Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Coordinating space telescope operations in an integrated planning and scheduling architecture

The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

Muscettola, Nicola↗

Hybrid Resources: Challenges, Implications, Opportunities, and Innovation

The electric power system has historically been designed to provide reliable energy to loads by using a relatively small number of well-understood generators. The distinction between load, generation, and transmission resources has been quite clear. Most of the responsibility for planning and operating a system - building a highly reliable network from less reliable parts - has been with the system manager, whether that be a utility, a regional market operator, or some similar entity. Given this historical context, many experts were initially perplexed by the rapidly growing popularity of hybrid resources, which combine multiple technologies into a single entity. Rather than depending on a system operator to provide instructions to individual technologies, hybrid resources intentionally take on more operational responsibility by optimizing and scheduling their combined functions. Interconnection queues in many regions reveal a large and growing interest in hybrids, suggesting that project developers and investors see them as providing advantages.

generators↗

YoDawg CI Runner

SAND2022-15186 O YoDawg CI Runner builds a container that hosts a Gitlab runner as a service. It provides the ability to run Podman in a nested fashion as part of a CI workflow (i.e., "Podman-in-Podman”). This allows CI jobs to be run on HPC resources by standard users through an on-demand batch scheduler. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Curry, Matthew↗

Evaluation of the Los Alamos Nuclear Material Packaging Risk Ranking Method

Repackaging nuclear material into robust containers to protect workers and the public has been ongoing at LANL and around the DOE complex for nearly two decades. The number of containers at LANL is around 5,000; limited resources for repackaging material has led to extended repackaging campaigns and the need to prioritize repackaging. Various methodologies have been used to prioritize the repackaging efforts and to demonstrate progress in risk reduction over time (e.g., Boerigter, 1997). The 2000-1 DNFSB recommendation recognized the limited DOE resources for repackaging, and acknowledged the need to “prioritize and schedule tasks to be undertaken with available funds according to consideration of risks.” Later, in DNFSB recommendation 2005-1, in addition to recommending that DOE develop a packaging standard, the Board recommended that “Characterization information should also be used to develop a surveillance program prioritized according to expected material and container risk (including, for example, material type, material form, and the age and type of container).” In response to requests and recommendations from the DOE and DNSFB to prioritize according to worker risk, a risk ranking method based on the potential consequence of dropping a container from 3 meters was developed in 2007 (Smith, 2007) and updated in 2014 (Hoffman, 2014). Various LANL implementation plans for repackaging were developed over the years using this methodology (Stone, 2014). Currently, this method is utilized in conjunction with an algorithm to mitigate programmatic risk to prioritize container repackaging and material processing (Prochnow, 2015). The purpose of this study is to document how the current risk ranking method works, how it is used and potential limitations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

National facilities study. Volume 5: Space research and development facilities task group

With the beginnings of the U.S. space program, there was a pressing need to develop facilities that could support the technology research and development, testing, and operations of evolving space systems. Redundancy in facilities that was once and advantage in providing flexibility and schedule accommodation is instead fast becoming a burden on scarce resources. As a result, there is a clear perception in many sectors that the U.S. has many space R&D facilities that are under-utilized and which are no longer cost-effective to maintain. At the same time, it is clear that the U.S. continues to possess many space R&D facilities which are the best -- or among the best -- in the world. In order to remain world class in key areas, careful assessment of current capabilities and planning for new facilities is needed. The National Facility Study (NFS) was initiated in 1992 to develop a comprehensive and integrated long-term plan for future aerospace facilities that meets current and projected government and commercial needs. In order to assess the nation's capability to support space research and development (R&D), a Space R&D Task Group was formed. The Task Group was co-chaired by NASA and DOD. The Task Group formed four major, technologically- and functionally- oriented working groups: Human and Machine Operations; Information and Communications; Propulsion and Power; and Materials, Structures, and Flight Dynamics. In addition to these groups, three supporting working groups were formed: Systems Engineering and Requirements; Strategy and Policy; and Costing Analysis. The Space R&D Task Group examined several hundred facilities against the template of a baseline mission and requirements model (developed in common with the Space Operations Task Group) and a set of excursions from the baseline. The model and excursions are described in Volume 3 of the NFS final report. In addition, as a part of the effort, the group examined key strategic issues associated with space R&D facilities planning for the U.S., and these are discussed in Section 4 of this volume.

