Room temperature crack growth rates and -20 deg F fracture toughness of welded 1 1/4 inch A-285 steel plate

Data are presented which were developed in support of a structural assessment of NASA-LEWIS' 10-foot by 10-foot supersonic wind tunnel, critical portions of which are fabricated from rolled and welded 1 1/4 inch thick A-285 steel plate. Test material was flame cut from the tunnel wall and included longitudinal and circumferential weld joints. Parent metal, welds, and weld heat affected zone were tested. Tensile strength and fracture toughness were determined at -20 F, the estimated lowest tunnel operating temperature. Crack growth rates were measured at room temperature, where growth rates in service are expected to be highest.

Shannon, J. L., Jr.↗

Development and fabrication of a diffusion welded Columbium alloy heat exchanger

A Mini Brayton space power generation system required the development of a Columbium alloy heat exchanger to transfer heat from a radioisotope heat source to a He/Xe working fluid. A light-weight design featured the simultaneous diffusion welding of 148 longitudinal fins in an annular heat exchanger about 9-1/2 in. in diameter, 13-1/2 in. in length and 1/4 in. in radial thickness. To complete the heat exchanger, additional gas ducting elements and attachment supports were added by GTA welding in a vacuum-purged inert atmosphere welding chamber. The development required the modification of an existing large size hot isostatic press to achieve HIP capabilities of 2800 F and 10,000 psi for at least 3 hr. Excellent diffusion welds were achieved in a high-quality component which met all system requirements.

Zimmerman, W. F.↗

Checking weld penetration

Fused wire in weld root area verifies weld penetration in electron-beam-welded joints. Method could be used in automotive, aircraft, and machinery manufacturing when electron-beam-welds cannot be inspected ultrasonically.

Macfarlane, D. I.↗

Study of solar cell welds

The thermal imaging technique was evaluated for its capabilities in the nondestructive evaluation of solar cell welds. The temperature and spatial resolution of state of the art instrumentation was sufficient for both qualitative and quantitative determination of the quality of solar cell welds. The addition of color digitized thermography enhanced the aspects of the thermographic display and allowed easily computerized testing procedures. For automated testing systems an accurate correlation of weld quality with temperature profiles of the welds needs to be performed. In comparison, the holographic technique was complementary with the thermal imaging technique, except that the holographic analysis appeared to be more quantitative at the present time. However, the thermal imaging approach is much more versatile in overall capabilities.

Workman, G. L.↗

Verifying root fusion in electron-beam welds

Ultrasonic equipment and x-y recorder indicate where back side of joint is properly welded. Wire waveguide placed in groove at root of joint to be welded is fused when joint is adequately penetrated. Ultransonic signal moving down waveguide is reflected where guide is melted. Change in reflected-signal arrival time with change in weld-head position is nearly constant unless joint is incompletely penetrated. Method permits determination of penetration depth in preweld samples without opening vacuum chamber and sectioning weld. Technique is particularly valuable when back side of joint is inaccessible.

Becker, F. L.↗

Weld-Wire Monitor

Changes in the size or composition of weld wire being fed to an automatic welding machine are detected by an impedance-monitoring instrument. The instrument triggers an alarm if the changes would affect weld quality or cause weld failure. Device could find applications in construction of pipelines or nuclear powerplants.

Olson, R.↗

Controlling Electron-Beam-Weld Focus

Control loop measures weld-spot temperature to regulate focus current. Square-wave generator modulates current in electron-beam focus coil so that focal point is varied between points slightly above and below surface of weld. Sensor detects intensity of light emitted by weld, proportional to fourth power of temperature at hottest part of weld spot. Sensor signal is detected by chopper demodulator synchronized by square-wave generator, to determine whether average position of focal point is higher than, coincident with, or lower than optimum point; and focus coil current is adjusted accordingly.

Coate, F. M.↗

Clamp and Gas Nozzle for TIG Welding

Tool that combines clamp with gas nozzle is aid to tungsten/inert-gas (TIG) welding in hard-to-reach spots. Tool holds work to be welded while directing a stream of argon gas at weld joint, providing an oxygen-free environment for tungsten-arc welding.

Gue, G. B.↗

Method of cold welding using ion beam technology

A method for cold welding metal joints is described. In order to remove the contamination layer on the surface of the metal, an ion beam generator is used in a vacuum environment. A gas, such as xenon or argon, is ionized and accelerated toward the metal surface. The beam of gas effectively sputters away the surface oxides and contamination layer so that clean underlying metal is exposed in the area to be welded. The use of this method allows cold welding with minimal deformation. Both similar and dissimilar metals can be cold welded with this method.

