Search NASA⌕ Search

SEARCH · Search NASA

Results for “Unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Sub-Area: 2.5 Demonstration of Promising Energy Storage Technologies - Project Type: Flywheel Energy Storage Demonstration (Revision V1.0)

In this program, Amber Kinetics designed, built, and tested a sub-­scale 5 kWh engineering prototype flywheel system. Applying lessons learned from the engineering prototype, Amber Kinetics then designed, built and tested full-­size, commercial-­scale 25 kWh flywheel systems. The systems underwent basic functional qualification testing before being installed, sequentially, at the company’s outdoor test site in Alameda, CA for full-­speed field-testing. The primary considerations in testing the prototype units were to demonstrate the functionality of the system, verify the frequencies of resonant modes, and quantify spinning losses and motor/generator efficiency.

42 ENGINEERING↗

New Zealand Multi-Mode Technology Demonstration at the US Navy's Wave Energy Test Site

The objective of the project is to redeploy the Wave Energy Technology – New Zealand (WET-NZ and now known as Azura) device that was tested at the NNMREC test site in 2013 at the United States Navy’s Wave Energy Test Site (WETS). The goal is to conduct open-ocean, grid connected testing for a period of up to 12 months to 1) optimize energy capture and 2) validate LCOE model.

16 TIDAL AND WAVE POWER↗

MPACT Verification and Validation Manual (rev 1)

The MPACT code provides the capability to calculate the steady-state and transient reactor core neutron distribution for operating nuclear power plant (PWR) conditions across multiple fuel cycles. As required in the CASL SQA plan, it is the responsibility of UM and ORNL as joint owners of MPACT to ensure that verification and validation activities are performed and documented in a V&V manual with supporting publications and CASL technical reports which can be distributed for reference and distribution within VERA. This document provides the first revision of the MPACT verification and validation (V&V) manual and describes the current state of MPACT V&V and updates the framework for future MPACT V&V activities. During FY16, MPACT V&V activities in the areas of code verification have continued to mature and work has progressed on code error evaluation using the Method of Manufactured Solutions (MMS). Several specific tasks have also been completed to improve MPACT code verification to include tasks to improve the unit and regression test coverage. A joint UM/ORNL task was completed to develop standardize coding standards and workflow for the continued collaborative development of MPACT. During the past year, MPACT validation work has continued in both the areas of measured data from critical experiments as well as measured data from operating nuclear power plants. Preliminary work was also performed in FY16 on the use of post-irradiation examinations for evaluation and validation of the isotopic depletion capability in MPACT. Based on the results of V&V efforts this past year, the confidence level has increased in the ability of MPACT to model an operational Pressurized Water Reactor. Areas were identified which require increased emphasis during FY17 to include updating all the V&V problems with the new 51-group library, the completion of cycle 2 of the BEAVRS benchmark, initial validation for BWR applications, the addition of Uncertainty Quantification results into the benchmark results, and the completion of specific validation tasks for the CASL Challenge problems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

GIGA-Lens: Fast Bayesian Inference for Strong Gravitational Lens Modeling

We present GIGA-Lens: a gradient-informed, GPU-accelerated Bayesian framework for modeling strong gravitational lensing systems, implemented in TensorFlow and JAX. The three components, optimization using multistart gradient descent, posterior covariance estimation with variational inference, and sampling via Hamiltonian Monte Carlo, all take advantage of gradient information through automatic differentiation and massive parallelization on graphics processing units (GPUs). We test our pipeline on a large set of simulated systems and demonstrate in detail its high level of performance. The average time to model a single system on four Nvidia A100 GPUs is 105 s. The robustness, speed, and scalability offered by this framework make it possible to model the large number of strong lenses found in current surveys and present a very promising prospect for the modeling of ${ \mathcal O }({10}^{5})$ lensing systems expected to be discovered in the era of the Vera C. Rubin Observatory, Euclid, and the Nancy Grace Roman Space Telescope.