Source record↗

Mission planning for the Lidar in Space Technology Experiment

Developing a mission planning system for a Space Shuttle mission is a complex procedure. Several months of preparation are required to develop a plan that optimizes science return during the short operations time frame. Further complicating the scenario is the necessity to schedule around crew activities and other payloads which share Orbiter resources. SpaceTec, Inc. developed the mission planning system for the Lidar In Space Technology Experiment, or LITE, which flew on Space Shuttle mission STS-64 in September of 1994. SpaceTec used a combination of off-th-shelf and in-house developed software to analyze various mission scenarios both premission and real-time during the flight. From this analysis, SpaceTec developed a comprehensive mission plan that met the mission objectives.

Redifer, Matthew E.↗

SSME component assembly and life management expert system

The space shuttle utilizes several rocket engine systems, all of which must function with a high degree of reliability for successful mission completion. The space shuttle main engine (SSME) is by far the most complex of the rocket engine systems and is designed to be reusable. The reusability of spacecraft systems introduces many problems related to testing, reliability, and logistics. Components must be assembled from parts inventories in a manner which will most effectively utilize the available parts. Assembly must be scheduled to efficiently utilize available assembly benches while still maintaining flight schedules. Assembled components must be assigned to as many contiguous flights as possible, to minimize component changes. Each component must undergo a rigorous testing program prior to flight. In addition, testing and assembly of flight engines and components must be done in conjunction with the assembly and testing of developmental engines and components. The development, testing, manufacture, and flight assignments of the engine fleet involves the satisfaction of many logistical and operational requirements, subject to many constraints. The purpose of the SSME Component Assembly and Life Management Expert System (CALMES) is to assist the engine assembly and scheduling process, and to insure that these activities utilize available resources as efficiently as possible.

Ali, M.↗

What We Did Last Summer: Depicting DES Data to Enhance Simulation Utility and Use

At Kennedy Space Center (KSC), an important use of Discrete Event Simulation (DES) addresses ground operations .of missions to space. DES allows managers, scientists and engineers to assess the number of missions KSC can complete on a given schedule within different facilities, the effects of various configurations of resources and detect possible problems or unwanted situations. For fifteen years, DES has supported KSC efficiency, cost savings and improved safety and performance. The dense and abstract DES data, however, proves difficult to comprehend and, NASA managers realized, is subject to misinterpretation, misunderstanding and even, misuse. In summer 2008, KSC developed and implemented a NASA Exploration Systems Mission Directorate (ESMD) project based on the premise that visualization could enhance NASA's understanding and use of DES.

Elfrey, Priscilla↗

Coordinating Shared Activities

Shared Activity Coordination (ShAC) is a computer program for planning and scheduling the activities of an autonomous team of interacting spacecraft and exploratory robots. ShAC could also be adapted to such terrestrial uses as helping multiple factory managers work toward competing goals while sharing such common resources as floor space, raw materials, and transports. ShAC iteratively invokes the Continuous Activity Scheduling Planning Execution and Replanning (CASPER) program to replan and propagate changes to other planning programs in an effort to resolve conflicts. A domain-expert specifies which activities and parameters thereof are shared and reports the expected conditions and effects of these activities on the environment. By specifying these conditions and effects differently for each planning program, the domain-expert subprogram defines roles that each spacecraft plays in a coordinated activity. The domain-expert subprogram also specifies which planning program has scheduling control over each shared activity. ShAC enables sharing of information, consensus over the scheduling of collaborative activities, and distributed conflict resolution. As the other planning programs incorporate new goals and alter their schedules in the changing environment, ShAC continually coordinates to respond to unexpected events.

Clement, Bradley↗

Modeling Temporal Processes in Early Spacecraft Design: Application of Discrete-Event Simulations for Darpa's F6 Program

While the ability to model the state of a space system over time is essential during spacecraft operations, the use of time-based simulations remains rare in preliminary design. The absence of the time dimension in most traditional early design tools can however become a hurdle when designing complex systems whose development and operations can be disrupted by various events, such as delays or failures. As the value delivered by a space system is highly affected by such events, exploring the trade space for designs that yield the maximum value calls for the explicit modeling of time.This paper discusses the use of discrete-event models to simulate spacecraft development schedule as well as operational scenarios and on-orbit resources in the presence of uncertainty. It illustrates how such simulations can be utilized to support trade studies, through the example of a tool developed for DARPA's F6 program to assist the design of "fractionated spacecraft".

trade space exploration↗

Space Communications and Navigation Validation: Extracting Data for the Strategic Center for Networking, Integration, and Communications Scheduling Algorithms

