Avionics, controls and human factors technology plan. Volume 2: Program element descriptions
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
An ad-hoc committee was asked to review the following questions relevant to the space station program: (1) onboard maintainability and repair; (2) in-space research and technology program and facility plans; (3) solar thermodynamic research and technology development program planning; (4) program performance (cost estimating, management, and cost avoidance); (5) onboard versus ground-based mission control; and (6) technology development road maps from IOC to the growth station. The objective of these new assignments is to provide NASA with advice on ways and means for improving the content, performance, and/or effectiveness of these elements of the space station program.
This report describes, using viewgraphs, the Marshall Space Flight Center's Large Space Structures Ground Test Facilities located in building 4619. Major topics include the Active Control Evaluation of Systems (ACES) Laboratory; the Control-Structures Interaction/Controls, Astrophysics, and Structures Experiment in Space (CSI/CASES); Advanced Development Facility; and the ACES Guest Investigator Program.
The Oak Ridge National Laboratory (ORNL) Package Testing Program (PTP) uses commercial off-the-shelf (COTS) software in performing data collection of thermal test results for package designs that contain radioactive materials. Specifically, this software is used to collect temperature data from the furnace, packages, and ambient air to prepare and execute the thermal test specified in 10 CFR 71.73, “Thermal Test.” This software quality assurance (SQA) plan sets forth the guidelines, standards, and procedures that shall be used to provide SQA for PTP software applications. This is a living document that will be maintained for the lifecycle of the PTP program. The SQA plan follows the requirements set forth in ORNL Standards Based Management System (SBMS): Information Technology; Subject Area: Software Quality Assurance. When applicable to the requirements as described in ORNL SBMS, Software Quality Assurance, the software shall be listed in the ORNL Software Registration System (SRS). Exemptions to this SBMS are COTS and firmware that are not modified; spreadsheet applications and personal productivity tools that do not have a utility or safety application, research applications, legacy software, system software, vendor-supplied software used to interface with the vendor’s services, software used within the organization to facilitate processing or management of information, and software developed for applications not specific to the US Department of Energy (DOE).
Current and planned NASA space programs are outlined. The major current activity is the development and installation of the Space Transportation System consisting of the Space Shuttle, Spacelab and upper stages for payload launching from the Shuttle. NASA's space sciences program includes spaceborne astronomy by means of the future Space Telescope and Spacelab instruments as well as the current HEAO and IUE satellites. In the area of solar-terrestrial physics, the Solar Maximum Mission and the Solar Polar Mission are scheduled for 1980 and 1983, respectively. Planetary programs generally include ground-based and flyby observations to specify planetary environments, exploration missions to acquire knowledge of planetary processes, history and evolution, and study missions to investigate specific problems. Missions underway include the Voyager mission to Jupiter and Saturn and the Pioneer Venus mission. Research involving the inner planets, the outer planets and asteroids and comets is being planned.
The PLANS system is described which is a finite element program for nonlinear analysis. The system represents a collection of special purpose computer programs each associated with a distinct physical problem class. Modules of PLANS specifically referenced and described in detail include: (1) REVBY, for the plastic analysis of bodies of revolution; (2) OUT-OF-PLANE, for the plastic analysis of 3-D built-up structures where membrane effects are predominant; (3) BEND, for the plastic analysis of built-up structures where bending and membrane effects are significant; (4) HEX, for the 3-D elastic-plastic analysis of general solids; and (5) OUT-OF-PLANE-MG, for material and geometrically nonlinear analysis of built-up structures. The SATELLITE program for data debugging and plotting of input geometries is also described. The theoretical foundations upon which the analysis is based are presented. Discussed are the form of the governing equations, the methods of solution, plasticity theories available, a general system description and flow of the programs, and the elements available for use.
Compression algorithm and computer program for planning and controlling large management projects
The general test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The inertial unit contains six gyros and three orthogonal accelerometers. The software incorporates failure detection and correction logic and a land vehicle navigation program. The principal objective of the test is a demonstration of the practicability, reliability, and performance of the inertial measuring unit with failure detection and correction in operational environments.
The planning, administration, description, and evaluation of the MSFC/Auburn U/U of Alabama research program are briefly outlined. Abstracts of fellows' research activities are included.
THREAD programming language, which was developed to meet the needs of researchers in developing robotics applications that perform such tasks as grasp, trajectory design, sensor data analysis, and interfacing with external subsystems in order to perform servo-level control of manipulators and real time sensing is discussed. The philosophy behind THREAD, the issues which entered into its design, and the features of the language are discussed from the viewpoint of researchers who want to develop algorithms in a simulation environment, and from those who want to implement physical robotics systems. The detailed functions of the many complex robotics algorithms and tools which are part of the language are not explained, but an overall impression of their capability is given.
Planning activities are continuing between NASA, the DoD, and two foreign governments to develop the technology and to show the design capability by the mid-1990's for advanced, supersonic, short takeoff and vertical landing (STOVL) aircraft. Propulsion technology is the key to achieving viable STOVL aircraft, and NASA Lewis will play a lead role in the development of these required propulsion technologies. The initial research programs are focused on technologies common to two or more of the possible STOVL propulsion system concepts. An overview is presented of the NASA Lewis role in the overall program plan and recent results of the research program. The future research program will be focused on one or possibly two of the propulsion concepts seen as most likely to be successful in the post advanced tactical fighter time frame.