79 ASTRONOMY AND ASTROPHYSICS↗

Sample Identifiers and Metadata to Support Data Management and Reuse in Multidisciplinary Ecosystem Sciences

Physical samples are foundational entities for research across biological, Earth, and environmental sciences. Data generated from sample-based analyses are not only the basis of individual studies, but can also be integrated with other data to answer new and broader-scale questions. Ecosystem studies increasingly rely on multidisciplinary team-science to study climate and environmental changes. While there are widely adopted conventions within certain domains to describe sample data, these have gaps when applied in a multidisciplinary context. In this study, we reviewed existing practices for identifying, characterizing, and linking related environmental samples. We then tested practicalities of assigning persistent identifiers to samples, with standardized metadata, in a pilot field test involving eight United States Department of Energy projects. Participants collected a variety of sample types, with analyses conducted across multiple facilities. We address terminology gaps for multidisciplinary research and make recommendations for assigning identifiers and metadata that supports sample tracking, integration, and reuse. Furthermore, our goal is to provide a practical approach to sample management, geared towards ecosystem scientists who contribute and reuse sample data.

54 ENVIRONMENTAL SCIENCES↗

The Euratom Fast Collar (EFC): A Safeguards Instrument Design to Address Future Fuel Measurement Challenges

Summary of this presentation: (1) EFC instrument design for {sup 235}U verification measurements issued to EURATOM to issue a call for commercial tender; (2) Achieved a fast (Cd mode) measurement with less than 2% relative uncertainty in the doubles neutron counting rate in 10 minutes using a standard source strength; (3) Assay time in fast mode consistent with the needs of an inspector; (4) Extended to realistic calibration range for modern fuel designs - Relatively insensitive to gadolinia content for fuel designs with up to 32 burnable poison rods and 15 wt % gadolinia concentration, which is a realistic maximum for modern PWR fuel; (5) Improved performance over the standard thermal neutron collar with greater than twice the efficiency of the original design; (6) Novel tube pattern to reduce the impact of accidental pile-up; and (7) Joint test of prototype unit - EURATOM-LANL.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Numerical Modeling Research at the US Navy Wave Energy Test Site, Honolulu, Hawaii.

The U.S. Navy Wave Energy Test Site (WETS) in Hawaii, the United States’ first grid-connected test site of its kind, has been operational since 2015. The Hawaii Natural Energy Institute (HNEI) at the University of Hawaii is providing key research support for this facility. In this paper, we present some of the numerical modeling research on Wave Energy Converters (WECs) undertaken as part of this effort. In the first part, we describe numerical modeling results and comparison with trial data for the Northwest Energy Innovations (NWEI) Azura WEC device. In the second part, the power performance of a WEC array currently being developed by a Honolulu based company –National Power Concepts (NPC)– is described.

16 TIDAL AND WAVE POWER↗

Mixed Oxide Fresh Fuel Package Auxiliary Equipment

The United States Department of Energy's National Nuclear Security Administration (NNSA) is overseeing the construction the Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF) on the Savannah River Site. The new facility, being constructed by NNSA's contractor Shaw AREVA MOX Services, will fabricate fuel assemblies utilizing surplus plutonium as feedstock. The fuel will be used in designated commercial nuclear reactors. The MOX Fresh Fuel Package (MFFP), which has recently been licensed by the Nuclear Regulatory Commission (NRC) as a type B package (USA/9295/B(U)F-96), will be utilized to transport the fabricated fuel assemblies from the MFFF to the nuclear reactors. It was necessary to develop auxiliary equipment that would be able to efficiently handle the high precision fuel assemblies. Also, the physical constraints of the MFFF and the nuclear power plants require that the equipment be capable of loading and unloading the fuel assemblies both vertically and horizontally. The ability to reconfigure the load/unload evolution builds in a large degree of flexibility for the MFFP for the handling of many types of both fuel and non fuel payloads. The design and analysis met various technical specifications including dynamic and static seismic criteria. The fabrication was completed by three major fabrication facilities within the United States. The testing was conducted by Sandia National Laboratories. The unique design specifications and successful testing sequences will be discussed. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nevada Higher Education Benefits from US Department of Energy (DOE) Environmental Management (EM) Nevada Program's Transfer of Geologic Samples - 20442