Efficiency in communication system architecture performance between Space Communications and Navigation (SCaN) assets and missions is crucial, as space communication is varied, complex, and often not utilized to its full potential. The SCaN Strategic Center for Networking, Integration, and Communications (SCENIC) new scheduling algorithms, which are designed to simulate the allocation of resources between SCaN assets and missions, have the potential to simulate an increase of this efficiency; however, they require real-world data to be validated against. The purpose of this project was to extract said validation data, which details the frequency and duration of utilized contact windows between missions and assets in the Near Earth Network (NEN), Space Network (SN), and Deep Space Network (DSN). Stored as images in daily operations summaries (DOSs), the tabular data existed in a variety of file formats such as.pdf, .docx, and .doc. Since the tables were stored as images, ABBYY® FineReader® (ABBYY Software Ltd.) optical character recognition (OCR) was implemented, which is a proprietary software that reads images from text. The comma separated value (CSV) output was utilized as input to a series of MATLAB® (The MathWorks, Inc.) methods for reformatting, at which point it was ready to be machine-read. Finally, the results were converted to a Microsoft Excel format for human readability. Along with being used for validation purposes, the data will also be used to map equipment degradation as a function of time to analyze the reliability of network assets.

Kontur, Noah P.↗

Design, implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Design implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Humboldt bay power plant decommissioning transition to civil works - 15039

Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR, completed the Plant Systems Removal Phase by removal of all radiologically significant plant systems from the buildings in June 2014. The HBPP historical design and construction, close proximity to the bay and associated tidal interactions poses unique challenges to an effective decommissioning effort as the Site transitions to a major earthwork project - designated as Civil Works. The last significant large component removal project remaining is segmentation and disposal of the reactor pressure vessel shell and this project is now integrated and executed under Civil Works with PG and E solely in an oversight role across the site beginning 2015. The value from run-up and mock-up testing of tooling to segment the HBPP reactor vessel will be discussed. Experience obtained, especially at error prone interfaces, during start-up, systemisation and operating phases for the First of a Kind (KOAK) tooling will be discussed. Implementation of the civil scope of work commenced July 2013. Its status and experience applicable to other decommissioning efforts will be provided from an owner's perspective. Implementation of the civil work scope includes development and implementation of oversight capability including policy, procedures and deployment of skilled, experienced and trained oversight staff in the field. Challenges encountered and solutions implemented during mobilization and ramp up of the civil contractor commensurate with demobilization of the self-perform staff will be covered. Partnering with the contractor to establish a good Client/Contractor relationship and tips on where to invest owner resources will be shared. Development of a solid baseline project schedule that incorporates regulatory constraints, client expectations and contract constraints and its importance to safe, compliant project execution will be shared. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Automated electrical demand peak leveling in a manufacturing facility with short term energy storage for smart grid participation

Demand side management of energy is a vital function in the smart grid that allows for greater integration of renewable energy resources, and is facilitated with economic incentives in energy and demand pricing schedules. Manufacturing systems can take advantage of these incentives to reduce their energy costs through active energy management. This paper is a simulation analysis on the implementation of a novel algorithm that levelizes the maximum power load of an industrial bakery that operates under an on-peak demand price structure. The algorithm takes advantage of an untapped thermal energy storage resource in the facility, a chilled glycol buffer tank, to level the short intra-day power oscillations that the facility experiences. One of the key advantages of the algorithm is that it does not require precise demand forecasting or complex control algorithms, such as model predictive control. Even with substantial error in peak power estimates (5%), the algorithm is expected to result in at least a 2% peak reduction. Under ideal prediction, the algorithm reduces the on-peak facility power maximum by 7.3% of the possible 9.0% reduction the storage can provide. Further, the algorithm uses very few facility specific inputs, and can readily be adapted for any facility with short intra-day oscillatory power profiles and untapped storage capacity. The key insight of the paper is the employment of a novel algorithm to leverage untapped energy storage in manufacturing facilities to transform them into smart grid participants with no major capital investment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advisory Algorithm for Scheduling Open Sectors, Operating Positions, and Workstations

