Search NASA⌕ Search

SEARCH · Search NASA

Results for “TECHNICAL DETAILS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Transportation Operations Model (TOM) Technical Manual

The Transportation Operations Model (TOM) is a component of the Transportation Storage Logistics (TSL) model, which assists the analyst in planning and evaluating scenarios for the transportation and storage of spent nuclear fuel (SNF). TOM was originally developed for the DOE’s Office of Civilian Radioactive Waste Management (OCRWM) in 2006. TOM provides detailed modeling of the transportation of spent nuclear fuel and the assets needed to accomplish that. This Transportation Operations Model (TOM) Technical Manual presents the theory and algorithm behind the model. Further information on the Transportation Storage Logistics model is available in the Transportation Storage Logistics Users’ Manual, and in the Transportation Storage Logistics Model Data Management Manual.

Busch, Ingrid Karin↗

Public – Private Partnership to Promote Efficient Manufacturing and Workforce Development (IAC Final Technical Report)

Through delivering ninety (90) energy assessments to small- and medium-sized manufacturing facilities in and around Tennessee, significant understandings were gained through providing detailed energy assessment reports to manufacturers and training seventy-seven (77) engineering students in which thirty-five (35) certified IAC students were recognized by DOE. The robust involvement of Tennessee Valley Authority (TVA), local utility and Tennessee Tech’s Cybersecurity Education, Research, and Outreach Center (CEROC) in majority of assessments made the technical operation very effective where leaded to 40.5% implementation rate of energy recommendations. Other benefits of the award to the public are a dynamic modeling tool capable of analyzing existing cooling towers for energy use optimization was developed and presented to DOE IAC, providing technical assistance to non-participating manufacturers in the form of workshop and training, publishing fifteen (15) peer-reviewed conference and journal papers as well as a book chapter in the area of industrial energy efficiency field, assisting the TVA Magnolia Combined Cycle Power Plant to become the First 50001 Ready Certified Power Plant in the U.S. through briefing them on ISO 50001 and 50001 Ready as well as providing an energy assessment to the plant, assisted the new IAC center at Clemson University with on-site and remote support, and provided assessment and training in unique areas of water, waste water, cyber security and smart manufacturing to our clients, students and community.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.

54 ENVIRONMENTAL SCIENCES↗

Resilient distributed state estimation with mobile agents: overcoming Byzantine adversaries, communication losses, and intermittent measurements

Applications in environmental monitoring, surveillance and patrolling typically require a network of mobile agents to collectively gain information regarding the state of a static or dynamical process evolving over a region. However, these networks of mobile agents also introduce various challenges, including intermittent observations of the dynamical process, loss of communication links due to mobility and packet drops, and the potential for malicious or faulty behavior by some of the agents. The main contribution of this paper is the development of resilient, fully-distributed, and provably correct state estimation algorithms that simultaneously account for each of the above considerations, and in turn, offer a general framework for reasoning about state estimation problems in dynamic, failure-prone and adversarial environments. Specifically, we develop a simple switched linear observer for dealing with the issue of time-varying measurement models, and resilient filtering techniques for dealing with worst-case adversarial behavior subject to time-varying communication patterns among the agents. Here, our approach considers both communication patterns that recur in a deterministic manner, and patterns that are induced by random packet drops. For each scenario, we identify conditions on the dynamical system, the patrols, the nominal communication network topology, and the failure models that guarantee applicability of our proposed techniques. Finally, we complement our theoretical results with detailed simulations that illustrate the efficacy of our algorithms in the presence of the technical challenges described above.