Sater, B. L.↗

SLAM examination of solar cells and solar cell welds

The scanning laser acoustic microscope (SLAM) has been evaluated for non-destructive examination of solar cells and interconnector bonds. Using this technique, it is possible to view through materials in order to reveal regions of discontinuity such as microcracks and voids. Of particular interest is the ability to evaluate, in a unique manner, the bonds produced by parallel gap welding. It is possible to not only determine the area and geometry of the bond between the tab and cell, but also to reveal any microcracks incurred during the welding. By correlating the SLAM results with conventional techniques of weld evaluation a more confident weld parameter optimization can be obtained.

Stella, P. M.↗

Automated Variable-Polarity Plasma-Arc Welding

Variable-polarity plasma-arc methods produces better welds at lower cost than gas-shielded tungsten-arc welding in assemblies. Weld porosity very low and costs of joint preparation, depeaking, inspection, and weld repair minimized.

Numes, A. C., Jr.↗

Automatic weld torch guidance control system

A highly reliable, fully digital, closed circuit television optical, type automatic weld seam tracking control system was developed. This automatic tracking equipment is used to reduce weld tooling costs and increase overall automatic welding reliability. The system utilizes a charge injection device digital camera which as 60,512 inidividual pixels as the light sensing elements. Through conventional scanning means, each pixel in the focal plane is sequentially scanned, the light level signal digitized, and an 8-bit word transmitted to scratch pad memory. From memory, the microprocessor performs an analysis of the digital signal and computes the tracking error. Lastly, the corrective signal is transmitted to a cross seam actuator digital drive motor controller to complete the closed loop, feedback, tracking system. This weld seam tracking control system is capable of a tracking accuracy of + or - 0.2 mm, or better. As configured, the system is applicable to square butt, V-groove, and lap joint weldments.

Smaith, H. E.↗

Patterns of residual stresses due to welding

Residual stresses caused by welding result from the nonuniform rate of cooling and the restrained thermal contraction or non-uniform plastic deformation. From the zone of extremely high temperature at the weld, heat flows into both the adjoining cool body and the surrounding atmosphere. The weld metal solidifies under very rapid cooling. The plasticity of the hot metal allows adjustment initially, but as the structure cools the rigidity of the surrounding cold metal inhibits further contraction. The zone is compressed and the weld is put under tensile stresses of high magnitude. The danger of cracking in these structural elements is great. Change in specific volume is caused by the change in temperature.

Botros, B. M.↗

Welding Many Thin Metal Layers

Electron-beam welding yields reliable, leakproof joints. Welding bands (also called "doublers") sandwiched between layers welded to increase final weld-section thickness. New technique ensures repeatable leakproof assemblies.

Hartwell, B. O.↗

In-house welding studies supporting the prelaunch assessment of the STS-6 main engines

Welding studies were undertaken as a result of problems with the Challenger engines. The process used to perform these welds on heat exchanger coils, and sample test data, are described. Recommendations for process improvement are included. Effort to simulate problem welds, as well as good welds, test data, and conclusions for the high pressure fuel turbopump are also are discussed.

Hawkins, L. L.↗

The NASA welding assessment program

The potential cost and performance advantages of welding was understood but ignored by solar panel manufacturers in the U.S. Although NASA, DOD and COMSAT have supported welding development efforts, soldering remains the only U.S. space qualified method for interconnecting solar cells. The reason is that no U.S. satellite prime contractor found it necessary, due to mission requirements, to abandon the space proven soldering process. It appears that the proposed NASA space station program will provide an array requirement, a 10 year operation in a low Earth orbital environment, that mandates welding. The status of welding technology in the U.S. is assessed.

Scott-Monck, J.↗

Improved techniques of parallel gap welding and monitoring

Welding programs which show that parallel gas welding is a reliable process are discussed. When monitoring controls and nondestructive tests are incorporated into the process, parallel gap welding becomes more reliable and cost effective. The panel fabrication techniques and the HAC thermal cycling test indicate reliable product integrity. The design and building of automated tooling and fixturing for welding are discussed.

Mardesich, N.↗

Variable polarity plasma arc welding on the Space Shuttle external tank

Variable polarity plasma arc (VPPA) techniques used at NASA's Marshall Space Flight Center for the fabrication of the Space Shuttle External Tank are presentedd. The high plasma arc jet velocities of 300-2000 m/s are produced by heating the plasma gas as it passes through a constraining orifice, with the plasma arc torch becoming a miniature jet engine. As compared to the GTA jet, the VPPA has the following advantages: (1) less sensitive to contamination, (2) a more symmetrical fusion zone, and (3) greater joint penetration. The VPPA welding system is computerized, operating with a microprocessor, to set welding variables in accordance with set points inputs, including the manipulator and wire feeder, as well as torch control and power supply. Some other VPPA welding technique advantages are: reduction in weld repair costs by elimination of porosity; reduction of joint preparation costs through elimination of the need to scrape or file faying surfaces; reduction in depeaking costs; eventual reduction of the 100 percent-X-ray inspection requirements. The paper includes a series of schematic and block diagrams.

Nunes, A. C., Jr.↗