Air traffic controller supervisors configure available sector, operating position, and work-station resources to safely and efficiently control air traffic in a region of airspace. In this paper, an algorithm for assisting supervisors with this task is described and demonstrated on two sample problem instances. The algorithm produces configuration schedule advisories that minimize a cost. The cost is a weighted sum of two competing costs: one penalizing mismatches between configurations and predicted air traffic demand and another penalizing the effort associated with changing configurations. The problem considered by the algorithm is a shortest path problem that is solved with a dynamic programming value iteration algorithm. The cost function contains numerous parameters. Default values for most of these are suggested based on descriptions of air traffic control procedures and subject-matter expert feedback. The parameter determining the relative importance of the two competing costs is tuned by comparing historical configurations with corresponding algorithm advisories. Two sample problem instances for which appropriate configuration advisories are obvious were designed to illustrate characteristics of the algorithm. Results demonstrate how the algorithm suggests advisories that appropriately utilize changes in airspace configurations and changes in the number of operating positions allocated to each open sector. The results also demonstrate how the advisories suggest appropriate times for configuration changes.

Bloem, Michael↗

Quantum/AI Topology-Aware Latency-Adaptive HPC Workflow Scheduling Optimization

The growing demand for more powerful high-performance computing (HPC) systems has led to a steady rise in energy consumption by supercomputing worldwide. This study is focused on comparing our Application-Topology Mapper (ATMapper) to the popular Simple Linux Utility for Resource Management (SLURM) for the purpose of exploring methods that can further optimize job-scheduling within HPC systems. ATMapper is an Artificial-Intelligence based approach to job-scheduling that is currently being enhanced with quantum annealing (QA) to generate optimal schedules faster. We are applying QA to speedup our ATMapper process to achieve higher computing efficiency, thereby reducing HPC energy consumption. Here, we examine how four job-scheduling approaches perform in processor node assignment when using an example network architecture of 4 interconnected nodes. Using a specialized script, we are assessing the schedule of a computation flow with 11 interdependent tasks. The data movements among nodes were tracked to count for the number of interactions (network hops) between nodes needed to complete the tasks. The total number of hops and the job completion time were then used to quantify the efficiency of the different mapping approaches. In addition to SLURM, we also compare our ATMapper to the QA-enabled LBNL TIGER and the D-Wave Distributed Computing processor assignment approaches. The preliminary results showed that our topology-aware, latency-adaptive ATMapper is significantly more efficient when compared to the other scheduling approaches due to its load-imbalance network allocation. The scheduler displayed a computing efficiency of 53% by performing significantly fewer network hops than its alternatives. By reducing the number of hops, ATMapper was able to perform all 11 tasks by using only 3 nodes out of given 4. This research indicates the potential to use QA/AI for HPC job-scheduling. Later, we will test a SLURM simulator program to draw further comparisons on the effectiveness of ATMapper's scheduling approach. The results of this comparison will serve as a baseline for later improving SLURM's performance using a QA-enhanced ATMapper approach.

Caraveo, Braulio [University of Huston - Clear Lak↗

Historic Significance and Current Condition Assessment of Building 06-CP-170, the Yucca Flat Weather Station, Area 6, Nevada National Security Site, Nye County, Nevada

This report was produced in partial fulfillment of the mitigation of adverse effects to Building 06-CP-170, the Yucca Flat Weather Station on the Nevada National Security Site (NNSS), and is intended to comply with the 2021 Memorandum of Agreement DE-GM58-21NA25543 Between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Demolition of Fourteen Buildings and Structures in Area 6 of the Nevada National Security Site, Nye County, Nevada (hereafter referred to as the MOA). This MOA was executed to resolve adverse effects from the U.S. Department of Energy (DOE) plan to demolish 14 architectural resources at the Control Point and in the vicinity in Area 6 of the NNSS. The management and operations contractor for the NNSS identified these 14 architectural resources as environmental hazards unsafe for human occupation due to deterioration and rodent infestation. Building 06-CP-170 is scheduled for demolition as part of this undertaking. Building 06-CP-170 was originally recorded in 2018 during a Section 106 cultural resources inventory for a proposed installation of a 138-kilovolt transmission line on the NNSS. The building was determined individually eligible by the DOE, in consultation with the Nevada State Historic Preservation Office, for inclusion in the National Register of Historic Places under the Secretary of the Interior’s Significance Criterion A because of its association with nuclear testing. Pursuant to Stipulation III.D.3 of the MOA, this report provides a summary of the historic significance of Building 06-CP-170 and a description of its current condition and accessory resources. In addition, an updated Architectural Resource Assessment (ARA) form with new information and photographs is included in the appendix in fulfillment of Stipulation III.D.2.

54 ENVIRONMENTAL SCIENCES↗