Search NASA⌕ Search

SEARCH · Search NASA

Results for “active load control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Photo-driven growth of a monolayer of platinum spherical-nanocrowns uniformly coated on a membrane toward fuel cell applications

Membrane electrode assemblies (MEAs) serve as the core units of polymer electrolyte membrane fuel cells (PEMFCs) and are regularly fabricated by painting a slurry of commercial Pt/C onto a membrane, leading to thick and disordered electrocatalyst layers (CLs). Herein, we report a photo-driven fabrication of MEAs with ultra-thin and ordered CLs by growing a monolayer of dendritic platinum spherical nanocrowns onto each side of a photocatalyst-modified membrane. This approach allows us to control the thickness and platinum loading of ordered CLs by simply varying the concentration of the platinum precursor under tungsten light irradiation. The resultant MEAs exhibit an excellent fuel cell power density of 1.01 ± 0.05 W cm –2 at a platinum loading of 53 ± 1.5 μg cm cathode –2 . Furthermore, this exceptional activity likely arises from the nanostructured platinum crowns, efficient mass transport, and uniform reaction rate in the ultrathin (59 ± 12 nm thick) and ordered CLs according to electrochemical and theoretical investigations.

25 ENERGY STORAGE↗

Expert Elicitation on Wind Farm Control

Wind farm control is an active and growing field of research in which the control actions of individual turbines in a farm are coordinated, accounting for inter-turbine aerodynamic interaction, to improve the overall performance of the wind farm and to reduce costs. The primary objectives of wind farm control include increasing power production, reducing turbine loads, and providing electricity grid support services. Additional objectives include improving reliability or reducing external impacts to the environment and communities. In 2019, a European research project (FarmConners) was started with the main goal of providing an overview of the state-of-the-art in wind farm control, identifying consensus of research findings, data sets, and best practices, providing a summary of the main research challenges, and establishing a roadmap on how to address these challenges. Complementary to the FarmConners project, an IEA Wind Topical Expert Meeting (TEM) and two rounds of surveys among experts were performed. From these events we can clearly identify an interest in more public validation campaigns. Additionally, a deeper understanding of the mechanical loads and the uncertainties concerning the effectiveness of wind farm control are considered two major research gaps.

17 WIND ENERGY↗

Analysis of Double-Output CLL Resonant Converter for All-Electric UAV Applications

This paper presents a double-output resonant converter with high-frequency isolation for unmanned aerial vehicle (UAV) applications. The proposed topology is developed by using a full-bridge resonant inverter and double-output half-bridge active rectifiers. For the control system, a phase-shifted pulse width modulation (PS-PWM) method is utilized to adjusts the power flow among the output rectifiers in a wide voltage range regulation with a central control. The theoretical analysis of the converter is explored using the system model under different load conditions with constant frequency. The proposed system is validated with experimental results using 60 V input source and generating 0 - 100 V in each output at a full power of 500 W with 96% maximum efficiency in the laboratory experimental setup.

Asa, Erdem↗

AmeriFlux FLUXNET-1F US-KS2 Kennedy Space Center (scrub oak)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-KS2 Kennedy Space Center (scrub oak). This is the FLUXNET version of the carbon flux data for the site US-KS2 Kennedy Space Center (scrub oak) produced by applying the standard ONEFlux (1F) software. Site Description - The Kennedy Space Center Scrub Oak site is located within the Merritt Island National Wildlife Refuge at the Kennedy Space Center (KSC) on the east coast of central Florida. Situated in a 10 ha scrub oak ecosystem, the surrounding stand was completely burned by a prescribed fire in 1996. The purpose of the burn was to control understory fuel load, which has been a common practice since 1969. Within a few weeks of the 1996 burn, the stand began to naturally regenerate from roots and rhizomes. Most scrub oak stands in the region undergo a 7 to 10 year disturbance cycle, mostly related to fire or hurricane activity. A severe drought gripped most of Florida beginning in 1998 until the later half of 2001 resulting in four years of relatively low amount of annual rainfall. Exceptionally high annual rainfall amount in 2004 was the result of a pair of hurricanes that hit the area in August and September of 2004. Prevaling wind directions for the site are as follows: W to NW in the winter, afternoon E sea breeze in the summer.

Drake, Bert↗

Decoupler pylon - A simple, effective wing/store flutter suppressor

As an alternative to alleviating wing/store flutter by conventional passive methods or by more advanced active control methods, a quasi-passive concept, referred to as the decoupler pylon, is investigated which combines desirable features of both methods. Passive soft-spring/damper elements are used to decouple wing modes from store pitch modes, and a low-power control system maintains store alignment under changing mean loads. It is shown by analysis and wind tunnel tests that the decoupler pylon provides substantial increase in flutter speed and makes flutter virtually insensitive to inertia and center-of-gravity location of the store.