42 ENGINEERING↗

Helium–Xenon mixtures to improve the topological signature in high pressure gas xenon TPCs

Within the framework of xenon-based double beta decay experiments, we propose the possibility to improve the background rejection of an electroluminescent Time Projection Chamber (EL TPC) by reducing the diffusion of the drifting electrons while keeping nearly intact the energy resolution of a pure xenon EL TPC. Additionally, based on state-of-the-art microscopic simulations, a substantial addition of helium, around 10 or 15 %, may reduce drastically the transverse diffusion down to 2.5 mm/ $\sqrt{m}$ from the 10.5 mm/ $\sqrt{m}$ of pure xenon. The longitudinal diffusion remains around 4 mm/ $\sqrt{m}$. Light production studies have been performed as well. They show that the relative variation in energy resolution introduced by such a change does not exceed a few percent, which leaves the energy resolution practically unchanged. Lastly, the technical caveats of using photomultipliers close to an helium atmosphere are also discussed in detail.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

"Dedicated To The Continued Education, Training and Demonstration of PEM Fuel Cell Powered Lift Trucks In Real-World Applications."

The project objective was to further assist in the commercialization of fuel cell and H2 technology by building further upon the successful fuel cell lift truck deployments that were executed by LiftOne in 2007, with longer deployments of this technology in real-world applications. We involved facilities management, operators, maintenance personnel, safety groups, and Authorities Having Jurisdiction. LiftOne strived to educate a broad group from many areas of industry and the community as to the benefits of this technology. Included were First Responders from the local areas. We conducted month long deployments with end-users to validate the value proposition and the market requirements for fuel cell powered lift trucks. Management, lift truck operators, Authorities Having Jurisdiction and the general public experienced 'hands on' fuel cell experience in the material handling applications. We partnered with Hydrogenics in the execution of the deployment segment of the program. Air Products supplied the compressed H2 gas and the mobile fueler. Data from the Fuel Cell Power Packs and the mobile fueler was sent to the DOE and NREL as required. Also, LiftOne conducted the H2 Education Seminars on a rotating basis at their locations for lift trucks users and for other selected segments of the community over the project's 36 month duration. Executive Summary The technology employed during the deployments program was not new, as the equipment had been used in several previous demos and early adoptions within the material handling industry. This was the case with the new HyPx Series PEM - Fuel Cell Power Packs used, which had been demo'd before during the 2007 Greater Columbia Fuel Cell Challenge. The Air Products HF-150 Fueler was used outdoors during the deployments and had similarly been used for many previous demo programs. The methods used centered on providing this technology as the power for electric sit-down lift trucks at high profile companies operating large fleets. As a long-standing lift truck dealership, LiftOne was able to introduce the fuel cells to such companies in the demanding applications. Accomplishments vs Objectives: We were successful in respect to the stated objectives. The Education Segment's H2 Education Sessions were able to introduce fuel cell technology to many companies and reached the intended broad audience. Also, demos of the lift truck at the sessions as well as the conferences; expos and area events provided great additional exposure. The Deployments were successful in allowing the 6 participating companies to test the 2 fuel cell powered lift trucks in their demanding applications. One of the 6 sites (BMW) eventually adopted over 80 fuel cells from Plug Power. LiftOne was one of the 3 fuel cell demonstrators at BMW for this trial and played a major role in helping to prove the viability and efficiency of this alternative form of energy for BMW. The other 5 companies that participated in the project's deployments were encouraged by the trials and while not converting over to fuel cell power at this time, expressed the desire to revisit acquisition scenarios in the near future as the cost of fuel cells and infrastructure continue to improve. The Education sessions began in March of 2009 at the 7 LiftOne Branches and continued throughout the duration of the project. Attendees came from a large base of lift truck users in North Carolina, South Carolina and Virginia. The sessions were free and invitations were sent out to potential users and companies with intrigue. In addition to the Education content at the sessions (which was offered in a 'H2 101' format), LiftOne was able to demonstrate a working fuel cell powered lift truck, which proved to be a big draw with the 'hands on' experience. LiftOne also demo'd the fuel cell lift trucks at many conferences, expos, professional association meetings, trade shows and 'Green' events in major cities region including Charlotte, Greenville, and Columbia. Such events allowed for H2 Education Material to be presented, and recruit attendees for future sessions. The Deployments began in May '09 and continued through August'10. While the overall results were good, there were some technical problems with the fuel cells at times during the trials. These items are detailed in the attachment provided with this submission. There were never any safety issues during the trials as design features and diagnostic capabilities allowed for quick analysis and field repairs. There were no products developed during this award, as we demo'd existing products. During the project, Tom Dever was able to speak at several panel type discussions and presentations at the NHA/ Fuel Cell & H2 Energy Annual Conference, as well as at the Promat Show in Chicago. Expertise and deployment/ education experiences were imparted during these events. The presentations are included as attachments.

