Search NASA⌕ Search

SEARCH · Search NASA

Results for “Task scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

MEXEC: An Onboard Integrated Planning and Execution Approach for Spacecraft Commanding

The traditional form of spacecraft commanding is with sequences that specify when commands should execute based on a schedule generated on the ground. Some sequences have control logic and event driven responses to increase flexibility, but it is limited. An approach to increase autonomy is to use goal-based planning and commanding. Using this paradigm, intention and behavior is modeled on board the spacecraft. In this paper we describe MEXEC (Multi-mission EXECutive), a multi-mission, task-based, onboard planning and execution software designed specifically to be used as flight software. As a path to infusion for future flight projects, we describe two experiments performed on the ASTERIA CubeSat and testbed that demonstrate that MEXEC can be integrated and used for spacecraft operations and increase robustness and science return compared to the standard sequences that were being used.

Campuzano, Brian↗

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

Hitz, F. R.↗

Liquid Methane/Liquid Oxygen Propellant Conditioning Feed System (PCFS) Test Rigs

As part of their Propulsion and Cryogenic Advanced Development (PCAD) program, NASA has embarked upon an effort to develop chemical rocket engines which utilize non-toxic, cryogenic propellants such as liquid oxygen (LO2) and liquid methane (LCH4). This effort includes the development and testing of a 100 lbf Reaction Control Engine (RCE) that will be used to evaluate the performance of a LO2/LCH4 rocket engine over a broad range of propellant temperatures and pressures. This testing will take place at NASA-Glenn Research Center's (GRC) Research Combustion Laboratory (RCL) test facility in Cleveland, OH, and is currently scheduled to begin in late 2008. While the initial tests will be performed at sea level, follow-on testing will be performed at NASA-GRC's Altitude Combustion Stand (ACS) for altitude testing. In support of these tests, Sierra Lobo, Inc. (SLI) has designed, developed, and fabricated two separate portable propellant feed systems under the Propellant Conditioning and Feed System (PCFS) task: one system for LCH4, and one for LO2. These systems will be capable of supplying propellants over a large range of conditions from highly densified to several hundred pounds per square inch (psi) saturated. This paper presents the details of the PCFS design and explores the full capability of these propellant feed systems.

Skaff, A.↗

Rise and Shine: The Use of Polychromatic Short-Wavelength-Enriched Light to Mitigate Sleep Inertia at Night Following Awaking From Slow-Wave Sleep

Sleep inertia is the brief period of performance impairment and reduced alertness experienced after waking, especially from slow-wave sleep. We assessed the efficacy of polychromatic short-wavelength-enriched light to improve vigilant attention, alertness and mood immediately after waking from slow-wave sleep at night. Twelve participants (six female, 23.3 ± 4.2 years) maintained an actigraphy-confirmed sleep schedule of 8.5 hr for 5 nights, and 5 hr for 1 night prior to an overnight laboratory visit. In the laboratory, participants were awakened from slow-wave sleep, and immediately exposed to either dim, red ambient light (control) or polychromatic short-wavelength-enriched light (light) for 1 hr in a randomized crossover design. They completed a 5-min Psychomotor Vigilance Task, the Karolinska Sleepiness Scale, and Visual Analogue Scales of mood at 2, 17, 32 and 47 min after waking. Following this testing period, lights were turned off and participants returned to sleep. They were awakened from their subsequent slow-wave sleep period and received the opposite condition. Compared with the control condition, participants exposed to light had fewer Psychomotor Vigilance Task lapses (χ 2 [1] = 5.285, p = 0.022), reported feeling more alert (Karolinska Sleepiness Scale: F 1,77 = 4.955, p = 0.029; Visual Analogue Scale alert : F 1,77 = 8.226, p = 0.005), and reported improved mood (Visual Analogue Scale cheerful : F 1,77 = 8.615, p = 0.004). There was no significant difference in sleep-onset latency between conditions following the testing period (t 10 = 1.024, p = 0.330). Our results suggest that exposure to polychromatic short-wavelength-enriched light immediately after waking from slow-wave sleep at night may help improve vigilant attention, subjective alertness, and mood. Future studies should explore the potential mechanisms of this countermeasure and its efficacy in real-world environments.

alertness↗

Composites for Advanced Space Transportation Systems (CASTS)

A summary is given of the in-house and contract work accomplished under the CASTS Project. In July 1975 the CASTS Project was initiated to develop graphite fiber/polyimide matrix (GR/PI) composite structures with 589K (600 F) operational capability for application to aerospace vehicles. Major tasks include: (1) screening composites and adhesives, (2) developing fabrication procedures and specifications, (3) developing design allowables test methods and data, and (4) design and test of structural elements and construction of an aft body flap for the Space Shuttle Orbiter Vehicle which will be ground tested. Portions of the information are from ongoing research and must be considered preliminary. The CASTS Project is scheduled to be completed in September 1983.