The Nevada National Security Site (NNSS), formerly the Nevada Test Site, was the location of 100 historic atmospheric and 828 historic underground nuclear tests from 1951 to 1992. Related to this historic nuclear testing, geologic and hydrologic studies of the site were conducted utilizing the skills and the expertise of the U.S. Geological Survey (USGS) and national laboratories (Los Alamos National Laboratory, Lawrence Livermore National Laboratory), who were principal in leading the development of weapons and were responsible for specific underground testing programs. The subsurface samples and technical/scientific data associated with NNSS geologic studies (past and present) are preserved and stored at the USGS Mercury Core Library and Data Center located at the NNSS. Currently, the facility stores over 2,000,000 linear feet of cores and cuttings from more than 2,600 drill holes that can be accessed for study. Most of the samples and historic geologic work was focused directly on subsurface geologic settings that relate directly to historic underground nuclear testing. Since 1992, the United States has observed a unilateral moratorium on full-scale nuclear testing, and the U.S. Department of Energy (DOE) Environmental Management (EM) Nevada Program is now responsible for hydrogeologic characterization of the potential impacts to the natural groundwater systems that may have resulted from historic underground nuclear tests. As part of this effort, the EM Nevada Program Underground Test Area (UGTA) Activity has drilled and completed over 58 deep (2,000 - 7,000 ft.) characterization wells, totaling in excess of 170,000 linear feet of cuttings and core samples. Cutting samples were collected as triplicate samples for each respective depth interval, to account for potential later nondestructive/destructive analysis and to preserve samples for regulatory purposes. Recently, it was recognized by the EM Nevada Program that opportunities may exist to reduce the cost and floor space required for the storage of geologic samples at the Mercury Core Library without impacting the integrity and representative nature of the samples necessary for project execution. An initiative was sponsored by EM Nevada Program to evaluate several options: 1) disposal of a portion of cuttings and cores in a land fill setting; 2) reduction in sample volume through skeletonizing core and cuttings from wells to a representative but much smaller number of samples; and 3) solicit potential interest in the academic community where other geoscientists could freely access the samples for studies. The Nevada state university system through the Nevada Bureau of Mines and Geology responded positively to the opportunity to receive these NNSS samples from the EM Nevada Program. In June 2019, approximately 17,000 geologic samples, representing greater than 170,000 linear feet of drilling and weighing over 20,000 pounds, were shipped from the NNSS to the Great Basin Science Sample and Records Library located in Reno, Nevada. The benefits resulting from this transfer were realized by the EM Nevada Program in terms of cost and space savings for geologic sample storage at the NNSS. The transfer did not impact the EM Nevada Program mission as access to representative geologic samples for regulatory and scientific purposes was preserved. Moreover, the Nevada Bureau of Mines and Geology acquired a significant resource of subsurface geologic samples and supporting technical data to support academic and scientific studies in a complex volcanic setting in southwest Nevada. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Future Opportunities for LWR Irradiations in US Test Reactors

