Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Computerized Operator Support System – Phase II Development

A computerized operator support system (COSS) prototype for nuclear control room process control is proposed and discussed. The COSS aids operators in addressing rapid plant upsets that would otherwise result in the shutdown of the power plant and interrupt electrical power generation, representing significant costs to the owning utility. In its current stage of development the prototype demonstrates four advanced functions operators can use to more efficiently monitor and control the plant. These advanced functions consist of: (1) a synthesized and intuitive high level overview display of system components and interrelations, (2) an enthalpy-based mathematical chemical and volume control system (CVCS) model to detect and diagnose component failures, (3) recommended strategies to mitigate component failure effects and return the plant back to pre-fault status, and (4) computer-based procedures to walk the operator through the recommended mitigation actions. The COSS was demonstrated to a group of operators and their feedback was collected. The operators responded positively to the COSS capabilities and features and indicated the system would be an effective operator aid. The operators also suggested several additional features and capabilities for the next iteration of development. Future versions of the COSS prototype will include additional plant systems, flexible computer-based procedure presentation formats, and support for simultaneous component fault diagnosis and dual fault synergistic mitigation action strategies to more efficiently arrest any plant upsets.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Interactive orbital proximity operations planning system

An interactive graphical planning system for on-site planning of proximity operations in the congested multispacecraft environment about the space station is presented. The system shows the astronaut a bird's eye perspective of the space station, the orbital plane, and the co-orbiting spacecraft. The system operates in two operational modes: (1) a viewpoint mode, in which the astronaut is able to move the viewpoint around in the orbital plane to range in on areas of interest; and (2) a trajectory design mode, in which the trajectory is planned. Trajectory design involves the composition of a set of waypoints which result in a fuel-optimal trajectory which satisfies all operational constraints, such as departure and arrival constraints, plume impingement constraints, and structural constraints. The main purpose of the system is to present the trajectory and the constraints in an easily interpretable graphical format. Through a graphical interactive process, the trajectory waypoints are edited until all operational constraints are satisfied. A series of experiments was conducted to evaluate the system. Eight airline pilots with no prior background in orbital mechanics participated in the experiments. Subject training included a stand-alone training session of about 6 hours duration, in which the subjects became familiar with orbital mechanics concepts and performed a series of exercises to familiarize themselves with the control and display features of the system. They then carried out a series of production runs in which 90 different trajectory design situations were randomly addressed. The purpose of these experiments was to investigate how the planning time, planning efforts, and fuel expenditures were affected by the planning difficulty. Some results of these experiments are presented.

Grunwald, Arthur J.↗

Metrics required for Power System Resilient Operations and Protection

Today’s complex grid involves many interdependent systems. Various layers of hierarchical control and communication systems are coordinated, both spatially and temporally to achieve gird reliability. As new communication network based control system technologies are being deployed, the interconnected nature of these systems is becoming more complex. Deployment of smart grid concepts promises effective integration of renewable resources, especially if combined with energy storage. However, without a philosophical focus on resilience, a smart grid will potentially lead to higher magnitude and/or duration of disruptive events. The effectiveness of a resilient infrastructure depends upon its ability to anticipate, absorb, adapt to, and/or rapidly recover from a potentially catastrophic event. Future system operations can be enhanced with a resilient philosophy through architecting the complexity with state awareness metrics that recognize changing system conditions and provide for an agile and adaptive response. The starting point for metrics lies in first understanding the attributes of performance that will be qualified. In this paper, we will overview those attributes and describe how they will be characterized by designing a distributed agent that can be applied to the power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating the Impact of Managed EV Charging for Reliable Operation of Bulk Power Systems with High Non-Dispatchable Generation

The growth of electric vehicles (EVs) and variable-generation (VG) sources introduces new challenges for power-system operations. This study introduces a modeling framework and evaluates five EV charging strategies under projected 2040 grid conditions in the Evergy service territory with high non-dispatchable generation. Using realistic EV behavior and generation models, their impacts on system peak demand, ramp rate, and reserve capacity are evaluated. Results show that only the peak-avoidance strategy effectively reduces system peak demand, while decentralized strategies-particularly cost based dynamic charging-can exacerbate peaks due to synchronized user behavior. However, ramp-rate minimization strategy significantly reduce the stress on dispatchable generation achieving the lowest maximum absolute ramp rate (MARR) (56.81 MW) and lowest reserve requirement (2.39 GW). In contrast, unmanaged and TOU random strategies increase the stress on dispatchable generation sources with increased MARR and reserve requirements. These findings highlight the importance of coordinated, system-aware managed charging strategies to ensure reliable and affordable grid operation in the presence of EVs and VG sources.