Davis, J. G., Jr.↗

Applications of artificial intelligence to mission planning

The scheduling problem facing NASA-Marshall mission planning is extremely difficult for several reasons. The most critical factor is the computational complexity involved in developing a schedule. The size of the search space is large along some dimensions and infinite along others. It is because of this and other difficulties that many of the conventional operation research techniques are not feasible or inadequate to solve the problems by themselves. Therefore, the purpose is to examine various artificial intelligence (AI) techniques to assist conventional techniques or to replace them. The specific tasks performed were as follows: (1) to identify mission planning applications for object oriented and rule based programming; (2) to investigate interfacing AI dedicated hardware (Lisp machines) to VAX hardware; (3) to demonstrate how Lisp may be called from within FORTRAN programs; (4) to investigate and report on programming techniques used in some commercial AI shells, such as Knowledge Engineering Environment (KEE); and (5) to study and report on algorithmic methods to reduce complexity as related to AI techniques.

Ford, Donnie R.↗

Test/score/report: Simulation techniques for automating the test process

A Test/Score/Report capability is currently being developed for the Transportable Payload Operations Control Center (TPOCC) Advanced Spacecraft Simulator (TASS) system which will automate testing of the Goddard Space Flight Center (GSFC) Payload Operations Control Center (POCC) and Mission Operations Center (MOC) software in three areas: telemetry decommutation, spacecraft command processing, and spacecraft memory load and dump processing. Automated computer control of the acceptance test process is one of the primary goals of a test team. With the proper simulation tools and user interface, the task of acceptance testing, regression testing, and repeatability of specific test procedures of a ground data system can be a simpler task. Ideally, the goal for complete automation would be to plug the operational deliverable into the simulator, press the start button, execute the test procedure, accumulate and analyze the data, score the results, and report the results to the test team along with a go/no recommendation to the test team. In practice, this may not be possible because of inadequate test tools, pressures of schedules, limited resources, etc. Most tests are accomplished using a certain degree of automation and test procedures that are labor intensive. This paper discusses some simulation techniques that can improve the automation of the test process. The TASS system tests the POCC/MOC software and provides a score based on the test results. The TASS system displays statistics on the success of the POCC/MOC system processing in each of the three areas as well as event messages pertaining to the Test/Score/Report processing. The TASS system also provides formatted reports documenting each step performed during the tests and the results of each step. A prototype of the Test/Score/Report capability is available and currently being used to test some POCC/MOC software deliveries. When this capability is fully operational it should greatly reduce the time necessary to test a POCC/MOC software delivery, as well as improve the quality of the test process.

Hageman, Barbara H.↗

An At-Home Evaluation of a Light Intervention to Mitigate Sleep Inertia Symptoms

Introduction: Sleep inertia symptoms typically occur after waking from nocturnal sleep. Under laboratory settings, light exposure upon waking has been shown to improve alertness, mood, and vigilant attention. We investigated whether a field-deployable light-emitting device would help to improve alertness and working memory in a real-world setting. Methods: Thirty-five participants (18 female; 26.4 ± 6.0 y) completed an at-home, within-subject, randomized crossover study. Participants wore actiwatches during their normal sleep-wake schedule for five nights ahead of the adaptation and experimental nights. On the experimental night, participants performed baseline testing before their self-selected bedtime. Forty-five minutes after bedtime, participants received a phone call and were instructed to perform test bouts while wearing light-emitting glasses with the light either on (light condition) or off (control). A 3-minute descending subtraction task (DST) and the Karolinska Sleepiness Scale (KSS) were performed at +7, +17, +27, and +37 minutes after the call. Participants were then instructed to go back to sleep and were called 45 minutes after lights out to repeat the test bouts in the opposite condition. A series of mixed-effects models were performed with fixed effects of condition, test bout, and their interaction, and a random effect of participant. Condition order, sex, and baseline were included as covariates. Results: There was a significant effect of test bout for DST total responses (χ2 [3] = 17.42; p < .001) and total correct (χ2 [3] = 21.29; p < .001) with improved performance at +27 and +37 minutes compared to +7 minutes. Sex was a significant predictor for KSS (F1,30 = 10.26; p = .003), with females (8.20 ± 0.23) rating higher sleepiness than males (7.10 ± 0.25). There were no other significant effects for DST or KSS outcomes (p > .05). Conclusion: These results suggest that the intervention was not able to improve working memory or alertness under naturalistic at-home settings. Further analysis is needed to determine whether these results are applicable to other cognitive performance domains.

