electric system planning and operations—particularly under high electrification futures.

43 PARTICLE ACCELERATORS↗

Critical Drivers for Safety Culture: Examining Department of Energy and U.S. Army Operational Experiences - 12382

Evaluating operational incidents can provide a window into the drivers most critical to establishing and maintaining a strong safety culture, thereby minimizing the potential project risk associated with safety incidents. By examining U.S. Department of Energy (DOE) versus U.S. Army drivers in terms of regulatory and contract requirements, programs implemented to address the requirements, and example case studies of operational events, a view of the elements most critical to making a positive influence on safety culture is presented. Four case studies are used in this evaluation; two from DOE and two from U.S. Army experiences. Although the standards guiding operations at these facilities are different, there are many similarities in the level of hazards, as well as the causes and the potential consequences of the events presented. Two of the incidents examined, one from a DOE operation and the other from a U.S. Army facility, resulted in workers receiving chemical burns. The remaining two incidents are similar in that significant conduct of operations failures occurred resulting in high-level radioactive waste (in the case of the DOE facility) or chemical agent (in the case of the Army facility) being transferred outside of engineering controls. A review of the investigation reports for all four events indicates the primary causes to be failures in work planning leading to ineffective hazard evaluation and control, lack of procedure adherence, and most importantly, lack of management oversight to effectively reinforce expectations for safe work planning and execution. DOE and Army safety programs are similar, and although there are some differences in contractual requirements, the expectations for safe performance are essentially the same. This analysis concludes that instilling a positive safety culture comes down to management leadership and engagement to (1) cultivate an environment that values a questioning attitude and (2) continually reinforce expectations for the appropriate level of rigor in work planning and procedure adherence. A review of the root causes and key contributing causes to the events indicate: - Three of the four root cause analyses cite lack of management engagement (oversight, involvement, ability to recognize issues, etc.) as a root cause to the events. - Two of the four root cause analyses cite work planning failures as a root cause to the events and all cause analyses reflect work planning failures as contributing factors to the events. - All events with the exception of the Tuba City plant shutdown indicate procedure noncompliance as a key contributor; in the case of Tuba City the procedure issues were primarily related to a lack of procedures, or a lack of sufficiently detailed procedures. - All events included discussion or suggestion of a lack of a questioning attitude, either on the part of management/supervision, work planners, or workers. This analysis suggests that the most critical drivers to safety culture are: - Management engagement, - Effective work planning and procedures, and - Procedure adherence with a questioning attitude to ensure procedural problems are identified and fixed. In high-hazard operational environments the importance of robust work planning processes and procedure adherence cannot be overstated. However, having the processes by themselves is not enough. Management must actively engage in expectation setting and ensure work planning that meets expectations for hazard analysis and control, develop a culture that encourages incident reporting and a questioning attitude, and routinely observe work performance to reinforce expectations for adherence to procedures/work control documents. In conclusion, the most critical driver to achieving a workforce culture that supports safe and effective project performance can be summarized as follows: 'Management engagement to continually reinforce expectations for work planning processes and procedure adherence in an environment that cultivates a questioning attitude'. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel performance analysis of FeCrAl cladding during LWR operation

This work focuses on modeling the integral thermo-mechanical performance of FeCrAl cladded fuel during normal operation in light-water reactors. Preliminary analysis has been performed to assess FeCrAl alloys (namely Alkrothal 720 and APMT) as a suitable fuel cladding replacement for Zr-alloys, using the MOOSE-based, finite-element fuel performance code BISON. These simulations identify the effects of the mechanical-stress and irradiation responses of FeCrAl and provide a comparison with Zr-alloys. In comparing these clad materials, fuel rods have been simulated for normal reactor operation and simple steady-state operation. Normal reactor operating conditions target the cladding performance over the rod lifetime (∼4 cycles) for the highest-power rod in the highest-power fuel assembly under reactor power maneuvering. The power histories and axial temperature profiles input into BISON were generated from a neutronics study on full-core reactivity equivalence for FeCrAl using the 3D full core simulator NESTLE. Evolution of the FeCrAl cladding behavior over time is evaluated by using steady-state operating conditions such as a simple axial power profile, a constant cladding surface temperature, and a constant fuel power history. The fuel rod designs and operating conditions used are based off the Peach Bottom BWR and design consideration was given to minimize the neutronic penalty of the FeCrAl cladding by changing fuel enrichment and cladding thickness. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NM in HLW Borosilicate Glass: Focus on the High Performances of the IHMM Operated at La Hague Plant - 19019