After several years of relatively low activity in the field of Light Water Reactor (LWR) fuel development, the Department of Energy again began to engage in developing new fuel technologies and irradiation performance data prompted by the Fukushima Daichi nuclear accidents. New competencies for irradiation testing in material test reactors in the United States began to be developed at this time using the Advanced Test Reactor (ATR), High Flux Isotope Reactor (HFIR), Massachusetts Institute of Technology Reactor (MITR), and the Transient Reactor Test Facility (TREAT). Capsules for testing fuel and cladding materials in ATR and HFIR were deployed, a Pressurized Water Reactor (PWR) condition loop for testing fuel rods was established in ATR, cladding corrosion studies were performed using a water loop in MITR, and TREAT pulse testing capabilities were commissioned for fuel rods in water capsules. The more recent and unexpected closure of the Halden Boiling Water Reactor (HBWR) also prompted further investments in Loss of Coolant Accident (LOCA) testing capabilities at TREAT. New configurations of these test devices show further potential in enhanced steam condition control and other investigations are building toward a flowing water loop for testing transient to dryout conditions. The closure of HBWR also prompted a major project currently underway to construct additional water loops in ATR where a novel approach is being pursued to enable Boiling Water Reactor (BWR) conditions. A meaningful collaborative project was awarded to MITR which, amidst an unexpected major overhaul of the reactor, has expanded cladding corrosion test capabilities at MITR. New explorations have led to methods for unique experiments at HFIR including channel box irradiations. New device developments are also bridging toward future potential for instrumented capsule irradiation tests in ATR and HFIR. Finally, a new project referred to as the System Physics Advanced Reactor Critical facility (SPARC) is gaining traction towards a large zero-power reactor able to produce physics validation data for LWR fuel bundle designs with increased enrichment and enhanced absorbers for 24-month operation cycles. This paper provides a brief summary of the status of these irradiation testbed capabilities with an emphasis on current efforts toward future capabilities to obtain new data and maximize the performance potential of LWR fuel technologies.

Woolstenhulme, Nicolas [Idaho National Laboratory ↗

Development of a Rotary Micro-filter for Radioactive Waste Applications

The processing rates of Savannah River Site (SRS) high-level waste decontamination processes are limited by the flow rate of the solid-liquid separation. The baseline process, using a 0.1 micron cross-flow filter, produces {approx}1.36 x 10{sup -5} m/s ({approx}0.02 gpm/ft{sup 2}) of filtrate under expected operating conditions. Savannah River National Laboratory (SRNL) demonstrated significantly higher filter flux for actual waste samples using a small-scale rotary filter. With funding from the U. S. Department of Energy Office of Cleanup Technology, SRNL personnel are evaluating and developing the rotary micro-filter for radioactive service at SRS. The authors improved the design for the disks and filter unit to make them suitable for high-level radioactive service. They procured two units using the new design, tested them with simulated SRS wastes, and evaluated the operation of the units. Work to date provides the following conclusions and program status. - The authors modified the design of the filter disks to remove epoxy and Ryton{sup R}. The new design includes welding both stainless steel and ceramic coated stainless steel filter media to a stainless steel support plate. The welded disks were tested in the full-scale unit. They showed good reliability and met filtrate quality requirements. - The authors modified the design of the unit, making installation and removal easier. The new design uses a modular, one-piece filter stack that is removed simply by disassembly of a flange on the upper (inlet) side of the filter housing. All seals and rotary unions are contained within the removable stack. - While it is extremely difficult to predict the life of the seal, the vendor representative indicates a minimum of one year in present service conditions is reasonable. Changing the seal face material from silicon-carbide to a graphite-impregnated silicon-carbide is expected to double the life of the seal. Replacement of the current seal with an air seal could increase the lifetime to 5 years and is undergoing testing in the current work. - The bottom bushing showed wear due to a misalignment during the manufacture of the filter tank. Replacing the graphite bushing with a more wear resistant material such as a carbide material will increase the lifetime of the bushing. This replacement requires a more wear resistant part or coating to prevent excessive wear of the shaft. The authors are currently conducting testing with the more wear resistant bushing. - The project team plans to use the rotary micro-filter as a filter in advance of an ion exchange process under development for potential deployment in SRS waste tank risers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DEVELOPMENT OF A ROTARY MICROFILTER FOR RADIOACTIVE WASTE APPLICATIONS