light↗

Timeline Resource Analysis Program (TRAP): User's manual and program document

The Timeline Resource Analysis Program (TRAP), developed for scheduling and timelining problems, is described. Given an activity network, TRAP generates timeline plots, resource histograms, and tabular summaries of the network, schedules, and resource levels. It is written in ANSI FORTRAN for the Honeywell SIGMA 5 computer and operates in the interactive mode using the TEKTRONIX 4014-1 graphics terminal. The input network file may be a standard SIGMA 5 file or one generated using the Interactive Graphics Design System. The timeline plots can be displayed in two orderings: according to the sequence in which the tasks were read on input, and a waterfall sequence in which the tasks are ordered by start time. The input order is especially meaningful when the network consists of several interacting subnetworks. The waterfall sequence is helpful in assessing the project status at any point in time.

Sessler, J. G.↗

A comparison of hand grasp breakaway strengths and bare-handed grip strengths of the astronauts, SML 3 test subjects, and the subjects from the general population

Astronauts have the task of retrieving and deploying satellites and handling massive objects in a around the payload bay. Concerns were raised that manual handling of such massive objects might induce loads to the shuttle suits exceeding the design-certified loads. The Crew and Thermal Division of NASA JSC simulated the satellite handling tasks (Satellite Manload Tests 1 and 3) and determined the maximum possible load that a suited member could impart onto the suit. In addition, the tests revealed that the load to the suit by an astronaut could be calculated from the astronaut's maximum hand grasp breakaway strength. Thus, this study was conducted to document that hand grasp breakaway strengths of the astronauts who were scheduled to perform EVA during the upcoming missions. In addition, this study verified whether the SML 3 test results were sufficient for documenting the maximum possible load. An attempt was made to predict grasp strength from grip strength and hand anthropometry. Based on the results from this study, the SML 3 test results were deemed sufficient to document the maximum possible load on the suit. Finally, prediction of grasp strength from grip strength was not as accurate as expected. Hence, it was recommended that grasp strength be collected from the astronauts in order to obtain accurate load estimation.

Rajulu, Sudhakar L.↗

Clinical Core Competency Training for NASA Flight Surgeons

Introduction: The cohort of NASA flight surgeons (FS) is a very accomplished group with varied clinical backgrounds; however, the NASA Flight Surgeon Office has identified that the extremely demanding schedule of this cohort prevents many of these physicians from practicing clinical medicine on a regular basis. In an effort to improve clinical competency, the NASA FS Office has dedicated one day a week for the FS to receive clinical training. Each week, an FS is assigned to one of five clinical settings, one being medical patient simulation. The Medical Operations Support Team (MOST) was tasked to develop curricula using medical patient simulation that would meet the clinical and operational needs of the NASA FS Office. Methods: The MOST met with the Lead FS and Training Lead FS to identify those core competencies most important to the FS cohort. The MOST presented core competency standards from the American Colleges of Emergency Medicine and Internal Medicine as a basis for developing the training. Results: The MOST identified those clinical areas that could be best demonstrated and taught using medical patient simulation, in particular, using high fidelity human patient simulators. Curricula are currently being developed and additional classes will be implemented to instruct the FS cohort. The curricula will incorporate several environments for instruction, including lab-based and simulated microgravity-based environments. Discussion: The response from the NASA FS cohort to the initial introductory class has been positive. As a result of this effort, the MOST has identified three types of training to meet the clinical needs of the FS Office; clinical core competency training, individual clinical refresher training, and just-in-time training (specific for post-ISS Expedition landings). The MOST is continuing to work with the FS Office to augment the clinical training for the FS cohort, including the integration of Web-based learning.

Polk, J. D.↗

The Use of Behavior Models for Predicting Complex Operations

Modeling and simulation (M&S) plays an important role when complex human-system notions are being proposed, developed and tested within the system design process. National Aeronautics and Space Administration (NASA) as an agency uses many different types of M&S approaches for predicting human-system interactions, especially when it is early in the development phase of a conceptual design. NASA Ames Research Center possesses a number of M&S capabilities ranging from airflow, flight path models, aircraft models, scheduling models, human performance models (HPMs), and bioinformatics models among a host of other kinds of M&S capabilities that are used for predicting whether the proposed designs will benefit the specific mission criteria. The Man-Machine Integration Design and Analysis System (MIDAS) is a NASA ARC HPM software tool that integrates many models of human behavior with environment models, equipment models, and procedural / task models. The challenge to model comprehensibility is heightened as the number of models that are integrated and the requisite fidelity of the procedural sets are increased. Model transparency is needed for some of the more complex HPMs to maintain comprehensibility of the integrated model performance. This will be exemplified in a recent MIDAS v5 application model and plans for future model refinements will be presented.