Ruthenium, palladium and rhodium, which belong to Platinum-Group Metals (PGM), are part of fission products resulting from nuclear fuel reprocessing. All High Level Waste (HLW) vitrification facilities have experienced operational issues that can be related to the presence of Noble Metals (NM) in the melter. These metals have low solubility and modify glass properties such as viscosity or electrical and thermal conductivity. These dense metals also tend to settle to the bottom of the melter. Whatever the vitrification process operated, the specific properties and behavior of NM have a propensity to impact the production capacity by decreasing the glass throughput and increasing downtimes. Orano and the CEA have studied the behavior of NM in borosilicate glass for many years. It has led to several technological improvements and process operation optimizations on the Induction Heated Metallic Melter (IHMM) currently operated at La Hague plant. These enhancements, implemented since active commissioning, have headed to a high efficiency in terms glass production and NM incorporation (more than 21000 canisters produced with up to 3 % of Noble Metals in the glass). This paper sets out the continuous improvement program implemented on the La Hague vitrification lines that has led to outstanding records of operation in terms of production capacity and NM incorporation. The benefits of the close collaboration between R and D, engineering, and operation teams is particularly emphasized. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Challenges of Repository Operation in an Existing Mine - 19339

A generally accepted principle related to long term management of radioactive waste/ spent fuel is the isolation in a geological repository. In Germany, the disposal operation of low-level waste (LLW) and intermediate-level waste (ILW) started in the Asse II mine in 1967 and in the former German Democratic Republic in the Morsleben repository in 1971. After the German reunification, the responsibility for the existing sites changed several times until the Bundesgesellschaft fuer Endlagerung (BGE) became new license holder for both sites in 2017. The BGE is responsible to carry out the operative tasks of searching for a high-level waste (HLW) repository, the planning and construction of the Konrad repository for the emplacement of low- and intermediate-level waste (LILW), the operation of the Asse II mine including the retrieval of the emplaced waste, and the preparation for the closure of the Morsleben repository. Nevertheless, the challenges of repository operation in an existing mine have not changed in all these years, as the regulatory framework is mainly written for Nuclear Power Plants (NPPs) and is difficult to adapt for a repository mine. In particular, conditions in a mine are substantially different from 'clean' above-ground nuclear installations. Dust due to mining activities, relatively high temperatures, and a corrosive atmosphere in a salt mine might be present. Therefore, the usability of the repository for several decades during the different operational phases, i.e. planning, construction, emplacement, and closure, can only be ensured by continuous maintenance. Furthermore, the atomic law is applicable for above-ground facilities and the mining law for mines of every description. The difficulty of geological repositories is to ensure that both laws are going to be applied above and below ground with no regulatory framework tailored especially for such sites. A special case is the Asse II mine where the mining law was applied from the very beginning, before the atomic law needed to be established later on and now requires the retrieval of the radioactive waste before decommissioning. In this presentation, similarities and differences in the legal framework of the repositories in the responsibility of BGE and some operational experiences throughout the years are described. This applies to the radiation protection regime, the excavation ratio, the host rock stability and the backfilling concepts of the mining areas. Further challenges arise from the demonstration of long term safety according to the state-of-the-art of science and technology for either existing repositories/ mines or those under construction or planned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Supporting resilience in nuclear power plant operations - conceptual frames for human factors development and validation - 166