14 - SOLAR ENERGY↗

A distributed telerobotics system for space operations

Robotic systems for space operations will require a combination of teleoperation, closely supervised autonomy, and loosely supervised autonomy. They may involve multiple robots, multiple controlling sites, and long communication delays. We have constructed a distributed telerobotics system as a framework for studying these problems. Our system is based on a modular interconnection scheme which allows the components of either manual or autonomous control systems to communicate and share information. It uses a wide area network to connect robots and operators at several different sites. This presentation will describe the structure of our system, the components used in our configurations, and results of some of our teleoperation experiments.

Wise, James D.↗

Model-based Systems Engineering: Creation and Implementation of Model Validation Rules for MOS 2.0

Model-based Systems Engineering (MBSE) is an emerging modeling application that is used to enhance the system development process. MBSE allows for the centralization of project and system information that would otherwise be stored in extraneous locations, yielding better communication, expedited document generation and increased knowledge capture. Based on MBSE concepts and the employment of the Systems Modeling Language (SysML), extremely large and complex systems can be modeled from conceptual design through all system lifecycles. The Operations Revitalization Initiative (OpsRev) seeks to leverage MBSE to modernize the aging Advanced Multi-Mission Operations Systems (AMMOS) into the Mission Operations System 2.0 (MOS 2.0). The MOS 2.0 will be delivered in a series of conceptual and design models and documents built using the modeling tool MagicDraw. To ensure model completeness and cohesiveness, it is imperative that the MOS 2.0 models adhere to the specifications, patterns and profiles of the Mission Service Architecture Framework, thus leading to the use of validation rules. This paper outlines the process by which validation rules are identified, designed, implemented and tested. Ultimately, these rules provide the ability to maintain model correctness and synchronization in a simple, quick and effective manner, thus allowing the continuation of project and system progress.

Model-based Systems Engineering (MBSE)↗

Survey of U.S. Ancillary Services Markets

In addition to providing energy to end-consumers, power system operators are also responsible for ensuring system reliability. To this end, power markets maintain an array of ancillary services to ensure that it is always possible to balance the supply and demand for energy in real-time. A subset of these ancillary services are commonly procured through market-based mechanisms: namely, Regulation, Spinning, and Non-spinning Reserves. Regulation Reserves are maintained to respond to supply/demand imbalances over short time frames, typically on the order of several seconds to one minute. Resources that provide Regulation Reserves adjust their generation or load levels in response to automatic generation control (AGC) signals provided by the system operator. Contingency reserves are maintained to provide additional generation capacity in the event that load increases substantially or supply side resources reduce their output or are taken offline. The reserves are typically segmented into two categories, 1) Spinning or Synchronized Reserves that are provided by generation units that are actively generating and have the ability to increase or decrease their output, 2) Non-spinning or Non-synchronized Reserves that are provided by generation resources that are not actively generating, but are able to start up and provide generation within a specified timeframe. Contingency reserves typically have response times on the order of ten to 30 minutes and can also be provided by demand-side resources that are capable of reducing their load. There are seven distinct power markets in the United States, each operated by a Regional Transmission Operator (RTO) or Independent System Operator (ISO) that operates the transmission system in its territory, operates markets for energy and ancillary services, and maintains system reliability. Each power market offers its own set of ancillary services, and precise definitions, requirements, and market mechanisms differ between markets. Despite the differences between markets, both in terms of services offered and system requirements, some broad trends generally apply. Regulation Reserves typically have the highest market prices, followed by Spinning Reserves and Non-spinning Reserves. Prices for Regulation Reserves have been the highest in the PJM market, since it opened in October 2012. This is partially because PJM experienced large price spikes during the period of extreme weather conditions in early 2014. ERCOT has traditionally had the highest prices for Spinning Reserves (called Responsive Reserves in ERCOT), including several periods of sustained high prices between 2010 and 2012. This can be explained in part by the relatively high penetration of variable wind resources and a similarly high requirement relative to peak load. ERCOT has also traditionally had the highest price for Non-spinning Reserves, followed by the NYISO East region. Both have experienced several periods of prolonged high prices since their inception, an occurrence that has not been regularly seen in other markets. In ISO-NE and PJM for example, the market clearing price for Non-spinning Reserves is typically $0/MWh more than 95% of the time. Market volume (in terms of the average amount of capacity of each service that is provided to a system) typically follows the reverse order of prices, as systems maintain the most Non-spinning Reserves capacity followed by Spinning Reserves and Regulation Reserves. PJM generally has the largest market for Regulation Reserves both in terms of capacity. The size of most Regulation Reserves markets in terms of capacity stay relatively constant year-to-year, as this is dictated largely by system requirements. PJM also generally has the largest Spinning Reserves market in terms of capacity. SPP, MISO, ISO-NE and SPP (beginning in 2014) all have Spinning Reserve markets with similar average capacity levels. When combined, the markets for Non-spinning and Operating reserves in ISO-NE have a comparable capacity to the market for Primary Reserves 1 in PJM. SPP, MISO, and CAISO all have smaller markets for their respective Non-spinning Reserves products that are roughly the same size as each other in terms of capacity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Tangible Solutions for Grid Operation Upgrade