Gore, Brian F.↗

Fatigue in U.S. Astronauts Onboard the International Space Station: Environmental Factors, Operational Impacts, and Implementation of Countermeasures

Since 2000, US astronauts have been supporting missions up to a six month duration on the International Space Station (ISS). Crewmembers have experienced fatigue for reasons similar to military deployments. Astronauts experience psychological stressors such as heavy workloads, extended duty periods, circadian misalignment, inadequate/ineffective sleep, and loss of the environmental cues of a gravity environment. Complicating the psychological stressors are environmental factors; distracting background noise, unexpected and variable mission schedules, unfavorable thermal control, elevated CO2 levels, and an unusual sleep environment with schedules that impinge on pre‐sleep periods. Physiological contributors to poor sleep and fatigue include a cephalad fluid shift and back pain. Restful sleep is further challenged due to a lack of gravity‐related proprioceptive cues and need for restraints. The term "space fog" has been used by astronauts to describe a phenomenon of forgetfulness, slowed reaction time and transient confusion while trying to complete tasks. There is a distinct temporal correlation with arrival on the Space Station and the onset of slowed cognitive skills and a spontaneous resolution that may take up to 6 weeks. The Genesis of this phenomenon may be chronic fatigue secondary to transitioning from a planar environment to a 360deg microgravity perspective. Recently, countermeasures to improve sleep duration and quality in astronauts on the ISS have been instituted with moderate degrees of success as measured by self‐reaction time (psychomotor vigilance task testing), actigraphy, and subjective reports. Judicious use of stimulants and hypnotics, light therapy, controlled sleep periods and sleep shifting and reducing ambient CO2 levels are a few of the most promising countermeasures being used in space to improve sleep and reduce fatigue.

Scheuring, R. A.↗

Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

Jacobs, Derya, A.↗

Research In Nonlinear Flight Control for Tiltrotor Aircraft Operating in the Terminal Area

The research during the first year of the effort focused on the implementation of the recently developed combination of neural net work adaptive control and feedback linearization. At the core of this research is the comprehensive simulation code Generic Tiltrotor Simulator (GTRS) of the XV-15 tilt rotor aircraft. For this research the GTRS code has been ported to a Fortran environment for use on PC. The emphasis of the research is on terminal area approach procedures, including conversion from aircraft to helicopter configuration. This report focuses on the longitudinal control which is the more challenging case for augmentation. Therefore, an attitude command attitude hold (ACAH) control augmentation is considered which is typically used for the pitch channel during approach procedures. To evaluate the performance of the neural network adaptive control architecture it was necessary to develop a set of low order pilot models capable of performing such tasks as, follow desired altitude profiles, follow desired speed profiles, operate on both sides of powercurve, convert, including flaps as well as mastangle changes, operate with different stability and control augmentation system (SCAS) modes. The pilot models are divided in two sets, one for the backside of the powercurve and one for the frontside. These two sets are linearly blended with speed. The mastangle is also scheduled with speed. Different aspects of the proposed architecture for the neural network (NNW) augmented model inversion were also demonstrated. The demonstration involved implementation of a NNW architecture using linearized models from GTRS, including rotor states, to represent the XV-15 at various operating points. The dynamics used for the model inversion were based on the XV-15 operating at 30 Kts, with residualized rotor dynamics, and not including cross coupling between translational and rotational states. The neural network demonstrated ACAH control under various circumstances. Future efforts will include the implementation into the Fortran environment of GTRS, including pilot modeling and NNW augmentation for the lateral channels. These efforts should lead to the development of architectures that will provide for fully automated approach, using similar strategies.

Calise, A. J.↗

Leadership Development Program Final Project

TOSC is NASA's prime contractor tasked to successfully assemble, test, and launch the EM1 spacecraft. TOSC success is highly dependent on design products from the other NASA Programs manufacturing and delivering the flight hardware; Space Launch System(SLS) and Multi-Purpose Crew Vehicle(MPCV). Design products directly feed into TOSC's: Procedures, Personnel training, Hardware assembly, Software development, Integrated vehicle test and checkout, Launch. TOSC senior management recognized a significant schedule risk as these products are still being developed by the other two (2) programs; SVE and ACE positions were created.

Design products required for Engineering↗

Automated mixed traffic vehicle control and scheduling study

The operation and the expected performance of a proposed automatic guideway transit system which uses low speed automated mixed traffic vehicles (AMTVs) were analyzed. Vehicle scheduling and headway control policies were evaluated with a transit system simulation model. The effect of mixed traffic interference on the average vehicle speed was examined with a vehicle pedestrian interface model. Control parameters regulating vehicle speed were evaluated for safe stopping and passenger comfort. Some preliminary data on the cost and operation of an experimental AMTV system are included. These data were the result of a separate task conducted at JPL, and were included as background information.

Peng, T. K. C.↗