Reed, W. H.↗

Compendium of NASA Data Base for the Global Tropospheric Experiment's Pacific Exploratory Mission-Tropics B (PEM-Tropics B): DC-8 - Volume 1

This report provides a compendium of NASA aircraft data that are available from NASA's Global Tropospheric Experiment's (GTE) Pacific Exploratory Mission-Tropics B (PEM-Tropics B) conducted in March and April 1999. PEM-Tropics B was conducted during the southern-tropical wet season when the influence from biomass burning observed in PEM-Tropics A was minimal. Major deployment sites were Hawaii, Kiritimati (Christmas Island), Tahiti, Fiji, and Easter Island. The broad goals of PEM-Tropics B were to improved understanding of the oxidizing power of the atmosphere and the processes controlling sulfur aerosol formation and to establish baseline values for chemical species that are directly coupled to the oxidizing power and aerosol loading of the troposphere. The purpose of this document is to provide a representation of aircraft data that will be available in archived format via NASA Langley's Distributed Active Archive Center (DAAC) or are available through the GTE Project Office archive. The data format is not intended to support original research/analysis, but to assist the reader in identifying data that are of interest.

Scott, A. Donald, Jr.↗

Compendium of NASA Data Base for the Global Tropospheric Experiment's Pacific Exploratory Mission - Tropics B (PEM-Tropics B): P-3B - Volume 2

This report provides a compendium of NASA aircraft data that are available from NASA's Global Tropospheric Experiment's (GTE) Pacific Exploratory Mission-Tropics B (PEM-Tropics B) conducted in March and April 1999. PEM-Tropics B was conducted during the southern-tropical wet season when the influence from biomass burning observed in PEM-Tropics A was minimal. Major deployment sites were Hawaii, Kiritimati (Christmas Island), Tahiti, Fiji, and Easter Island. The broad goals of PEM-Tropics B were to improved understanding of the oxidizing power of the atmosphere and the processes controlling sulfur aerosol formation and to establish baseline values for chemical species that are directly coupled to the oxidizing power and aerosol loading of the troposphere. The purpose of this document is to provide a representation of aircraft data that will be available in archived format via NASA Langley's Distributed Active Archive Center (DAAC) or are available through the GTE Project Office archive. The data format is not intended to support original research/analysis, but to assist the reader in identifying data that are of interest.

Scott, A. Donald, Jr.↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Synergistic Effect of High Sulfur Loading Layered Cathode, Ceramic Separator and Gel Electrolyte

Lithium sulfur (Li-S) batteries are promising candidates for next-generation energy storage devices as they are capable of providing higher energy density and lower cost in comparison to the state of the art Li-ion batteries. To gain these characteristics, there are challenges such as polysulfide crossover, large volume changes during cycling, and deposition of insulating lithium sulfide that need to be alleviated. A popular approach to address these issues is to control the structure and properties of the carbon cathode in order to influence the transport of polysulfides, surface area for reaction, and lithium sulfide deposition. Ceramic separators on the other hand can drastically affect ion diffusion and overall battery performance. Safety concerns regarding the flammable liquid electrolyte can be reduced by deploying gel electrolyte. Towards this direction, we developed a layer-on-layer cathode structure with sulfur-impregnated activated carbon alternating with graphene layer, which was fabricated by Air-assisted electrospray. A much higher sulfur loading compared to slurry cast cathodes can be provided in this method. Combining the new cathode with gel electrolyte can offer higher safety of the battery and capacity retention. Ceramic separator would compensate the reduced ion conductivity of the gel electrolyte and the combination of these variables will be very promising in improvement of battery performance and safety.