08 HYDROGEN↗

Real-Time Detection Methods to Monitor TRU Compositions in UREX+Process Streams

The U.S. Department of Energy has developed advanced methods for reprocessing spent nuclear fuel. The majority of this development was accomplished under the Advanced Fuel Cycle Initiative (AFCI), building on the strong legacy of process development R&D over the past 50 years. The most prominent processing method under development is named UREX+. The name refers to a family of processing methods that begin with the Uranium Extraction (UREX) process and incorporate a variety of other methods to separate uranium, selected fission products, and the transuranic (TRU) isotopes from dissolved spent nuclear fuel. It is important to consider issues such as safeguards strategies and materials control and accountability methods. Monitoring of higher actinides during aqueous separations is a critical research area. By providing on-line materials accountability for the processes, covert diversion of the materials streams becomes much more difficult. The importance of the nuclear fuel cycle continues to rise on national and international agendas. The U.S. Department of Energy is evaluating and developing advanced methods for safeguarding nuclear materials along with instrumentation in various stages of the fuel cycle, especially in material balance areas (MBAs) and during reprocessing of used nuclear fuel. One of the challenges related to the implementation of any type of MBA and/or reprocessing technology (e.g., PUREX or UREX) is the real-time quantification and control of the transuranic (TRU) isotopes as they move through the process. Monitoring of higher actinides from their neutron emission (including multiplicity) and alpha signatures during transit in MBAs and in aqueous separations is a critical research area. By providing on-line real-time materials accountability, diversion of the materials becomes much more difficult. The objective of this consortium was to develop real time detection methods to monitor the efficacy of the UREX+ process and to safeguard the separated TRUs against unlawful diversion from within a processing facility. To achieve this, a comprehensive strategy was implemented to incorporate traditional detectors and advanced Tensioned Metastable Fluid (TMFD) metastable fluid detectors (developed, in part, under this project) into a novel detector assembly coupled to the UREX+ centrifugal contactor array. The sections below provide a brief summary of the technical achievements completed during this project. The principal outcomes are documented in more complete details contained the doctoral dissertations and masters theses, journal papers, conference proceedings and additional items for more than the 35 publications that are listed in the program bibliography in Section 3.

McDeavitt, Sean M.↗

New Mexico State University Arrowhead Center PROSPER Project

This document is the final technical report of the Arrowhead Center Prosper Project at New Mexico State University. The Prosper Project was a research and public policy initiative funded by the National Energy Technology Laboratory (NETL) of the U.S. Department of Energy (DOE). The Prosper project (DOE Grant Number DE-NT0004397) began on October 1, 2008 (FY2009, Quarter 1) and ended on December 31, 2012 (FY2013, Quarter 1). All project milestones were completed on time and within the budget. This report contains a summary of ten technical reports resulting from research conducted during the project. This report also contains a detailed description of the research dissemination and outreach activities of the project including a description of the policy impacts of the project. The report also describes project activities that will be maintained after the end of the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2016 Offshore Wind Technologies Market Report

The 2016 Offshore Wind Technologies Market Report was developed by the National Renewable Energy Laboratory (NREL) for the U.S. Department of Energy (DOE) and is intended to provide offshore wind policymakers, regulators, developers, researchers, engineers, financiers, and supply chain participants, with quantitative information about the offshore wind market, technology, and cost trends in the United States and worldwide. In particular, this report is intended to provide detailed information on the domestic offshore wind industry to provide context to help navigate technical and market barriers and opportunities. The scope of the report covers the status of the 111 operating offshore wind projects in the global fleet through December 31, 2016, and provides the status and analysis on a broader pipeline of 593 projects at some stage of development. In addition, this report provides a wider assessment of domestic developments and events through the second quarter of 2017 to provide a more up-to-date discussion of this dynamically evolving industry.

