Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Scheduler Modeling of IBR Plants for Providing Ancillary Services [SWR-25-16]

Inverter-based resources (IBRs) have been integral components of modern power systems and their capability in providing grid services have been widely studied. To promote the deployment of IBR grid services in real utility operation, this software proposes a scheduler model for IBRs. The energy and reserve are co-optimized in day-ahead, various ancillary services, including operating reserve provision, peak load reduction, voltage regulation and power factor control are integrated in the model.

Wang, Xiaofei [National Renewable Energy Laborator↗

E-PVT: enhanced position-velocity-time scheduler for computer-controlled optical finishing with comprehensive considerations of dynamics constraints, continuity and efficiency

Deterministic computer-controlled optical finishing is an essential approach for achieving high-quality optical surfaces. Its determinism and convergence rely heavily on precise and smooth motion control to guide the machine tool over an optical surface to correct residual errors. One widely supported and smooth motion control model is position-velocity-time (PVT), which employs piecewise cubic polynomials to describe positions. Our prior research introduced a PVT-based velocity scheduling method, demonstrating sub-nanometer level convergence in ion beam figuring (IBF) processes. However, three challenges remained. Firstly, this method relies on quadratic programming, resulting in computational intensiveness for dense tool paths. Secondly, the dynamics constraints and velocity and acceleration continuities are not comprehensively considered, limiting the full potential of PVT-based control. Thirdly, no compensation mechanism existed when dynamics constraints are exceeded. In this study, in response to these challenges, we proposed the Enhanced PVT (E-PVT) method, reducing the time complexity from O ( n 3 ) to O ( n ) while fully addressing dynamics constraints and continuities. A novel compensation method utilizing particle swarm optimization was proposed to address situations where dynamics constraints might be exceeded while maintaining the overall processing efficiency. Validation through simulation and experimentation confirmed the improved performance of E-PVT.

36 MATERIALS SCIENCE↗

Depot Charging Schedule Optimization for Medium- and Heavy-Duty Battery-Electric Trucks

Charge management, which lowers charging costs for fleets and prevents straining the electrical grid, is critical to the successful deployment of medium- and heavy-duty battery-electric trucks (MHD BETs). This study introduces an energy demand and cost management framework that optimizes depot charging for MHD BETs by combining an energy consumption machine learning model and a linear program optimization model. The framework considers key factors impacting real-world MHD BET operations, including vehicle and charger configurations, duty cycles, use cases, geographic and climate conditions, operation schedules, and utilities’ time-of-use (TOU) rates and demand charges. The framework was applied to a hypothetical fleet of 100 MHD BETs in California under three different utilities for 365 days, with results compared to unmanaged charging. The optimized charging solution avoided more than 90% of on-peak charging, reduced fleet charging peak load by 64–75%, and lowered fleet energy variable costs by 54–64%. This study concluded that the proposed charge management framework significantly reduces energy costs and peak loads for MHD BET fleets while making recommendations for fleet electrification infrastructure planning and the design of utility TOU rates and demand charges.

Song, Shuhan↗

Actuator device schedules rate of valve closure

Prevalve actuator schedules the closure rate of a valve. The actuator is spring loaded to produce a normally open valve and pneumatically powered to close the valve. The closure rate is controlled by means of pneumatic snubber and booster circuitry.

Source record↗

Automatic planning concept - An analysis of optimum scheduling

Study considers resource costs, mission constraints, and experiment results as linear functions, insofar as possible, in an effort to develop optimum scheduling by the use of linear programming. It involves a mathematical approach in which a number of constraints are considered operative.

Rebelein, P. R.↗