Many countries worldwide are setting clean energy targets to decarbonize the energy sector and add higher wind and solar capacities. Given their distributed nature, variable renewable energy (VRE) assets can have unique grid integration considerations, and require grid operation practices to be modernized. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage renewable energy resource operation in the system control center. Further, system operation planning is conducted with VRE and load forecasting to enable reliable real-time system operation. NREL has partnered with many system operators in the region to identify appropriate technology and grid modernization solutions. NREL and partners from system operators in the region will present on the challenges and some solutions that have been applied and share best practices such as energy management system upgrades, VRE forecasting framework, grid flexibility improvements, and staff training.

emerging economies↗

Flexible Service Contracting for Risk Management within Integrated Transmission and Distribution Systems

The general objective of our project has been to investigate the ability of Independent Distribution System Operators (IDSOs), functioning as linkage agents for Integrated Transmission and Distribution (ITD) systems, to facilitate the flexible availability and usage of reserve in support of ITD system operations. This general objective is in accordance with Order 2222 of the U.S. Federal Energy Regulatory Commission (FERC), titled “Participation of Distributed Energy Resource Aggregations in Markets Operated by Regional Transmission Organizations and Independent System Operators”. The Final Rule for FERC Order 2222 was issued on September 17, 2020. The primary contribution of our project is that we have formulated an innovative energy management Transactive Energy Design (TES) approach for ITD systems that provides promising support for our project objective. Specifically, we have developed a new type of IDSO-managed TES design for distribution system operations, as well as new types of swing contracts permitting IDSOs to participate in transmission system operations as providers of reserve harnessed from distribution system resources in return for appropriate compensation. Together, these design elements constitute a scalable market-based approach facilitating efficient reserve procurement for ITD system operations from a fuller range of power resources. The efficacy of our approach has been demonstrated by means of detailed conceptual analyses as well as test case simulations. To implement the latter, we have developed the ITD TES Platform V2.0, a computational platform that permits the modeling and software implementation of ITD system operations over time. The Electric Reliability Council of Texas (ERCOT) energy region has been used as the empirical anchor for the development of this platform. Our conceptual and test-case work has been reported in a Wiley/IEEE Press book, two refereed book chapters, and seven refereed journal articles. The key components comprising the ITD TES Platform V2.0 have been released as documented open-source software at online GitHub repositories.

24 POWER TRANSMISSION AND DISTRIBUTION↗

From Formal Requirements to Highly Assured Software for Unmanned Aircraft Systems

Operational requirements of safety-critical systems are often written in restricted specification logics. These restricted logics are amenable to automated analysis techniques such as model-checking, but are not rich enough to express complex requirements of unmanned systems. This short paper advocates for the use of expressive logics, such as higher-order logic, to specify the complex operational requirements and safety properties of unmanned systems. These rich logics are less amenable to automation and, hence, require the use of interactive theorem proving techniques. However, these logics support the formal verification of complex requirements such as those involving the physical environment. Moreover, these logics enable validation techniques that increase con dence in the correctness of numerically intensive software. These features result in highly-assured software that may be easier to certify. The feasibility of this approach is illustrated with examples drawn for NASA's unmanned aircraft systems.