17 WIND ENERGY↗

Wasatch Solar Project Final Report

The Wasatch Solar Project was a collaborative effort to conduct stakeholder engagement and provide technical assistance and analysis to support solar market development in Utah. The Wasatch Solar Project addressed four topic areas: 1) technical analysis to inform an assessment of the net benefits and costs of solar in Utah; 2) development of a 10-Year Solar Deployment Plan to create a clear path for continued solar deployment in Utah; 3) demonstration of the costs and resiliency benefits of solar and storage for resiliency at emergency response facilities or public facilities; and 4) technical assistance to create a replicable Commercial Property Assessed Clean Energy (C-PACE) financing program in Utah. The Wasatch Solar Project identified that new technical new technical challenges arise as nascent markets grow to higher penetrations of solar, requiring more detailed interconnection standards and improved efficiency in the interconnection process; that it is difficult for entities served by utilities that do not collect hourly usage data to assess the economic value of solar and storage; that despite significant resiliency benefits, the high cost of battery storage limits its adoption at healthcare and emergency response facilities in states like Utah that have low electricity rates; that administration of C-PACE financing at a local jurisdictional level can be complex, cumbersome, and a barrier to widespread utilization; and that investments in distributed generation can result in long-term savings for utility customers.

14 SOLAR ENERGY↗

Terry Turbopump Expanded Operating Band Modeling and Simulation Efforts in Fiscal Year 2021 Extended Period of Performance (Final Report)

This report documents the progress made under the Terry Turbine Expanded Operating Band (TTEXOB) program's modeling and simulation (MODSIM) initiative at Sandia National Laboratories (SNL ). It describes the US Federal Fiscal Year 2021 (FY21) extended period-of-performance MODSIM work completed since the closure of FY20 with due reference to the Texas A&M University (TAMU) hybrid milestone 5/6 experimental program. This work, which falls under Milestone 7 of the program, provides a counterpart to the various experiments. The overall TTEXOB program and its milestone-based approach are described in the program's Summary Plan. Details of the individual milestone test plans can be found in the corresponding detailed test plan, e.g. the Milestone 3 and 4 Detailed Test Plan. SNL MODISM is conducted alongside experiments performed at TAMU, and SNL technical staff regularly consults with TAMU on the experimental program. In FY21, MELCOR code models and capabilities were exercised in two different contexts: experimental comparisons to the TAMU ZS-1 and GS-2, and stand-alone analyses of a station black-out (SBO) scenario in a generic boiling water reactor (BWR). Code to experiment comparisons met with fair success when turbine losses were well characterized as for the ZS-1 turbine. Both deterministic and Bayesian calibration processes were used to find a recommended turbine torque multiplier for ZS-1 type turbines. This process could be repeated for GS-2 type turbines if GS-2 losses were better understood. Stand-alone generic BWR SBO calculations revealed that three different modes of self-regulating turbopump behavior may be observed depending on certain modeling parameters and choices having to do with turbine nozzles. Aspects of this predicted behavior may have been observed in TAMU GS-2 experiments.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

North Birmingham Housing Energy Baseline and Upgrade Strategies [Slides]

The community of North Birmingham, Alabama, participated in the Communities LEAP pilot program. As part of this technical assistance pilot, residential buildings, energy efficiency, and electrification were analyzed. This slide deck details the baseline analysis of residential buildings in the community and potential upgrade strategies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Solar Spectrum Conversion for an Algae Bioreactor (CRADA Final Report)