The processing rate of Savannah River Site (SRS) high-level waste decontamination processes are limited by the flow rate of the solid-liquid separation. The baseline process, using a 0.1 micron cross-flow filter, produces {approx}0.02 gpm/sq. ft. of filtrate under expected operating conditions. Savannah River National Laboratory (SRNL) demonstrated significantly higher filter flux for actual waste samples using a small-scale rotary filter. With funding from the U. S. Department of Energy Office of Cleanup Technology, SRNL personnel are evaluating and developing the rotary microfilter for radioactive service at SRS. The authors improved the design for the disks and filter unit to make them suitable for high-level radioactive service. They procured two units using the new design, tested them with simulated SRS wastes, and evaluated the operation of the units. Work to date provides the following conclusions and program status: (1) The authors modified the design of the filter disks to remove epoxy and Ryton{reg_sign}. The new design includes welding both stainless steel and ceramic coated stainless steel filter media to a stainless steel support plate. The welded disks were tested in the full-scale unit. They showed good reliability and met filtrate quality requirements. (2) The authors modified the design of the unit, making installation and removal easier. The new design uses a modular, one-piece filter stack that is removed simply by disassembly of a flange on the upper (inlet) side of the filter housing. All seals and rotary unions are contained within the removable stack. (3) While it is extremely difficult to predict the life of the seal, the vendor representative indicates a minimum of one year in present service conditions is reasonable. Changing the seal face material from silicon-carbide to a graphite-impregnated silicon-carbide is expected to double the life of the seal. Replacement of the current seal with an air seal could increase the lifetime to 5 years and is undergoing testing in the current work. (4) The bottom bushing showed wear due to a misalignment during the manufacture of the filter tank. Replacing the graphite bushing with a more wear resistant material such as a carbide material will increase the lifetime of the bushing. This replacement requires a more wear resistant part or coating to prevent excessive wear of the shaft. The authors are currently conducting testing with the more wear resistant bushing. (5) The project team plans to use the rotary microfilter as a filter in advance of an ion exchange process under development for potential deployment in SRS waste tank risers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure Report for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR) Nevada Test and Training Range, Nevada, Revision 0 with ROTC-1

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 415: Project 57 No. 1 Plutonium Dispersion, which is located on Range 4808A of the Nevada Test and Training Range (NTTR). This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. CAU 415 comprises one corrective action site (CAS): NAFR-23-02, Pu Contaminated Soil. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 415 based on the implementation of the corrective action of Closure in Place.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addendum to the Closure Report for Corrective Action Unit 423: Area 3 Building 03-60 Underground Discharge Point, Tonopah Test Range, Nevada, Revision 0

This document constitutes an addendum to the July 1999, Closure Report for Corrective Action Unit 423: Area 3 Building 0360 Underground Discharge Point, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-002-0308, Underground Discharge Point. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

54 ENVIRONMENTAL SCIENCES↗

Submittal of Final Post-Closure Inspection Letter Report for Corrective Action Unit 91: Area 3 U-3fi Injection Well, Nevada Test Site, Nevada, Revision 0, December 2007

This letter serves as the post-closure monitoring letter report for the above Corrective Action Unit (CAU) for calendar year 2007. CAU 91 is inspected every six months. The first inspection was conducted on March 29,2007, and the second inspection was conducted on September 27, 2007. Vegetation growth around the edge of the aboveground monument concrete pad was observed during the March inspection. This vegetation was removed on May 24,2007. All access roads, fences, gates, and signs were in excellent condition. No settling, cracking, or erosion was observed on the cover, and the use restriction had been maintained. No issues were identified, and no corrective actions were needed as a result of the September inspection. The post-closure inspection checklists for CAU 91 are attached. Photographs and field notes taken during site inspections are maintained in the project files.

54 ENVIRONMENTAL SCIENCES↗

Addendum to the Closure Report for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit Nevada Test Site, Nevada, Revison 0

This document constitutes an addendum to the June 2003, Closure Report for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 06-20-02, 20-inch Cased Hole • CAS 06-23-03, Drain Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

54 ENVIRONMENTAL SCIENCES↗

Addendum to the Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites Nevada Test Site, Nevada, Revision 0

This document constitutes an addendum to the September 2003, Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 12-25-04, UST 12-16-2 Waste Oil Release • CAS 18-25-01, Oil Spills • CAS 18-25-02, Oil Spills • CAS 18-25-03, Oil Spill • CAS 29-44-01, Fuel Spill These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

54 ENVIRONMENTAL SCIENCES↗