Munoz, Cesar↗

Data collection operational support system, part 1

The Data Collection Operational Support system has been shown to be a usable means of transmitting numerical data over a 2-way VHF satellite link. It is also capable of supporting educational applications. The design, operation, use, results, and recommendations of the system are discussed.

Woughter, W. R., Jr.↗

HIPPO – A Software Platform for Electricity Market Research and Development

The goal of this project is to provide Regional transmission organizations (RTOs) and independent system operators (ISOs) a market design and prototyping software, High-Performance Power-Grid Optimization (HIPPO), that they can evaluate electricity market design options, calculate market planning strategies and operational performance. With the high standards and strict reliability requirements for operating power systems, impacts of new technologies need to be fully investigated prior to any consideration for adoption. A market design and prototyping software tool which can be used to prototype electricity market design options, to calculate market planning strategies and operational performance with high precision, and to investigate the impacts for integrating future power grid technologies will be valuable to RTOs/ISOs who operate power systems, to vendors like GE and ABB who provide the market solvers, and to market participants and researchers who are actively doing market research. HIPPO is a such tool that can be used to improve the current market operations and provide capabilities for rigorous forward-looking design and prototyping of next-generation energy markets. HIPPO has a high-resolution model for the day-ahead SCUC, which was validated with MISO and GE-Grid Solutions. HIPPO is built with parallel and distributed computing capabilities and can be executed in both multi-thread and high-performance computing (HPC) settings. This capability provides fast solution speed necessary to handle the larger and more complex SCUC problems of real-world cases and the potentially growing size and complexity of future scenarios. In addition, HIPPO has a concurrent optimizer (CO) which manages multiple algorithm executions simultaneously and leverages the advantages from different algorithms. This structure provides flexibility to better benchmark competing approaches. Highly accurate market model, fast solution technologies and flexible model and algorithm control are the features which will make HIPPO an extensible platform for developing and testing multiple approaches to meet a wide range of future market needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Six-Degree-of-Freedom Test Facility

Shuttle to Space station docking has become an important issue in the last few years. Docking sensors have been proposed that will provide high precision measurements required for the fuel efficient rendezvous and docking of space vehicles. These sensors will also be used for satellite servicing and orbital assembly. The performance of the docking sensors must be tested before they are implemented in a space environment. A Six-Degree-of-Freedom (6-DOF) Test Facility has been developed at the Tracking & Communications Section, Johnson Space Center to test the static and dynamic accuracies of docking sensors. A candidate sensor is evaluated by comparing the sensor's static position and velocity measurements to the more accurate 6-DOF system. The 6-DOF Test Facility's hardware is fully integrated. Software has been developed in-house to support system operation. The system has been tested statically and the operational parameters verified. System accuracies remain to be determined. Dynamic testing of the facility is expected to begin shortly. Several companies such as McDonnell Douglas, Autonomous Technologies, and General Dynamics are scheduled to test sensors in the next few months. The 6-DOF facility will be available for use in November 1991. This presentation describes the subcomponents, operation, and capabilities of the 6-DOF Test Facility. Discussions will be held on system accuracies. Additional applications of the 6-DOF system will also be addressed.

Bittel, Michelle A.↗

Automating security monitoring and analysis for Space Station Freedom's electric power system

Operating a large, space power system requires classifying the system's status and analyzing its security. Conventional algorithms are used by terrestrial electric utilities to provide such information to their dispatchers, but their application aboard Space Station Freedom will consume too much processing time. A new approach for monitoring and analysis using adaptive pattern techniques is presented. This approach yields an on-line security monitoring and analysis algorithm that is accurate and fast; and thus, it can free the Space Station Freedom's power control computers for other tasks.

Dolce, James L.↗

Automating security monitoring and analysis for Space Station Freedom's electric power system

Operating a large, space power system requires classifying the system's status and analyzing its security. Conventional algorithms are used by terrestrial electric utilities to provide such information to their dispatchers, but their application aboard Space Station Freedom will consume too much processing time. A novel approach for monitoring and analysis using adaptive pattern techniques is presented. This approach yields an on-line security monitoring and analysis algorithm that is accurate and fast; and thus, it can free the Space Station Freedom's power control computers for other tasks.

Dolce, James L.↗