This project focused on developing advanced optical coatings to improve solar energy utilization. The research aimed to create lanthanide-doped upconversion nanoparticles (UCNPs) capable of capturing unused near-infrared (NIR) light from the sun and converting it into visible light (blue and red photons) that can be used for photosynthesis. The primary goal was to identify, synthesize, and integrate highly efficient UCNPs into a transparent thin-film device. Through a comprehensive workflow involving computer simulations, high-throughput robotic synthesis, and detailed optical characterization, the project successfully developed a high-performance material. The key technical achievement was the creation of a core-shell UCNP (NaYF₄:20%Yb³⁺, 2%Er³⁺ coated with a 10 nm NaYF₄ shell) that demonstrated a quantum yield of 3.2% for converting 980 nm NIR light into visible light. Transparent thin films fabricated from these nanoparticles showed excellent optical properties, confirming their potential for practical applications. This research adds to the scientific understanding of energy transfer in lanthanide materials and demonstrates a technically effective method for creating efficient light-converting coatings. The primary benefit to the public lies in the potential for these coatings to enhance the efficiency of solar-driven processes, such as boosting the growth of algae in photobioreactors for biofuel production.

14 SOLAR ENERGY↗

Final Report for Subcontract# B539681

This report summarizes the work performed under subcontract B539681. The scope of work described in the subcontract encompasses studies of fundamental research for fast ignition. The work statement from the from the original subcontract and the subsequent extension can be summarized in three major components: modeling of electron transport in experimental targets, development of diagnostics, and experimental implementation and analysis. All three of these areas have been addressed during the subcontract period, although the tasks detailed in the original subcontract were adapted to research conditions with guidance from the technical contact. The work performed in each of these areas is described. (1) Modeling of electron transport in experimental targets - Electron transport and x-ray generation in experimental targets were modeled with the Monte Carlo code Integrated Tiger Series 3.0 (ITS 3.0). This code package was also used to model the response of Bremsstrahlung spectrometer described in the paper. The modeling helped with target and spectrometer designs and was also used to interpret the measured data from the experiments. this work is coupled to the diagnostic development and experimental analysis and is described in the deliverable of the report. (2) Diagnostic Development - During the subcontract period a filter-stack Bremsstrahlung spectrometer using image plate dosimeters was developed, tested, and calibrated. The spectrometer design and sample data taken with the spectrometer was presented at the High Temperature Plasma Diagnostics conference (Albuquerque, NM 2008). The information was also subsequently published in the peer-reviewed conference proceedings (rev. Sci. Instrum. 79:10E305 (2008)). The diagnostic was fielded on over 10 experiments at the Jupiter Laser Facility at Lawrence Livermore and was also adapted for use on OMEGA EP, was discussed in the subcontract extension. A composition study of the image plate dosimeters was also disseminated as an internal LLNL technical memo. In addition, research was performed into two other diagnostics. Single Photon Counting using a CCD (Single Hit Spectrometer) is a well-established technique in the literature. The subcontractor assisted with implementation and calibration of the Single Hit Spectrometer and developed general use software for analysis of the output data. This software is currently being used by a number of collaborators at Lawrence Livermore. The development of a Single Hit Imager was also initially explored at the beginning of the subcontract period but, under direction of the technical contact, not further pursued in order to focus on the other priorities. (3) Experimental Implementation and Analysis - The subcontractor participated in over 10 separate 2-8 week experiments at the Jupiter Laser Facility at Lawrence Livermore. On many of these experiments, the diagnostics described above were fielded to take x-ray measurements for different physics goals, including those described in the original subcontract and for studies of diagnostic related issues for the National Ignition Facility. A series of experiments were carried out on planar foil targets to study the electrons generated in the relativistic laser plasma interaction under fast ignition relevant conditions. The data was analyzed with the Monte Carlo modeling described above.