25 ENERGY STORAGE↗

Identifying higher oxygenate synthesis sites in Cu catalysts promoted and stabilized by atomic layer deposited Fe 2 O 3

The conversion of syngas to higher oxygenates is an important step in the pathway towards the long-term sustainable production of fuels and chemicals. Mixed Cu/Fe catalysts combine metals with different CO activation characteristics, a property that makes them promising candidates for higher oxygenate production. However, Cu/Fe catalysts suffer from instability due to sintering and phase separation, and the active sites for higher oxygenate formation on these materials are not well understood. In this work, we use atomic layer deposition (ALD) to modify silica-supported Cu nanoparticles with monolayer precise amounts of Fe 2 O 3 and study the effects on catalyst structure, reactivity, and stability. We demonstrate that the Fe 2 O 3 ALD process is inherently selective towards deposition on the SiO 2 surface versus the Cu nanoparticles. As a result, a sufficiently thick Fe 2 O 3 layer surrounding the Cu nanoparticles acts as a barrier against Cu migration, preventing catalyst deactivation through sintering without covering the Cu. In syngas conversion reactions, we find that higher oxygenate selectivity increases with Fe 2 O 3 loading at low and intermediate ALD cycle numbers. Furthermore, using in situ X-ray absorption spectroscopy, we demonstrate that the Fe near the Cu nanoparticles is reduced to a metallic state under reaction conditions. From these measurements, we identify these metallic Cu/Fe interfaces as the active sites for higher oxygenate formation, which are most abundant at intermediate Fe 2 O 3 ALD cycle numbers. As the Fe 2 O 3 loading increases, higher oxygenate selectivity falls, resulting from encapsulation of the Cu nanoparticles by thick Fe 2 O 3 layers. Overall, the results demonstrate how thickness-controlled ALD Fe 2 O 3 can be used as both a promoter and stabilizer of Cu-based higher oxygenate synthesis catalysts.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Comparative analysis of on-orbit dynamic performance of several large antenna concepts

A comparative analysis of the on-orbit dynamic performance of four large anetanna concepts is presented. Among the antenna concepts evaluated are: the box truss; tetrahedral truss; warp-radial rib; and the hoop and column antenna designs. The characteristics and magnitudes of the antennas' dynamic response were evaluated in terms of structural displacements and member loads incurred during various slew-rate maneuvers. The results of the dynamic response analysis are compared to the design requirements of the Land Mobile Satellite System (LMSS) with respect to surface accuracy, decenter, defocus, and angular rocking. Comments are made on the effectiveness of structural damping and the application of active controls for vibrational response reduction. Schematic illustrations of the antenna design concepts are provided.

Andersen, G. C.↗

Evaluation of 16 measures of mental workload using a simulated flight task emphasizing mediational activity

As aircraft and other systems become more automated, a shift is occurring in human operator participation in these systems. This shift is away from manual control and toward activities that tap the higher mental functioning of human operators. Therefore, an experiment was performed in a moving-base flight simulator to assess mediational (cognitive) workload measurement. Specifically, 16 workload estimation techniques were evaluated as to their sensitivity and intrusion in a flight task emphasizing mediational behavior. Task loading, using navigation problems presented on a display, was treated as an independent variable, and workload-measure values were treated as dependent variables. Results indicate that two mediational task measures, two rating scale measures, time estimation, and two eye behavior measures were reliably sensitive to mediational loading. The time estimation measure did, however, intrude on mediational task performance. Several of the remaining measures were completely insensitive to mediational load.

Wierwille, W. W.↗

Hybrid circuit breakers

In one aspect, a hybrid circuit protection device for current-limiting a fault current between a source and a load during a fault is provided. The hybrid circuit protection device includes an input configured to couple to the source, an output configured to couple to the load, a return configured to couple the source to the load, a main switch configured to selectively couple the input to the output, a switching network coupled in parallel with the main switch, and a controller. The controller is configured to determine that the main switch has opened in response to the fault current, where the fault current has an initial value, and activate the switching network to current-limit the fault current to less than the initial value during the fault.

Qi, Li↗

Airfoil leading edge blowing to control bow shock waves

Abstract This manuscript presents a detailed characterization of active control of bow shock waves via leading edge injection, including subsonic coolant ejection and the appearance of Coanda effects. The flow phenomena occurring at steady and pulsating flow injection regimes were analyzed using steady and unsteady two-dimensional Reynolds-Averaged Navier Stokes, leading to a precise evaluation of the thermal load and drag reductions. Steady supersonic injection yields the largest abatement in thermal load and aerodynamic drag, while subsonic or fluctuating ones can also provide significant improvements at reduced cooling mass flow rates. Furthermore, a Coanda effect, causing a non-symmetric flow topology, was observed and analyzed for reduced injection port size. This Coanda effect is due to the sudden expansion happening from the injection port to the main flow and it causes the flow topology at the leading edge to become non-symmetric despite the complete symmetry of the problem. This is the first time in the literature such a phenomenon is documented for a supersonic airfoil leading edge injection. Furthermore, it enables the design of novel flow control strategies for the leading edge shock topology and flow structures in supersonic flows.

42 ENGINEERING↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