Applications of Program Evaluation and Review Technique /PERT/ in NASA
The purpose of the Integrated Technology Plan (ITP) is to serve as a strategic plan for the OAST space research and technology (R&T) program, and as a strategic planning framework for other NASA and national participants in advocating and conducting technology developments that support future U.S. civil space missions. The ITP begins with a discussion of the national policy and NASA organization which establishes the overall framework for civil space R&T planning. The second chapter provides a top-level review of the potential users of civil space R&T, their strategic mission plans, and the technologies they have identified as needed to achieve those plans. The overall methodology used to develop a civil space technology strategy is discussed. The technical details of the 1991 strategic plan are described, ending with a review of civil space R&T priorities. The fourth chapter describes how the strategic plan is annually translated into the OAST Space R&T Program, with a summary of the fiscal year 1992 program. The ITP concludes with a discussion of requirements for technology development coordination and strategies for facilitating the transfer of civil space technology to the private sector. Several appendices also are attached that provide further information regarding budget implications of the strategic plan, organizational roles, and other topics.
An overview of the ACTS Experiments Program is presented. ACTS is being developed and will flight test the advanced technologies associated with: a Ka-band multibeam antenna, onboard signal processing and switching as well as laser communications. A nominal 3 yr experiments program is planned. Through the experiments program, the capabilities of the ACTS system will be made available to U.S. industry, university and government experimenters to test, prove the feasibility and evaluate the key ACTS system technologies. Communication modes of operation using the baseband processor and microwave switch matrix are presented, along with the antenna coverage pattern. Potential experiment categories are also presented and briefly discussed. An overall schedule of activities associated with the experiments program is outlined. Results of the ACTS Experiments Program will provide information vital to successful industry implementation of ACTS technology in a future operational system.
In 2017, NASA initiated the Artemis program to send astronauts back to the lunar surface, create a sustainable human lunar exploration program, and lead the first human exploration mission to the Mars surface. While much of NASA’s plans for the Artemis program currently focus on the Human Lunar Return and the ability for astronauts to explore the lunar surface for limited durations each year, the longer-term vision for the Artemis program is to enable sustained human exploration and commercial operations in cis-lunar space and the lunar surface. An important aspect of achieving this long-term vision, is to better understand and characterize the resources on the Moon and Mars and learn how to extract and use these resources. Known as In Situ Resource Utilization (ISRU), the identification, mapping, extraction, and processing of space resources has the potential to greatly reduce the cost and risk of human exploration. These are achieved by reducing what needs to be delivered from Earth and the dependency on these supplies, lowering costs through commercial operations, and expanding infrastructure for safer and more capable exploration and surface operations. To guide development of ISRU technologies and systems on the ground and demonstrate these capabilities on the Moon and Mars, the NASA Space Technology Mission Directorate (STMD) created and released the ISRU Envisioned Future Priorities (EFP) strategic plan in 2022 and updated it in 2023. While lunar ISRU technology development had already started, these publicly released strategic plans have been used to guide and prioritize technology development, and assess the progress in achieving the vision. Since the release of the ISRU EFP, there have been several significant activities/events that have occurred with respect to human lunar exploration, surface infrastructure, and ISRU. One was the release of the Artemis Architecture Definition Document Revision 1 that included ISRU as a sub-architecture. The second was the release of several STMD solicitations including the Announcement of Collaborative Opportunities (ACO) and Tipping Point (TP). The third was the release of a Request for Information for the Lunar Infrastructure Foundational Technology-1 (LIFT-1) mission with the primary objective of extracting oxygen from lunar regolith. The fourth was the release of STMD technology and capability Shortfalls, and the review, ranking by numerous stakeholders and individuals, and subsequent prioritization of the Shortfalls that will be utilized in future solicitation and development plans. This paper will provide an overview and status of on-going technology and system development activities, an update of ISRU into the Artemis campaign, an update on ISRU-related mission, and the impacts of the Shortfall prioritization.
The planning and preparation activities and the results of the briefings associated with the Paris Air Show are described. A team of key personnel were available during the show to familiarize international users with the STS program and the space shuttle capabilities. Participation at the show included the operation of an STS booth at the U.S. pavilion, the presentation of several invitational briefings, and detailed discussions with individual organizations.
This document outlines Rubin Observatory's plans for a dedicated \emph{Early Science Program} to enable high-impact science prior to the first annual data release of the Legacy Survey of Space and Time (LSST). Components of the Early Science Program include releasing science-grade commissioning data products via a series of ``Data Previews,'' ramping up of the transient alert stream during commissioning, implementing a program of incremental template generation to augment alert production in the early phases of the survey, and the first LSST Data Release, DR1, based on the first 6 months of data from the LSST. A detailed breakdown of which data products can be expected when is provided. The Rubin Operations team is working closely with the science community to optimize the Early Science Program for the time-domain and solar system science achievable in the first year of operations. This is a living document; both it and the Early Science Program will continue to evolve over the course of commissioning and pre-operations in response to the state of the as-built system and to community guidance.