42 ENGINEERING↗

Factors Impacting Decommissioning Costs - 13576

The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Swedish Solution for Reconditioning, Transport, Interim Storage and Final Disposal of Failed Fuel - 17024

Despite today's increasingly more reliable operation of nuclear power plants, failed fuel rods exist in all Swedish plants. Managing intermediate storage and sub-sequential final disposal of such rods has been a growing problem. The Swedish system for spent fuel management uses the principle of intermediate storage of the fuel in a central intermediate storage facility (CLAB) before disposal in a final repository according to the KBS-3 method. However, the intermediate storage facility does not allow storage of failed fuel and the final repository has limitations on moisture in the deposited fuel and hence failed or broken fuel rods cannot be accepted as-is. The nuclear power companies in Sweden have jointly established the Swedish Nuclear Fuel and Waste Management Co, SKB, to manage the spent fuel and the operational waste. To find a solution to transport the failed fuel to storage, SKB has established a project with the goal to have all currently failed fuel rods from all the Swedish nuclear power plants reconditioned and transported to the intermediate storage facility before the year of 2020. The project has established the acceptance criteria for reconditioned failed fuel in the final repository and evaluated a number of options for treatment, encapsulation and transportation of the failed fuel rods. Furthermore, two suppliers have developed reconditioning methods fulfilling the criteria and contracts were signed with both suppliers in May 2016. This paper outlines the details of the Swedish solution for treatment and storage of failed fuel including the technical requirements for the reconditioning method and transportability. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multidisciplinary design optimization in Architecture, Engineering, and Construction: a detailed review and call for collaboration

The design of buildings has become a complex and multidisciplinary problem involving multiple conflicting objectives as architects and designers address competing technical, economic, environmental, and societal concerns. This has been driving research in Architecture, Engineering, and Construction (AEC) toward rigorous multidisciplinary decision-making frameworks that generate and evaluate numerous design alternatives using multi-objective optimization in concert with simulation and analysis models of varying fidelity and computational expense. While such frameworks are well known and widely employed in the aerospace and systems engineering domains, efforts by design professionals and researchers in the AEC field are scattered at best. In this paper, we provide a detailed review of recent developments in optimization frameworks in the AEC field and subsequently highlight how such developments are largely compartmentalized into separate domains such as structural, energy, daylighting, and other performance factors. Herein, we further discuss the technical challenges involved in concurrent coupled multidisciplinary design optimization (MDO) in the AEC field such as interoperability issues between Building Information Modeling (BIM) environments, analysis/simulation tools, and optimization frameworks. We conclude by outlining research needed for more unified modeling and simulation-based optimization frameworks to aid in complex and multidisciplinary building design processes. We also highlight the need for the identification and development of multi-fidelity simulation tools for use across multiple design phases. As such, this paper contributes a novel roadmap to leverage aerospace and systems engineering research in MDO into the field of AEC, along with a call for researchers in the MDO community to seek collaborations in AEC field.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Gulf Nuclear Energy Infrastructure Institute (GNEII): Origins, Objectives, and Operations—A Joint Report

The Gulf Nuclear Energy Infrastructure Institute (GNEII—pronounced "genie") seeks to develop expertise among future leaders of Gulf-region nuclear power programs in global standards, norms and best practices in nuclear energy programs. More specifically, the institute aims to contribute to the enhancement of nuclear security, safety, and safeguards (the so-called nuclear "3S") by providing an avenue for regional nuclear interaction, technical collaboration, lessons-learned discussions, and best-practices sharing. It is a multidisciplinary human capacity development institute offering education, research and technical services to support responsible nuclear energy programs in the Gulf and Middle East regions. In this Joint Report, Chapter 2 discusses GNEII's origins (including drivers, milestones, and design principles), Chapter 3 discusses GNEII's objectives (including goals, mission, and vision), Chapter 4 discusses GNEII's operations (including education, research, and technical service pillars), Chapter 5 discusses major insights and next steps, and Chapter 6 provides a list of publications offering additional depictions and details of GNEII's evolution. Though only one piece of a multi-faceted, multi-national effort to develop human infrastructure needs for nascent nuclear energy programs, GNEII offers a model that addresses the socio-technical attributes of nuclear 3S that can be replicated globally.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