This is a summary paper of conceptual developments on nuclear power plant operation by the human factors team at VTT Technical Research Centre of Finland. While drawing together years of studies, the paper also discusses recent progresses in training development. Firstly, there is a long background in work analysis and system validation. The analysis model applied provides a model for assessing and identifying 'core-task functions,' that is, basic functions that should be fulfilled within work activity. Secondly, we have evaluated the existing training practices at a Finnish plant and identified challenges that could be generally prevalent in the nuclear domain - they seem to reflect the hierarchical and safety-critical nature of NPP operation. In terms of potential solutions, we are currently testing and developing some new self-evaluation and self-confrontation methods. First and foremost, however, we discuss the common theory basis for our research approaches. On the broadest level, our development and research work reflects the view of safety as expressed by resilience engineering literature: safety is not seen merely as 'negative' lack of mistakes, but also as 'positive' capability to solve and anticipate problems. For example, it is assumed that operators' capability for situational interpretation should be supported at all times: even if the emergency procedures dictate operator activity specifically, the operators should understand the influence of the operating procedures for the plant process and system state. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Augmented reality system for remote operation - 200

This paper presents a new approach to applications of augmented reality techniques for performing telerobotic operations in uncertain and hazardous environments. Particular application examples include remote or partially-automated operation of robotic manipulators in nuclear waste facilities, decommissioning sites, or as a part of incident remediation. Recently advances in virtual reality (VR) and augmented reality (AR) technology presents opportunity for enhancing the performance of such remote operations. VR can provide immersive artificial environment for the operator to interact with. As an advanced concept, AR adds to it the blending or artificial contents with real world - users are able to interact with virtual contents in the real world. This work addresses key technological innovations necessary for adopting the VR/AR technologies for the remote operation of hardware robotic systems in real world tasks. To this end, this work focuses on implementation of 'virtual fixtures', which allows intuitive and precise guidance of remote operation, as well as key enhancements in 3D sensing/reconstruction technology. In addition, the implementation details of the integration of the multi-modal augmented reality system to the telerobotic control system are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computer-based human-machine interfaces for emergency operation - 233

The Halden Reactor Project (HRP) has many years of experience in developing and evaluating principles for computer-based human-machine interfaces (HMIs). We have synthesized the lessons learned in an integrated design concept that is implemented on a boiling water reactor (BWR) simulator in the Halden Man Machine Laboratory (HAMMLAB). The design concept is intended to alert and support the operators in monitoring and controlling the plant during normal operation, emergency situations and outages. The computer-based HMIs include an alarm system, operating displays, operating procedures and large screen displays. The design concept has been tested in a simulator study in HAMMLAB. This paper describes the design and initial testing of the computer-based emergency operating procedures (EOPs) and other displays to support the operators when using the EOPs. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An operation verification strategy against network attack of DCS in nuclear power plant - 323

Digital Instrumentation and control (I and C) system serves as the 'senses and nervous system' of a nuclear power plant (NPP). It plays an important role in the safe and economic operation in the NPPs. Digital I and C system has a series of advantages compared with analogue ones, but the introduction of the operation system platform, the application software, and the network communication structure are causing security risk to the power plant. Different kinds of procedures have already been adopted against these risks such as the communication isolation, but the security attacks still occur from time to time in the industrial fields around the world. This paper presents two computer security methods based on the thought of software verification and validation with step-by-step operation identification. First, three scenarios of security attack are proposed according to the structure of a distributed control system (DCS). Then a method with two network bypasses and a security computer are adopted to obtain the operation commands, the actuation signal, and the operation feedback in case of the first two scenarios by identifying the consistency of the obtained data. Furthermore, the method is optimized by combining the operation procedure and the camera shot to identify the anomaly of the information flow, thus to improve the effectiveness against the computer security issues. In the end, the influence and feasibility of this method is discussed. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